Loading...
ERES18-0108 Early Power Release EARLY POWER AGREEMENT & RELEASE CITY OF ATLANTIC BEACH Electric power is requested now under the conditions and terms of this fully executed Agreement&Release Job Address: -110 2;A%''t.``St5Np^ 9210e Permit No. V I()o Service Type(Circle One): OverheaCUtidergioun We,the undersigned General Contractor and Electrician,understand and agree: 1. "Early Power" is purely for our construction convenience, it is not required by Codes and does not substitute ubstiand such irs inclat d prention of theme C/O((Certificate of OccupancyJtGat must be issued before occupancy, 2. The nspecantioonsfmust haveBpr�ioh�ro�einclpudelcng m1eer base connections. early power energizing. All rough 3. Occupancy or use of the new construction before a formal C/O constitutes fraudulent use of the early electric service. Such action is expressly prohibited, and penalized by The City of Atlantic Beach Ordinances. A violation of this Agreement shall result m a request for prompt removal of electric service after a twenty-four how notice. 4. "Early Power"release authority,is the Electrician and/or the Contractor and most not occur before: a. Equipm ant,devices and fixtures are installed(or blanked oft)safely. b. Pane its complete with breakers and cover,and(labeling required at final inspection). c. Service connection and grounding is complete. e The c�az�i xcssyer m has entl em Heed with address. addresselectrical check. f. Temporary address numliets displayed(Permanent numbers are required for C/O). S. This fully completed form is to be submitted to the Building Depattmem by hand,mail or fax. 6. Future such Agreements will not be accepted from those who violate anyone of the above items. CO CT DATE Z 1Ja 24D{� PRINTN EL C C(LArJILC1A ��QMC DATE 2► �t,ar�{g PRB4TNANE �T.r st2vP[( A 800 Seminole Road,Atlantic Beach FL 32233 Phone:(904)247-5826 In:(904)247-5845 http://www.coab.us revised G130 09