Loading...
Exh 4APREPARED 6/02/03y 8!15:27 LICENSE ACTIVITY REPORT BY BUSINESS NAME PAGE 1 City of A tlantic Beach _ NEW LICENSES FOR YEAR: 2003 BETWEEN: 05/01/03' TO05/31/03 -. - - _ - PROGRAM O L122L DEPT: ALL. DEPARTMENTS CLASS: ALL CLASSES. LIC # BUSINESS NAME ISSUED TYPE CLASSIFICATION. OWNER NAME & ADDRESS ', 03-05656 -ADAMS. VENDING - 5/09/03. NEW MISCELLANEOUS SALES, OTHER THAN -LISTED - - - - - - DAWN M ADAMS - 03-05663 AlA ROOFING COMPANY, INC. ~ 5/22/03. NEW ROOFING CONTRACTOR 'fFTRM/CORP.) ~ - .. RYAN MILLS - _ _ - ~ 1505 OSCEOLA AVENUE, JAX BEACH FL. 3.22.50 -. 03-0565'7- DANIEL YOUNG - - 5/12/03 .NEW MISC. SERVICE.ESTABLISHMENT, NOT -LISTED 03-OB661 I)YNAMZC STEEL & GEN. CONTR,INC 5/20/03 NEW BOAT.REPAIR - - - - . JOSEPH G. FAZRLEY, SR 8854 DURHAM ROAD, TIMBERLAKE. NC 27583 03-05653 -JOYCE HENDERSON HOME IMPROVEMT 5/01/03 NEW MINOR CONTRACTOR (MISC. ODD JOBS/REPAIR) 03-05654 JOYCE HENDERSON LAWN CARE - - 5/01/03 NEW LAWN/YARD SERVICE - - ~ - 03-.05665 ORGANIC MARKETTNG 5/29/03 NEW ADVERTISING AGENCY, FIRM OR CORP. DARCY A. DEWITT _ 182 MAGNOLIA STREET, ATLANTIC BEACH FL 32233 03-05662 `RADIO SHACK #01-8874 ~ 5/ZI/03 NEW ELECTRONICEQUIPMENT/RADIO/TELEVISION - -- 03-05658 ROBERT BASKIN -~ " ~ 5/15/03 NEW . MINOR CONTRACTOR - (MISC. ODD JOBS/REPAIR) •. ~ " 03-OS669 ROBERT J. EMAHISER CONST. `.5/27/03 NEW CARPENTRY - ~ ~ . - - . ,.. ROBERT J, EMAHISER ~ : - 603 MAIN STREET, ATLANTIC BEACH FL 32233 ~ - 03-0$655 TIMES SQUARE PRINTING 5/05/03 - NEW PRINTER/PRINT SHOP JEFF KLOTZ 2006 OAK GROVE CIRCLE, JAX BEACH FL 32250 03-05659 YOUR HANDYMAN INC. 5/19/03 NEW MINOR CONTRACTOR (MISC. ODD JOBS/REPAIR) > - BLAINE FILTHAUT 342 9TH. STREET,. ATLANTIC BEACH FL 32233 - ~ ~' H .. ~ O W ~ H PUBLIC WORIZS and UTILITY PROJECT STATUS REPORT (D)=DESIGN ENGINEER DEPARTMENTS (CE&>)=CONSTRUCTION ENGINEER (C)=CONTRACTOR PROJECT DESCRIPTION PROJECT NO. AND INFORMATION STATUS ON 6/2/03 1 Care City Stormwater Project CORE99 Sherry Drive`- FinalPayment approved on 8/1/02. (D) = Original by England, Thims & Miller Preliminary Redesign =100% Revised Preliminary Design by The Core City -Contractor started on 7/19/02 and completed permanent weir at Fleet complete SherryDrive Design = 100% R-A-M Professional Group Re-Design by Aikenhead & Odom Landin and installed baffle boxes on Pine Street, 5th and 7th at Sherr Drive. Installed th t ", 10th ; 11th and 12th Sts., Plaza and East Coast Dr. (between water lines on 5 , 7 complete (C) = Callaway Contracting, Inc. Storm drainage completed along 5th, 7a', 11th Street to Seminole Road 10th and 4th). Sherry Drive Construction. _ 100% (for SherryDrive) , and Plaza, 5th, 7th, Sth„9th, 10th, 11th and 12th Streets. New sanitary sewer line Qverall Redesign. = 100% Petticoat Contracting (for Core'City) installed on 11th and 12th Street. Paved 7th, 9th 10th, 11th, and 12th Street, Plaza and Downstream Design =100% (CE&I) =Public Works (for Sherry Drive) East Coast from 5th to 10th. Core City Construction = 7D% GAI Consulting (for Core City)- 2 Buccaneer Wastewater Treatment (D) =Gannett Fleming One bid received on 8/21/02. Commission rejected bid on 919102, and authorized staff Plant - (C) = Gruhn May, Ina to re-bid project, and fund with mid-year budget modification. Bids received on Redesign of sludge facility=100% (CE&I) ° Gannett Fleming and Public Works 10/16/02 and'Commission awarded project to Gruhn May, Ina qn 10/28/02. Construction =I D% Preconstruction conference held on 11/13!02. Contractor ordering materials. City of ..Jacksonville permit received 4/1/03.. Change Order No. I approved by City Commission 4/28/03. Notice to Proceed revised to 4/28/03. Began work on roadway and piping. 3 Mayport Flyover (D) = Bessent, Hammack & Ruckman (BHR) J.A. Jones advised that JTA has funding in place and preconstruction conference held Plana Bump (C) _ Construction & Electrical Specialists on for January 1-0, 2003, Utility conference on February 3, 2003. Contractor has Design = d 00% complete (CE&I) = J.A. Janes realigned l0" water line, paved. road and eliminated bump, Area of standing water remains to be corrected. Project meeting held on 5/6103, and area of standing water Construction =1 DD% complete, cannot be redirected without major work on Mayport Road. 4 Maypart Jr. Enlisted Men Family 100 Units Housing - ~~ = prosser Hallock Storm drainage is complete, Construction of sanitarysewer is 100% complete, with the . (C) = Picerne Military Housing exception of the li$ station and wetwell. Construction of water is 100% complete. Design =100% complete (CE&I) = Prosser Hallock & Navy Overall project is 95 % complete. Received call from engineer on 6/28/02 that a new - Lift Station Design = 100% lift station will need to be constructed. Lift station re-design complete. DEP permit complete received. Force main and lift station construction underway. Construction ° 97% complete o trJ w .A 5 Stormwater Master Plan and (D) = Camp, Dresser & McKee Presentation given at special Commission Meeting on 9/16102. CDM addressed Prelirrainary Design existing and improved tide control at Aquatic Drive; discussed Aquatic Gardens pond, and possilillity of constructing incremental improvements. Received report and held. Master Pdan Update =100% workshop with Commission on 1/27/03. Met with property owners to obtain area for . complete retention pond. Commission authorized negotiation on 4/28/03 with CDM for Hopkins Prelimdnary Design = 0% Creek design. Approval of contract on Commission agenda for 6/9/03. complete Construction = 0% complete 6 SCADA System Design/Build (D) =Control Design, Inc. Preconstruetion meeting held on 9/4/02. Computer equipment ordered and received by (C) =Control Design, Inc. 9/25/02. Most hardware has been received. Designing control screens, and Design =100% (CE&I) =Public Utilities programming logic. Installation of antenna bases completed:. Commission authorized ~'rogramming & Construction Change Order # l to upgrade radios on 1/27/03. Vendor performed radio survey on - S 0% facilities. Meeting with contractors held on 3/26/03 to discuss revised scope. . Contractor replacing antenna bases and structures, programming PLC§. 7 Cooperative Beaches Utility. (D) = atone, Joca & Mahoney Commission awarded contract to SJM on 11/11/02: Jacksonville Beach authorized Plan reimbursement on 11/18/02. Neptune Beach authorized on 1213/02. Kick off meeting held on 12/13/02.. Consultants working on modeling and review of meter Design = SO% reading/billing information, Consultants met with Finance and Meter Reading staff on 4/29/03. Consultants received additional. information needed for model from Jacksonville Beach on 5/23103. 8 Navy Privatization (D) =Gannett Fleming, Inc:. Commission awarded contract 12/9/02. Kickoff meeting 12120/02. Assembling data Design .=100% for consultant. Workshops held 2/24/03 and 3/24/03. Draft technical proposal submitted for review2/20/03. Consultant met with staff and CityAttorney on 4/24/03 to draft contract section.. Submittal of final proposal (Volume I & I)) on Commission agenda for 6/9/03. 9 Relocation of Elevated Tank for (D) = HGTI Request for Proposals advertised 9/29/02. Technical proposals received on 10/23/02.. Water Plant 2 (C } = Gruhn May, Inc. Bids received 10/30/02. All bids rejected on 11/11102. Pre-bid meeting held on Design =10000/a (CE&I) =Public Works 2/12/03. Bids received 2/26/03. City Commission awarded contract on 3110103. ` Construction =30% Demolition permit received and contractor began dismantling tank on 4/1/03. Tank dismantled, and has been transported to Water Plant #2. Processing permit for reconstruction. 10 Ocean Blvd. Water Main (D) =Public Works Survey complete. Design 100°/® complete, with drainage line included for Adele Grage Replacement (C) ° Miranda Contracting, Inc. Community Center. Pre-Bid meeting held on 11/19/02. Bids received 12/4/02. Design = .100% (CE&I) =Public Works Awarded contract on 1/13/03. Pre-construction meeting held on 1/30/03. Notice to Construction = 80% proceed 3117/03. Met with Petticoat on 2119 to coordinate construction schedules. - Construction underway. Completed water line from Ahern to 5th Street and encountered old brick entire way. On 4/28/03, City Commission authorized change, order for cost of brick removal. Water and Stormwater wont completed and main being tested. o~ w .P 11 DEP Permit Renewal WWTP#2 (D) = Weitz & Ivloye Reports. completed and application submitted by 9/24!02. Received RAI No. 1 on 10/24/02, Met with DEP on 10/29/02. Received draft permit on 2/18/03. Review and - comments to DEP 2/28/03. DEP respgnse received 3/13/03. Publiccomment period. Responded to request for additional information on 4/21103,. Notice of Intent to Issue Permit received 4/30/03. i2 Church Road Extension (D) = J. Lucas & Associates `Advertised 10/27/02. Pre-Bid meeting held on 11/21/02. Bids received 12/11102. Design =100% (C) = R&B Construction Co.,-Inc. Commission authorized rebid on 1/13/03 and bids received 2!12/03. Commission Construction = 95% (CE&I) =Public Works awarded project to R&B Construction Co. om2/24/03. Water line and concrete culvert in ditch. completed.. Subgrade completed, sewer line conduits completed aad <. roadway paved.- 13 Dewees Ave. Area Drainage (D) =Public Works Design 100% complete, with drainage line included for Coral St. Prebid meeting- on and Paving Improvements (C) =Southeast Land Developers, Inc. 1/9/03 and. bids due on 1/15/03. Commission awarded to Southeast Land Developers, Design = 100% (CE&n -Public Works Inc. on 1/27/03. Construction`surveybegan. Drainage being completed on Dewees. Construction ° 90% Ave, Coquina Ct.,-Shell and Coral Sts. Subgrade being completed. 14 2002-3 CDBG Paving and (D) =Public Works L.D. Bradley delivered survey on 2/1.9/03 and preliminary design completed. Draining (Jordan) (C) = R&B Contracting, Inc. Mandatory pre-bid held on 4/3/03 and bids received 4/1.0/03. Commission awarded Design ° 100% (CE&I) =Public Works contract to R&B Contracting, Inc. on 4/28/03. Preconstruction conference held on Construction ° 0% 5122/03. 15 We11 Rehab & Replacement (D) = CH2M Hill Engineering proposals received on 1/10703. Commissionauthorizednegotietion on Design = 20% (C) _ 2/10/03.. Field visit with engineer 2/25/03 scope clarification meeting 2727/03. Construction - 0% (CE&I) = CH2M Hill Commission awarded contract for Phase I on 4/28/03. Met with SJRWMD to review ~ We112 back lu en lan on 5/30/03. P gg g P 16 Replace Switchgear at WWTPI (D) ° Public Utilities: Specifications completed.. Bids for materials. received 5/21/03, on Commission Design-100% (C) =Brooks Limbaugh agenda for b/9/@3. " Construction- 0% (CE&I) =Public Utilities