Exh 8DAGENDA ITEM 8D
J[7LY 14, 2003
CTTY OF ATLANTIC BEACH
CITY COMMISSION MEETING
STAFF REPORT
AGENDA ITEM: Change Order No. 1
Relocation, Installation and Coating of Elevated Storage Tank at Water
.Plant 2
Bid No. 0203-2 (Re-Bid)
SUBMITTED BY: Dona Kaluaiiak, CEP, Utility Duector
DATE:. July 3, 2003
BACKGROUND: On March 10, 2003, the City Commission awarded a contract to telocate a
300,000 gallon elevated tank from Kisst++~+*+~ to Water Plarn No. 2 (2301 Mayport Road). The
tank was donated to the City by Mr. Wendell McKinnon, Vice Mayor of Kissimmee. The project
was originally bid as a design/build project, however all bids were excessively high, and the
project was re-bid as a construction project, with the basic tank placement and connection to the
water system designed in-house. Per specifications, the contractor would have to obtain the DEP
permit, provide engineering calculations for the foundation, and provide final as-built drawings.
No line item for engineering work was included in the bid forms.
Two problems required the contractor to perform additional field work and design engineering
that was not inchuied as part of the bid:
• The as-bu$t drawings of the existing tank, provided late in the project by Mr. McKity~on,
were not drawings of the tank being donated to the City. of Atlantic Beach. Therefore, the
contractor bad no accurate drawings for reconstruction of the tank, modification of the
tank, or preparation of the final as-bunts of the reconstructed tank that must be submitted
to DEP. Resolution of this issce required taking extremely accurate field measurements of
every component of the tank, recording the measurements, and drafting an "as-both" of
the tank in Kissimmee.
• In order to match the level of the City's existing elevated tank, the legs of the relocated
tank will have to be shortened considerably. This required engineering design to prepare
a construction drawing of the tank at the revised height, with revised calculations atxi
measurements for the size and spacing of the foundation pads.
Due to a miscommunication with the contractor, this work has already been performed. The
contractor has not requested any funds for profit or overhead, but merely reimbursement for the
actual cost of the work. The total cost for both the field work and the design work is 513,590.
As a reference, when the project was initially bid as a design/build, the bid price for the
engineering line item was 562,000.
AGENDA ITEM SD
JULY 14, 2003
BUDGET: The project was awarded with no contingency, but fiords are avatlable in the Water
Fund under account number 400-5504-533-6300, as the Ocean Blvd. Water Main project was
under budget by $53,000.
RECOMMENDATION: Approve Change Order No. 1 for Relocation, Installation and Coating
of Elevated Storage Tank at Water Plant No. 2 in the amount of ~ 13,590.
ATTACHMENTS: 1. Change Order No. 1
2. Invoice from Jack Ethridge Tank Co. to Giuhn May, Inc.
3. Hours breakdown for field work and design work.
REVIEWED BY CITY
2
AGENDA ITEM 8D
JULY 14, 2003
ANGE ORDER NO. i
Contractor. Gndm May, Inca Owner: City of Atlantic Beach
6897 Phillips Parkway Drive North
lacksonvt7le, FL 32256
904-2b2-9544
Fax: 904-268-0679
Attention: Mr. Gordon Gruhn Ciry Bid No. 0203-2 (Re-Bid)
.Project Blevated Tank at WTP #2
You aro hereby requested to comply with the following changes in the Contract Documents:
1. Revised Scope of Work. The additional scope of work below reflects a direct pass-through of the
contractor's actual cost, with no mark-up for profit or overhead.
ITEM
NO.
ESCRIPTION
TY
NIT DECEASE
IN
UNIT CONTRACT
TRICE S PRICE S RYCREASEIN
CONTRACT
PRICE S
Fieldwork requited due to the fact 1 LS 58,190 ~~,~+,,~~~ ~,~~~ e,
`~ 58,190
that the as-built drawings provided ~~,~
,~,~~,,, ;h ~„
by Mr. McRinn~ were incorrect and s'~ ~M~'^''~'~
,~ ~,~~~~~
did not matchdimensiatsoffihe ,
~s ^~~"~ ak~5"~,'
4 " P '"t "
lC,lOCBted tank. Exact dmlenstOAS Of `~ ~,`~~~4 sm~~`~°~
every component had t0 bC 1rleaalIICd ~x~~~~k
~ ¢
precisely, recorded and drafted ~ ~
aa
~,~~
~~~~~~~
order tb enstae proper £
h~~~ ` "~ ~°~a=u~
reconsWction. ~~
r„
~~
~° a
,
,
~
Additional design work required dim I LS ssaoo =~~~,~'~ ,~,~
~~
{
~
~ ss aoo
~
ti11hC fact th$t f~ ICg3 Of the f811k ~}9Y
~
,~~ {z
`
"
+~`°
"
wrll need to ~ shortened to match ~i
~u~
fait ~ f
y
Y
Y
O
the ekwation of the existing devoted „
fie
~
[
~
yA ~~
~„~'s #~'` ~ ~"
~
tank 8t WTP#l. P;.~ ~ ~
6, kr x~~
`
~"~'
'~
~"
<~
'°`
,
~r
,
~
Gv;u
:
~,, . .
IVOtC' Itetric are an aAAftmn to rricTino Rir! Iterr,c
TOTALS m~~~~,~ ` ~,~' ;r n'
"r~~^~'~ ~y~ ° ~`~,
~~
~ 513 590
,
,
~~~~~,
~
NET CHANGE IN CONTRACT PRICE ~~` ~3~~a`"m;
~~
~
fi'
"
~
`
513,590
,
,
..=,f
>t
~
<
The above revised scope of work wt11 increase the pmject cost by 513,s90
Accepted By: Date:
Contractor
Approved By:
Owner
Date:
07/03/2003 14:01 FAd 904 288 0879 GRURN MAY INC
JACK ETHRIDGE TANK COMPANY, INC.
Complete Tank Matnfenante and Ssectlon
. 2001 ETIIItIDGE LANE
BRYC&VILLE, FLORIDA 32009
.. Phone (904) 266-9263 ptreq(904) ~bellaadh.net (~) 266-4389
E-Meil:}ethrid~tan~w~ '
Juno 23, 2003
A~~DA ITEM 8D
JULY 14, 2003
Bruhn May, int.
8897 Phil lips Highway Drive North
Jacksonv111e, ilorida
0.ttn: Bordon Bruhn
RE: Lhsnge Order for nrodification of tower. Elevated TankPRtlantic Beach,Flortda.
Bordon.
Th1~ is a request for ehsnge order for spolflcattons to the tower as foi/ows:
BuDtratt 21'.9 11/18" from eolumns,1N-4 3/4" from first Dsy rods, 21'-8 3/4" from flrsi bay riser
and shorten overflow end Ladders as required.
Th1s-change order M111 be for an additional cost of :13,590.00
Please axewte tM s change order as soon ar possibie.
Regards,
r+` a l
Jidge ~ _
President
File ,
~~GVi ~a~a~ ~~s ~c~ua~ ~ ,~.
~~~ d~ ~a Jas Pl~~ta~ t R~~"
. ~a..,..~- •
-.
07/03/2003 14:01 FA2 904 288 0879 GRUIiN tIAY INC
y GRUHN MAY, INC.
o
o®®
0 0
weer i Sewar Contracrors
6897 Phllilps Parkwvy Drive, North Jacksonville, Florkia 32256
Telephone 262-9544 Fax. 268-0679
2Ju402
Donna Kaluznlak
Utilities Director City of AtlanUC Beach
Change Order for Engineedng Work
Elevated Tank Relocation ~ WTP S 2
Donna: This is the breakdown for the engineerin® work performed to establish an as-buiR and then
determine the amourd the tank would have to lowered.
r~~DA ITEM 8D
JULY 14, 2003
Rate Fteld Work F.W. Total Office Work O.W. Total
Engineer and assistant $230.00 18 $4,140.00 8 $1,380.00
Engineer office work $150.00 8 $900.00 12 $1,800.00
Engineers assistant $80.00 0 $0.00 12 $980.00.
Drafting work $90.00 0 $0.00 11 $990,00
Office personnel $45,00 0
$0.00
8 ~
$270.00
Engineer and 2 assistarrts $350:00 9 $3,150.00 0 $0.00
elevated field work (on tank) Subtotal $8,190.00 $5,400.00
Grand Total $13,590.00