Exh 8DAGENDA ITEM 8D J[7LY 14, 2003 CTTY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Change Order No. 1 Relocation, Installation and Coating of Elevated Storage Tank at Water .Plant 2 Bid No. 0203-2 (Re-Bid) SUBMITTED BY: Dona Kaluaiiak, CEP, Utility Duector DATE:. July 3, 2003 BACKGROUND: On March 10, 2003, the City Commission awarded a contract to telocate a 300,000 gallon elevated tank from Kisst++~+*+~ to Water Plarn No. 2 (2301 Mayport Road). The tank was donated to the City by Mr. Wendell McKinnon, Vice Mayor of Kissimmee. The project was originally bid as a design/build project, however all bids were excessively high, and the project was re-bid as a construction project, with the basic tank placement and connection to the water system designed in-house. Per specifications, the contractor would have to obtain the DEP permit, provide engineering calculations for the foundation, and provide final as-built drawings. No line item for engineering work was included in the bid forms. Two problems required the contractor to perform additional field work and design engineering that was not inchuied as part of the bid: • The as-bu$t drawings of the existing tank, provided late in the project by Mr. McKity~on, were not drawings of the tank being donated to the City. of Atlantic Beach. Therefore, the contractor bad no accurate drawings for reconstruction of the tank, modification of the tank, or preparation of the final as-bunts of the reconstructed tank that must be submitted to DEP. Resolution of this issce required taking extremely accurate field measurements of every component of the tank, recording the measurements, and drafting an "as-both" of the tank in Kissimmee. • In order to match the level of the City's existing elevated tank, the legs of the relocated tank will have to be shortened considerably. This required engineering design to prepare a construction drawing of the tank at the revised height, with revised calculations atxi measurements for the size and spacing of the foundation pads. Due to a miscommunication with the contractor, this work has already been performed. The contractor has not requested any funds for profit or overhead, but merely reimbursement for the actual cost of the work. The total cost for both the field work and the design work is 513,590. As a reference, when the project was initially bid as a design/build, the bid price for the engineering line item was 562,000. AGENDA ITEM SD JULY 14, 2003 BUDGET: The project was awarded with no contingency, but fiords are avatlable in the Water Fund under account number 400-5504-533-6300, as the Ocean Blvd. Water Main project was under budget by $53,000. RECOMMENDATION: Approve Change Order No. 1 for Relocation, Installation and Coating of Elevated Storage Tank at Water Plant No. 2 in the amount of ~ 13,590. ATTACHMENTS: 1. Change Order No. 1 2. Invoice from Jack Ethridge Tank Co. to Giuhn May, Inc. 3. Hours breakdown for field work and design work. REVIEWED BY CITY 2 AGENDA ITEM 8D JULY 14, 2003 ANGE ORDER NO. i Contractor. Gndm May, Inca Owner: City of Atlantic Beach 6897 Phillips Parkway Drive North lacksonvt7le, FL 32256 904-2b2-9544 Fax: 904-268-0679 Attention: Mr. Gordon Gruhn Ciry Bid No. 0203-2 (Re-Bid) .Project Blevated Tank at WTP #2 You aro hereby requested to comply with the following changes in the Contract Documents: 1. Revised Scope of Work. The additional scope of work below reflects a direct pass-through of the contractor's actual cost, with no mark-up for profit or overhead. ITEM NO. ESCRIPTION TY NIT DECEASE IN UNIT CONTRACT TRICE S PRICE S RYCREASEIN CONTRACT PRICE S Fieldwork requited due to the fact 1 LS 58,190 ~~,~+,,~~~ ~,~~~ e, `~ 58,190 that the as-built drawings provided ~~,~ ,~,~~,,, ;h ~„ by Mr. McRinn~ were incorrect and s'~ ~M~'^''~'~ ,~ ~,~~~~~ did not matchdimensiatsoffihe , ~s ^~~"~ ak~5"~,' 4 " P '"t " lC,lOCBted tank. Exact dmlenstOAS Of `~ ~,`~~~4 sm~~`~°~ every component had t0 bC 1rleaalIICd ~x~~~~k ~ ¢ precisely, recorded and drafted ~ ~ aa ~,~~ ~~~~~~~ order tb enstae proper £ h~~~ ` "~ ~°~a=u~ reconsWction. ~~ r„ ~~ ~° a , , ~ Additional design work required dim I LS ssaoo =~~~,~'~ ,~,~ ~~ { ~ ~ ss aoo ~ ti11hC fact th$t f~ ICg3 Of the f811k ~}9Y ~ ,~~ {z ` " +~`° " wrll need to ~ shortened to match ~i ~u~ fait ~ f y Y Y O the ekwation of the existing devoted „ fie ~ [ ~ yA ~~ ~„~'s #~'` ~ ~" ~ tank 8t WTP#l. P;.~ ~ ~ 6, kr x~~ ` ~"~' '~ ~" <~ '°` , ~r , ~ Gv;u : ~,, . . IVOtC' Itetric are an aAAftmn to rricTino Rir! Iterr,c TOTALS m~~~~,~ ` ~,~' ;r n' "r~~^~'~ ~y~ ° ~`~, ~~ ~ 513 590 , , ~~~~~, ~ NET CHANGE IN CONTRACT PRICE ~~` ~3~~a`"m; ~~ ~ fi' " ~ ` 513,590 , , ..=,f >t ~ < The above revised scope of work wt11 increase the pmject cost by 513,s90 Accepted By: Date: Contractor Approved By: Owner Date: 07/03/2003 14:01 FAd 904 288 0879 GRURN MAY INC JACK ETHRIDGE TANK COMPANY, INC. Complete Tank Matnfenante and Ssectlon . 2001 ETIIItIDGE LANE BRYC&VILLE, FLORIDA 32009 .. Phone (904) 266-9263 ptreq(904) ~bellaadh.net (~) 266-4389 E-Meil:}ethrid~tan~w~ ' Juno 23, 2003 A~~DA ITEM 8D JULY 14, 2003 Bruhn May, int. 8897 Phil lips Highway Drive North Jacksonv111e, ilorida 0.ttn: Bordon Bruhn RE: Lhsnge Order for nrodification of tower. Elevated TankPRtlantic Beach,Flortda. Bordon. Th1~ is a request for ehsnge order for spolflcattons to the tower as foi/ows: BuDtratt 21'.9 11/18" from eolumns,1N-4 3/4" from first Dsy rods, 21'-8 3/4" from flrsi bay riser and shorten overflow end Ladders as required. Th1s-change order M111 be for an additional cost of :13,590.00 Please axewte tM s change order as soon ar possibie. Regards, r+` a l Jidge ~ _ President File , ~~GVi ~a~a~ ~~s ~c~ua~ ~ ,~. ~~~ d~ ~a Jas Pl~~ta~ t R~~" . ~a..,..~- • -. 07/03/2003 14:01 FA2 904 288 0879 GRUIiN tIAY INC y GRUHN MAY, INC. o o®® 0 0 weer i Sewar Contracrors 6897 Phllilps Parkwvy Drive, North Jacksonville, Florkia 32256 Telephone 262-9544 Fax. 268-0679 2Ju402 Donna Kaluznlak Utilities Director City of AtlanUC Beach Change Order for Engineedng Work Elevated Tank Relocation ~ WTP S 2 Donna: This is the breakdown for the engineerin® work performed to establish an as-buiR and then determine the amourd the tank would have to lowered. r~~DA ITEM 8D JULY 14, 2003 Rate Fteld Work F.W. Total Office Work O.W. Total Engineer and assistant $230.00 18 $4,140.00 8 $1,380.00 Engineer office work $150.00 8 $900.00 12 $1,800.00 Engineers assistant $80.00 0 $0.00 12 $980.00. Drafting work $90.00 0 $0.00 11 $990,00 Office personnel $45,00 0 $0.00 8 ~ $270.00 Engineer and 2 assistarrts $350:00 9 $3,150.00 0 $0.00 elevated field work (on tank) Subtotal $8,190.00 $5,400.00 Grand Total $13,590.00 Thank you, Gordon Gruhn SPATE OF FLORIDA LICENSED COMRACTORS CU C043134 CV C024ti80 CG C058974 Ca C041666