611 TIMBER BRIDGE LN - REVISION 8/7/18 OFFICE COPY
fj,` CITY OF ATLANTIC BEACH
. 800 Seminole Road
ra
75 , = --r Atlantic Beach,Florida 32233
REVISION REQUEST/CORRECTIONS TO PLAN REVIEW COMMENTS
Date 8/7/2018 RCN isiou to Issucdl Permit Corrections to Comments Permit# RES18-0244
Project Address 61 1 Timber Bridge Lane
Contractor/Contact Name Audrey Regnler
Phone 904.595.5243 Email aregnier@tollbrothers.com
Description of Proposed Revision/Corrections: Permit Fee Due $ p'--'
Responding to building review comments, see attached
Additional Increase in Building Value $ Additional S.F.
By signing below,I Audrey Re g n i e r affirm the Revision is inclusive of the proposed changes.
(printed name)
77q 8/7/2018
ignature of C ntractor Agent ontractor must sign if increase in valuation) Date
(Office Use Only)
Approved > Denied Not Applicable to Department
i Revision/Plan Review Comments PPQSt S ca h C 0 weir eC 7 e01 o!oc vk•%-4'A.- T -+-o vr+N;-1—
p. i-e_.
Department Review Required:
Building
P anning & Zoning eviewed By
Tree Administrator
Public Works
Public Utilities F -9- I?
Public Safety Date
Fire Services
:')Fnor ropy
TOLLARCH ITECTU RE
MEMO
TO: Stacia Moore
Atlantic Beach Ambassador
160 Cape May Avenue
Ponte Vedra, Florida 32081
CC: Audrey Regnier
FROM: Manuel Gonzalez, AIA
Toll Brothers, Inc.
DATE: August 6, 2018
RE: Atlantic Beach Ambassador-Lot 0166-Captiva-Coastal-AO# 169200
BLDG PERMIT#RES 18-0244
On the above referenced lot,this letter shall be used to revise or clarify the following condition(s):
Building Department Comments: y1q -9-1
I--
1041A(dom
1. Height: Window glazing at the #312e21 nn shall be tempered safety glass according to
R308.4.5 Glazing and wet surfaces. Submit a revision to confirm this window will be installed
to conform to code cited above. Plans will be redlined by examiner, initialed and dated. Please
submit revision prior to picking up plans.
Toll Brothers responds:
Bedroom #3 window sill height at 24"above finished floor
Sincerely,
4• OF FUN
f4 °° 1P \•
i i
• % AR' , i a rj
S%RED
Manuel Gonzalez, AIA
AR 96730
FLORIDA DIVISION
2966 Commerce Park Drive Suite 100 ■ Orlando,FL 32819 ■ (407)248-5800 • FAX:(407)248-5899
PHILADELPHIA■ORLANDO ■ DALLAS ■ SEATTLE
A TO'Brothers COMPANY
` f.e }r :'4
`> CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD
Jtri 0 ATLANTIC BEACH, FL 32233
(904) 247-5800
44,
i cr
BUILDING REVIEW COMMENTS
Date: 7/31/2018
Permit #: RES18-0244 Site Address: 611 TIMBER BRIDGE LN
Review Status: approved. RE#: 169505 2090
Applicant: Property Owner: TOLL FL VI LIMITED PARTNERSHIP
Email: Email: aregnier@tollbrothers.com
Phone: Phone: 595.5243
THIS REVIEW IS ONE OF MULTIPLE DEPARTMENT REVIEWS.
Revisions may not be submitted until ALL departments have completed their respective reviews.
Revisions submitted MUST respond to EACH department review. Submittals that respond to only one or a
few correction items will not be accepted.
Correction Comments: foaihrvati.
I. Window glazing at the #3 belt shall be tempered safety glass according to R308.4.5 Glazing and
wet surfaces. Submit a revision to confirm this window will be installed to conform to code cited above.
Plans will be redlined by examiner, initialed and dated. Please submit revision prior to picking up plans.
Building
Mike Jones
Building Inspector/Plans Examiner
City of Atlantic Beach
800 Seminole Road
Atlantic Beach, FL 32233
904.247.5 844
Email:mjones@coab.us
Resubmittal Notes:
All revisions and changes shall clearly stand out from the rest of the drawing on the sheet as a revision by way of
completely encircling the change with "clouding". The revision shall also be identified as to the sequence of revision by
indicating a triangle with the revision sequence number within it and located adjacent to the cloud. The revision date
and revision sequence number shall also be indicated in a conspicuous location in the title block for each sheet on which
a revision for that sequence occurs. For projects still in the initial review stage and permit pending, all sheets with
revisions shall be inserted into each set of drawings.The original sheets must be clearly marked "VOID" but are to be left
within the set of drawings. Complete new sets of drawings will not be accepted. ADDITIONAL ITEMS MAY BE REQUIRED
DEPENDING UPON NEW INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.