Loading...
810 HIBISCUS ST - SOLAR 4 4140. --,> sA CITY OF ATLANTIC BEACH ' 800 SEMINOLE ROAD (-,-,.„,.,:r,,, ATLANTIC BEACH, FL 32233 -01119' INSPECTION PHONE LINE 247-5814 ELECTRICAL SOLAR PANEL - MUST CALL BY 4PM FOR NEXT DAY INSPECTION: 247-5814 PERMIT INFORMATION: PERMIT NO: SOLR18-0002 Description: Solar PhotoVoltaic System Estimated Value: 18000 Issue Date: 8/13/2018 Expiration Date: 2/9/2019 PROPERTY ADDRESS: Address: 810 HIBISCUS ST RE Number: 170945 1110 PROPERTY OWNER: Name: RHODES DONALD B Address: 810 HIBISCUS ST ATLANTIC BEACH, FL 32233-2544 GENERAL CONTRACTOR INFORMATION: Name: Address: Phone: Name: All American Solar LLC Address: 1060 E Industrial Dr STE A Orange City, FL 32763 Phone: PERMIT INFORMATION: Please see attached conditions of approval. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOU PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. * A notice of Commencement is only required for work exceeding an estimated value of $2,500. For HVAC work, a Notice of Commencement is only required when HVAC work exceeds and estimated value of$7,500. �i':''��f�, City of Atlantic Beach APPLICATION NUMBER Js ABuilding Department (To be assigned by the Building Department.) II 'OL l g-6002.r A i 800 Seminole Road 5-- z Atlantic Beach, Florida 32233-5445 Phone (904)247-5826 • Fax(904)247-5845 �-/ �/// ��; 9� E-mail: building-dept@coab.us Date routed: t/2 (! ( g City web-site: http://www.coab.us ((( APPLICATION REVIEW AND TRACKING FORM artment review required Yes No Property Address: g t o l � ( S(..C.<_.S q wilding Applicant: PcU Amex-car &lar anning &Zoning Tree Administrator Project: So(g_t'. Rac-F S sieNN Public Works Public Utilities Public Safety Fire Services Review fee $ Dept Signature Other Agency Review or Permit Required Review or Receipt Date of Permit Verified By Florida Dept. of Environmental Protection Florida Dept. of Transportation St.Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS Reviewing Department First Review: I 'Approved. [ 6enied. Not applicable (Circle one.) Comments: BUILDING PLANNING &ZONING Reviewed by: Date: k—?"/ , TREE ADMIN. Second Review: M Approved as revised. ['Denied. ['Not applicable PUBLIC WORKS Comments: PUBLIC UTILITIES ,/y�cr- PUBLIC SAFETY Reviewed by: / 1Date: ice/ g FIRE SERVICES Third Review: ['Approved as revised. ['Denied. Not applicable Comments: Reviewed by: Date:_ Revised 05/19/2017 A —� OFFICE COPY ; ( I\-\ 0-, 4,:: , qt 'ter 1C�- ' ' • ,,{ i 8 2018 \ j CITY OF ATLANTIC BEACH : �;(���� AUG �� � --_ Li 800 Seminole Road ---`� Atlantic Beach,Florida 32233 "OtPi -- - REVISION REQUEST/CORRECTIONS TO PLAN REVIEW COMMENTS Date G k- 1,i) Revision to Issued Permit Corrections to Comments t Permit# SOL 91 1 Project Address al 0 Hif9/i-cus S Contractor/Contact Name A 11 7 n CP h $61161i GeA, 4 h13 Phone qr d -n., 3 Email fi7qi1c t//j/ errr hcD14 —bLc'" Description of Proposed Revision/Corrections: Permit Fee Due $ —d Z \1q0( 4 0 1,6 C 1-- --1)- c o c bfr --2/) c o d4 i) Additional Increase in Building Value $ Additional S.F. By signing below,I giAA 41606 ' affirm the Revision is inclusive of the proposed changes. (p i,ted name) g6, 1g- Signature of Contrac • Agen Contrac • • sign if increase in valuation) Date (Office Use Only) Approved k---- Denied Not Applicable to Department Revision/Plan Review Comments Department Review Required: Building Planning & Zoning fil Reviewed By Tree Administrator Public Works Public Utilities P- /0 ^/ Public Safety Date Fire Services rr '_'� CITY OF ATLANTIC BEACH y. ) 800 SEMINOLE ROAD " ; ATLANTIC BEACH, FL 32233 (904) 247-5800 BUILDING REVIEW COMMENTS Date: 8/2/2018 Permit#: SOLR18-0002 Site Address:4E10 HIBISCUS ST Review Status: Denied RE#: 170945 1110 Applicant: All American Solar LLC Property Owner: RHODES DONALD B Email: finance@allamericansolarllc.com Email: thegnsebastion@gmail.com Phone: 3862186930 Phone: 866.1615 THIS REVIEW IS ONE OF MULTIPLE DEPARTMENT REVIEWS. Revisions may not be submitted until ALL departments have completed their respective reviews. Revisions submitted MUST respond to EACH department review. Submittals that respond to only one or a few correction items will not be accepted. Correction Comments: 1. We don't see a lot of solar installs but the ones in the past have had documents fib-lir-EA submitted along with permit application. If you have some kind of pre-approval from JEA please sub • 2 copies -. e. If not the case, confirm by email to me. Thanks, Rt'C_ //eq• �`/O./ dr Building Mike Jones Building Inspector/Plans Examiner City of Atlantic Beach 800 Seminole Road Atlantic Beach, FL 32233 904.247.5844 Email:mjones@coab.us 6'era i ted key' Co ev% .4.,A, 4-s Er. • i 8- rn pr Resubmittal Notes: All revisions and changes shall clearly stand out from the rest of the drawing on the sheet as a revision by way of completely encircling the change with "clouding".The revision shall also be identified as to the sequence of revision by indicating a triangle with the revision sequence number within it and located adjacent to the cloud.The revision date and revision sequence number shall also be indicated in a conspicuous location in the title block for each sheet on which a revision for that sequence occurs. For projects still in the initial review stage and permit pending, all sheets with � � i^ Building Permit ApplicatiotiFFIPY12/8/17 , � City of Atlantic Beach �rx,./110. 800 Seminole Road,Atlantic Beach,FL 32233 PhgDe:(r447-5826) Fax:(904)247-5845 1 ` ritob Address: (., 1 D 1�i 1 brs C Permit Number: J�"�' ooz QQ Legal Description S"r'C j��,,'�' "" RE# 1909y5 //10 Valuation of Work(Replacement Cost)$ 8 U© i Heated/Cooled SF Non-Heated/Cooled • Class of Work(Circle one): New Addition Alteration Repair Move 0-..• •ool Window/Door • Use of existing/proposed structure(s)(Circle one): Commercial •esidenti. • If an existing structure,is a fire sprinkler system installed?(Circle one): Yes No N/A • Submit a Tree Removal Permit Application if any trees are to be removed or Affidavit of No Tree Removal Describe in detail the type of work to be performed: 90 L,,gii- 0hdo--)0 L /9-IC- S5-71P1'''11701))1 Florida Product Approval# for multiple products use product approval form Property Owner Infor t'on �.(,'�,Q; j �j i C��S Name: 14l t /Ig hVR' ✓ Address/ 0 /4 7/� Y -57L City / // I State Zip Phone • E-Mail .€?°7s e+ii 61 a , Owner or Agent(If Ager/Power of Attorney or Ageficy Letter Required) BeAl 44/1%5 Contractor Information Name of Company: 19/A./441,,t �CQ f c Silo/cit. L Qualifying Agent: 961411 "iz_ Address l0b0 1(1 ,b/�s City State F Zip -6 i Office PhoneJob Site/Con�t, �ct Numb r 41°7- .' State Certification/Registration# C vl✓5 9 j E-Mail Fr►r/gne @`/!/ ar %Gone Architect Name&Phone# p Engineer's Name&Phone# ,1 4/1/) �r6rr�G/7 � p7 31 191-} f Workers Compensation / xempt nsurer/Lease Employees/Expiration Date Application is hereby made to obtain a permit to do work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all the laws regulationg construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING,SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS,TANKS,and AIR CONDITIONERS,etc. NOTICE: In addition to the requirements of this permit,there may be additional restrictions applicable to this property that may be found in the public records of this county,and there may be additional permits required from other governmental entities such as water management districts,state agencies,or federal agencies. OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTO: - ' c ORE-' RECORDING YOUR NOTICE OF COMMENCEMENT. - 7 / glliglIll (Signature of Owner or Agent) -`(Signature of Contractor) (including contractor) Signed and sworn to(.r affirmed) before rAe t.is d. If Signed nd sworn to Or affirm-• before me ,his , day of %100,,f D :,• a, .* MY COMMISI., • ,! !OM i 4? .1•7EXPIRE ��a ure o'Notary) ture o `�r.S� _/ S September 07 ;;g - ADAMS (407)3t,' 53 Flondallota yServiu;com •, MY COMMISSION#FF915794 [ ] 'ersonally Known •• [ Personally Known OR ^.,_„';, o.V "� EXPIRES September Produced Identification/+ I , [ ]Produced Identification ptember 07 2018 Type of Identification: 1" - P rt1/•Q,wA Type of Identification: (407)398-0'53 FlondallotaiySarowa coni 41 All American Solar HARNESSING THE SUN OVER ALL OF FLORIDA POWER OF ATTORNEY Company Name: All American Solar LLC Date : July 19, 2018 Address: 1060 E Industrial Dr Suite A Orange City FL 32763 Phone Number: 386-218-6930 I, Steven Lorenz of All American Solar LLC hereby give Ben Adams limited power of attorney for Atlantic Beach Florida to apply for and pickup permits until further notice. If I wish for Ben Adams to stop signing for and picking up permits, I will send you a letter stating such ..nte0' Signature of Licensed Contractor License # CVC56961 Sworn to and subscribed to me this 1 day of _J(-A-lLi , 2018. Steven Lorenz is pers) ly known to me. AL NOTARY PUBLIC VI, _ SHAWN M BIND ?� '? MY COMMISSION#FF904711 EXPIRES July 29,2010 3607#3 flowarout .com • 10(90 E o N i RI--�cD' 01 f f 5a2(03 PM NOTICE OF COMMENCEMENT The undersignederebygivesnoteethat�provementviEhemadeTo cer2inreal groperty,end in accordance with Chapter 713, Fiorida51-'*7Ps,fie following informationisprovided inthisNotice of•Cammencenent J90995-10 I. DESCF.L'TF0NQBP_iOP=(Levi description offneproperty&street add;ess,iioYaleble)=30110 NO.: SDBDTAISION 9LOC-t 'PACT TAT SLAG 127 185 -3J-2$ -�jE •070 14)C SCGN 53.5Fr 1-615 J3r1'7 sorb ex %I r\ l Z C�E1 $ALDESCRr�TIONOPITa'IiOYFSt NT: 56 G.4(2_ pl /0 C S C/SrVA'1 4b 5Dl 5 ) 3 S y S. OWrical. OP=7:E01V O LESS E ILr0 tMA'tIONIFTBELESSEF COISI'RACT'DEOB IM°ROYEMEPIT: , F. �(/`/3 aNas:eanrizddrus: .P0,l MI/0 'reofF 121100(6 g • ,j hiJcl)) y Ci'/ C b.:�.•�:iapvp=y: 0 W v' c.Nemeand 23d.sso:«rosimple iidebolde:(4°'di/ue.�axrE Euro liss .Elm* , Al A n • 4. a, 1tTR 4 'SI4az : 'V�/(I 1/�/ 47i• i rut 70 Wr �i, 2 7 , :r/ /.L .3v203 b.Phonenc = al Alk 0 S, SIIRE 'ga-xpL'cz7le,awpya_/ RI ftho/y�c=hodsattethecD: Me* acc em -, ^' essAi ) b.;acme a:nb= c,Armommroft and:5 IN1/! 4 / 1 L:;ade'saddrrsn /N/ 4 b.l'hcne=b.= Df 4- • 7. Peaswithinfoe Stzieo Florida,deSignatecl byOmer upon whom ncrtices or other doming=:nay be served s s protded by Secii04713-13(1)(a)7.,1criclato ter 2.132==d address: f'�/7'7- b.Pcancezn:.besofdesia„e—ipmseas:, I Z.a.Iaadditioatohfmselforhersel;Cvmerdesignares ( ( A- of !//,n V— to receive a copy of heLienor's Notice as provided.in Section 74.13(1)) Florida Staitles. b.71==acz:bccofp:two.cr hy' ci sisc i b'Oxarr. / (b) CF 9-Expirntioa daze ofn.ofice ofcorameneement(the expf atioa r!at"-will be I yea from the dsfe of recording unless a dicot daze is specified); ,20 N4•AA kV TO•" "ER! alt -A S. •. :%.,;• O .Y.�• Yz ,a•1R.ATS0No--'i N032 O'"C• I td. 3. ea •RECO•"STflEEFa -R•PERPAY F.TS . .V.Cn&•---iz713 P.•TI ON 3. 3 - O,j•A ILLY.-_ ,:_sip _:.s 1 1 E•.s PA.0' T.a. .. •2 :4.412:. •du1. • '-• •'1. • '. -- - z.•POW!,• '• OB Is. : •:..' •c .as. i •E13 • • ►Y 'tJ ••--yt .y1 i h_ • .•J �9 . " *. 414..L ER•R• -• ..0 . Bof•>- • : ! i. WO- .' •. o•.isy r-.ma ...Ica • ria PILI {`...bort=llnrcof anter or Lessee;crOwner's orLessee's (PrintName earl Provide Signatory's Iiee/Of ce) 4 Trfh orize d O._ceralirectorlPar=erllc.nuger) ` te•oi F(oc i i-0. • Comity of ' D0/4'...', . The foregoingiastamentwasacknowledged.before me£nie a_i'" day of Ivq^� ,?Aa$ - Aoe .co2ho Ge-5 O`'�i`er bY CtYPoo£e6hariY]:•.cg.oTic- o o: (risme ofbarty on b4121fofv.laona instrument was ceased) Pesona11ypn =Produced ProducedT_dentifiratian Typeofldeati.SmtionProduced. QC sec`S `-Z cernSC 1 ^ r '7i►i SRA I. BING c� °'��- MY COMMISSION#FF942746 r smi32ilu'e m-kg- not:Initc) (Prim Type,e:Stamp Co of Norar.Purni a aflsToreryPublic) *�• EXPIRES December 10.2019 O107)398-013.3 FlvidallotsrySent,.corn Pv-IO-75-12 Property Appraiser-Property Details https://paopropertysearch.coj.netBasic/Detail.aspx?RE=1709451110 1 RHODES DONALD B+ . Primary Site Address Official Record Book/Page Tile# 810 HIBISCUS ST 810 HIBISCUS ST 06861-01818 F F I C E C O Pr ATLANTIC BEACH,FL 32233-2544 Atlantic Beach FL 32233 RHODES IRENE F 810 HIBISCUS ST Property Detail Value Summary RE# 170945-1110 2017 Certified 2018 In Progress Tax District USD3 Value Method CAMA CAMA Property Use 0100 Single Family Total Building Value $86,714.00 $94,966.00 #of Buildings 1 Extra Feature Value $1,558.00 $1,501.00 Legal Desc. For ful legal description see Land Value(Market) $20,280.00 $24,960.00 Land&Legal section bebw Land Value(Aaric.l $0.00 $0.00 Subdivision 03119 ATLANTIC BEACH SEC H Just(Market)Value $108,552.00 $121,427.00 Total Area 2736 Assessed Value $74,897.00 $76,469.00 The sale of this property may result in higher property taxes.For more information go Cap Diff/Portability Amt $33,655.00/$0.00 $44,958.00/$0.00 to Save Our Homes and our Property Tax Estimator.'In Progress'property values, ung $49,897.00 See bebw exemptions and other supporting information on this page are part of the workng tax Taxable Value $25,000.00 See bebw roll and are subject to change.Certified values rsted in the Value Summary are those certified in October,but may include any official changes made after certfication Lean how the Property Aooraiser's Office values property, + Taxable Values and Exemptions—In Progress If there are no exemptions applicable to a taxing authority,the Taxable Value is the same as the Assessed Value fisted above in the Value Summary box. County/Municipal Taxable Value S)RWMD/FIND Taxable Value School Taxable Value Assessed Value $76,469.00 Assessed Value $76469.00 Assessed Value $76,469.00 Homestead(HX) $25,000.00 Homestead(HX) $25,000.00 Homestead LHX) ....._......................_...2$25,000.00 Homestead Bandng 196.031(1)(b)(HB) Homestead Bandng 196.031(1)(b)(HB) Taxable Value $51,469.00 -$25,000.00 -$25,000.00 Taxable Value $26,469.00 Taxable Value $26,469.00 Sales History Book/Page Sale Date I Sale Price 1 Deed Instrument Tvue Code Oual(iied/Unqualified Vacant/Improved 06861-01818 2/26,199C $52,900.00 V.'D Warranty Deed Quaffed Improved +-- Extra Features LN !Feature Code !Feature Description Bkig. Length Width Total Units Value 1 FPPR7 Fireplace Prefab 1 0 0 1.00 $619.00 2 GRW R2 Garage/Uti Bdg Wood 1 16 10 160.00 $882.00 +# Land&Legal --1 Land Legal I LN Code Use Description Land Land LN I Legal Description Category Units Land Type Value Q Zoning!Front Depth 1 18-34 38-2S-29E.070 Front 1 0101 ACS MD 8-19 UNITS PER ARG 140.00 1 77.00 1 Common 140.00 Footage $24,960.00 2 ATLANTIC BEACH SEC H 3 S 35FT LOT 5,N 5.17FT LOT 6 4 (EX PT RECD 0/R BK 6650-1051) 5 BLK 154 Buildings Building 1 _ Building 1 Ste Address I Element Code Detail .• 810 HIBISCUS ST -- Atlantic Beach FL 32233 Exterior Wall ' 16 16 Frame Stucco 55 Roof Struct 3 3 Gable or Hip t" Buiding Type 0101-SFR 1 STORY Roofng Cover 3 3 Asph/Comp Shng Year Built 19881 I ass IInterior Wal 5 5 Drywal Building Value $94,966.00 Int Fborng 11 11 Cer Clay Tie Int Fborng 14 14 Carpet Gross I Heated Effective Heatng Fuel 4 4 Electric Due Area 'Area Area Heating Type 4 4 Forced-Ducted L- rBase Area 1144 1144 1144 At Cond 3 3 Central 1 of 2 7/19/2018,02:12 PM FFICE COFV JEA Distributed Renewable Generation Interconnection Agreement (System Less Than or Equal to 2 MW) This Agreement is made and entered into this 8th day of August , 20 18 , by and between Donald B Rhodes ,(hereinafter called "Customer"),located at 810 Hibiscus St in Atlantic Beach , Florida,Zip Code: 32233 and JEA,a body politic and corporate,with a business address of 21 W. Church St.,Jacksonville, FL 32202.Customer and JEA shall collectively be called the "Parties".The physical location/premises where the interconnection is taking place is: 810 Hibiscus St Atlantic Beach 32233 WITNESSETH: Whereas,JEA,operates an electric distribution system serving Duval County and surrounding areas; Whereas,Customer has made a written Application to JEA,a copy being attached hereto,to allow connection of a Customer-Owned Distributed Renewable Generation System for any length of time to the distribution system at the location listed above; and Whereas,JEA desires to provide interconnection of Customer-Owned Distributed Renewable Generation System under conditions which will ensure the safety of JEA customers and employees,reliability and integrity of its distribution system. NOW,THEREFORE,for and in consideration of the mutual covenants and agreements herein set forth,the parties hereto covenant and agree as follows: Section 1.Definitions "Customer-owned distributed renewable generation" means an electric generating system located on a customer's premises that is primarily intended to offset part or all of the Customer's electricity requirements with renewable energy that is generated using one or more of the following fuels or energy sources: hydrogen,biomass,solar energy,geothermal energy,wind energy,ocean energy,waste heat,or hydroelectric power. "DER" means Distributed Energy Resources,which include all forms of distributed generation and energy storage. "Gross power rating" or GPR means the total manufacturer's AC nameplate generating capacity of one(1)or multiple on-site customer- owned distributed renewable generation and/or DER system(s)that will be interconnected to and operate in parallel with JEA distribution facilities. For inverter-based systems,the GPR shall be calculated by multiplying the total installed DC nameplate generating capacity by 0.85 in order to account for losses during the conversion from DC to AC. "Renewable Energy" means electrical,mechanical,or thermal energy produced from a method that uses one or more of the following fuels or energy sources: hydrogen,biomass,solar energy,geothermal energy,wind energy,ocean energy,waste heat,or hydroelectric power. "Renewable Energy Credits" shall mean any and all renewable energy credits(RECs),renewable energy certificates(RECs),benefits, environmental attributes,emissions reductions,offsets,and allowances,however entitled,attributable to the generation of electricity from the customer-owned distributed renewable generation system and its displacement of conventional energy generation. "DG-1" means electric generating system less than or equal to 2 MWAc. Section 2.Scope of Agreement 2.01.This Agreement defines the terms and conditions under which JEA and the Customer agree to interconnect Customer-Owned Dis- tributed Renewable Generation System(s)and/or DER of less than or equal to 2 MWAc to JEA's electric system. Section 3.Interconnection Application and Fees 3.01. In order to commence the process for interconnection of the customer-owned distributed renewable generation system,Customer shall complete and submit to JEA a JEA application form for interconnection. 3.02.Customer with distributed renewable generation greater than 100 kWAc and less than or equal to 2 MWAc shall be required to pay an application fee of$1,000.00 for the DG-1 Customer-owned distributed renewable generation system interconnection request. This application fee shall cover the cost for processing the Customer's application and the cost of an initial screening of the proposed interconnection's impact on the JEA's electric system,as such process is described in Section 10,hereto. 3.03. In the event the Customer-owned distributed renewable generation system greater than 100 kWAc and less than or equal to 2 MWAc does not pass the Initial Screen and the Customer elects to proceed with an Interconnection Study,as described in Section 10, hereto,the Customer shall be required to pay in advance the estimated cost of an interconnection study. March 19,2018 Page 1 of 5 Section 4.Applicable Codes and Standards 4.01. Prior to operating in parallel with JEA's electric system,Customer shall certify that the customer-owned distributed renewable generation system equipment, its installation,its operation and its maintenance are in compliance with the latest versions/revisions of the standards listed below. Customer with distributed renewable generation greater than 100 kWAc and less than or equal to 2 MWAc must provide the certification of compliance with the latest version and/or revision of the standards listed below in a form of engineering certification,signed by an engineer licensed in Florida. (a) IEEE-1547—IEEE Standard for Interconnecting Distributed Resources with Electric Power System; (b) IEEE-1547.1—IEEE Standard Conformance Test Procedures for Equipment Interconnection Distributed Resources with Electric Power Systems; (c) UL-1741 and UL-1741 SA—UL Standard for Inverters,Converters,Controllers and Interconnection System Equipment for Use with Distributed Energy Resources; (d) The most recent version of the National Electric Code,state and/or local building codes,mechanical codes and/or electrical codes; (e) The latest revision JEA Electric Systems Procedure ES 20202 902 DER Facilities; and (f) The manufacturer's installation,operation and maintenance instructions. 4.02.Customer may be requested to provide a copy of the documents listed in section 4.01(f)to JEA. Section 5.Inspection Requirements 5.01. Prior to commencing parallel operation with JEA's electric system,Customer shall have the customer-owned distributed renewable generation system inspected and approved by the appropriate code authorities having jurisdiction.Customer shall provide a copy of this inspection and approval to JEA. 5.02. Prior to and after operation of the customer-owned distributed renewable generation system in parallel with JEA's electric system, authorized JEA representatives may inspect the customer-owned distributed renewable generation system to verify that it is and continues to be in compliance with the standards and codes contained in this Agreement. 5.03.JEA shall provide Customer with as much notice as is reasonably practicable; either in writing,email,facsimile or by phone as to when JEA may conduct inspection and/or documentation review. Upon reasonable notice,or at any time without notice in the event of an emergency or hazardous condition,JEA shall have access to Customer's premises for any reasonable purpose in connection with the performance of the obligations imposed by this Agreement,or,if necessary,to meet JEA's obligations to provide service to its customers. 5.04. In no event shall any statement,representation,or lack thereof,either express or implied,by JEA,relieve the Customer of exclusive responsibility for the Customer's system. Specifically,any JEA inspection of the customer-owned distributed renewable generation system shall not be construed as confirming or endorsing the system design or its operating or maintenance procedures nor as a warranty or guarantee as to the safety,reliability,or durability of the customer-owned distributed renewable generation system equipment.JEA's inspection,acceptance,or its failure to inspect shall not be deemed an endorsement of any customer-owned distributed renewable generation system equipment or procedure. Section 6. Distributed Generation 6.01.JEA will allow customer-owned distributed renewable generation systems less than or equal to 2 MWAc under the JEA Distributed Generation Policy. Section 7. Modifications and/or Additions to the Customer-Owned Distributed Renewable Generation System 7.01. It is the Customer's responsibility to notify JEA of any change to the GPR of the customer-owned distributed renewable generation system by submitting a new application for interconnection specifying the modifications at least 60 days prior to beginning the modifications. 7.02. If Customer adds another customer-owned distributed renewable generation system which (a) utilizes the same JEA-interactive inverter for both systems; or (b) utilizes a separate JEA-interactive inverter for each system, then Customer shall provide JEA with 60 days written notice of the addition. Section 8.Power Delivered to JEA 8.01.The customer-owned distributed renewable generation system(s)and DER systems(s)total maximum power exporting capability shall not exceed 90%of JEA distribution service rating at the Customer's electric service point. March 19,2018 Page 2 of 5 Section 9.Administrative Requirements and Installation of Meter 9.01. Customer must execute this Agreement and return it to JEA prior to beginning parallel operations with JEA's electric system.Sub- ject to an approved inspection, including installation of acceptable disconnect switch,this Agreement shall be executed by JEA within 60 calendar days of receipt of completed required documentation and returned to the customer. 9.02. Once JEA has received Customer's written documentation that the requirements of this Agreement have been met and the correct operation of the manual switch has been demonstrated to a JEA representative,JEA will install the required meter.JEA must have access to this meter at all times. Section 10. Interconnection Study Process (for distributed renewable generation and/or DER greater than 100 kWAC and less than or equal to 2 MWAC) 10.01. Initial Screen 10.01.1.JEA will perform an Initial Screening of Customer's request for interconnection which evaluates the potential impacts to the JEA electric system,consistent with prudent utility practice. 10.01.2. In order to pass the Initial Screen,Customer's interconnection shall not exceed established industry standards,as set forth in the Interconnection Study Process and shall not require construction of Interconnection Facilities and Distribution Upgrades on JEA's electric system. 10.01.3. If the Customer's interconnection request passes the Initial Screen,the Customer's request shall be approved and Customer will be provided an executable Interconnection Agreement. 10.02. In those instances in which the Customer-owned distributed renewable generation and/or DER system does not pass the Initial Screen,the Customer may elect to proceed with an Interconnection Study. In general,the purpose of the Interconnection Study will be to better determine what adverse impacts the Customer-owned distributed renewable generation and/or DER system has on the JEA system and what facilities will be required to resolve such impacts. 10.03. Interconnection Study 10.03.1.The Interconnection Study Process shall be used by a Customer proposing to interconnect its certified Customer-owned distributed renewable generation and/or DER system, in those instances in which such system did not pass the Initial Screen. 10.03.2. Upon Customer execution of the Interconnection Agreement;the Customer shall be obligated to pay for any and all costs for Interconnection Facilities and Distribution Upgrades identified in the Interconnection Study in order to interconnect the proposed Customer-owned distributed renewable generation and/or DER system. Section 11. Cost Responsibility for Interconnection Facilities and Distribution Upgrades(for distributed renewable generation greater than 100 kWAc and less than or equal to 2 MWAc) 11.01.The Customer shall pay JEA for the actual cost of any and all JEA Interconnection Facilities and Distribution Upgrades required to implement this Interconnection Agreement.JEA shall provide a best estimate cost,including overheads,for the purchase and construction of JEA's Interconnection Facilities and Distribution Upgrades required and shall provide a detailed itemization of such costs. 11.02.The Customer shall be responsible for all reasonable expenses, including overheads,associated with: (a) owning,operating,maintaining,repairing,and replacing its own Interconnection Facilities and other equipment;and (b) operating,maintaining,repairing,and replacing JEA's Interconnection Facilities and Distribution Upgrades. 11.03.JEA shall design,procure,construct, install and own the Interconnection Facilities and Distribution Upgrades,required for JEA to implement this Interconnection Agreement. If JEA and the Customer agree,the Customer may construct Interconnection Facilities and Distribution Upgrades that are located on land owned by the Customer.The actual cost of Interconnection Facilities and Distribution Upgrades,including overheads,shall be directly assigned to and paid by the Customer. Section 12. Customer Insurance Requirements (for distributed renewable generation greater than 100 kWAc and less than or equal to 2 MWAc) 12.01.The Customer agrees to provide and maintain general liability insurance for personal and property damage,or sufficient guarantee and proof of self-insurance, in the amount of not less than$2 million during the entire period of this Interconnection Agreement. Initial proof of insurance shall be in the form of a copy of the policy attached to this Interconnection Agreement evidencing the owner's property insurance or other insurance policy in effect at the time of interconnection. Section 13. Customer Equipment 13.01. Customer is responsible for the protection of its generation equipment, inverters,protection devices,and other system components from damage due to normal and abnormal operations that occur on JEA's electric system in delivering and restoring system power.Customer is also responsible for ensuring that the customer-owned distributed renewable generation system equipment is March 19,2018 Page 3 of 5 inspected,maintained,and tested regularly in accordance with the manufacturer's instructions to ensure that it is operating correctly and safely. Such inspection should occur after large storms have traversed Customer's location and after connection with JEA's system has been restored. 13.02. If the customer's DER systems)contains an energy storage system,the charging operation of the energy storage system shall not cause the current peak demand for the service to increase.Any changes or modifications performed to the DER system that may result in increased load demand the customer shall contact JEA. Section 14.AC Disconnect Switch 14.01. Customer shall install,at customer's sole expense,a AC disconnect switch of the visible load break type to provide a separation point between the AC power output of the customer-owned distributed renewable generation system and any Customer wiring connected to JEA's electric system such that back feed from the customer-owned distributed renewable generation system to JEA's electric system cannot occur when the switch is in the open position.The AC disconnect switch shall be mounted separate from the meter socket on an exterior surface adjacent to the meter.The switch must be readily accessible to JEA at all time and capable of being locked in the open position with a JEA padlock.When locked and tagged in the open position by JEA,this switch will be under the control of JEA.The switch shall meet all applicable local and national electrical codes for the installed distributed renewable generation systems.The switch shall be permanently labeled with three inch high letters clearly stating"JEA(name of distributed renewable generation)DISCONNECT". If the switch is mounted out of sight of the meter,permanently mounted instructions must be posted at the meter clearly stating the location of the disconnect switch. 14.02.JEA may open the switch and lock it,isolating the customer-owned distributed renewable generation system,without prior notice to Customer.To the extent practical,however,prior notice shall be given. If prior notice is not given,JEA shall at the time of disconnec- tion leave a door hanger notifying the Customer that the distributed renewable generation has been disconnected,including an expla- nation of the condition necessitating such action.The switch will be unlocked by JEA as soon as practical once the conditions causing the disconnection cease to exist.Customer may have to close the switch to re-energize the distributed renewable generation.Typical conditions which may require the switch to be opened include,but are not limited to: (a) JEA electric system emergencies or maintenance requirements. (b) Hazardous conditions existing on JEA's electric system due to the operation of the Customer's distributed renewable generation or protective equipment as determined by JEA. (c) Adverse electrical effects(such as power quality problems)on the electrical equipment of JEA's other electric consumers caused by the distributed renewable generation system as determined by JEA. 14.03. On termination of services pursuant to this Agreement,JEA shall open and padlock the AC disconnect switch and remove any additional metering equipment related to this Agreement.At the Customer's expense,within 10 working days following the termination, the Customer shall permanently isolate the customer-owned distributed renewable generation system and any associated equipment from JEA's electric supply system,notify JEA that the isolation is complete,and coordinate with JEA for return of JEA's lock. Section 15.Metering Equipment 15.01.JEA will furnish,install,own and maintain metering equipment capable of measuring the flow of kilowatt-hours(kWh)of energy. The Customer's service associated with the customer-owned distributed renewable generation system will be metered at a single metering point and the metering equipment will measure energy delivered by JEA to Customer,and also measure energy delivered by Customer to JEA. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal. Section 16. Renewable Energy Credits 16.01. Pursuant to the JEA Distributed Generation Policy: For customer-owned distributed renewable generation systems less than or equal to 2 MWAc,the customer shall retain the Renewable Energy Certificates associated with customer-utilized renewable generation. For any kWh purchased by JEA,the renewable energy attributes will be transferred to JEA. Section 17.Indemnification 17.01. Customer agrees to indemnify,defend and hold harmless JEA,its subsidiaries or affiliates,and their respective employees, officers and directors,governing boards,successors,and assigns against any and all liability,loss,damage,cost or expense,including attorney's fees,which JEA,its subsidiaries,affiliates,and their respective employees,officers and directors,governing boards,successors, and assigns may hereafter incur,suffer or be required to pay by reason of negligence on the part of the Customer under the obligation of this Agreement.This indemnification shall survive the term of this Agreement for events that occurred during the Agreement term. Section 18.Assignment 18.01. Customer shall not have the right to assign its benefits or obligations under this Agreement without JEA's prior written consent and such consent shall not be unreasonably withheld. If there is a change in ownership of the customer-owned distributed renewable March 19,2018 Page 4 of 5 generation system,Customer shall provide written notice to JEA at least 30 days prior to the change in ownership.The new owner will be required to assume in writing Customer's rights and duties under this Agreement,or execute a new Standard Interconnection Agreement. The new owner shall not be permitted to deliver energy to JEA's electric grid or begin parallel operations until the new owner assumes this Agreement,or executes a new Agreement,and submits an IRS Form W-9. Section 19. Lease Agreements and Retail Purchase of Electricity 19.01.Customer may contract with a third party for the purchase,lease,operation,or maintenance of an on-site distributed renewable generation system under terms and conditions that do not include the retail purchase of electricity from the third party. Customer shall provide JEA a copy of the lease agreement for any leased interconnection or generation equipment.Customer shall not enter into any lease agreement that results in the retail purchase of electricity; or the retail sale of electricity from the customer-owned distributed renewable generation system. Notwithstanding this restriction,in the event that Customer is determined to have engaged in the retail purchase of electricity from a party other than JEA,then Customer shall be in breach of this Agreement and may be subject to the jurisdiction of the Florida Public Service Commission and to fines/penalties. Section 20. Entire Agreement 20.01.This Agreement supersedes all previous agreements and representations either written or verbal heretofore made between JEA and Customer with respect to matters herein contained.This Agreement,when duly executed,constitutes the only Agreement between parties hereto relative to the matters herein described. Section 21.Governing Law&Tariff 21.01.This Agreement shall be governed by and construed and enforced in accordance with the laws,rules and regulations of the State of Florida and JEA's Tariff as it may be modified,changed,or amended from time to time. 21.02.This Agreement incorporates by reference the terms of the JEA Electric Documentation Volume 1 filed with the Florida Public Service Commission by JEA,including associated technical terms and abbreviations,general rules and regulations and standard electric service requirements(as may be applicable)as amended from time to time.To the extent of any conflict between this Agreement and such Electric Documentation Volume 1,the Electric Documentation Volume 1 shall control. 21.03.JEA and Customer recognize that the Florida Statutes and/or the Florida Public Service Commission Rules, including those Rules directly addressing the subject of this Agreement,may be amended from time to time. In the event that such statutes and/or rules are amended that affect the terms and conditions of this Agreement,JEA and Customer agree to supersede and replace this Agreement with a new Interconnection Agreement which complies with the amended statutes/rules. 21.04.Customer agrees to furnish JEA with an IRS Form W-9 at the time that the contract is executed. Customer understands that JEA is required to,and will report the dollar value of,the kWh credits for the electricity that the customer sells to JEA on IRS Form 1099- MISC.Customer further understands that these credits may be subject to U. S. Federal Income Tax. 21.05. Customer also understands that JEA will bill,and that the customer is liable for,all applicable State and local Utility Taxes on the net amount of electric power that the customer purchases from JEA.Gross Utility Taxes are reduced by the credits that the customer receives for selling power back to JEA. If the amount of power sold back to JEA is greater than the amount of power purchased from JEA for any given month then taxes will be based only on the Customer Charge. Customer cannot receive a net credit for state or local taxes. IN WITNESS WHEREOF,Customer and JEA have executed this Agreement the day and year first above written. JEA Approved as to Form By: Title: Date: Office of General Counsel CUSTOMER ( L By: - 12 f,,'/ /5 nih'�14 (Signature) (Print Name) (� (Title, if Corporation) (Customer Account Number) 9 2 9/s '3 7 ZOO f Date: `rS -?5' 14 March 19,2018 Page 5 of 5 • JEA Application for Interconnection of Distributed Generation System Less than or Equal to 100 kWBuilding Conind.ini“, IMPORTANT: Interconnection of a distributed generation system and/or energy storage system to JEA's distribution grid requires JEA's Application Pre-Approval prior to the start of the installation,and Installed System Approval prior to the start of its operation.Approval for interconnection to JEA's distribution grid requires the following: 1) JEA must receive and approve all required documents listed in Documentation(Section 5). 2) The distributed generation system and/or energy storage system must pass the JEA on-site inspection. Customer should review the JEA Distributed Generation Policy prior to submitting this application.Customer is responsible for any costs that may be incurred with the services that required the utilization of additional JEA engineers. 1. JEA CUSTOMER INFORMATION Account Holder Name: Donald B Rhodes JEA Account#: 92415 34200 Service Address: 810 Hibiscus St City: Atlantic Beach State: FL Zip: 32233 Account is: ✓❑Residential D Commercial Phone#: 904-866-1615 Other#: Email: thegnsebastian@gmail.com 2. GENERATION SYSTEM INFORMATION(For multiple generations/storages,submit application for each individually) New Generation System? 0 Yes D No(Skip to Section 3) Generation source: ❑Solar(PV) ❑Wind ❑Bio-mass 0 Other: Manufacturer Gross Output Power Rating of System(kWoc): 5.85 Number of Solar Panels: 20 Panel Manufacturer: Q cells Q Plus L-G4.2 325 Watt Inverter Manufacturer: Enphase I Q 6+ Number of Inverters: 20 All Inverters UL 1741 SA Listed? ❑Yes 0 No 3. ENERGY STORAGE SYSTEM INFORMATION Energy storage system(battery)included? 0 Yes 0 No(Skip to Section 4) Manufacturer: Usable storage capacity: kWh Peak output: kW Guaranteed lifetime cycles: Guaranteed lifetime years: Battery Chemistry: Total Generation(s)and/or Storage(s)Gross Output: kWoc 4. CONTRACTOR INFORMATION Installation Contractor: Steven Lorenz Florida License#: CVC56961 32763 Address: 1060 E Industrial Dr Suite A City: Orange City State: FL Zip: Phone#: 386-218-6930 Fax#: Email: Electric Contractor: Florida License#: Address: City: State: Zip: Phone#: Fax#: Email: 5. DOCUMENTATION(Initial to certify that documents are submitted together with this application) (a) Required Application Pre-Approval documents to be submitted together with this application: Application for Interconnection One-line electric diagram,if generation system includes energy storage system Interconnection Agreement (insert N/A,if not applicable) IRS Form W-9 Energy storage system technical specification sheet(s)(Insert N/A,if not applicable) (b) Required Installed System Approval documents to be submitted before JEA on-site inspection: Site survey clearly showing location of generation and/or battery system,inverter,disconnect switch(es) Finalized Electric Permit Inverter compliance with UL Standard 1741 and UL Standard 1741 SA Completed and Signed System Installation and Inspection Checklist(Page 2) By signing below,I hereby certify that I am the JEA Account Holder and that all the information provided in this application is true and correct to the best of my knowledge,that I have read and understand the JEA Distributed Generation Policy,that I have submitted with this application all the required documentation listed in Section 5(a)and that I will submit all the required documentation listed in Section 5(b)prior to JEA on-site inspection. 1.ee•/le/2)7<------""' Signature: Name(Print): ��� ! � ��..�'�,/`"w" Date: f March 19,2018 Page 1 of 2 p. • JEA Application for Interconnection of Distributed Generation System Less than or Equal to 100 kW thstIclong Communay` 6. SYSTEM INSTALLATION AND INSPECTION CHECKLIST Check all the boxes that apply and mark"N/A"over the boxes if the items are not applicable. ❑ System hardware must be in compliance with the latest and all approved revisions of UL Standard 1741,UL Standard 1741 SA,IEEE Standard 1547. ❑ System installation must be in compliance with all relevant articles of the National Electric Code(particularly Article 690)and subsequent revisions, all local building codes and the latest revision JEA Electric Systems Procedure ES 20202 902 DER Facilities. ❑ The electric permit must be finalized by the local permit authority. O All required documentation must have been received by JEA before JEA schedules the on-site inspection. ❑ The system must be tested by the installer for proper operation before calling for JEA on-site inspection. ❑ An external manual AC disconnect switch for the generation system should be placed within 5 feet of the JEA meter so they can be accessed at any time,if physically possible. ❑ If the system includes energy storage,a separate external manual AC disconnect switch for the energy storage system must be placed next to the generation system external manual AC disconnect switch. ❑ If any of the required external manual AC disconnect switches cannot be located within 5 feet of the meter,customer must provide a sign and permanently mount it next to the meter clearly stating the location(s)of the AC disconnect switch(es).The customer provided sign must be made of hard plastic,metal or weatherproof vinyl,6"X 6"minimum with red background and 3/8"minimum white lettering. ❑ A JEA provided sign stating"Generation System Disconnect"and,if energy storage system is included,a JEA provided sign stating"Energy Storage System Disconnect"must be permanently mounted by the installer at the respective locations of external manual AC disconnect switches. ❑ The external manual AC disconnect switch for the generation system and,if energy storage is included,the separate external manual AC disconnect switch for the energy storage system must be in the open position(OFF)until JEA inspects the system and changes the meter for a two-register meter.Do not energize the generation system and,if energy storage Is included,the energy storage system,and do not export energy to JEA before JEA Installs the new two register meter.The current meter may reverse register direction and activate anti-theft signals to JEA. ❑ All other breakers for the generation system or the energy storage system should be in the ON position.The JEA inspector cannot test the generation system or the energy storage system if they are not in the ON position. ❑ After JEA installs the two-register meter,JEA will leave the external disconnect switch(es)in OFF position.The customer must put the external manual AC disconnect switch(es)in ON for the generation system and energy storage system to work. ❑ JEA does not allow coupler or splices to be installed on the conductor in the meter can.JEA does not allow an adapter for PV connection.JEA will allow the landing of secondary conductors via approved terminating lugs on the load side of the meter in accordance with NEC and the local inspection authority. ❑ If an energy storage system is included,the JEA inspector will verify the nameplate data,confirm that the system is connected per the previously provided one-line electrical diagram and the JEA provided energy storage disconnect sign is properly located at the required external manual AC disconnect switch. ❑ My JEA Utility Tracker is not available to customers with generation systems. By checking all boxes that apply and by signing below,I hereby certify that I am the JEA Account Holder and that I have read,understand and agree to all requirements and procedures on Section 6-System Installation and Inspection Checklist. Signature: Name(Print): �t)I q/V\ V ,/�J� Date: IO Address: 91 Q i-i V}I Us S"$ - City: /4/41/91C 446 State: Zip: 322- 3 March 19,2018 Page 2 of 2 FFICE CO FISEIA rinridacedarhrrigyiudu+trirsAwn ie�ion June 28, 2017 Dear building official, On June 23rd of 2017 Governor Rick Scott signed HB 1021 amending 377.705 of Florida Statute authorizing solar energy systems manufactured or sold in the state to be certified by professional engineers. In effect a Florida Solar Energy Center, (FSEC,) certification is no longer required by state statute for materials or systems to be sold or installed in the state of Florida. On page 6, lines 138-144 read; All solar energy systems sold in the state must meet the standards established by the center and shall display accepted results or approved performance tests in a manner prescribed by the center, unless otherwise certified by an engineer licensed pursuant to chapter 471 using the standards contained in the most recent version of the Florida Building Code. Please find HB 1021 attached for your convenience.This modification to 377.705 will go into effect July 1, 2017 If you have any questions, please feel free to contact FIaSEIA at (407) 339-2010 or(800) 426-5899 Regards, The Board of Directors of FIaSEIA Florida Solar Energy Industries Association (FIaSEIA) 2555 Porter Lake Dr., Suite 106 Sarasota, FL 34240 ` - OFFICE COPYlif PLUS L. 4 2320345 Q t , ‘ , . , . ., Q.ANTUM SOLAR MODULE The Q.ANTUM solar module Q.PLUS L-G4.2 with power classes up to 345 Wp is the strongest module of its type on the market globally. ill� r Powered by 72 Q CELLS solar cells Q.PLUS L-G4.2 was specially de- signed for large solar power plants to reduce BOS costs. But there is11 I even more to our polycrystalline modules. Only Q CELLS offers German 111 engineering quality with our unique triple Yield Security. III .. lig II LOW ELECTRICITY GENERATION COSTS Ij . G Higher yield per surface area and lower BOS costs thanks to higher power classes and an efficiency rate of up to 17.6%. I /ehINNOVATIVE ALL-WEATHER TECHNOLOGY ii Optimal yields,whatever the weather with excellent low-light .. mai and temperature behavior. Eong PING HIGH PERFORMANCE Tl gy1 EUPaRANDPV QC Lon term leld securit with Anti-PID Technology', EUPDRESEARCH C�CEILS TO SII A., Hot-Spot-Protect and Traceable QualityTra.Q MODULES ANTI PID TECHNOLOGY (APT) LIGHT-WEIGHT QUALITY FRAME 2015 IMP) PROTECT High-tech aluminum alloy frame, certified for TRACEABLE high snow(5400 Pa)and wind loads(2400 Pa). DhnMn O A RELIABLE INVESTMENT - -._W GICEELS Inclusive 12-year product warranty and 25-year linear Best polycrystalline solar module 1013 performance guarantee2. APRO.B2235 151•011.1•101 ' APT test conditions:Cells at-1000V against grounded,with conductive me- tal foil covered module surface,25°C, THE IDEAL SOLUTION FOR: 168h 2 See data sheet on rear for further MIGround-mounted information. solar power plants Engineered in Germany G1 CELLS c /A 1 r ti. I MECHANICAL SPECIFICATION Format 78.5in x 39.4 in x 1.38 in(including frame) (1994 mm x 1000 mm x 35 mm) Weight 52.9 lb(24 kg) =. .._..-= MT 1.0 rroll Front Cover 0.13 in(3.2 mm)thermally pre-stressed glass with anti-reflection technology °"'""""°"'"'"" """"°"'° °'r""""�I Back Cover Composite film "O ., Frame Anodised aluminum Cell 6 x 12 Q.ANTUM solar cells Junction box 3.35-4.13in x 2.36-3.15in x 0.59-0.67in(85-105 mm x 60-80 mm x 4..°.„...„..,v,..(0Ew�B, 15-17 mm),Protection class z1P67,with bypass diodes .......„...,�wB,. °,,, „els E Cable 4 mm°Solar cable;(+)2 47.24 in(1200 mm),(-)2 47.24 in(1200 mm) _ x _ - _ Connector Amphenol H4,IP68 ,°,,,n, i-I ,•„.,", ...::::I7-"""' ELECTRICAL CHARACTERISTICS POWER CLASS 320 325 330 335 340 345 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC'(POWER TOLERANCE+5W/-OW) Power at MPP' PMPP [W] 320 325 330 335 340 345 Short Circuit Current* I,o [Al 9.39 9.44 9.49 9.54 9.59 9.64 E Open Circuit Voltage* V. [V] 46.17 46.43 46.68 46.94 47.20 47.46 Current at MPP* IMPP [A] 8.79 8.85 8.91 8.97 9.03 9.09 Voltage at MPP* VMPP [V] 36.39 36.70 37.02 37.33 37.63 37.93 Efficiency' rl [%] 2_16.0 216.3 216.5 216.8 217.1 217.3 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NOC' Power at MPP' PMPP [W] 237.2 241.0 244.7 248.4 252.1 255.8 E Short Circuit Current* Iso [A] 7.57 7.61 7.65 7.69 7.73 7.77 e Open Circuit Voltage* V. [V] 43.08 43.32 43.56 43.81 44.05 4.4.29 Current at MPP* IMPP [A] 6.89 6.94 6.99 7.04 7.09 7.14 Voltage at MPP* VMPP [V] 34.44 34.72 35.01 35.29 35.56 35.83 '1000 W/m',25°C,spectrum AM 1.5G 'Measurement tolerances STC t3%;NOC*5% '800 W/m',NOCT,spectrum AM 1.5G *typical values,actual values may differ O CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE P:r ,-;, i r r I 1 1 At least 97.4 of nominal power during K i I I P 3 . first year.Thereafter max.0.6%degra- °°F- '- , i--i--i I `-' >8 dation per year. W :=is i5 At least 92%of nominal power after m __`--t--`--`--`--`--`--t 1 Bo l0 W - years. 4 .. r__r__r__r_-r-_r_-r--r '" At least 83%of nominal power after m 25 ars. W .--- Ye � r--r--r-r-r-r--r--r m All data within measurement tolerances. too 000 000 .ao coo em 700 .00 eoo ,000 Full warranties in accordance with the warranty terms of the Q CELLS sales IoeaoingcE lW/m'1 75 organisation of your respective country. B °. YEARS The typical change in module efficiency at an irradiance of 200 W/ma in relation N `01a""� `"-01°„� to 1000 W/m'(both at 25°C and AM 1.5G spectrum)is-1.5%(relative). L TEMPERATURE COEFFICIENTS $ vs Temperature Coefficient of I,o a [%/K] +0.04 Temperature Coefficient of V. p 1%/K] -0.29 n Temperature Coefficient of PMPP y 1%/K1 -0.40 Normal Operating Cell Temperature NOCT [°F] 113*5.4(45 t 3°C) < d PROPERTIES FOR SYSTEM DESIGN Maximum System Voltage V,9, [V] 1500(IEC)/1500(UL) Safety Class II S' Maximum Series Fuse Rating [A DC] 15 Fire Rating C/Type 1 i d Max Load(UL)' [lbs/f] 75(3600 Pa) Permitted module temperature 40°F up to+185°F on continuous duty (-40°C up to+85°C) Load Rating(UL)' [lbs/ft'] 33(1600 Pa) 'see installation manual i 0 QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION 1 IEC 61215(Ed.2);IEC 61730(Ed.1),Application class A Number of Modules per Pallet 29 This data sheet complies with DIN EN 50380. .y Number of Pallets per 40'Container 22 Pallet Dimensions(LxWxH) 81.3x45.3x46.9in 2 es • AVE SPa (2065 x 1150 x 1190mm) c u„„..us a 111.1702 aB.B.., - Pallet Weight 1671 lbs(758 kg) NOTE Installation instructions must be followed.See the installation and operating manual or contact our technical service department for further information on approved installation and use ' of this product. v, Hanwha O CELLS USA Corp. 300 Spectrum Center Drive,Suite 1250,Irvine,CA 92618,USA I TEL+1 949 748 59 96 I EMAIL q-cells-usa@q-cells.com Blue Pacific Solar Q CELLS Engineered in GermanyOWE] 'S t- www.BluePacificSolar.com • FI �C 'Y. Data Sheet Enphase Microinverters Enphase The high-powered smart grid-ready Enphase IQ 6 Micro" and Enphase IQ 6+ Micro' IQ 6 and IQ 6+ dramatically simplify the installation process while achieving the highest efficiency for module-level Microinverters power electronics. Part of the Enphase IQ System,the IQ 6 and IQ 6+ Micro integrate seamlessly with the Enphase IQ Envoy", Enphase Q AggregatorTM, Enphase IQ Battery'"", and the Enphase Enlighten" monitoring and analysis software. The IQ 6 and IQ 6+ Micro extend the reliability standards set forth by previous generations and undergo over a million hours of power-on testing. Enabling Enphase to provide an industry-leading warranty of up to 25 years. Easy to Install • Lightweight and simple .: • Faster installation with improved two-wire cabling • Built-in rapid shutdown compliant(NEC 2014) art. Productive and Reliable `_ • Optimized for high powered 60-cell and 72- cell*modules • More than a million hours of testing • Class II double-insulated enclosure Smart Grid Ready • Complies with fixed power factor,voltage and frequency ride-through requirements • Remotely updates to respond to changing grid requirements • Configurable for varying grid profiles a *The IQ 6+Micro is required to support 72-cell modules CERTIFIED SAFETY USC" E341165 EN P H AS E To learn more about Enphase offerings,visit enphase.com u Enphase IQ 6 and IQ 6+ Microinverters INPUT DATA(DC) IQ6-60-2-US AND IQ6-60-5-US IQ6PLUS-72-2-US AND IQ6PLUS-72-5-US Commonly used module pairings' 195 W-330 W+ 235 W-400 W+ Module compatibility 60-cell PV modules only 60-cell and 72-cell PV modules Maximum input DC voltage 48 V 62 V Peak power tracking voltage 27 V-37 V 27 V-45 V Operating range 16 V-48 V 16 V-62 V Min/Max start voltage 22 V/48 V 22 V/62 V Max DC short circuit current(module Ise) 15 A 15 A Overvoltage class DC port II II DC port backfeed under single fault 0 A 0 A PV array configuration 1 x 1 ungrounded array;No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA(AC) IQ6-60-2-US AND IQ6-60-5-US IQ6PLUS-72-2-US AND IQ6PLUS-72-5-US Peak output power 240 VA 290 VA Maximum continuous output power 230 VA 280 VA Nominal voltage/range2 240 V/211-264 V 208 V(10)/183-229 V 240 V/211-264 V 208V(10)/183-229 V Nominal output current 0.96 A 1.11 A 1.17 A 1.35 A Nominal frequency 60 Hz 60 Hz Extended frequency range 47-68 Hz 47-68 Hz Power factor at rated power 1.0 1.0 Maximum units per 20 A branch circuit 16(240 VAC) 13(240 VAC) 14(single-phase 208 VAC) 11 (single-phase 208 VAC) Overvoltage class AC port III III AC port backfeed under single fault 0 A 0 A Power factor(adjustable) 0.7 leading...0.7 lagging 0.7 leading...0.7 lagging EFFICIENCY @240 V @208 V(10) @240 V @208 V(10) CEC weighted efficiency 97.0% 96.5% 97.0% 96.5% MECHANICAL DATA Ambient temperature range -40°C to+65°C Relative humidity range 4%to 100%(condensing) Connector type MC4 or Amphenol H4 UTX Dimensions(WxHxD) 219 mm x 191 mm x 37.9 mm(without bracket) Weight 1.5 kg(3.3 lbs) Cooling Natural convection-No fans Approved for wet locations Yes Pollution degree PD3 Environmental category/UV exposure rating Outdoor-NEMA 250,type 6(IP67) FEATURES Communication Power line Monitoring Enlighten Manager and MyEnlighten monitoring options Compatible with Enphase IQ Envoy Compliance UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO.107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according manufacturer's instructions. 1.No enforced DC/AC ratio.See the compatibility calculator at enphase.com/en-us/support/module-compatibility. 2.Nominal voltage range can be extended beyond nominal if required by the utility. To learn more about Enphase offerings,visit enphase.com '4 2017 Enphase Energy.All rights reserved.All trademarks or brands used are the property of Enphase Energy,Inc. E N P H A S E 2017-05-01 `,/