Exh 8BAGENDA ITEM #SB JULY 28, 2003 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Change Order #9 SUBMITTED BY: Robert S. Kosoy, P.E. Director of Public Work DATE: July 17, 2003 BACKGROUND: Work on the Core City hnprovements Project on various streets required that 7 items be added to the contract. Items 2, 3 5, 6 and 7 are adjustments to original contract quantities. Items 1 and 4 aze additional items required due to unforeseen site conditions. These items aze described in the Change Order Item Summary Sheets. The proposed Change Order work for these items added 2 days to the construction contract. The total for Change Order.#9, as summarized in the attached documents, is $40,595.30, with a total of 2 days added to the contract, and a grand total of 84 days added thru Change Order #9. We will have expended 67% of the contingency with this Change Order. This percentage tracks well with the money spent through monthly payments ending in June 30, 2003, which are 82% of the total project funds. The Contractor is planning to complete the project by early Fall, and hopefully receive all of the incentive. BUDGET: The original contingency amount, as approved by the Commission is $627,623.09. The nine change orders will reduce the _ contingency by $420,804.64 to $206,818.45. RECOMMENDATION: Approve Change Order #9. ATTACHMENTS: Two signed originals (one to be signed and returned to Contractor) of Change Order #9 with Item Summary Sheets (6 pages total). REVIEWED BY CITY MANAGER: AGENDA ITEM #8B JULY 28; 2003. City of Atlantic Beach Construction Change Order Change Order No: 9 Date: 15-Jul-03 Description of Proiect: Core City Improvements Project Name of Contractor: Petticoat Contractin g. Inc. Contractor's Address: 11025 Blasius Rd. Jacksonville. FL 32226 Bid No.: 0102.13 Original Contract Amount: $ 4,184,153.91 Original Contingency Previous Change Orders: $ 380,209.34 Amount• $ 627,623.09 Change Order No.: 9 $ 40,595.30 Less Total C.O. To Date: $ (420,804.64) Revised Contract Totalthru C.O. No.: 9 $ 4,604,958.55 Remaining Contingency:. $ 206,818.45 Original Contract Time: 540 D~ Contract Time Added thru C.O. No.: 9 &4 Davs Revised Contract Time : 624 Davs Projected Completed Date: 30-Mar-04 In compliance with the General Conditions of the above. the referenced contract, PETTICOAT CONTRACTING, INC. and THE CITY OF ATLANTIC BEACH do both hereby agree that PETTICOAT CONTRACTING, INC. shall make the following changes, additions or deletions to the work specified in the specifications and plans. "See attached summary The costof the changes under this Change Order will increase the initial Contrail in the amount of: $ 40,595.30 PETTICOAT CONTRACTING, INC- (~ ~ 14 d PetOcoat Contractng, Inc. Date ~1~c ~2cS (fie. ~'T . Title CITY OF ATLANTIC BEACH City Manager Date AGENDA ITEM #8B JULY 28, 2003 Change Order No. 9 Item Summary Sheet No. Description 1. Conflict Manhole on 3~d Street: Add 2 drainage structures to eliminate conflicts with the existing sanitary sewer services on 3~d Street. Direct costs shown are extended from unit prices established in the bid documents, or costs for similar work approved. under previous change orders. Total Cost: $7,216.00 Days Added: 1 2. Additional Driveways (Remove and Replace): Additional driveway pavement replaced on Stn Street 11th Street and various other residences. The additional replacement was necessary for the proper function of the project. These quantities are an accumulation of minor modifications that have occurred from the beginning of the project. Direct costs shown are extended from unit prices established in the bid documents. Total Cost: $6,950.00 Days Added: 1 3. Additional Curb (Remove and Replace): Additional curb and gutter replaced on 9th Street 11th Street and various other residences. The additional .replacement was necessary for the proper function of the project. Direct costs shown are extended from unit prices established in the bid documents, or costs for similar work approved under previous change orders. Total Cost: $1,768.00 Days Added: 1 4. Retaining Wall at 5th Street. and East Coast Drive: Retaining wall added td harmonize new pavement grades with existing right-of-way at 270 5th Street. Total Cost: $1,110.00 Days Added: 0 5. (and 6J Optional Base and 1'/a" Asphalt: Additional pavement repair East Coast Drive and 11th Street, 5th St. and Sherry Drive, and 8th Street and Sherry Drive. Direct costs shown are extended fromunit prices established in the bid documents. Total Cost: $1,889.40 .Days Added: 1 7. Sod Overrun: The contract Plans contemplated a 2' replacement strip along each reconstructed roadway. In many locations, additional regrading was required due to the change in grades associated with the reconstructed roadways. Additional sod was required td restore these disturbed areas. These quantities are an accumulation of minor modifications that have occurred from the beginning of the project. Direct costs shown are extended from unit prices established in the bid documents. Total Cost: $18,009.00 Days Added: 0 AGENDA ITEM #8B JULY 28, 2003 Atlantic Beach Core City Improvements Project Petticoat Contracting, Ina Change Order #9 Summary Item Description Qty Unit Price Extension Days 1 Conflict Manhole at 3rd St 2 EA $3,608.00 $7,216.00 1 2* Additional Driveways (Rem & Repi) 139 SY $50.00 $6,950.00 1 3* Additional Curb (Rem & Repi) 104 LF $17.00 $1,768.00 1 4 Retaining Wall at 5th & East Coast 1 LS $1,100.00 $1,100.00 5* Opdoaal Base 141 SY $9.40 $1,325.40 1 6* 1-1/4"Asphalt 1415Y $4.00 $564.00 7* Additional Sod 3335 SY $5.40 $18,009.00 Time Credit for Water Main Ezteasion -2 * Based on Original Contract Item .Subtotal: $36,932.40 General Conditions and Bond on Original Items at 12.8%: $3,662.90 Total: .$40,595.30 2 AGENDA ITEM #8B JULY 28, 2003 Sod Quantity Overrun Sod (SY) Location Placed Seminole Road- 9th to 11th 1479 Seminole Road- Plaza to 9th 708 East Coast-10th to 7th 293 7th Street 552 8th Street 426 9th Street .620 Plaza 1426 10th Street 1033 11th Street 1233 11th Street(West of Seminole) 811 12th Street 3454 Total Placed to date 12035 Total Original Plan Quantity 8700 Overrun to Date 3335 AGENDA ITEM #SB JULY 28, 2003 Driveway Quantity Location 9th Street 11th Street 490 Sherry Drive 393 Plaza Baffle Box additions Total Driveway Additions Additional Curb 5th Street Baffle Box 5th Realignment 490 Sherry Drive. 393 Plaza Total Curb Additions Plan Actual Quanti Quanti Overrun 474 538 64 267 289 22 0 32 32 0 3 3 0 18 18 139 0 31 31 0 42 42 0 17 17 0 t4 14 104