Exh 4BAGENDA ITEM #4B AUGUST 25, 2003 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Town Center -Phase III SUBMITTED BY: Robert S. Kosoy, P.E. Director of Public Works DATE: August 14, 2003 BACKGROUND: In 2001, the second phase of Town Center was completed and then City of Jacksonville Mayor John Delaney presided over the dedication on May 23, 2001. The first two phases were completed with the City of Jacksonville funds for design, construction and construction management. In Fiscal Year 2002-3, we budgeted $75,000 for Phase III in the Convention Development Fund with the expectation of funding from the City of Jacksonville for a part of the project. Unfortunately, we were not able to obtain the City of Jacksonviile's commitment for funding and prepared a package in-house, updating the original plans and preparing specifications in-house. Seven potential bidders attended a mandatory prebid meeting on July 17, 2003 and bids were opened on August 6, 2003. The three bids received were: 1. Petticoat Contracting, Inc. $135,030.70 2. R&B Contracting, Inc. $156,710.50 3. Walding Company $126,845.00 RECOMMENDATION: Award the contract to Walding Company for $126,845.00. If a medjool palm is desired at the corner of Ocean Blvd. and Ahem Street, an additional $4,500 should be added. BUDGET: $75,000 is budgeted in the Convention Development Tax Fund, and the balance, $51,845.00 (or $56,345.00), can be funded from the %2 cent sales tax fund. ATTACHMENT: Bid Analysis REVIEWED BY CITY MANAGER: BID ANALYSIS -- TOWN CENTER -- PHASE III __- - - - ...-- - _ _ - ~ __ ~ - r --- -T_ ~_ _ BASE BID ITEMS QTY. a UNITS Petticoat Contracting -- - . - - -- R&B Contracting - Walding Co. 1 Ma_intenanc_e_of Traffic --- 2. Site Work 1 1 LS - LS $7,465 OO $20,000 00 i $7 465.00 - -- $20 000.00 $8,075 00 $21,167.00 $8,075.00 - $21,167.00 $3,000.00 $18 586.00 _ _ $3 000.00 $18,586.00 3. Remove & Dispose Asphalt Pavement & BA -- 952 - SY $12 75 -- $12,138.00 $13.00 $12,376.00 $4.00 - $3,808.00 4. Remove & Dispose Concrete WaIkslDrive 53 SY $12 00 ___ $636.00 $5.00 $265.00 - $10.00 - $530.00 5. Remove & Dispose Header Curb ------- 40__ LF $6.00 _ _ $240.00 $4.50 - $180.00 -- $10.00 $400.00 6. Sawcut 2" Asphalt -- - 150 - LF $1.50 $225.00 $4.00 - $600.00 $3.00 _ $450.00 7. Sawcut 4' Concrete 40 LF - $3.00 -- $120.00 _ - $7.00 $280.00 __ $5.00 __ $200.00 8. Transplant Palms - --- -- 16 EA - $325.00 $5,200.00 - $250.00 $4,000.00 $250.00 $ 4,000.00 9. Salvage Metal Post/Sign _ 4 EA $45.00 - $180.00 - $50.00 - $200.00 $75.00 _ $300.00 10. Salvage Wood Post/Sign __ 1 EA _ $65.00 _ $65.00 $50.00 -. ___ $50.00 $75.00 $75.00 11. Raise, Adjust: MH, WM, WV, Etc. Covers - - ~ 4 - _ EA $335.00 $1,340.00 $500.00 - _ $2,000.00 $250.00 _ $1,000.00 12. Asphaltic Pavement & Ba s e 1380, SY _ $17.00 $23,460.00 $26.50 $36,570.00 -- $19.65 - $27,117.00 _ _ _ 13. Concrete Curb & Gutter _ _ _ _ _ _ 396 _ LF $16.00 $6,336.00 $14.75 _ $5,841.00 _ $12.50 $4,950.00 14. Parking Stripes -Paint _ 410 LF $0.50 $205.00 $1.00 $410.00 _ $0.60 $246.00 15. Crosswalk Stripes - Paint_ _ 160 LF _ $2.00 _ $320.00 $3.00 $480.00 __ $1.70 $272.00 16. Centerline/Lane Stripes Markings. (Paint) 300 LF $0.50 $150.00 $1.00 _ _ $300.00 _ _ $0.75 $225.00 17. Type"C"Inlet - --- 2 - EA $1,849.00 $3,698.00 $1,125.00 _ $2,250.00 -- _ $ 1,200.00 $2,400.00 18. 10" Ductile Iron Pipe _ --- 282 LF $33.00 $9,306.00 _$24.00 _ $6,768.00 _ _ $35.00 $9,870.00 19. 3" PVC Irtigation Sleeves __ 120 LF $3.00 - $360.00 $3.75 $450.00 --- $7.00 $840.00 20. Concrete Walks w/Handicap Ramps 21. Indian Hawthorne 174 - 187 SY EA $31.00 - _ $10.50 $5,394.00 $1,963.50 $38.50 - $14 00 $6,699.00 -- $2 618.00 - - $29.00 $11.00 _ $5,046.00 $2,057.00 22. Lantana 346 EA $5.25 $1,816.50 $600 $2076.00 __ $5.50 $1,903.00 23. Provide and Install Sabal Palmetto 35 EA $300.00 $10,500.00 $250 00 $8,750.00 $265.00 $9,275.00 24. Irrigation System 1 LS $2,400.00.00 2 400.00 $9,350.00 $9,350.00 $3,500.00 $3,500.00 25. Relocate Existing Fire Hydrant _ 1 EA $1,150.00 $1,150.00 $2,375.00 $2,375.00 $4,000.00 $4,000.00 26. Remove Catch Basin 1 EA $250 00 $250.00 $685.00 $685.00 $750.00 $750.00 27 Convert Sewer Cleanout to Sewer Manhole -- -- -- 1 -- - LS r $2,500 00 - $2 500.00 - 4 $1 455.0t~ -- $1 455.00 _ $5 500.00 - _ __ $5,500.00 _ _ _.. _-_ -- TOTAL BASE BID _ FIFTEEN PERCENT CONTINGENCY -- TOTAL BASE BID PLUS CONTINGENCY -~ 0.15 -- _ $117,418.00 $17,612.70 $135,030.70 - _ _ t $136,270.00 ~ $20,440.50 _____ $156,710.50 -.. - $11_0,300.00_ _ $16,545.00 $126,845.00 a ~~ ~~ "'7 i,,, o "~ w°~