Exh 4BAGENDA ITEM #4B
AUGUST 25, 2003
CITY OF ATLANTIC BEACH
CITY COMMISSION MEETING
STAFF REPORT
AGENDA ITEM: Town Center -Phase III
SUBMITTED BY: Robert S. Kosoy, P.E.
Director of Public Works
DATE: August 14, 2003
BACKGROUND: In 2001, the second phase of Town Center was completed and then
City of Jacksonville Mayor John Delaney presided over the
dedication on May 23, 2001. The first two phases were completed
with the City of Jacksonville funds for design, construction and
construction management.
In Fiscal Year 2002-3, we budgeted $75,000 for Phase III in the
Convention Development Fund with the expectation of funding
from the City of Jacksonville for a part of the project.
Unfortunately, we were not able to obtain the City of
Jacksonviile's commitment for funding and prepared a package
in-house, updating the original plans and preparing specifications
in-house.
Seven potential bidders attended a mandatory prebid meeting
on July 17, 2003 and bids were opened on August 6, 2003.
The three bids received were:
1. Petticoat Contracting, Inc. $135,030.70
2. R&B Contracting, Inc. $156,710.50
3. Walding Company $126,845.00
RECOMMENDATION: Award the contract to Walding Company for $126,845.00. If a
medjool palm is desired at the corner of Ocean Blvd. and Ahem
Street, an additional $4,500 should be added.
BUDGET: $75,000 is budgeted in the Convention Development Tax Fund,
and the balance, $51,845.00 (or $56,345.00), can be funded from
the %2 cent sales tax fund.
ATTACHMENT: Bid Analysis
REVIEWED BY CITY MANAGER:
BID ANALYSIS -- TOWN CENTER -- PHASE III
__- - - -
...--
-
_ _
-
~
__
~
-
r --- -T_
~_ _
BASE BID ITEMS
QTY.
a UNITS
Petticoat Contracting
-- - . - -
--
R&B Contracting -
Walding Co.
1 Ma_intenanc_e_of Traffic
---
2. Site Work
1
1
LS
-
LS
$7,465 OO
$20,000 00
i $7 465.00
- --
$20 000.00
$8,075 00
$21,167.00
$8,075.00
-
$21,167.00
$3,000.00
$18 586.00 _ _
$3 000.00
$18,586.00
3. Remove & Dispose Asphalt Pavement & BA
-- 952
- SY $12 75
-- $12,138.00 $13.00 $12,376.00 $4.00
- $3,808.00
4. Remove & Dispose Concrete WaIkslDrive
53
SY
$12 00
___ $636.00
$5.00
$265.00 -
$10.00 -
$530.00
5. Remove & Dispose Header Curb
------- 40__ LF $6.00 _ _ $240.00 $4.50
- $180.00
-- $10.00 $400.00
6. Sawcut 2" Asphalt
-- -
150
-
LF
$1.50
$225.00
$4.00 -
$600.00
$3.00 _
$450.00
7. Sawcut 4' Concrete
40
LF -
$3.00 --
$120.00 _
-
$7.00
$280.00 __
$5.00 __
$200.00
8. Transplant Palms
- --- -- 16 EA
- $325.00 $5,200.00
- $250.00 $4,000.00 $250.00 $
4,000.00
9. Salvage Metal Post/Sign _ 4 EA $45.00
- $180.00
- $50.00
- $200.00 $75.00 _
$300.00
10. Salvage Wood Post/Sign __
1
EA
_ $65.00
_ $65.00
$50.00 -.
___
$50.00
$75.00
$75.00
11. Raise, Adjust: MH, WM, WV, Etc. Covers
- - ~ 4
- _ EA $335.00 $1,340.00 $500.00
- _
$2,000.00 $250.00 _
$1,000.00
12. Asphaltic Pavement & Ba
s
e
1380,
SY
_ $17.00
$23,460.00
$26.50
$36,570.00 --
$19.65 -
$27,117.00
_
_
_
13. Concrete Curb & Gutter _ _ _ _ _ _ 396 _ LF $16.00 $6,336.00 $14.75 _ $5,841.00 _
$12.50 $4,950.00
14. Parking Stripes -Paint _ 410 LF $0.50 $205.00 $1.00 $410.00 _
$0.60 $246.00
15. Crosswalk Stripes - Paint_ _ 160 LF _ $2.00 _ $320.00 $3.00 $480.00 __
$1.70 $272.00
16. Centerline/Lane Stripes Markings. (Paint) 300 LF $0.50 $150.00 $1.00
_ _
$300.00
_ _
$0.75 $225.00
17. Type"C"Inlet
- ---
2
-
EA
$1,849.00
$3,698.00
$1,125.00 _
$2,250.00
-- _
$
1,200.00
$2,400.00
18. 10" Ductile Iron Pipe _
--- 282 LF $33.00 $9,306.00 _$24.00 _ $6,768.00 _
_ $35.00 $9,870.00
19. 3" PVC Irtigation Sleeves
__ 120 LF $3.00
- $360.00 $3.75 $450.00
--- $7.00 $840.00
20. Concrete Walks w/Handicap Ramps
21. Indian Hawthorne
174
-
187
SY
EA
$31.00
-
_ $10.50
$5,394.00
$1,963.50
$38.50
-
$14 00
$6,699.00
--
$2 618.00
- -
$29.00
$11.00 _
$5,046.00
$2,057.00
22. Lantana
346
EA
$5.25
$1,816.50
$600
$2076.00 __
$5.50
$1,903.00
23. Provide and Install Sabal Palmetto 35 EA $300.00 $10,500.00 $250 00 $8,750.00 $265.00 $9,275.00
24. Irrigation System 1 LS $2,400.00.00 2 400.00 $9,350.00 $9,350.00 $3,500.00 $3,500.00
25. Relocate Existing Fire Hydrant _ 1 EA $1,150.00 $1,150.00 $2,375.00 $2,375.00 $4,000.00 $4,000.00
26. Remove Catch Basin 1 EA $250 00 $250.00 $685.00 $685.00 $750.00 $750.00
27 Convert Sewer Cleanout to Sewer Manhole
-- -- --
1
--
-
LS
r
$2,500 00
-
$2 500.00
- 4
$1 455.0t~
--
$1 455.00
_
$5 500.00
- _ __
$5,500.00
_ _ _..
_-_ --
TOTAL BASE BID _
FIFTEEN PERCENT CONTINGENCY
--
TOTAL BASE BID PLUS CONTINGENCY
-~
0.15
--
_
$117,418.00
$17,612.70
$135,030.70 -
_ _ t $136,270.00
~ $20,440.50
_____
$156,710.50 -.. -
$11_0,300.00_
_
$16,545.00
$126,845.00
a
~~
~~
"'7 i,,,
o "~