Exh 4CAGENDA ITEM #4C SEPTEMBER 22, 2003 ,' CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT .AGENDA ITEM: Wellfield Improvements at Well Nos. 2 and SN Bid No. 0203-17 .SUBMITTED BY:, Donna Kaluzniak, CEP, Utility Director DATE: September I2, 2003 BACKGROUND: This project' includes the backplugging of Well No. 2 (1100 Sandpiper- -Lane) as required by the St. Johns-River Water Management District, and the rehabilitation and upgrade of Well No. 5N (902 Assisi Lane). Project plans and specifications were developed by CH2M Hill. Five bidders were prequalified and attended the mandatory pre-bid meeting. Four .bids were received on September. l0, 2003: Description Integrity Well & Layne- Rowe.Drilling VV. Earl Pump' Christensen.. Company. Floyd & Sons Com an ,Inc. Backplug Well:. $3.1,800.00 $87,064.0 . $33,SSQ.00 $25,200.00 #2 0' Upgrade Well $22,000.00. No Bid $22,864.00 $15,000.00 SN Subtotal $53,800.00 $87,064.00 $56,414.00 $40,200.00 10% $5,380.00 $8,706.40 $5,641.40 $4,024.00 Contin enc Total -$59,180.00 $95,770.40 $62,055.40 $44,220.00 The contractor with the lowest bid meeting all specifications was W. Earl Floyd & Sons, in the amount of $44,220. BUDGET:... A total of $350,006 is budgeted for well improvements in the Water Production Fund under account no. 400-5502-533-6300...-This amount included engineering fees,. which have: already been encumbered, and monies to completely replace Well No. 2. Because -the SJRWMD is allowing us to backplug Well No. 2 instead of replacing. it, the cost is considerably lower than the budgeted .amount. RECOMMENDATION: Award the bid for Well Field Improvements at Well Nos. 2 and SN to W. Earl Floyd & Sons in the amount of $44,220. ATTACHMENTS: 1. Bid tabulation form 2. Award Recommendation from CH2M Hill 1 _ _ l _ , ~ _ __ - ----___ _ I ~ I I Required Documents Integrity Well- 8- Pump. A.C: Schultes of FL Layne-Christensen Com an , )nc. Rowe Drilling Com an W. Earl Floyd & Sons ~ Bid Bond in the Amount of 5% X X X X Ori final Insurance Certificate X X X X Submission in Tri licate X X X X Com leted W-9 Form X- X X X Si ned Co of Document Re uirements Checklist X X X X Sworn Statement on Public Entit Crimes X X X X Dru Free Work lace Certification X X - X X Documentation of Recei t of An Addenda X X X X 1. Furnish all Labor,. E ui merit and Mateirals to Back lu a otable 1&" Well Well #2 $31,800.00 $87,064.00 $33,550.00 $25,200.00 2. Provide Mechanical U Pades to Well No. 5N, a 12" X 18" Well, as Detailed in the S ecificatiQns $22,000.00 No bid submitted $22,864.00 $15,004.00 TOTAL BASE BID- Items 1 and 2 $53,800.00 $87,064.00 $56,414.00 $40,200.00 TEN PERCENT - 10% CONTINGENCY $5,380.00 $8,706.40 $5,641.40 $4,020.00 TL}TAL BASE BID Items 1 and 2 PLUS 10% CONTINGENCY- $69,180.00 $95,770.40 $62,055.40 $44,220.00 09L12I2003 10:00 -904-733-2808 CH2M HILL AGENDA ITEM #4C -~ SEPTEMBER 22, 2003 e}i2M MILL 8428 Baymasdow~ Poad. SUitO ?_00 ' J~+Cksanvith, FL32286 CH~~VIHILL ; .September 12, 2003 Donna Ka]uzniak, CEP Utility Director.:: City of Atlantic I3eaeh- 1200 Sahd~ipex Lane Atlantic BEach, Florida 32233-~3f8 RE: VVellfield Improvements at Wells Nos. 2 & SN CH2 L Pmject Number 181S81.ABA2 Award Recommendation - Cyty did No. 0203-17 Dear Dotazia: Four bids were received by the City of Atlantic Beach fax the cgnstruction of `the subject project on September 10, 2003. We have reviewed: each. of the, :four bid packages submitted and alI bids have been checked, verified- and evaluated. for conformance with the criteria set forth in the bidding documents.' The bid. subzrtined by Layne-Christensen Company, inc. was not. completed properly az~d resulted iza only a partial bid price. The cost O~f the items included in their partial. bid exceeded all of the other bids however. The lowest responsive responsible bidder fvxthe bid is W. Earl Floyd & Svns with. a Total Bid Prig of $44,220.00. W. E~ir.1 Floyd & Sons has perfo,rtned similar projects far numerous clients in the 'eater Jacksonville ~,nca .and have-been given- very positive evaluations with regard to their work quality, personnel, safety record acid change order history. We would tltGrefore recommend thatthe City. of Atlantic Feach award the subject project to W,1/arl Floyd & Sons far the Total Bid. in the amount of $44,220.00. pur..firna is pleased to support the City of Atlantic. $each with their implementation of this iz~nportant improvez~t}ent to the City" water system and we are ready to assist with the constructiaxi phase of the project once the award is made. Please call me at 733-119 if You have. any questions or. if we cats facilitate the award process in any way, "Sincerely, W>l1~am K. Powe ], A~. Constntetioi~.1`vlan alter cc: Mile Dykes, P.E. - Cl;i2N~ttI1-Project Manager Project Fiie I I ~ I'