Loading...
Exh 4GAGENDA ITElVi.. #4G SEPTEMBER22; 2003 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM; Influent Screen at Wastewater Plant #2 SUBMITTED BY: Donna Kaluzniak CEP, Utili Directo DATE:: September 11, .2003 BACKGROUND: The existing preliminary treatment units for influent to Wastewater Plant #2 (739 Wonderwood Road) are insufficient, allowing debris to enter the plant that can build up in tanks and damage .the mechanical equipment.. Staff budgeted. to rehabilitate one existing Andritz Hydrasieve screening unit and purchase a second matching Hydrasieve to install at the plant. influent structure. These screens. are double-sided stainless steel sieve-type units to remove eery small particles of grit and debris (0.060 inches).. Staff requested a price to purchase the new unit directly from the manufacturer;. This is a sole source item, as it must match the existing unit, and'the cost is $24,920. Because this was a sole source item; staff obtained prices for a similar type of sieve screen unit from. two other manufacturers. These units are a.ll proprietary, sole source, designs, so are not exactly the satxze, but are very similar to the unut we' are asking to purchase. A screen-from Merit Co. (if double. sided like this Hydrasieve) would cost $31,300, and from. Karon Equipment is $31,020,.. BUDGET: ' Staffbudgeted $50,000 for static screens for °the influent structure in the Sewer Treatment Fund under account no. 410-5508-535-6300. RECOMMENDATION: Authorize staffto purchase the Andritz Hydrasieve screening unit .from Andritz-Ruthner, Inc. in the amount of $24,920. ATTACHMENTS: 1. Quote from Andritz Hydrasieve, with description REVIEWED BY CITY MANAGE I . ,. - _- ~ u ~I ' ~ ~~ -ITEM QTY. DESCRIPTIQN 1. One (~) HYDRASII~VE° 552-6-M2" ~ ~~ Andritz-Ruthner; tnc. Hydrasieve Modef 552-6-M2" with two {2) 72" inch Marvel® Screens that have an opening of 0.060".. The modular Nydrasieve will consist of: a screen frame with a single inlet, a single slotted outlet, a drain connection,. influent distribution. chamber, and. pivoting:screen:panels with three {3) distinct slopes. All componentswili be 316 stainless steel The static screens will<be designed and': built to withstand rnaximurn possible static and- hydraulic forces exerted by the liquid.. All structural and functional parts will be sized for the loads encountered during. the screening operations. The frame will be constructed of 3T6 stainless,steel material The side panels will :support the screen, head-box and effluent hopper. The side panels will be flanged and wiil.have predriUed mounting holes. Each modular unit has a common built-in deep head-box with a 16-inch'O.D. influent with plain end inlet, end a 14" x 72" slotted effluent, bottom discharge. The influent pipe wll be constructed of 316 stainless steel Longitudinal seams wild be welded continuous inside and out, with external welds ground flush. Each side frame panek will be fitted with iwo 6-inch-diameter:holes to serve as an .observation port ahd as access to the screen panel pivot. The frame will inc}ude eight {8) 316. stainless steel rods, ?inch in diameter, with threaded ends. The rods will be positioned and utilized to pull,the side panel tight against the screen. Rods wilt be assembled the frame with ? -16 NC nuts. and jam nuts on each end.. The modular unit wiH have a single integral influent distribution chamber constructed of 31$ stainless steel. The chamber will receive the incoming #low and evenly distribute the flow to each weir. Each discharge weir will be the full width of the frame, having swell- - radiused crown with. a 14inch long screen approach apron. The influent chamber will have a 3-inch NPT drain, 316 staiMess steel, and a PVC pipe plug for periodic draining of the head-box. .Page 1 of 4 WSS-2707 City of Atlanta beach September 10, 2003 I' I I AGENDA ITEM #4G ..SEPTEMBER 22, 2.003 ENVIRONMENT ANDPROCESS?ECHN~LOGIES After final weld and weld: clean up, the frame wiB be mediabtasted to a satin finish. The entire exterior surface, including the. inlet connection,"will be mediablasted. The interior surface of the side panels, above the screen line, will be mediablasted. A fully hinged flow dstribution baffe exkending the full width of the weir will be furnished for each screen. The baffle will be constructed of 16 gauge, 316 stainless. steel. Thebaffles will be accurately positioned and.located so that the con#oured extension lip is paraUet with the weir approach apron. The baffles (vane deflectors} will distribute the influent over the width of the screens after it has flowed over the Weir. The screen. elements will be a single panel following the contour of 25-35-45-degrees to the vertical and positioned in the frame in the direction of the slurry flow.. The screen panels will be constructed of 31S stainless steel transverse bars having a triangular cross section and a 36Q degree looped attachmerrt of each bar to the longitudinal '/ inch diameter support .rods. The stainless steel support rods will be on 2a/a-inch centers and be constructed of 316 stainless'steel. Top and bottom of screen panel will be reinforced with minimum ?inch by 1-inch bars running full width of screen panel. Each longitudinal support rod will be welded #o topand bottom reinforcing bar. Bottom of'screen panel will have minimum 1O gauge by 2-718 inch wide sheet running full width of screen panel, to serve as solidsdischarge lip: The solids discharge- lip will be welded continuous to bottom reinforcing bar. Topside (screen. surface] weld will be ground smooth.. The wedge wire screen panel wiN be pivot-mounted at the center, on the horizontal axis, to allow for inspection -and cleaning the backside of the screen panel. Backside of screen panel will be ....adequately reinforced to allow screen pivot wi}bout sagging, bending or deflection of screen during cleaning or operation of unit. The above unit: has no moving parts, and requires neitherelectrical nor mechanical hook-up. Andritz-Ruthner, Encs warrants to buyer thaf the screen frame and screen: panel will be delivered free from defects irr material and. workmanship."This warranty will.. commence upon delivery of the products and will expire on tho earlier to occur of five (5} years frtan initial operation of the products or five ~5), years from delivery thereof ' (the "Warranty Period"). Initial operation will be deemed to take place when the ,products are first used in production or, if applicable, when the products pass or are :deemed to pass a performance test, whichever comes first. The environment or ma#eriats the equipment may be exposed to may. be abrasive or corrosive. This ..warranty does not cover the service life of the equipment against such abrasion or COrrOSiOn. 2. hot Basic Engineering and Aocumentation 3. Lot :Freight to Jobsite P121C1~. FOB Arlington, TX ..... .................' ...................................... .................. $24,920.DO USD NOTE Th/s price proposal is based on the attached Andrifz-Ruthner, Inc.. "Standard Terms and Conditions of Sa/e' : 1Ne draw your attention to the limi~atians of liability. and exclusion of consequential damages set forth i'n paragraph.4 of these terms. Agreement to such limtatfons and exclusions is a requirement of our doing business and this proposal is made on the ' assumption that you will so agree. Please read carefully. .Page 2 of 4 VUSS-2707 City of Atlanta- Beach September 10, 2003 . ~.r~ ~; - ., , _ __ AGENDA ITEM #4G SEPTEMBER.22; 2003 I. ;: ENVIRONMENT ANQ PROCESS TECHNOLOGIES: COlVI~VI~~CIAL `CONt3/T/4NS BERMS AND CONQITIONS This price proposal is based on the attached Andritz=Ruthner, inc. "Standard Terms and Conditions of Sale„_ SPECIAL INFQRMATION • Prices do not include any unloading or any applicable fees or taxes {Local, `Federal, or Final Destination} '+ Price does not include Installation or building modifications • Quotation is valid for 90 days • Unless na#ed cas# fior freight is not included TERMS OE PAYMENT 100 % Net Thirty {30) Days to customers with established- credit.. .SHUNT Approval drawings wi11 be famished one to iwo {1~-2}..weeks after receipt of purchase order. Equipment will ship six to eight (6-$} weeks after return of approval drawings. and/or release for fabrication.- ACCESSORIES This. proposal includes.only those items specificalty mentioned in the. equipment descriptions. Any items that. may be necessary far. the .operation of .the equipment, but are not pecificaliy mentioned. such as motprs, drives, controls, pr equipment supports, are to be supplied by others. ABRASION OR CAUSTIC MATERIALS The environment or materials the equipment may be exposed to may be abrasive or corrosive. This Rroposal makes no representations ar warranties concerning the service life of the ..equipment against such abrasion orccxrosian. - PURCHASE ORDERS Ali purchase orders will. be faxed or mailed to: Andr~tz- Ruthner, -Inc. 1:010. CommerGal Blvd:, South Arlington, Texas 76001 Phone: 817/ 455-561.1 Fax: 817/ 468-3961 Attn.: Dave Cromer or John Htaghes All purchase offers (orders} are subject to acceptance at our headquarters in Arlington, Texas. WA..~ R+~NTY Andritz shad provide a five (5) year standard warranty EXCLUSIONS Financing • Cranes or lifting devices • Unloading and/or storage of equipment at jobsite Page 3 of 4 WSS 27Q7 CiEy of ABanta' Beach September 10, 20tl3 ~~ I i, ii AGENDA ITEM #4G - SEPTEMBER 22, 2003 ENVIRONMENT AND. PROGESS7EGHNOLOGIES • Local, state or federal taxes or fees- • Foundation design and engineering (Andritz wiH furnish equipment'drawingssnd data) • Utiliftes for erection and operation • Gauges .and. instrumentation not specifically mentioned" in our scope of supply • Interconnecting. wiring; conduit, piping, tubing, valves,. etc., between filter, control panel, and upstream or downstream equipment ENGINEERING , Following are the major engineering services provided by Andritz with this. contract: ^ General arrangement drawings. of equipment. supplied by Andritz designed. for installation ^ Machine outline drawings, complete with piping and wiring requirements ^ Electrical and:. pneumatic- panel and wiring drawings, if provided by Andritz Operating and maintenance manuals, including spare parts lists ^ Motor and -drive list ^ Sequence of operation. PR4~ECT MANAGEMENT Andritz will appoint a Project Manager for- the .duration of the contract:. Project Management services are included in this package and are as follows ^ Production of a complete critical path projec# schedule for Andritz equipment ^ Coordinate with the. customer's Engineering and Andritz Engineering. on system. design :and drawing schedule commitments ^ Coordinate with-manufacturing on material procurement and construction to ensure Andritz commitments are maintained. ERECTION,TRAINING, AND START-UP ASSISTANCE Andritz will provide erection and start-up supervision for which the purchaser shall pay $650'.00 per day (USD) plus expenses, for eight (8) hours per day. ^ At the request of the purchaser, overtime service will be provided at a rate of 1.5 times the quoted rates. for weekdays; 2.0 times the. quoted rate for weekends. • Expenses are defined as the cost_of travel from Seller's plant to the 'point- of installation and return, together with all living expenses during the period of service.. ^ .The above charges shall be made for .time involved, including delays that are beyond the Seller's control. EQUIPMENT STANDARD Any deviations from the Andritz standard mechanical and electrical specification, which are not the owner's preference, must be further. discussed, Refer to the Andrifiz standard specifications .enclosed. - Page 4 of 4 - wsS-2707 City of Atlanta Beach September 10, 2003 -_-- _ _ _ -----~ l~ l_ ~ P,