Loading...
0 11TH ST - FIRE FLOW TEST O 1 v 0o .� Gindlesperger,Toni From: Jim Lucas <jmlgator@bellsouth.net> ICX Sent: Wednesday, October 03, 2018 9:58 AM To: Gindlesperger,Toni Cc: Pittman, Bill Subject: Selva2 Attachments: KM BT20020181002042040.pdf Toni, Attached is the fire flow test that was done within the year and the calculations for the fire protection. This information was submitted for the original set of plans approved by the fire marshal and the City. Since nothing has changed with the fire system, the calculations are the same. Let us know if you need any additional information. to.Dl9-04 iq January 4,2018 James M. Lucas, PE. J. Lucas&Associates Inc. 1305 Cedar Street Jacksonville, Florida 32207 RE: Fire Flow Tests on 11th St. Water Main for Selva Preserve Dear Mr.Lucas: The City performed a flow test on the fire hydrant at 11`h St.and Linkside Dr. with the following results: Location: 1lth Street and Linkside Drive Test Date/Time: 10/2/17 11:24 AM Static Pressure: 51 psi Residual Pressure: 44 psi Test Flow Rate: 1,100 gpm Estimated Flow @ 20 psi: 2,456 Tested by: Chris Walker, Division Director The above estimated flow at 20 psi are based on NFPA section 291,AWWA M-17. Should you need additional information,please call me at(904)247-5874 or email me at kmoore@coab.us. Sincerely, �� fit'• �cr�. Kayle Moore,PE Deputy Public Works Director cc: Chris Walker, Division Director Public Works Department 1200 Sandpiper Lane Atlantic Beach, FL 32233 (904) 247-5834 NUMBER: 1413 J. LUCAS&ASSOCIATES,INC. PROJECT SELVA PRESERVE 1/4/2018 WATERMAIN ANALYSIS STATIC RESIDUAL FLOW PITOT TEST STAT-TP STAT-RES SORT CALC. READING READING READING READING PRESS. FLOW 51 44 1100 42.49108 20 31 7 2.1044 2315 51 44 1100 42.49108 45.2 5.8 7 0.9091 1000 51 44 1100 42.49108 50.0 1.0 7 0.3780 416 51 44 1100 42.49108 48.0 3.0 7 0.6547 720 51 44 1100 42.49108 46.0 5.0 7 0.8452 930 51 44 1100 42.49108 45.0 6.0 7 0.9258 1018 EXISTING STATIC PRESSURE 51 LOCATION OF FIRE HYDRANT: TEST HYDRANT: 11TH ST& EXISTING RESIDUAL PRES. = 44 (AT HYDRANT) LINKSIDE DRIVE RESIDUAL HYDRANT: CALCULATED FLOW = 1100 GPM 1100 PITOT READING = 42.49108 PSI TEST: 10/2/2017 REQUIRED FIRE FLOW = 1000 GPM NO. OF PORTS 1 Q =750 GPM Q = 1000 GPM Q= 1500 GPM C = 130 C= 130 C= 130 HL (6') = 43.6 '/1000 70 '/1000 157 '11000 HL (8') = 10.75 11000 18 11000 38.7 '/1000 HL (10")= 3.6 '/1000 6 11000 13 11000 HL (12")= 1.49 '/1000 2.5 '/1000 5.41 11000 HL (16")= 0.37 11000 0.61 11000 1.33 '/1000 HL (20")= 0.12 '/1001 0.2 '11000 0.5, ,( „ , HEAD LOSS FROM TEST HYDRANT TO FIRE CONNECTION ,����� ..M•.... 0,--.. LENGTH OF PIPE DIAMETER OF PIPE HEADLOSS �``,,��'� NSA~•.•'�0 i NO.1 : 70 53 6 3.71 FT . * 666 8 11.99 FT . STA '.i a,0 10 0.00 FT ': � .•4Q1 0 12 0.00 FT O,((c•'••.i.,..IQ.P,.•'�, 0 16 0.00 FT s`.s�''NAL�N \. 0 20 0.00 FT ''•lanm„1«rt:,, TOTAL HEAD LOSS 15.70 FT 6.80 PSI RESIDUAL AT HYDRANT AT FIRE FLOW 45.2 PSI NET RESIDUAL AT END OF PIPE 38.42 PSI SYSTEM MEETS FIRE FLOW REQUIREMENTS