4APUBLIC WORKS and UTILITY DEPARTMENTS
PROJECT STATUS REPORT
(D) =DESIGN ENGINEER, (CE&I) =CONSTRUCTION ENGINEER, (C) =-CONTRACTOR
PROJECT DESCRIPTION PROJECT NO. ANDINFORMATION STATUS ON 1016/03
1 Core City Stormwater Project CORE99 Sherry Drive -Final Payment approved on 0$/01/02.
Preliminary Redesign =100% complete
Sherry Drive Design = 100% complete (D) = Original by England, Thims Rc Miller
Revised Preliminar Desi n b The
y g y -
Core City- Contractor started on 07/15/02 and completed permanent weir at Fleet
`"
"
Sherry Drive.Constr•uction =100% -
R-A-M Professional Group Landing and installed baffle boxes on Pine Street, 5
and T
at Shenry Drive.
Installed new water lines on Ahern
2nd 4'" toT"
10'"
11'" and 12'"Streets
Plaza
com late
p °
Overall Redesign = 100% complete Re•Design by Aikenhead & Odom
(C)= .Callaway Contracting, Inc: ,
,
,
,
and East Coast Drive (between 10'" and Ahern). Storm drainage completed on la`
through 12 Streets. New sanitary sewer line installed on 11'"and12'" Suee[
Paved
Downstream pesign =100% complete
° (for Sherry Drive)
Petticoat Contracting (far Core City) .
,n m
Ahern through 12 Streets, andEast Coast from Ahern to 10 , And flnfll COAL feY
Core City Construction = 100/ complete
(except puncGlist Items)
: - (CE&I) =Public Works (for Sherry Drive) Sherry Drive.
. GAT Consulting (for Core City)
2 Buccaneer Wastewater Treatment Plant (D) =Gannett Fleming CiTy of Jacksonville permit received 04101/03: Change Order No. 1 approved by City
Redesignofsludge facility. =100% complete (C) =Gruhn May, Ina Commission 04/28/03. Notice [o Proceed revised to 04/28/03. Tank constructed,
Constre{coon =g5% complete (CE&1) _ Gannett Fleming and Public Works drainagesystem started, underground piping constructed. Concrete for container
area, etacomplete. Roadway construction started.
3 Mayport Flyover Plaza Bump (D) =.Hessen[, Hammack & Rnekman (BHR) J.A. Jones advised that JTA has funding in place and preconstruetion conference held
Design = 100% complete ' (C) = Construction & Electrical Specialists on for 01/10/03. Utility conference on 02/03!03. Contractor has realigned ] 0" water
Construction = 100% complete (CE&I) = J.A. Tones- line, paved roadand eliminated bump. Area of standing water remains to be
corrected: Project meeting held on05/06/03. Additional striping completed to
improve traffic flow across Mayport Road.
4 Mayport Jr. Enlisted Men Family Housing - (D) = Prosser Hallock - : Storm drainage is complete. Constmction of sanitary sewer is 100% complete,with
100 Units - (C) = Picerne Military Housing the exception of the lift station and wetwelL-0onstruction of water is 100% complete:
Design = 100% complete (CE&1) = Prosser`Hallock & Navy Overall project is 95%complete. Received call from engineer on 06/28/02 that a
-L~ Station Design = 100% complete _ new ]il) statiorrwill need to be constructed. Lift station re-design complete: DEP
Construction = 99%complete permit received.Forcemoin completed. Lift station constmction underway, about
80%complete.
S. Hopkins Creek Regional Retention (D) =Camp, Dresser & McKee (CllM) ; - Commission authorized negotiation on 04/28(03 with. CDM for Hopkins Creek
Facility design and approved conn~act for preliminary design report on-06/23/03. Designer
Design = 25% complete - working on two conceptual plans for 1.7 acre retention pond. Me[ with. Sunrise
Construction = 0%complete Church on.8/24/03 regarding sale of property. Attempting to obtain two
commercial appraisals.
Od
~ ~
,~ H
~' hl
w
N
O ~..
W
PUBLIC WORKS and UTILITY'DEPARTMENTS
PROJECT STATUS REPORT
(D)=DESTGNENGINEER,(CE&I)-CONSTRUCTION ENGINEER,(C)=CONTRACTOR
PROJECT DESCRDTTION PROJECT NO. AND INFORMATION STATUS ON 10/6/03
6 SCADA System DesignBuild (D) = Conhol Design, Inc. Precoastruction meeting held on 09/04/02. Computer equipment ordered and
Design =100% complete - (C) =Control Design, Ina received by 09/25/02. Most hardware has been received. Designing control screens;
Programming.& Construction =100% (CE&I) =Public Utilities and programnwtg logic. Installation of antenna bases completed. Commission
complete, authorized Change Order #1 to upgrade radios on 01/27/03. Vendor performed radio
survey on facilities. Meeting with contractors held on 03/26/03 to discuss revised
scope: Contractor replaced antenna bases and structures,progrmnmed PLCs,
- Towers, antennas and radios installed, WP #1, #2 & #3 on lhre. Debugging W WTP:
#1 & #2.. Improved connectivity [o network approved at the 91&/03 Commission
Meeting. Equipment being installed..
7 Cooperative Beaches Utility Plan (D) =Stone, Joca & Mahoney Commission awarded contractto SJM on 11/11/02. Jacksonville Beach authorized
.Design = 70%complete reimbursement on 11/18/02. Neptune Beach authorized on 12/03/02. Kick off
- - meeting held on 12/13/02: Consultants working on modeling and review of meter
readingPoilling information. Consultants met with Finance and Meter Reading staff
on 04/29/03. Consultants received' additional information needed for model from .
- Jacksonville Beach on 05/23/03. Requested additional operations information on
06/24/03: Draft Plan received 9/10103, under review, additional information :
provided. -
8 .Navy Privatization (D).=Gannett Fleming, Inc... Commission awarded contract 12/9/02. Kickoffmeeting 12/20/02.
Design = 100%complete Assembling data for consultant, Workshops held 02/24/03 and 03/24/03.
Draft technical proposal submitted for review 02/20/03. Consultant met with
staffand City Attorney on 04/24/03 to draft contract section. Submittal of
final proposal (Volume I & II) authorized by Commission on 06/09/03.
Submitted on 06/19/03. Received financial capability questionnaire on
07/28/03.
9 Relocation of Elevated Tank for Water (D) = HGTI Request for Proposals advertised 09/29/02. Technical proposals received on
Plant 2 (C) = Gmhn May, Inc. 10/23/02.. Bids received 10/30/02. Allbids rejected on 11/11/02. Pre-bid
Design =100% complete (CB&I) =Public Works
meeting held on 02/12/03. Bids received 02/26/03.: City Commission
Construction =35%complete awarded contract on 03/10/03. Demolition pm•mit received and cohtractor
began dismantling tank on 04/01/03. Tank dismantled, and has been
transported to Water Plant #2. DEP permiYreceived 7/16/03. Contractor
pouring foundation. Completed repairs to columns and balcony,
OZ
~ ~'
'~ H
~. ~
w
' N N
O qk
- O A
W '~
PUBLIC WORKS and UTILITY DEPARTMENTS
'PROJECT STATUS REPORT
(D) =DESIGN ENGINEER, (CE&I) = CONSTRUCTION ENGINEER,:(C)=CONTRACTOR ;
PROJECT DESCRD'TION. PROJECT NO. AND INFORMATION STATUS ON.10/6/03
10 Ocean Blvd. Water Main Replacement (D) =Public Works Survey complete. Design 100% complete, with drainage lmeinchided for Adele
Design = 100%complete (C) =Miranda Contracting, Inc. ' Grage Community Center. Pre-Bid meeting held on 11./19/02. Bids received
Constracdion = 98%complete (CE&I) -Public Works 12/04/02, Awarded contract on 01/13/03. Pre-construction meeting heldon
- O (/30/03. Notlce to proceed 03/17103. Met with Petticoat on 02/19/03 to coordinate
construction schedules. Construction underway:. Completed water line from Ahern
-. to Sa' Sn~eet and encountered old brick entire way. On 04!28/03, City Commission
authorized change order for cost of brick removal. Water, stormwater andpaving
workcompleted. Contractor agreed to mill and repave'/," depth of southbound lane -
.third or fourth week of October, after Change Order work done by Petticoat.
12 2002-3 CDBG Pavingand Draining (D) =Public Works L.D. Bradley delivered survey on 02/19/03 and preliminary design completed.
(Jordan) (C) = R&B Contracting; Inc: Mandatory pre-bid held on 04/03/03 and bids received 04/10/03. Commission
Design = 100%complete- (CE&I) =Public Works awarded contract to R&B Contracting, Inc. on 04/28/03. Preconstractimi conference
°
Construction = 100%complete held on 05/22/03. Storm drainage ms[alled androadway completed. Final inspection
held on 7/29/03. Completed additional sidewalk work on Francis Ave.
13. Well Rehab &Replacement (D) = CH2M Hill Engineerbrg proposals received on 01/10/03.. Commission authorized negotiation on
Design = 95%complete (C)= W. Earl Floyd -02/10/03. Field visit with engineer 02/25/03, scope clarification meeting 02/27/03.
Construction = 0%complete (CE&I) CH2M Hpl Commission awarded contract for Phase I on 04/28/03. Met with SJRWMD to
review We112 backplugging plan on 05(30/03. Plan for Well SN rehabilitation
- complete, specifications and plan for backplugging complete. Prequalification
packages received on 8/27/03. Mandatory Pre-Bid meeting to be held on 9/4/03:
Commission awarded contract on 9/22/03.
14 Replace Switchgear at W WTPI (D) =Public Utilites Specifications completed. Commission awazded bids for materials 06109/03.
Design=100%complete (C)=BrooksLimbaugh Connactorreviewmgsubmittals. Materialedelivered,contractarchecking -
Construction = 0%complete (CE&I) Public Utilities delivery. -.
15 Town Center Pump Station (D) =Public Works Groundbreaking ceremony held on July 29, 2003. Project expected to begin late
Design = 100%complete (C) _. Callaway Contracting ' October when materials azrive.
Construction = 0%com late (CE&I) = Waitz & Moye
16 Town Center Phase III (D)=Public Works - Bid opening held on 8/6/03 and low bidder was Walding Co.. Budget ordinance
Design = 100% complete (C) = Walding Co.: - -approved for additional funding.
Construction = 0%com late (CE&I) =Public Works
17 Milling and Paving 2003 (D) = N/A Milled and paved all or portions of 29 streets. Final lnspectioa bald on 10/1/03.
Design = N/A - (C) =Underground Utilities
Construction =100% com Bete (CE&I) =Public Works
$ ~.
°w y
BUILDING DEPT.MONTHLY ACTIVITY REPORT
REPORTING FOR MONTH OF SEPTEMBER, 2003'
COMPARISON: YEAR-TO-DATE SEPTEMBER, 2002 Vs. YEAR-TO-DATE SEPTEMBER, 200_3
PERMIT TYPE NUMBER OF PERMITS CONSTRUCTION VALUATION TOTAL INSPECTIONS
SINGLE FAMILY
DUPLEX
!REMODEL/ADDITION
COMMERCIAL'
OTHERS YTD 2002
43
6
173
` 15
735: YrD 2003
54
43
80
45
1433 YTD 2002
$ 8,302,047.00
$ 2,800,000.00
$ 5,692,369.00.
$ 1,065,879.00
$ '1,978086.00 YTD 2003
$ 9,228,948.00
$ ; 6,502,002.00
$ 3,733,725.00
$ 4,006;815.00
$ 2,389;540.00 YTD 2002
2849 YTD. 2003
3171
TOTAL 972 1655 $ 19,838,381.00 .$ 25,867,030.00
PERMITS ISSUED MONTH O F SEPTEMBER, 2003
NO.PERMITS PERMIT COST CONSTRUCTION VALUE INSPECTIONS
SINGLE FAMILY 2 $ 1,665.00 $ 240,000.00 BUILDING 120
li DUPLEX/T'HOUSES _ CQNCRETE 23
ADDITION/REMODEL 12 $ 5,505.00 $ 819,515.00 ELECTRICAL 55-
COMMERCIAL
DECKS 3
2 $ 3,474.00
$ 795.00 $ 61Q694.00
$ 14,000.00 PLUMBING
MECHANICAL 50
24
FENCE 3 $ 105.00 $ 14,000.00 - TREES 43
'UTILITY - _ MISC. 19
ROOFING 12 $ 1,421.00 $ 91,235.00. TOTAL 334
,.SHEDS 5 $ 292.00 $ 6,809.00
GARAGE _ _ _
WELLS -
SIGNS 17 $ 2,295.00 .
ELECTRICAL 35 $ 2,699.00
PLUMBING- 44 $ 3,243.00
MECHANICAL 34 $ 2,369,00
PORCH
IRRIG/SPRKL 5
_ $ 482.00
_ $ 23,700.00
-
SIDING
TREE REMOVAL 6
12 $ 704.00
_ $ 56,570.00
SWIMMING POOL 1 $ 187.00
$ 18,850.00
DRIVEWAY/PATIO 3 $ 70.00
WINDOWS/DOORS-
DEMO/MOVING/TRAI 3
§ $ 292.00
500.00 $ 21,000.00
TOTAL 204 $ 25,498.00 $ 1,916,373.00
AGENDA ITEM #4A
OCTOBER 13, 2003 r
City of Atlantic Beach, FI.
Utility Sales Report
September 2003 September 2002
Gallons Actual Revenue `Gallons Actual Revenue
watef Sales Accounts _ (000) Revenue Per i,aoo gl Accounts ' (000) Revenue Per i,ooo gl
AtlantiCBeach 5,355 49409 $95,261 $1.93 5,278 55,423 $107,080. $1.93
Buccaneer 2,577 30,051 ' $65,820 $222 2,591 32;635 $73,109 $2:24
Total Water Sales 7,935 79,460 $162,081 $2.04 7,869 .88,058 $18D,189 $2.05
Water Planf Produc tion
Gallons Gallons.
` (D00) (000)...
Atlantic Beach 65,622 59,692
B000aneef 34,422 - ...25,520
Total Production 100,044 85,212
Total Water Billed 79,460 88,058
Water Loss for month:. 20,584 (2,846)
Percentage Loss 20.58%' ' 3.34%
Total 12 mo. Avg. Loss 15.09% 14.97°~
Gallons Actual Revenue Gallons Actua4 Revenue
Sealer Sales Accounts (000) - Revenue Per i,ooo gr Accounts (000) ' . Revenue Per 1,000 gl
Atlantic Beach 4,827.. 37,568. $146,058 3.89 4,734 39,166 $152,423 3.89
Buccaneer 2,471 28,534 $128,252 4.49 2,485 :30,897 $141,322 4.57
TotaFSewer Sates 7,298 66,102 .$274,311 $4.15 7,222 70,063.. $293,745 $4.19
Sewer. Treatment
Millions of Gallons 73.46 95.09
Rev. er 1,000 Gallons $3.73 $3.09
PREPARED 10(08/03, 8:37;54 LICENSE ACTIVITY REPORT BY BUSINESS NAME - - PAGE : 1
City of Atlantic Beach. - NEW LICENSES FOR YEAR: .2009 BETWEEN:-09/01/03 TO 09/30/03 '
PROGRAM OL122L - DEPT: ALL p£PARTMENTS CLASS: ALL CLASSES -
T.IC N BUSINE63 NAME ISSUED TYPE CLASSIFICATION -.
OWNERNAMEb ADDRESS -
04-05725 ABATLETIQ CLUB, INC: 9/02/03 NEW MASSAGE THERAPIST
WILLIAM W. NICOL _ '.:
634 BAY ST,_NEPTUNE BEACN PL 32266. - -
04 05786 RIO NATIONAL. INSURANCE CO. INCJ 9/25/03 NEW INSURANCE COMPANY
LESLIE SALEM-. ~ -
' - ~ 9501 NORTH POINT PARKWAY, SOITE 500, ALPHARETTA GA30022 -
04 05749. ALLEN W.. FORRB5T, CPP .9/12/03 NEW. FINANCIAL. CONSULTANT
- - ALLEN W. FORREST -
- 254 SORAL NAY, JAX BEACH PL 32250 - ..
04-05752 .AMERICAN, GENERAL LIFE IN3 CO 9/12/03 NEWINSURANC6'COMPANY- -
`T. CLAY SPIRES, VICE PRESIDENT
~' - P O HOX 4868, HOUSTON TX 77210
09-05791 AMERICAN IfOMEA95URANCE CO. 9/29/0]. NEW INSURANCBCOMPANY-
DAVYU BARROR, EENIOA ANALYST
- 1 CONNELL DRIVE/15T PLOOR,. BERKELEY HEIGHTS NJ 07922-
. -04 05798 AMERICAN-INY: GROUP LIPEINS. CO 9/29/03 NEW INSURANCE, COMPANY -
BARB J. MOORE
- - - 272? A-ALLEN PARXWAY, HOUSTON-TX 77210 - _
'04-05792. AMERICANINTL SOUTH IN3. CO. 9/29/03 NEWINSURANCE COMPANY
AMERICAN INTERNATSONAL CG'S. - - -
~' - -1 CONNBLL ORIVE(1ST FLOOR, BERKELEY HEIGHTS N3 07922 - ~. '
09-05783 AMERICAN LIFE. ASSURANCE.CO N.Y 9/29/Ol NEW INSURANCECOMPANY
BARB J. MOORE.
P.O.HOX 4868, HOUSTON TX 77210
- 04-05730 - BASKET-.CASE TO THE RESCUE -. 9/05)0] .NEW GIFTS/GREETING CARDS.
- JEFF STARMER
2962 NERSCEEL STREET,JACKSONVILLE FL 12205
04 05780 BROYINPAV INGG SITE INC. 9/19/03 NEW MISC., SERVICE ESTABLISHMENT, NOT LI51'ED
PATRICK BROWN.
1570 PARK 'TERRACE WEST,ATLANTIC BEACH FL 12233 -
.. 'iy
04 05759 CENTER STAGE . 9/17/.03 NEW PURNITURB. SALES ~ tsJ '
GARY GENNERI CH
65 PLAYERS CLUB VILLAS, POITB VBDRA FL 32082.
04-05739 COCACOI.A 9/09/03 NEW VENDING MACHINE ? N
: COCA COLA 1-?
100 TAMPA 9AK3 BLVD-350, TAMPA AFL 31637 ~
W
N
04-05735 - COCA .COLA 9/09/0) NEW VENDING MACHINE ~ O
~
COCA COLA ~
W
ACCOUNTING MANAGER, 100 TAMPA OAKS BLVD-J50, TAMPA FL33637
04-05743 COMMERCE AND-INDUSTRY INS. CO, 9/29/03NEW INSURANCECOMPANY
- AMERICAN INTERNATIONAL CG'S.- -
A1'TN: -DAVID BARROR,.1 CONI4ELL DRIVE/1ST DRIVE, BERKELEY HEIGHTS NJ07922 ,.
PREPARED 10/06/03,.8:39:59 - LICENSE ACTIVITYAEPORT HY. HUSINEE3NAME ..PAGE 2-
City of AtlaOtic Eeach. -NEW LICENSES FOR YEAR: 2004 HETYIEEN: 09/01/.03 TO 09/70703
' PROU'RAM OL122L DEPT: ALL DEPARTMENTSCLA~~:. ALL CLAS58S
' LIC X 9USINE55 NAME - ISSUED TYPE CLASSIFYCATIOII _
- ' OWNER NAME S ADDRESS ..
09-05]33 CYNTHIA DEWITT,-LMT 9/09(03 NEW MASSAGE ESTABLISHMENT
- -0YNTHIA DEW ITT
1)38 PARK TERRACE. WEST, ATLANTIC BEACH FL 32233 _
04 05]93 OONC POAD INSPECTION SERVICES 9/11/03NEW BUILDING INSPECTION
-FORD, DON C. -
338 6TN STREET, ATLANTIC BEACH FL :32231.
09-05984 DONALD DAGLEY'6 WORKSHOP 9/25/03 NEW AU'PO: SERVICE/REPAIR
DONALD DAGLEY _
~- 550. CAMELIASTREET, ATLANTIC HEACN.FL 32233
64-05]46 DR.JAY'E DING REPAIR 9j 12/01 NEW MISC.SERVICE ESTABLISHMENT, NOT LI3TE0
JAMES A: GGAOON
1385 SEMINOLE ROAD,. ATLANTICBEACH FL 32233.
' 09-05]99 E. COAST PROPERTIES OPJAX, INC. 9(29(0] NEW MINOR. CONTRACTOR (MISC. ODDJOBS/REPAIR) -
SCOTT M. NICHOLSON
: 1300 EAST COAST DRIVE, ATLANTICBEACH FL 32231
~
04-OS]32- ELIZABETH MCDANIEL LANDSCAPE 9/O9/p3 NEW LANDSCAPING/LOT CLEARING ,
%LI2ABETN MCDANIEL"
30] _9TH STREET, ATLANTIC EEACN FL 32233
09-05]26 EMMA'S CYBER NETWORK 9/02/03. NEW COMPUTER SERVICEB
- EMMA ELOI5E CRUZ
Hl] BONITA.ROAD, ATLANTIC BEACH FL 32233
09-OS]S9 . FLORIDA NETWORK, LLC, D/H)A 9/25/03 NEW REAL ESTATE SALES AGENT
' - - : FLORIDA NETWDBK, LLC. DBA
PAUDENTIAL~NE'fWORX REALTY, 363-12 ATLANTIC-BOULEVARD, .ATLANTIC BEACH FL 32233
09-05918 PVN 3VN AND BEYOND 9/04/03 NEW INTERNET SALES _
G. COLLEEN' CURTIN ~ -
1166 MAIN STREET, ATLANTIC BEACHPL 32233
04-0599A GRANITE STATE INSURANCE CO. 9/29/03 NEW INSURANCE COMPANY - -.
AMERICAN INTBRI4ATIONAL-CD`S-.
' '1 CONNELL DRIVE/1ST FLOOR, BERKE46Y IIEICiiTS NJ .0]922 .
09 05801 . GROOVE ROOMS 9/29/03 NEW MISC. SERVICE ESTAELISHMENT, NOT LISTED
. - DALE CHRISTENSON - Q
112 GLEAN-ER STREET,. NEPTUNE BEACH PL 12266 n
O Z
09-05802 GROOVE ROOMS 9f29j03 NEW VENDING MACNINE ~ d
.DALE CHR 15TENSON
112 OLEANDER STREET; MEPTVNE BEACH FL 32266 ~ a.
09-05800 GVIDEONE ELITE INS. CO'. 9/29/03 NEW INSVRANCE COMPANY ~ - W ~.
JAMES D. WALLACE '!N
1111 ASHWOATH RDAD, WEST DES MD1NE5 IA 50365 p yp
O A
09-05]56 HERE 2 'THERE MOVERS 9/19/03 .NEW MOVING/STORAGB COMPANY W `~ .
- TOM HARTLETT -
1907 8TH AVENVE N.; JAK BEACH FL 72250 ~ '
PREPARED 10/06/03, H:J9: 59 - LICENSE ACTIVITY REPORT HY BUSINESS NAME PAGE
3
City of .
AtlanticBeach NBW LIQENSES POR YEAR: 2004 BETWEEN: 09/O1/D3 1'0 09/30/03
.PROGRAM OL1224 DEPT: ALL DEPARTMENTS CLASS: ALL CLASSES
LIC ~ BUSINESS NAME ISSUED TXPE. CLASSI PICATION.
[ .OWNER NAME & ADDRE99
09-05953
HOT DOG HUT.. -__'_
9/19/03 NEW RESTAURANTS
-
ARNOLD bEMARCO
1912SUNCIIASE CT „ JACKSONVILLE FL 32296
09-05795 ILLINOIS NATIONAL INSURANCE Cb ~, 9/29/0] NEW INSURANCE COMPANY
r: AMERI CAN INTERNAT IONALCO'S.
- u~ATTN: DAVID HARROR, 3 CONNELL DRIVE/1ST FLOOA, BERKELEY HEIGHTS NJ 07922
04 OSBQ7 JANE 0.. WYTZKA _ ~9 /30/03- NEW CONSULTANT, NOT O1'NHRWISE CLASSIFIED
JANE C. WYTZKA
352 2N0 STREET, ATLANTIC BEACH FL'-322]3 -
09 05792 JOHN RODDAN CONCRETE WORK3 9/10/03 NEW CEMENT/STONE/BRICK-:
ROPDAN, JOHN - -
785 TRITON ROAD,_ ATLANTIC BEACH FL 32237 -
04-05768 KATHLEEN D. WINTERHOTHAM, LMN5 ~9/19/03 NEW MISC. PROFESSIONAli ESTABLISHMENT
KATHLEEN b. WINTERBOTHAM
- - - 3720 WICKLOW MANOR-CT.; JACKSONVILLE PL 32229 -
04-05769 -KATHLEEN D. WINTERBOTNAM, LMHS .9/19/03 NEW-.MENTAL. HEALTH COUNSELOR
KATHLEEN D. WINTERBOTHAM
3720 WICKLOW MANOR C'f.; .JACKSONVILLE FL32224
09 D5797 -MAGNOLIA PROPERTI ES - 9/12/03 NEW- REALESTATE AGENCY
EILEEN' BLOCKER.
8957 ADAM$ WALK DR., JACKSONVILLE FL 32217
09-05748 MAGNOLIA PROPERTIES 9/12/03 NEW -REAL ESTATE BROKER
.EILEEN BLOCKER - - _
8957 ADAMS NALK DR .., JACKSONVILLE PL 32217
09 05766 MARY SOUTHWICK 9/19/03 NCW MARRIAGE OR FAMILYCOUNSF LOR
..
'. - - MARY SOUTHWI CK .
3447 CATTAIL POND DRIVE, JACKSONVILLE FL 32229 -
09-05767 MARY SOUTRW ICK .9/19/03 :NEW MISC. PROFESS LONAG ESTABLISHMENT
MARY SONTHWICK
997 CATTAIL POND DRIVE, JACKSONVILLE FL 32229
09-05806 MICHAEL CONTE .9/29/03 NEW
' CARPENTRY
.
.
MICHAEL CONTE
Q ~ ;
870 CAMELIA BT., ATLANTIC BEACH FL 72233 - y ~
04 05989 MIDWESTERN UNITED LIPS. INS.CO. 9/26/03 NEW INSURANCE COMPANY
TERRY L. HURT, STATE TA% ACCT. ~ ~ '
5780 POWERS FERRY ROAD, .ATLANTA GA 30327 ~ N
09-05719 NAILS 6 SPA 9/1,0/03 NEW COSMCTOLOGY SALON - W
:
- - HUWG THANH NGUYEN - - V
~
.
4017 DAYRL ROAD, JACKSONVILLE FL 32207 - N
G ~.
O
09-05790 NAILS 6 BPA 9/10/03 NEW NAIL SPECIALIST
- W
HUNG TNANN NGUYEN - -
- - 901? DAYRL ROAD; JACKSONVILLE FL 322p7
PREPARED 1OJ06jO],H:37 X59 ~ LICENSE ACTIVITY REPORT HY HVSINESS NAME PAGE, 9
City OE AtlaHtic BeachNEW .LICENSES FOR YEAR: 2004 HETWEEN~ 09/01/03 T009/30JO3
PROGRAM OL122L 4EPT: ALL DEPARTMENTS CLASS: ALL CLASSES
LIC k -__-___
BUSINESS NAME
ISSUED 'TYPE CLASSIFICATION
OWNER NAME SAUDRESS - -
09-05941 NAILSL SPA 9/10/03 NEW NAID SPECIALIST
HllNG THANH NGUYEN
. 4017 DAYRL ROAD;: JACKSONVILLE FL 32207
~
09-05799 NEW HAMPSHIRE INDEMNITY CO.INC 9/29/03 NEW INSURANCE COMPANY -,
' LESLIE SALEM
4501 NORTH POINT PARRWAX M500, ALPHARETi'A GA 30022 - -
09-05796 NEW IiAMPSHIAE INSURANCE CO. 9/29/03 -.NEW INSURANCE COMPANY
- AMERICAN INTERNATIONAL CO'S.. - - - -
DAVID BARROR, 8RRX8LEY HEIGHTS NJ 07922. -
-09-05782 PEOPLES BENEFIT LIFfi 1NS. CO. 9/29/03 NEW~INSURANCE COMPANY _
DEBBIE KRUhIM.
C(0 TRK DEPARTMENT, 4333 EDGEWOOO RD NE,CEDAR. RAPIDS IA 5]999 -
04-05785 PROVIDENT LIF£ 6 ACCIDENT YNS 9/25/0] NEW YNSURANCE COMPANY-
' - HEV JOHNSON - ACCT ASST -.
- 1 FOUNTAIN SQUARE, CHATANOOGA TN 37402 -.
09-D5727 ROBERT ftORERTSON'S TREE CO. - 9/03/03 NSW TREE SERVICE/T'REE9URGEON
AOBERS D. ROHERTSON>
' - - 618 NY lUT'SON DRIVE W:, ATLANTIC BEACH PL32233 -
' 04-05951 SIDNEY CtITLDAESS DBL S LAWN CR 9I12/O3.NEW LAWN/YARD SERVICE
HIDNEY CNILDRESS '- -
712 CAVALLA RD, ATLANTIC"BEACfi'FL 3223}: -
04-05730 .THE EKTERTOA GAOVP INC 9/09/03 NEW GENERAL CONTRACTOR
' - STEPHEN B. KIRSTEN ~ ~ -
399 9TH STREET, ATLANTIC REACH FL 322]J
04-05790 UNITED. LIFE ANNUITYTNS CO 9/29/03NEW INSURANCE COMPANY.
TERRY L..HURT
5780 POWERS FERRY ROAD, NW,-ATLANTA GA 30327-9390 ~ -
' ..
a
-
. H
W
N
O
W ~/
PREPARED 30/06(03, 8:34:54 LICENSE ACTIVITY REPORT HY BUSINESS NAME PAGE 5
City of AClantic Beach - NEW LICENSES. FOR YEARN 2004 BETWEEN; 09J61103 TO 09/30/03
PROGRAM OL122L pEPT! ALL DEPARTMENT& CLASS: ALL CliASSES
QRANp TOTALS
________.___~_.. NEW LICENSES. __ __ _______ _____ _ ______.`RNW LICENSES _____; .___ . ____ __ _______ TRNLICENSES ___.___.. _ ___
- AC: E1 AC: 0 AC: p
PP: 0 PP:. 0 PP: 0
IN: 0 IN: tl INe - 0
VO: 0 VO: 0 VO: 0
PG:0 PG 0 PG: 0
' I,IG - 51 LICi 0 - LIG 0
- ~
~
~
~
7y H
'~ t~7
-
- - .`."
N
o ~
- w
_ ~