4APUBLIC WORKS and UTILITY DEPARTMENTS PROJECT STATUS REPORT (D) =DESIGN ENGINEER, (CE&I) =CONSTRUCTION ENGINEER, (C) =-CONTRACTOR PROJECT DESCRIPTION PROJECT NO. ANDINFORMATION STATUS ON 1016/03 1 Core City Stormwater Project CORE99 Sherry Drive -Final Payment approved on 0$/01/02. Preliminary Redesign =100% complete Sherry Drive Design = 100% complete (D) = Original by England, Thims Rc Miller Revised Preliminar Desi n b The y g y - Core City- Contractor started on 07/15/02 and completed permanent weir at Fleet `" " Sherry Drive.Constr•uction =100% - R-A-M Professional Group Landing and installed baffle boxes on Pine Street, 5 and T at Shenry Drive. Installed new water lines on Ahern 2nd 4'" toT" 10'" 11'" and 12'"Streets Plaza com late p ° Overall Redesign = 100% complete Re•Design by Aikenhead & Odom (C)= .Callaway Contracting, Inc: , , , , and East Coast Drive (between 10'" and Ahern). Storm drainage completed on la` through 12 Streets. New sanitary sewer line installed on 11'"and12'" Suee[ Paved Downstream pesign =100% complete ° (for Sherry Drive) Petticoat Contracting (far Core City) . ,n m Ahern through 12 Streets, andEast Coast from Ahern to 10 , And flnfll COAL feY Core City Construction = 100/ complete (except puncGlist Items) : - (CE&I) =Public Works (for Sherry Drive) Sherry Drive. . GAT Consulting (for Core City) 2 Buccaneer Wastewater Treatment Plant (D) =Gannett Fleming CiTy of Jacksonville permit received 04101/03: Change Order No. 1 approved by City Redesignofsludge facility. =100% complete (C) =Gruhn May, Ina Commission 04/28/03. Notice [o Proceed revised to 04/28/03. Tank constructed, Constre{coon =g5% complete (CE&1) _ Gannett Fleming and Public Works drainagesystem started, underground piping constructed. Concrete for container area, etacomplete. Roadway construction started. 3 Mayport Flyover Plaza Bump (D) =.Hessen[, Hammack & Rnekman (BHR) J.A. Jones advised that JTA has funding in place and preconstruetion conference held Design = 100% complete ' (C) = Construction & Electrical Specialists on for 01/10/03. Utility conference on 02/03!03. Contractor has realigned ] 0" water Construction = 100% complete (CE&I) = J.A. Tones- line, paved roadand eliminated bump. Area of standing water remains to be corrected: Project meeting held on05/06/03. Additional striping completed to improve traffic flow across Mayport Road. 4 Mayport Jr. Enlisted Men Family Housing - (D) = Prosser Hallock - : Storm drainage is complete. Constmction of sanitary sewer is 100% complete,with 100 Units - (C) = Picerne Military Housing the exception of the lift station and wetwelL-0onstruction of water is 100% complete: Design = 100% complete (CE&1) = Prosser`Hallock & Navy Overall project is 95%complete. Received call from engineer on 06/28/02 that a -L~ Station Design = 100% complete _ new ]il) statiorrwill need to be constructed. Lift station re-design complete: DEP Construction = 99%complete permit received.Forcemoin completed. Lift station constmction underway, about 80%complete. S. Hopkins Creek Regional Retention (D) =Camp, Dresser & McKee (CllM) ; - Commission authorized negotiation on 04/28(03 with. CDM for Hopkins Creek Facility design and approved conn~act for preliminary design report on-06/23/03. Designer Design = 25% complete - working on two conceptual plans for 1.7 acre retention pond. Me[ with. Sunrise Construction = 0%complete Church on.8/24/03 regarding sale of property. Attempting to obtain two commercial appraisals. Od ~ ~ ,~ H ~' hl w N O ~.. W PUBLIC WORKS and UTILITY'DEPARTMENTS PROJECT STATUS REPORT (D)=DESTGNENGINEER,(CE&I)-CONSTRUCTION ENGINEER,(C)=CONTRACTOR PROJECT DESCRDTTION PROJECT NO. AND INFORMATION STATUS ON 10/6/03 6 SCADA System DesignBuild (D) = Conhol Design, Inc. Precoastruction meeting held on 09/04/02. Computer equipment ordered and Design =100% complete - (C) =Control Design, Ina received by 09/25/02. Most hardware has been received. Designing control screens; Programming.& Construction =100% (CE&I) =Public Utilities and programnwtg logic. Installation of antenna bases completed. Commission complete, authorized Change Order #1 to upgrade radios on 01/27/03. Vendor performed radio survey on facilities. Meeting with contractors held on 03/26/03 to discuss revised scope: Contractor replaced antenna bases and structures,progrmnmed PLCs, - Towers, antennas and radios installed, WP #1, #2 & #3 on lhre. Debugging W WTP: #1 & #2.. Improved connectivity [o network approved at the 91&/03 Commission Meeting. Equipment being installed.. 7 Cooperative Beaches Utility Plan (D) =Stone, Joca & Mahoney Commission awarded contractto SJM on 11/11/02. Jacksonville Beach authorized .Design = 70%complete reimbursement on 11/18/02. Neptune Beach authorized on 12/03/02. Kick off - - meeting held on 12/13/02: Consultants working on modeling and review of meter readingPoilling information. Consultants met with Finance and Meter Reading staff on 04/29/03. Consultants received' additional information needed for model from . - Jacksonville Beach on 05/23/03. Requested additional operations information on 06/24/03: Draft Plan received 9/10103, under review, additional information : provided. - 8 .Navy Privatization (D).=Gannett Fleming, Inc... Commission awarded contract 12/9/02. Kickoffmeeting 12/20/02. Design = 100%complete Assembling data for consultant, Workshops held 02/24/03 and 03/24/03. Draft technical proposal submitted for review 02/20/03. Consultant met with staffand City Attorney on 04/24/03 to draft contract section. Submittal of final proposal (Volume I & II) authorized by Commission on 06/09/03. Submitted on 06/19/03. Received financial capability questionnaire on 07/28/03. 9 Relocation of Elevated Tank for Water (D) = HGTI Request for Proposals advertised 09/29/02. Technical proposals received on Plant 2 (C) = Gmhn May, Inc. 10/23/02.. Bids received 10/30/02. Allbids rejected on 11/11/02. Pre-bid Design =100% complete (CB&I) =Public Works meeting held on 02/12/03. Bids received 02/26/03.: City Commission Construction =35%complete awarded contract on 03/10/03. Demolition pm•mit received and cohtractor began dismantling tank on 04/01/03. Tank dismantled, and has been transported to Water Plant #2. DEP permiYreceived 7/16/03. Contractor pouring foundation. Completed repairs to columns and balcony, OZ ~ ~' '~ H ~. ~ w ' N N O qk - O A W '~ PUBLIC WORKS and UTILITY DEPARTMENTS 'PROJECT STATUS REPORT (D) =DESIGN ENGINEER, (CE&I) = CONSTRUCTION ENGINEER,:(C)=CONTRACTOR ; PROJECT DESCRD'TION. PROJECT NO. AND INFORMATION STATUS ON.10/6/03 10 Ocean Blvd. Water Main Replacement (D) =Public Works Survey complete. Design 100% complete, with drainage lmeinchided for Adele Design = 100%complete (C) =Miranda Contracting, Inc. ' Grage Community Center. Pre-Bid meeting held on 11./19/02. Bids received Constracdion = 98%complete (CE&I) -Public Works 12/04/02, Awarded contract on 01/13/03. Pre-construction meeting heldon - O (/30/03. Notlce to proceed 03/17103. Met with Petticoat on 02/19/03 to coordinate construction schedules. Construction underway:. Completed water line from Ahern -. to Sa' Sn~eet and encountered old brick entire way. On 04!28/03, City Commission authorized change order for cost of brick removal. Water, stormwater andpaving workcompleted. Contractor agreed to mill and repave'/," depth of southbound lane - .third or fourth week of October, after Change Order work done by Petticoat. 12 2002-3 CDBG Pavingand Draining (D) =Public Works L.D. Bradley delivered survey on 02/19/03 and preliminary design completed. (Jordan) (C) = R&B Contracting; Inc: Mandatory pre-bid held on 04/03/03 and bids received 04/10/03. Commission Design = 100%complete- (CE&I) =Public Works awarded contract to R&B Contracting, Inc. on 04/28/03. Preconstractimi conference ° Construction = 100%complete held on 05/22/03. Storm drainage ms[alled androadway completed. Final inspection held on 7/29/03. Completed additional sidewalk work on Francis Ave. 13. Well Rehab &Replacement (D) = CH2M Hill Engineerbrg proposals received on 01/10/03.. Commission authorized negotiation on Design = 95%complete (C)= W. Earl Floyd -02/10/03. Field visit with engineer 02/25/03, scope clarification meeting 02/27/03. Construction = 0%complete (CE&I) CH2M Hpl Commission awarded contract for Phase I on 04/28/03. Met with SJRWMD to review We112 backplugging plan on 05(30/03. Plan for Well SN rehabilitation - complete, specifications and plan for backplugging complete. Prequalification packages received on 8/27/03. Mandatory Pre-Bid meeting to be held on 9/4/03: Commission awarded contract on 9/22/03. 14 Replace Switchgear at W WTPI (D) =Public Utilites Specifications completed. Commission awazded bids for materials 06109/03. Design=100%complete (C)=BrooksLimbaugh Connactorreviewmgsubmittals. Materialedelivered,contractarchecking - Construction = 0%complete (CE&I) Public Utilities delivery. -. 15 Town Center Pump Station (D) =Public Works Groundbreaking ceremony held on July 29, 2003. Project expected to begin late Design = 100%complete (C) _. Callaway Contracting ' October when materials azrive. Construction = 0%com late (CE&I) = Waitz & Moye 16 Town Center Phase III (D)=Public Works - Bid opening held on 8/6/03 and low bidder was Walding Co.. Budget ordinance Design = 100% complete (C) = Walding Co.: - -approved for additional funding. Construction = 0%com late (CE&I) =Public Works 17 Milling and Paving 2003 (D) = N/A Milled and paved all or portions of 29 streets. Final lnspectioa bald on 10/1/03. Design = N/A - (C) =Underground Utilities Construction =100% com Bete (CE&I) =Public Works $ ~. °w y BUILDING DEPT.MONTHLY ACTIVITY REPORT REPORTING FOR MONTH OF SEPTEMBER, 2003' COMPARISON: YEAR-TO-DATE SEPTEMBER, 2002 Vs. YEAR-TO-DATE SEPTEMBER, 200_3 PERMIT TYPE NUMBER OF PERMITS CONSTRUCTION VALUATION TOTAL INSPECTIONS SINGLE FAMILY DUPLEX !REMODEL/ADDITION COMMERCIAL' OTHERS YTD 2002 43 6 173 ` 15 735: YrD 2003 54 43 80 45 1433 YTD 2002 $ 8,302,047.00 $ 2,800,000.00 $ 5,692,369.00. $ 1,065,879.00 $ '1,978086.00 YTD 2003 $ 9,228,948.00 $ ; 6,502,002.00 $ 3,733,725.00 $ 4,006;815.00 $ 2,389;540.00 YTD 2002 2849 YTD. 2003 3171 TOTAL 972 1655 $ 19,838,381.00 .$ 25,867,030.00 PERMITS ISSUED MONTH O F SEPTEMBER, 2003 NO.PERMITS PERMIT COST CONSTRUCTION VALUE INSPECTIONS SINGLE FAMILY 2 $ 1,665.00 $ 240,000.00 BUILDING 120 li DUPLEX/T'HOUSES _ CQNCRETE 23 ADDITION/REMODEL 12 $ 5,505.00 $ 819,515.00 ELECTRICAL 55- COMMERCIAL DECKS 3 2 $ 3,474.00 $ 795.00 $ 61Q694.00 $ 14,000.00 PLUMBING MECHANICAL 50 24 FENCE 3 $ 105.00 $ 14,000.00 - TREES 43 'UTILITY - _ MISC. 19 ROOFING 12 $ 1,421.00 $ 91,235.00. TOTAL 334 ,.SHEDS 5 $ 292.00 $ 6,809.00 GARAGE _ _ _ WELLS - SIGNS 17 $ 2,295.00 . ELECTRICAL 35 $ 2,699.00 PLUMBING- 44 $ 3,243.00 MECHANICAL 34 $ 2,369,00 PORCH IRRIG/SPRKL 5 _ $ 482.00 _ $ 23,700.00 - SIDING TREE REMOVAL 6 12 $ 704.00 _ $ 56,570.00 SWIMMING POOL 1 $ 187.00 $ 18,850.00 DRIVEWAY/PATIO 3 $ 70.00 WINDOWS/DOORS- DEMO/MOVING/TRAI 3 § $ 292.00 500.00 $ 21,000.00 TOTAL 204 $ 25,498.00 $ 1,916,373.00 AGENDA ITEM #4A OCTOBER 13, 2003 r City of Atlantic Beach, FI. Utility Sales Report September 2003 September 2002 Gallons Actual Revenue `Gallons Actual Revenue watef Sales Accounts _ (000) Revenue Per i,aoo gl Accounts ' (000) Revenue Per i,ooo gl AtlantiCBeach 5,355 49409 $95,261 $1.93 5,278 55,423 $107,080. $1.93 Buccaneer 2,577 30,051 ' $65,820 $222 2,591 32;635 $73,109 $2:24 Total Water Sales 7,935 79,460 $162,081 $2.04 7,869 .88,058 $18D,189 $2.05 Water Planf Produc tion Gallons Gallons. ` (D00) (000)... Atlantic Beach 65,622 59,692 B000aneef 34,422 - ...25,520 Total Production 100,044 85,212 Total Water Billed 79,460 88,058 Water Loss for month:. 20,584 (2,846) Percentage Loss 20.58%' ' 3.34% Total 12 mo. Avg. Loss 15.09% 14.97°~ Gallons Actual Revenue Gallons Actua4 Revenue Sealer Sales Accounts (000) - Revenue Per i,ooo gr Accounts (000) ' . Revenue Per 1,000 gl Atlantic Beach 4,827.. 37,568. $146,058 3.89 4,734 39,166 $152,423 3.89 Buccaneer 2,471 28,534 $128,252 4.49 2,485 :30,897 $141,322 4.57 TotaFSewer Sates 7,298 66,102 .$274,311 $4.15 7,222 70,063.. $293,745 $4.19 Sewer. Treatment Millions of Gallons 73.46 95.09 Rev. er 1,000 Gallons $3.73 $3.09 PREPARED 10(08/03, 8:37;54 LICENSE ACTIVITY REPORT BY BUSINESS NAME - - PAGE : 1 City of Atlantic Beach. - NEW LICENSES FOR YEAR: .2009 BETWEEN:-09/01/03 TO 09/30/03 ' PROGRAM OL122L - DEPT: ALL p£PARTMENTS CLASS: ALL CLASSES - T.IC N BUSINE63 NAME ISSUED TYPE CLASSIFICATION -. OWNERNAMEb ADDRESS - 04-05725 ABATLETIQ CLUB, INC: 9/02/03 NEW MASSAGE THERAPIST WILLIAM W. NICOL _ '.: 634 BAY ST,_NEPTUNE BEACN PL 32266. - - 04 05786 RIO NATIONAL. INSURANCE CO. INCJ 9/25/03 NEW INSURANCE COMPANY LESLIE SALEM-. ~ - ' - ~ 9501 NORTH POINT PARKWAY, SOITE 500, ALPHARETTA GA30022 - 04 05749. ALLEN W.. FORRB5T, CPP .9/12/03 NEW. FINANCIAL. CONSULTANT - - ALLEN W. FORREST - - 254 SORAL NAY, JAX BEACH PL 32250 - .. 04-05752 .AMERICAN, GENERAL LIFE IN3 CO 9/12/03 NEWINSURANC6'COMPANY- - `T. CLAY SPIRES, VICE PRESIDENT ~' - P O HOX 4868, HOUSTON TX 77210 09-05791 AMERICAN IfOMEA95URANCE CO. 9/29/0]. NEW INSURANCBCOMPANY- DAVYU BARROR, EENIOA ANALYST - 1 CONNELL DRIVE/15T PLOOR,. BERKELEY HEIGHTS NJ 07922- . -04 05798 AMERICAN-INY: GROUP LIPEINS. CO 9/29/03 NEW INSURANCE, COMPANY - BARB J. MOORE - - - 272? A-ALLEN PARXWAY, HOUSTON-TX 77210 - _ '04-05792. AMERICANINTL SOUTH IN3. CO. 9/29/03 NEWINSURANCE COMPANY AMERICAN INTERNATSONAL CG'S. - - - ~' - -1 CONNBLL ORIVE(1ST FLOOR, BERKELEY HEIGHTS N3 07922 - ~. ' 09-05783 AMERICAN LIFE. ASSURANCE.CO N.Y 9/29/Ol NEW INSURANCECOMPANY BARB J. MOORE. P.O.HOX 4868, HOUSTON TX 77210 - 04-05730 - BASKET-.CASE TO THE RESCUE -. 9/05)0] .NEW GIFTS/GREETING CARDS. - JEFF STARMER 2962 NERSCEEL STREET,JACKSONVILLE FL 12205 04 05780 BROYINPAV INGG SITE INC. 9/19/03 NEW MISC., SERVICE ESTABLISHMENT, NOT LI51'ED PATRICK BROWN. 1570 PARK 'TERRACE WEST,ATLANTIC BEACH FL 12233 - .. 'iy 04 05759 CENTER STAGE . 9/17/.03 NEW PURNITURB. SALES ~ tsJ ' GARY GENNERI CH 65 PLAYERS CLUB VILLAS, POITB VBDRA FL 32082. 04-05739 COCACOI.A 9/09/03 NEW VENDING MACHINE ? N : COCA COLA 1-? 100 TAMPA 9AK3 BLVD-350, TAMPA AFL 31637 ~ W N 04-05735 - COCA .COLA 9/09/0) NEW VENDING MACHINE ~ O ~ COCA COLA ~ W ACCOUNTING MANAGER, 100 TAMPA OAKS BLVD-J50, TAMPA FL33637 04-05743 COMMERCE AND-INDUSTRY INS. CO, 9/29/03NEW INSURANCECOMPANY - AMERICAN INTERNATIONAL CG'S.- - A1'TN: -DAVID BARROR,.1 CONI4ELL DRIVE/1ST DRIVE, BERKELEY HEIGHTS NJ07922 ,. PREPARED 10/06/03,.8:39:59 - LICENSE ACTIVITYAEPORT HY. HUSINEE3NAME ..PAGE 2- City of AtlaOtic Eeach. -NEW LICENSES FOR YEAR: 2004 HETYIEEN: 09/01/.03 TO 09/70703 ' PROU'RAM OL122L DEPT: ALL DEPARTMENTSCLA~~:. ALL CLAS58S ' LIC X 9USINE55 NAME - ISSUED TYPE CLASSIFYCATIOII _ - ' OWNER NAME S ADDRESS .. 09-05]33 CYNTHIA DEWITT,-LMT 9/09(03 NEW MASSAGE ESTABLISHMENT - -0YNTHIA DEW ITT 1)38 PARK TERRACE. WEST, ATLANTIC BEACH FL 32233 _ 04 05]93 OONC POAD INSPECTION SERVICES 9/11/03NEW BUILDING INSPECTION -FORD, DON C. - 338 6TN STREET, ATLANTIC BEACH FL :32231. 09-05984 DONALD DAGLEY'6 WORKSHOP 9/25/03 NEW AU'PO: SERVICE/REPAIR DONALD DAGLEY _ ~- 550. CAMELIASTREET, ATLANTIC HEACN.FL 32233 64-05]46 DR.JAY'E DING REPAIR 9j 12/01 NEW MISC.SERVICE ESTABLISHMENT, NOT LI3TE0 JAMES A: GGAOON 1385 SEMINOLE ROAD,. ATLANTICBEACH FL 32233. ' 09-05]99 E. COAST PROPERTIES OPJAX, INC. 9(29(0] NEW MINOR. CONTRACTOR (MISC. ODDJOBS/REPAIR) - SCOTT M. NICHOLSON : 1300 EAST COAST DRIVE, ATLANTICBEACH FL 32231 ~ 04-OS]32- ELIZABETH MCDANIEL LANDSCAPE 9/O9/p3 NEW LANDSCAPING/LOT CLEARING , %LI2ABETN MCDANIEL" 30] _9TH STREET, ATLANTIC EEACN FL 32233 09-05]26 EMMA'S CYBER NETWORK 9/02/03. NEW COMPUTER SERVICEB - EMMA ELOI5E CRUZ Hl] BONITA.ROAD, ATLANTIC BEACH FL 32233 09-OS]S9 . FLORIDA NETWORK, LLC, D/H)A 9/25/03 NEW REAL ESTATE SALES AGENT ' - - : FLORIDA NETWDBK, LLC. DBA PAUDENTIAL~NE'fWORX REALTY, 363-12 ATLANTIC-BOULEVARD, .ATLANTIC BEACH FL 32233 09-05918 PVN 3VN AND BEYOND 9/04/03 NEW INTERNET SALES _ G. COLLEEN' CURTIN ~ - 1166 MAIN STREET, ATLANTIC BEACHPL 32233 04-0599A GRANITE STATE INSURANCE CO. 9/29/03 NEW INSURANCE COMPANY - -. AMERICAN INTBRI4ATIONAL-CD`S-. ' '1 CONNELL DRIVE/1ST FLOOR, BERKE46Y IIEICiiTS NJ .0]922 . 09 05801 . GROOVE ROOMS 9/29/03 NEW MISC. SERVICE ESTAELISHMENT, NOT LISTED . - DALE CHRISTENSON - Q 112 GLEAN-ER STREET,. NEPTUNE BEACH PL 12266 n O Z 09-05802 GROOVE ROOMS 9f29j03 NEW VENDING MACNINE ~ d .DALE CHR 15TENSON 112 OLEANDER STREET; MEPTVNE BEACH FL 32266 ~ a. 09-05800 GVIDEONE ELITE INS. CO'. 9/29/03 NEW INSVRANCE COMPANY ~ - W ~. JAMES D. WALLACE '!N 1111 ASHWOATH RDAD, WEST DES MD1NE5 IA 50365 p yp O A 09-05]56 HERE 2 'THERE MOVERS 9/19/03 .NEW MOVING/STORAGB COMPANY W `~ . - TOM HARTLETT - 1907 8TH AVENVE N.; JAK BEACH FL 72250 ~ ' PREPARED 10/06/03, H:J9: 59 - LICENSE ACTIVITY REPORT HY BUSINESS NAME PAGE 3 City of . AtlanticBeach NBW LIQENSES POR YEAR: 2004 BETWEEN: 09/O1/D3 1'0 09/30/03 .PROGRAM OL1224 DEPT: ALL DEPARTMENTS CLASS: ALL CLASSES LIC ~ BUSINESS NAME ISSUED TXPE. CLASSI PICATION. [ .OWNER NAME & ADDRE99 09-05953 HOT DOG HUT.. -__'_ 9/19/03 NEW RESTAURANTS - ARNOLD bEMARCO 1912SUNCIIASE CT „ JACKSONVILLE FL 32296 09-05795 ILLINOIS NATIONAL INSURANCE Cb ~, 9/29/0] NEW INSURANCE COMPANY r: AMERI CAN INTERNAT IONALCO'S. - u~ATTN: DAVID HARROR, 3 CONNELL DRIVE/1ST FLOOA, BERKELEY HEIGHTS NJ 07922 04 OSBQ7 JANE 0.. WYTZKA _ ~9 /30/03- NEW CONSULTANT, NOT O1'NHRWISE CLASSIFIED JANE C. WYTZKA 352 2N0 STREET, ATLANTIC BEACH FL'-322]3 - 09 05792 JOHN RODDAN CONCRETE WORK3 9/10/03 NEW CEMENT/STONE/BRICK-: ROPDAN, JOHN - - 785 TRITON ROAD,_ ATLANTIC BEACH FL 32237 - 04-05768 KATHLEEN D. WINTERHOTHAM, LMN5 ~9/19/03 NEW MISC. PROFESSIONAli ESTABLISHMENT KATHLEEN b. WINTERBOTHAM - - - 3720 WICKLOW MANOR-CT.; JACKSONVILLE PL 32229 - 04-05769 -KATHLEEN D. WINTERBOTNAM, LMHS .9/19/03 NEW-.MENTAL. HEALTH COUNSELOR KATHLEEN D. WINTERBOTHAM 3720 WICKLOW MANOR C'f.; .JACKSONVILLE FL32224 09 D5797 -MAGNOLIA PROPERTI ES - 9/12/03 NEW- REALESTATE AGENCY EILEEN' BLOCKER. 8957 ADAM$ WALK DR., JACKSONVILLE FL 32217 09-05748 MAGNOLIA PROPERTIES 9/12/03 NEW -REAL ESTATE BROKER .EILEEN BLOCKER - - _ 8957 ADAMS NALK DR .., JACKSONVILLE PL 32217 09 05766 MARY SOUTHWICK 9/19/03 NCW MARRIAGE OR FAMILYCOUNSF LOR .. '. - - MARY SOUTHWI CK . 3447 CATTAIL POND DRIVE, JACKSONVILLE FL 32229 - 09-05767 MARY SOUTRW ICK .9/19/03 :NEW MISC. PROFESS LONAG ESTABLISHMENT MARY SONTHWICK 997 CATTAIL POND DRIVE, JACKSONVILLE FL 32229 09-05806 MICHAEL CONTE .9/29/03 NEW ' CARPENTRY . . MICHAEL CONTE Q ~ ; 870 CAMELIA BT., ATLANTIC BEACH FL 72233 - y ~ 04 05989 MIDWESTERN UNITED LIPS. INS.CO. 9/26/03 NEW INSURANCE COMPANY TERRY L. HURT, STATE TA% ACCT. ~ ~ ' 5780 POWERS FERRY ROAD, .ATLANTA GA 30327 ~ N 09-05719 NAILS 6 SPA 9/1,0/03 NEW COSMCTOLOGY SALON - W : - - HUWG THANH NGUYEN - - V ~ . 4017 DAYRL ROAD, JACKSONVILLE FL 32207 - N G ~. O 09-05790 NAILS 6 BPA 9/10/03 NEW NAIL SPECIALIST - W HUNG TNANN NGUYEN - - - - 901? DAYRL ROAD; JACKSONVILLE FL 322p7 PREPARED 1OJ06jO],H:37 X59 ~ LICENSE ACTIVITY REPORT HY HVSINESS NAME PAGE, 9 City OE AtlaHtic BeachNEW .LICENSES FOR YEAR: 2004 HETWEEN~ 09/01/03 T009/30JO3 PROGRAM OL122L 4EPT: ALL DEPARTMENTS CLASS: ALL CLASSES LIC k -__-___ BUSINESS NAME ISSUED 'TYPE CLASSIFICATION OWNER NAME SAUDRESS - - 09-05941 NAILSL SPA 9/10/03 NEW NAID SPECIALIST HllNG THANH NGUYEN . 4017 DAYRL ROAD;: JACKSONVILLE FL 32207 ~ 09-05799 NEW HAMPSHIRE INDEMNITY CO.INC 9/29/03 NEW INSURANCE COMPANY -, ' LESLIE SALEM 4501 NORTH POINT PARRWAX M500, ALPHARETi'A GA 30022 - - 09-05796 NEW IiAMPSHIAE INSURANCE CO. 9/29/03 -.NEW INSURANCE COMPANY - AMERICAN INTERNATIONAL CO'S.. - - - - DAVID BARROR, 8RRX8LEY HEIGHTS NJ 07922. - -09-05782 PEOPLES BENEFIT LIFfi 1NS. CO. 9/29/03 NEW~INSURANCE COMPANY _ DEBBIE KRUhIM. C(0 TRK DEPARTMENT, 4333 EDGEWOOO RD NE,CEDAR. RAPIDS IA 5]999 - 04-05785 PROVIDENT LIF£ 6 ACCIDENT YNS 9/25/0] NEW YNSURANCE COMPANY- ' - HEV JOHNSON - ACCT ASST -. - 1 FOUNTAIN SQUARE, CHATANOOGA TN 37402 -. 09-D5727 ROBERT ftORERTSON'S TREE CO. - 9/03/03 NSW TREE SERVICE/T'REE9URGEON AOBERS D. ROHERTSON> ' - - 618 NY lUT'SON DRIVE W:, ATLANTIC BEACH PL32233 - ' 04-05951 SIDNEY CtITLDAESS DBL S LAWN CR 9I12/O3.NEW LAWN/YARD SERVICE HIDNEY CNILDRESS '- - 712 CAVALLA RD, ATLANTIC"BEACfi'FL 3223}: - 04-05730 .THE EKTERTOA GAOVP INC 9/09/03 NEW GENERAL CONTRACTOR ' - STEPHEN B. KIRSTEN ~ ~ - 399 9TH STREET, ATLANTIC REACH FL 322]J 04-05790 UNITED. LIFE ANNUITYTNS CO 9/29/03NEW INSURANCE COMPANY. TERRY L..HURT 5780 POWERS FERRY ROAD, NW,-ATLANTA GA 30327-9390 ~ - ' .. a - . H W N O W ~/ PREPARED 30/06(03, 8:34:54 LICENSE ACTIVITY REPORT HY BUSINESS NAME PAGE 5 City of AClantic Beach - NEW LICENSES. FOR YEARN 2004 BETWEEN; 09J61103 TO 09/30/03 PROGRAM OL122L pEPT! ALL DEPARTMENT& CLASS: ALL CliASSES QRANp TOTALS ________.___~_.. NEW LICENSES. __ __ _______ _____ _ ______.`RNW LICENSES _____; .___ . ____ __ _______ TRNLICENSES ___.___.. _ ___ - AC: E1 AC: 0 AC: p PP: 0 PP:. 0 PP: 0 IN: 0 IN: tl INe - 0 VO: 0 VO: 0 VO: 0 PG:0 PG 0 PG: 0 ' I,IG - 51 LICi 0 - LIG 0 - ~ ~ ~ ~ 7y H '~ t~7 - - - .`." N o ~ - w _ ~