Exh 8FAGENDA ITEM #8F NOVEMBER 10, 2003 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: City Hall Expansion SUBMITTED BY: Jim Hanson, Cit DATE: October 31, 2003 BACKGROUND: PQH Architects have worked with city staffto develop several alternate floor plans and cost estimates for the expansion of City Hall. The azchitects are now ready to move onto the detailed design phase of the project where plans and specifications will be prepazed for bid. However, it is necessary before moving forwazd to get an approval by the City Commission of the concept of the floor plan and decisions on alternatives. The City has $250,000 budgeted for the City Hall expansion and the basic floor plan layout is estimated to cost $240,000 plus azchitectural fees. Two major issues that have been central to the discussion of the floor plan layout: the possible addition of adrive-through window and where/how to expand the building in the future. Vazious alternatives were discussed and priced for the expansion including going up to add most of the new space on the second level, going west in front of the building and expanding on the south end of the building. Because of the way City Hall is constructed, the azchitect concluded that it is not financially feasible to expand on the second story. The addition of an elevator and the unique construction of the building make the price per square foot of a second story expansion much more costly than the first floor alternatives. The most efficient expansion from both price and operational considerations is an extension to the building on the south end with a southwest-facing angle so that the building will best utilize the existing property. New columns to match the existing ones in the building would be extended to outline the new addition. The old columns would remain with the interior walls being designed azound them. However, the columns on the exterior of the building would make it very costly to expand in the future if more floor space were ever needed. Consequently, staff asked the architect to consider an alternative that would add some additional space for future growth at this time. Both the basic floor plan AGENDA ITEM #8F NOVEMBER 10, 2003 layout (without drive-through window) and the extended floor plan are shown on the attached drawing A-1 "Floor Plans No Drive Through". While the basic floor plan has an estimated cost of $240,000, the extended floor plan has an estimated cost of $311,425 (an additional $72,360). The basic floor plan will meet the city's current needs with a small amount of space available for future use. The City Commission may want to consider the additional space from an extended floor plan now because of the expense of future expansions. A considerable amount of work went into laying out adrive- through window as a possible addition to the Project. The conclusion was that adrive-through window attached to the building was not feasible without incorporating a somewhat awkward design. Because the cashiers are currently located in the center of the building, the relocation to a side for adrive-through window would require that the relatively small building have two main entrances. Additionally, there would be a considerable amount of customer foot traffic through the halls of the building. However,. another alternative exists that appears considerably more reasonable; adrive-through kiosk in the City Hall parking lot with a pneumatic tube running to the cashiers and a two way video monitor. This can be constructed in the parking lot for an additional estimated cost of $60,000. A drawing will be presented at the commission meeting showing a possible layout. Past experience in other city facilities has shown that the addition of drive-through windows has added considerable convenience for customers, particularly those with children or those who have trouble getting in and out of their cars. The addition usually shifts between half and two thirds of the foot traffic to the drive-through. A drive-thru kiosk may get a little less use. BUDGET: The current budget for the City Hall expansion is $250,000. The basic floor plan presented is estimated to cost $240,000 in addition to architectural services. The Commission should decide between three alternatives. The first is the basic plan without a remote kiosk. The second is to extend the floor plan to add 500 square feet for an estimated additional cost of $72,360. The third is to add the drive-through kiosk at an additional cost of $60,000. The present unallocated balance in the Half Cent Sales Tax Fund is $279,000. AGENDA ITEM #8F NOVEMBER 10, 2003 RECOMMENDATION: The Mayor and Commission should decide whether the kiosk or extra floor space should be added to the budget for the City Hall Expansion Project. ATTACHMENT: 1) Basic Floor Plan Layouts; one page showing the basic and extended plans and the second page showing the same plans with drive-through windows. 2) Opinion of probable cost 11/04/2003 10:25 9042960053 PQH ARCHITECTS AGENDA ITEM #8F NOVEMBER 10, 2003 ~I` . 11111 't 1 I 1 N 1 '1 111 l 1111 1/ f • 1. 1 st...•1 a n 1.. vlwliail~arsnaar+l:zc,~ ~-a^•»:c•. wro<txny,>tr ~u/.~r wllrfranls E ~~ AIL ~~ u1. Ilu• I.I. L1.1 1 -~~ .wr •tPx 11111 Y?I;t6 ~i.Ll~ ~~ ~11rSd 000'Fl „tlvn 111/ ~ 111111 111 M.n Il ________ __ 1~ ..,.w. .,,, ~ ' .... .... F .-tl ~~ r r- ~ -- ~ ~ ~• I~ r_ ~ t ! ti ~` ~ . .,,` o ~ ~ p 1 00 '~ o b 1 1 ~ ~ 1 1 1 ~ ~ r ~~ r ~r ~ o~~r ' __ ~ 1~ 6 >s~ o ~r r r o'$ a it ~ ~ Q~ ~ ~ !i ~n ~ IK .~ c, 1 1 •~ r= 1 '' ~ , ~ ~' yE r ~ t _ ~ r ; ~ r !~ ~ I- s i 1 i ~ E n e i a 5 ~ 4 1 1 A ~ a~ I r a I r ~ ~ ~~ I ~.u.«.w...r..www «.w... w. wrwwwar.l/«wtal./wur I.wln I~wrw1.... wuwwla.rl««rrrw.........~..0 I~IM =I 4 I= 11/04/2003 10:25 9042960053 PQH ARCHITECTS AGENDA ITEM #8F NOVEMBER 10, 2003 ~~ 11111 '1111111 Yl/llal lTral 11 t i 1/ l a. I n r 1 U u a I r l a ~ ~ .s~r'Y ~w/lrll r Iil/iaat ~~ lai/ f '1'1 I.TII ..fnnl u// q~pylyyp ir-~ysa.+i/r,+~:U~K ,pgiµuw~ex aw,v,` 4c7NJJ~NIr 7JtiJ~lU1J ~ 7fsas. JLlJ~Y.7~L' 1 X (~{~ ~~ ~ti IIOOId ~~ .. Q _ ~ Iluuu uu /t h ~rl I/r . . z ~' t. t' ~ o • r, ~' e ` ~ ~ ~ ~o° -; g o ~ , A o e ~ o '~ ~ ~ ~ p ee 11 _+ ~ ~ ` - e ~ e ~ ~ e 1 a pit ! 1 ~~ o ~ ~~ o e ~ ~~ e ~ o ~ e ~~ y t- ~ ~ ~" ~ ~ ' e N ~ e i 1 r a e l ~° e 8 `~ ~ ~ ~ Mr MY1W III MINI wI/IN ~w rww1111wMY11MIMr. NNNwr rrrWYwMMM rwMwM.«wwwlr..rw wrM rMMwr MY 11/04/2003 10:25 9042960053 PQH RRCHITECTS AGENDA ITEM #8F ,~,.~}yJf~j~~''{~ f „-,-- •..~'~' '.. ... .. ' -~. '~. '•G `~-~., NOVEMBER 10, 2003 .v ~i: ~~~ •.:1'~r r. 1.. ,~ . • y .'yb ,. ter. / ... r .. :.;1.: ~ -"°--F''"}S'RIGiRG ~.. P'f~~01 ~' ' .:~j~,~;y~'y J- r:. ~'. .~5~.~.r";'.r::. ~rw.'f~. .ti+G/R~If.'~,':. 'f Li •~. .. ~ ,.. ', :~3 ~, y..~. ~p*~ •~ K t ... .. ; ... ,. ,.. .. > t < ., ~ : ~^~ '~i.~,G} ~ T• ~'-.,~•''~ 0~-•L~i5~18R. 'fkiLv~)A1hi„~~~~,`~ ... ~; ~` ,., ~ ..~ ,,~. ~ G-,..~,.r.,.,..,.. 5r~64 M,;,,i, .1. ~,' ~ l.. '~.' ,,, ~G~1 ~i~-.h r • ' ~'~:1: ~' r~.l~,~l,,J,"`j~', Lt.16Lti. :.:. '. 1 Tyr, '. \ {.r' i~~ -~~~ ~,+,• `•~r~• ~`/•~~ J~ !' '~ r :r • ~•. ~1 .j i~ r .Y ., ; .I~: . i~2" r'k.. ,;z; ~f:.,,:t J• _ .~:: V~,~• Ayr ~~,.. ,'''i~ , ~ ~ ,.. .., .1 7. ". y~`x ~/ .. ..~ UN O~>Z 4ftou up \ AiIZ ?v ~'~ / ' rNlt~iNT D~pbyfT~ZY ~ ~ ~ 1 _......_--_..._~-~.~...___ ~._ __ --~--...,.~.-- -~ ~y'~MBRiC6M,-3,p~~A` bt ~E..~..~--0Q,1V4•'tl~Rtl Z46A1~s0 i ...._.~..... __ _..r.....- f~neP ~EIC in _ .: ~ ~~ ~~ , i --- - ..~ ,_,., ~: ~' pre im,in~ 0 ilAJ,on of robable Cost ' r Covered Shelter ' / 400 sf x 550/sf = 520,000 -'A"ftIC_flE~iCFi CITY HALL ADDITION ~ Electrical = ~ $ s,ooo '-`-~----~ Equipment = 512,500 DRIVE-THRU tSLAN~~.Z~PT.. SiteJPavetnent = s 7soo . ` , 1 ~ 2D' Je~ck & Bore. Rebuild = 510,000 ri rte. +c~ Sub-Total ~ 555,000 P~H . ~ Contingency > $ 5,000 • u 1Q/.2B/03 ~ ~feNnfet~ Total S , . 11/04/2003 10:25 9042960053 PQH ARCHITECTS AGENDA ITEM#8F NOVEMBER 10, 2003 o° ' o ` ~ o 0 0 0° °o - ~ ~ Tn o o00 I u~i ~ ~ qo $ 0 ~ 0 a 0 O ¢ o ~ vi n ~ = U , ip ( to vi ~ r°~ ~ Z u~ ~ U f .. ~ w I ~w~ tis, '~ a i w ~ w co us Q ul > i ~ ~ I ~ ~ ` ~ m ~ , ; i Q ~ m f I O i~ i0 + I o CI ~ ti o N J I ~ N ~N I O `O I O O O d O O ~ ~ppp ~ (`( Op ~ pp S S ~ ~ ~ ~ f d H O O ¢ ~ O f~ 2 v~ `~ ~~ ~ r r ~ M eis <O us ~ eq U7 cn U r a i . r aq M in W I te- m ~ a , p ~ ~ VN] ~ ti N J _ p Q o o O o o S O ~ rn r~ ~ ~ ~ w ~ °0 0 ~ O c W 0. U ` _O ' ~ ~ Z w ~ ~ M e is ~ vs O w ~ ~ °' or o° °~ o ~ rn ¢ ~? ~ ~ ~i J J o °o °o °o °o ~ o °o V a v c~`L1 Ti O f a N ~ vs v; w vs o w NV! 0 m i i O ~ ~ ~ I ~ o ti o to - A cn .J to J ¢ r : I .~ ~ r , O d O O O ~ U h W W t/! aA W ~ ~ ~ O I ~ ~ '~° m ~ r m r ~ a 4 ~ ~ s ~ ~ I n V A t W m v ~.5 a h ~o > N w ~ C 4- _m ~ i ~U. Q ~ ~ ~ m o ~ h ~ ~ ~ m N ~ ~ I~ ~ ~ ~ cn O = v c -~ ~ -p ~ ®p co a ~ ' ~ ~ g ~ ~° ~ ~ ~ a ~ o ~ o <~ ~ v- ~ a c 0 0 o Q p U ~ O ~ ~~pp ` a ~ H °„ V ~ OC O _ ~ ~ j t r ~C C C }+ ~a Y M v~ oar- ,~~ a st '~ V O U CJ p u~ I I r IN ~ ~ ~ m ~ W