Loading...
1870 SHERRY DR - REVISION 11-5-18CITY OF ATLANTIC BEACH 800 Seminole Road Atlantic Beach, Florida 32233 REVISION REQUEST / CORRECTIONS TO PLAN REVIEW COMMENTS Date 11 / 0 S / 2 018 Revision to Issued Permit X Corrections to Comments Permit # R E S 18-0346 Project Address S14VRpyfir . N Contractor / Contact Name B i 11 S i e b e l Phone 904-728-4748 Description of Proposed Revision / Corrections: Email wesiebel@gmail.com Permit Fee Du $ SO Floor joist chan2e from 2x1..0 to 2x6 and addition of 3 steps f Additional Increase in iBuilding Value $19 1,0. 0 0 Additional S.F. By sign' g below, I � �. affirm the Revision is inclusive of the proposed changes. prin ed name) e 2d/g' ignature of Contractor/ gent iWontractor must sign if increase in valuation) Date (Office use Only) Approved Denied Not Applicable to Department Revision/Plan Review Comments64 10CT 7G ,Ai�� - I) Ta 1 CUP-,` V P D_e artment Review Required: Building 'PmTnt�BrtlPiing lWeviewed By Tree Administrator Public Works / Public Utilities Public Safety Date Fire Services CII 4 1_011 #4 0* 5 1-011 O r - SECOND FLOOF� PLAN SCALE: 1/2" = 1'_011 LE67END INTERRUPTER - 110 VOLT �- SINGLE -POLE SWITGH -�- SAN -LIGHT COMBINATION LE(5ENE) 6" STUD WET WALL MEZEMKM NEW STUD WALLS EXISTING REMOVED NEN STEP 0 N _I REPAIR FINI5HE5 A5 REG2UIRED AXIS INCA BE,4121N6 Wfi�LL BLOW � 2, Cl„ DEMO CLOSET WALL � BATH OOM I I N BELO I 1AI REMOVE TLE ADD NEN FOOT NO NEIL BEAM BEAR I NGS NALL REPAIR FINISHES A5 R.EOU IRED m I� EXISTING BEARINGS NALL DROP GEUNG 1-311 311 FW 3 1-011 5 I_o ll FIRs7 FLOOiR FLAN (9I-111 C X Froject Scop: Bathroom Remodel +2� 5F Project Area Information: Site P�rea N�� Gonc. Drive Porches N/A Total House NSR Total Pro osed Lot c,overa e ivies Proposed Lot Coverage N/A Mean Roof Height N/A Number of Stories 2 Type of Conetruction: Type VB -2 Unprotected Unsprinkied Occupancy Glass: ize5idential Group R3 Applicably Godes: 2017 Florida Building Code- Building (6th edition) 2017 Florida Building code- Residential (6th edition) 2014 National Electrical Gode W'Ind Zone Information: See Wind Zone N/A ELEGTRIGAL NOTES 1. LOCATE ALL NEV4 ELECTRICAL OUTLETS, 5V41 TGHE5, L 1 GHT5, SMOKE DETECTORS, FANS, AND EXHAUST FANS PER ELECTRICAL BU I LD I NO CODES. 2. VERIFY V41 BUILDER. ANY SPECIAL BOOK-UP5. (RANGE HOODS, FIREPLACE FANS, LANDSCAPE L 1 GHTS, SPRINKLER SYE\STEM, SECURITY SYSTEM, INTERCOM SYSTEM, VACUUM SYSTEM, 5NI MM I NG POOL, PUMPS, ETC.) 5. PROVIDE A MINIMUM OF -7550 OF LIGHTING TO BE H 1 GH -EFF I CAGY. ALL R.EGE55ED L 1 GHTI NG 51 -TALL BE H 16H -EFF I GAGY = ciO% + OF THE L 15HT I NG . (PHILLIPS ENDURALED PAR 35) . 4. PROVIDE FOR AFG I PROTECTION ON ALL 120 VOLT, SINGLE PHASE, 15 $ 20 AMP BRANCH CIRCUITS 5UPPLY I NG OUTLETS INSTALLED IN LI V ING ROOM, NOOK, DEN, BEDROOMS, CLOSETS, HALLNAY, OR SIMILAR ROOMS SHALL BE PROTECTED BY A LISTED A1=G I , COMBINATION TYPE, INSTALLED TO PROTECT THE BRANCH CIRCUIT. 5. OUTLETS AT COUNTERS TO BE MOUNTED AT 43" AFF, ALL OTHERS TO BE MOUNTED AT 15" AFF UNLE55 OTHERNISE NOTED. PROJECT LOCATION GENERAL 5TRUCTURAL NOTES: Gocies: Florida Building Code 2017, American Concrete Institute, American Institute of Timber Construction. 2. Live Loads: Roof: 20 psf Floor: 40 psf Stair: 40 psf 3. Wind Load Notes Codes: Florida Building Code 2017 and ASCE-7-10 GENE fRAL. NOTE s. 1. THE GONSTRUGTION ViORK SHALL GOMPLY V41TH ALL FEDERAL, STATE AND LOGAL REGULATIONS AS THEY APPLY TO THIS PROJEGT ALONG V41 TH ALL THE REQUIREMENTS OF THE STANDARD BU I LD I NGGODE, SOUTHERN BUILDING GODS GON6RE55 INTERNATIONAL , LATEST EDITIONS. 2. PROVIDE G.E.I. GIRGUIT5 AT ALL OUTSIDE AND BATHROOM REGEPTAGLES. 3. DO NOT SGALE THE DRAKN65. DIMENSIONS SHALL GOVERN IN ALL I NSTANGE5. REPORT ANY D I SGREPANG I E5 TO THE ARGH I TELT IN W I TI NG BEFORE PROGEED I NG V41 TH THE VqORK. 4. PLANS A55UME A SOIL BEARING GAPAG I TY OF 2,500P.S.F. IF SITE GONDITIONS EXIST TO THE GONTRARY, NOTIFY ARGHI TEGT IN V4RI TI NG BEFORE PROGEED I NG Voll TH THE INORK. 5. ALL GONGRETE SHALL AGHIEVE 2,500 P.S.I. BEARING GAPAG I TY IN 28 DAYS. ALL GONGRETE SHALL BE READY -MIXED IN AGGORDANGE K TH A.S.T. 5PEGIFIGATIONS. (9. ALL RE I NFORG I NG 5TEEL5HALL BE NEV4 BILLET, DEFORMED STEEL A.S.T.M. -615 GRADE 60. -7. LIGHT BROOM F 1 N I SH ALL 51 DENALKS, 5TA I R5 AND RAMPS, 5GORE GONGRETE IN PATTERN I ND I GATED . BULL N05E ALL EXP05ED GONGRETE EDGES. SEE ARGHITEGTURAL FLOOR PLAN FOR PATTERNS AND GONSTRUGTION JOINTS. 8. PROVIDE Y4" ASPHALT IMPREGNATED EXPANSION JOINT NHEREVER GONGRETE SLAB BUTTS AND VERTIGAL STRUCTURE. Q . ALL. LUMBER IN GONTAGT VIII TH MA50NRY OR GONGRETE SHALL BE PRE55URE TREATED. 10. SUBGONTRAGTORS SHALL BE RESPON51 BLE FOR PROTEGT I NG ADJAGENT 5TRUGTURE5, EGU I PMENT, STREETS, 5 I DEV4ALKS, LAN05GAP I NG AND EXISTING GON5TRUGTION. 11. GERAMIG TILE: INTERIOR GOEFFIGIENT OF FRIGTION MINIMUM (MIN) .6, EXTERIOR USES AND INTERIOR USES AND INTERIOR - ViET, GOEFFIGIENT OF FRIGTION MIN b UNGLAZED. 12. TH 15 15 A BUILDER'S SET OF GONSTRUGTION DRAK NG5. IT 15 NOT THE INTENT OF THESE DRAK NGS TO 5HOVq EVERY DETAIL OF GONSTRUGTION. THE BUILDER SHALL BE RESPONSIBLE FOR SUPPLYING ADDITIONAL AND/OR SUPPLEMENTAL INFORMATION REQUIRED FOR TH15 PROJECT. IT SHALL BE THE BUILDER'S RESPON51 BI LTY TO GHEGK, VERIFY AND GOORD I NATE D I MEN51 ONS, BEARING POINTS AMD LOADS, GON5TRUGTION DETAILS, NOTES AND ALL PHASES OF GONSTRUGTION REQUIRED TO COMPLETE TH 15 PROJEGT. ALL F I N15H AND EQUIPMENT SELEGTI ONS SHALL BE VERIFIED VIII TH THE OVqNER/ G I Pro jest 13. PRIOR TO COMMENCEMENT OF SITE WORK THE Maps, General Notes � Floor Plan 02 CONTRACTOR SHALL BE RESPONSIBLE TO LOGATE Plan, 5e6tion � Details ALL UTILITIES AND IRRIGATION LINES AND REPORT W CO Nm ANY CONFLICT WITH THIS SET OF PLANS IN WRITING TM QN TO THE ARCHITECT. REVIEWED FOR CODE COMPLIANCE � CITY OF ATLANTIC BEACH 0U_ o SEE PERMITS FOR ADDITIONAL o°W REQUiFtENtENTS AND CONDITIONS °� Aa REVIEWED BY: DATE: 0 oz INIDEX OF 1D AUJING;5 < � REVISION BP#&S / -0 3 � DATE/ Drawing # Title SIGNED/-,I,?y G I Pro jest Data, Location Maps, General Notes � Floor Plan 02 Framing Plan, 5e6tion � Details W CO Nm NOV -7 PO 8 REVISION DATE II/If1P DATE Sept. 17, 201b PROD. MGR BBB DRAWN BY EP CHECKED BY SHEET TITLE SHEET # Pro, ject 4 Data � Floor Pian a w °0 W CO Nm � QN LU 0U_ o J o°W °� Aa 0 oz i:4 d d � o DATE Sept. 17, 201b PROD. MGR BBB DRAWN BY EP CHECKED BY SHEET TITLE SHEET # Pro, ject 4 Data � Floor Pian w � QN LU sm O � � o Q Om LU� O � OL � O � a D_ DATE Sept. 17, 201b PROD. MGR BBB DRAWN BY EP CHECKED BY SHEET TITLE SHEET # Pro, ject 4 Data � Floor Pian IN MATGH EX 15T I NCS BATHROOM SECTION Ah, SGALE : 1/2 11 - 1 1-0 11 5 1_0 11 FLOOR FRAMING i=L4N WALL BEL014 NEW 24X12 FO TING W/2 #5 DONT. EBAR NEW 2X6 FLOGIR JOIST @ IC " 0+. NEW 2X12 FLO(�R JOIST 9 16" O+. BATHROOMI BELON REPAIR FINISHES AS REQUIRED REVISFI) NOV - 7 2018 1 Gp° c: , y REVISION DATE I/I/18 I/5/18 DATE Sept. 1-1, 2018 g PROJ. MGR BBB DRAWN BY EP CHECKED BY SHEET TITLE SHEET # Framing Plan, 5ection, g12 Deta i 8 CD C\JN q (y) . H 0_j 0)U_ a U a °w �m � � aU Q 0 N DATE Sept. 1-1, 2018 g PROJ. MGR BBB DRAWN BY EP CHECKED BY SHEET TITLE SHEET # Framing Plan, 5ection, g12 Deta i