1870 SHERRY DR - REVISION 11-5-18CITY OF ATLANTIC BEACH
800 Seminole Road
Atlantic Beach, Florida 32233
REVISION REQUEST / CORRECTIONS TO PLAN REVIEW COMMENTS
Date 11 / 0 S / 2 018 Revision to Issued Permit X Corrections to Comments Permit # R E S 18-0346
Project Address S14VRpyfir . N
Contractor / Contact Name B i 11 S i e b e l
Phone 904-728-4748
Description of Proposed Revision / Corrections:
Email wesiebel@gmail.com
Permit Fee Du $ SO
Floor joist chan2e from 2x1..0 to 2x6 and addition of 3 steps
f
Additional Increase in iBuilding Value $19 1,0. 0 0 Additional S.F.
By sign' g below, I � �. affirm the Revision is inclusive of the proposed changes.
prin ed name)
e
2d/g'
ignature of Contractor/ gent iWontractor must sign if increase in valuation) Date
(Office use Only)
Approved Denied
Not Applicable to Department
Revision/Plan Review Comments64 10CT 7G ,Ai�� - I) Ta 1 CUP-,` V P
D_e artment Review Required:
Building
'PmTnt�BrtlPiing lWeviewed By
Tree Administrator
Public Works /
Public Utilities
Public Safety Date
Fire Services
CII
4 1_011
#4 0* 5 1-011
O
r -
SECOND FLOOF� PLAN
SCALE: 1/2" = 1'_011
LE67END
INTERRUPTER - 110 VOLT
�- SINGLE -POLE SWITGH
-�- SAN -LIGHT COMBINATION
LE(5ENE)
6" STUD WET WALL
MEZEMKM
NEW STUD WALLS
EXISTING REMOVED
NEN
STEP
0
N
_I
REPAIR FINI5HE5
A5 REG2UIRED AXIS INCA BE,4121N6
Wfi�LL BLOW �
2, Cl„ DEMO CLOSET
WALL �
BATH OOM I
I N BELO I
1AI
REMOVE TLE
ADD NEN FOOT NO
NEIL BEAM
BEAR I NGS NALL
REPAIR FINISHES
A5 R.EOU IRED
m
I�
EXISTING
BEARINGS NALL
DROP
GEUNG
1-311 311
FW
3 1-011
5 I_o ll
FIRs7 FLOOiR FLAN
(9I-111
C
X
Froject Scop:
Bathroom Remodel
+2� 5F
Project Area Information:
Site P�rea N��
Gonc. Drive Porches N/A
Total House NSR
Total Pro osed Lot c,overa e ivies
Proposed Lot Coverage N/A
Mean Roof Height N/A
Number of Stories 2
Type of Conetruction:
Type VB -2
Unprotected
Unsprinkied
Occupancy Glass:
ize5idential Group R3
Applicably Godes:
2017 Florida Building Code- Building (6th edition)
2017 Florida Building code- Residential (6th edition)
2014 National Electrical Gode
W'Ind Zone Information:
See Wind Zone N/A
ELEGTRIGAL NOTES
1. LOCATE ALL NEV4 ELECTRICAL OUTLETS,
5V41 TGHE5, L 1 GHT5, SMOKE DETECTORS, FANS, AND
EXHAUST FANS PER ELECTRICAL BU I LD I NO CODES.
2. VERIFY V41 BUILDER. ANY SPECIAL BOOK-UP5.
(RANGE HOODS, FIREPLACE FANS, LANDSCAPE
L 1 GHTS, SPRINKLER SYE\STEM, SECURITY SYSTEM,
INTERCOM SYSTEM, VACUUM SYSTEM, 5NI MM I NG
POOL, PUMPS, ETC.)
5. PROVIDE A MINIMUM OF -7550 OF LIGHTING TO
BE H 1 GH -EFF I CAGY. ALL R.EGE55ED L 1 GHTI NG
51 -TALL BE H 16H -EFF I GAGY = ciO% + OF THE
L 15HT I NG . (PHILLIPS ENDURALED PAR 35) .
4. PROVIDE FOR AFG I PROTECTION ON ALL 120
VOLT, SINGLE PHASE, 15 $ 20 AMP BRANCH
CIRCUITS 5UPPLY I NG OUTLETS INSTALLED IN LI V ING
ROOM, NOOK, DEN, BEDROOMS, CLOSETS,
HALLNAY, OR SIMILAR ROOMS SHALL BE
PROTECTED BY A LISTED A1=G I , COMBINATION
TYPE, INSTALLED TO PROTECT THE BRANCH
CIRCUIT.
5. OUTLETS AT COUNTERS TO BE MOUNTED AT
43" AFF, ALL OTHERS TO BE MOUNTED AT 15" AFF
UNLE55 OTHERNISE NOTED.
PROJECT LOCATION
GENERAL 5TRUCTURAL NOTES:
Gocies:
Florida Building Code 2017, American Concrete Institute,
American Institute of Timber Construction.
2. Live Loads:
Roof: 20 psf
Floor: 40 psf
Stair: 40 psf
3. Wind Load Notes
Codes: Florida Building Code 2017 and ASCE-7-10
GENE fRAL. NOTE s.
1. THE GONSTRUGTION ViORK SHALL GOMPLY V41TH ALL
FEDERAL, STATE AND LOGAL REGULATIONS AS THEY
APPLY TO THIS PROJEGT ALONG V41 TH ALL THE
REQUIREMENTS OF THE STANDARD BU I LD I NGGODE,
SOUTHERN BUILDING GODS GON6RE55 INTERNATIONAL ,
LATEST EDITIONS.
2. PROVIDE G.E.I. GIRGUIT5 AT ALL OUTSIDE AND
BATHROOM REGEPTAGLES.
3. DO NOT SGALE THE DRAKN65. DIMENSIONS SHALL
GOVERN IN ALL I NSTANGE5. REPORT ANY
D I SGREPANG I E5 TO THE ARGH I TELT IN W I TI NG BEFORE
PROGEED I NG V41 TH THE VqORK.
4. PLANS A55UME A SOIL BEARING GAPAG I TY OF
2,500P.S.F. IF SITE GONDITIONS EXIST TO THE
GONTRARY, NOTIFY ARGHI TEGT IN V4RI TI NG BEFORE
PROGEED I NG Voll TH THE INORK.
5. ALL GONGRETE SHALL AGHIEVE 2,500 P.S.I. BEARING
GAPAG I TY IN 28 DAYS. ALL GONGRETE SHALL BE
READY -MIXED IN AGGORDANGE K TH A.S.T.
5PEGIFIGATIONS.
(9. ALL RE I NFORG I NG 5TEEL5HALL BE NEV4 BILLET,
DEFORMED STEEL A.S.T.M. -615 GRADE 60.
-7. LIGHT BROOM F 1 N I SH ALL 51 DENALKS, 5TA I R5 AND
RAMPS, 5GORE GONGRETE IN PATTERN I ND I GATED . BULL
N05E ALL EXP05ED GONGRETE EDGES. SEE
ARGHITEGTURAL FLOOR PLAN FOR PATTERNS AND
GONSTRUGTION JOINTS.
8. PROVIDE Y4" ASPHALT IMPREGNATED EXPANSION
JOINT NHEREVER GONGRETE SLAB BUTTS AND
VERTIGAL STRUCTURE.
Q . ALL. LUMBER IN GONTAGT VIII TH MA50NRY OR
GONGRETE SHALL BE PRE55URE TREATED.
10. SUBGONTRAGTORS SHALL BE RESPON51 BLE FOR
PROTEGT I NG ADJAGENT 5TRUGTURE5, EGU I PMENT,
STREETS, 5 I DEV4ALKS, LAN05GAP I NG AND EXISTING
GON5TRUGTION.
11. GERAMIG TILE: INTERIOR GOEFFIGIENT OF FRIGTION
MINIMUM (MIN) .6, EXTERIOR USES AND INTERIOR USES
AND INTERIOR - ViET, GOEFFIGIENT OF FRIGTION MIN
b UNGLAZED.
12. TH 15 15 A BUILDER'S SET OF GONSTRUGTION
DRAK NG5. IT 15 NOT THE INTENT OF THESE DRAK NGS
TO 5HOVq EVERY DETAIL OF GONSTRUGTION. THE
BUILDER SHALL BE RESPONSIBLE FOR SUPPLYING
ADDITIONAL AND/OR SUPPLEMENTAL INFORMATION
REQUIRED FOR TH15 PROJECT. IT SHALL BE THE
BUILDER'S RESPON51 BI LTY TO GHEGK, VERIFY AND
GOORD I NATE D I MEN51 ONS, BEARING POINTS AMD
LOADS, GON5TRUGTION DETAILS, NOTES AND ALL
PHASES OF GONSTRUGTION REQUIRED TO COMPLETE
TH 15 PROJEGT. ALL F I N15H AND EQUIPMENT
SELEGTI ONS SHALL BE VERIFIED VIII TH THE OVqNER/
G I
Pro jest
13. PRIOR TO COMMENCEMENT OF SITE WORK THE
Maps, General Notes � Floor Plan
02
CONTRACTOR SHALL BE RESPONSIBLE TO LOGATE
Plan, 5e6tion �
Details
ALL UTILITIES AND IRRIGATION LINES AND REPORT
W
CO
Nm
ANY CONFLICT WITH THIS SET OF PLANS IN WRITING
TM
QN
TO THE ARCHITECT. REVIEWED FOR CODE COMPLIANCE
�
CITY OF ATLANTIC BEACH
0U_
o
SEE PERMITS FOR ADDITIONAL
o°W
REQUiFtENtENTS AND CONDITIONS
°�
Aa
REVIEWED BY: DATE:
0
oz
INIDEX OF 1D AUJING;5
<
�
REVISION
BP#&S / -0 3 �
DATE/
Drawing # Title SIGNED/-,I,?y
G I
Pro jest
Data, Location
Maps, General Notes � Floor Plan
02
Framing
Plan, 5e6tion �
Details
W
CO
Nm
NOV -7 PO 8
REVISION
DATE
II/If1P
DATE Sept. 17, 201b
PROD. MGR BBB
DRAWN BY EP
CHECKED BY
SHEET TITLE SHEET #
Pro, ject 4
Data �
Floor Pian
a
w
°0
W
CO
Nm
�
QN
LU
0U_
o
J
o°W
°�
Aa
0
oz
i:4
d d
�
o
DATE Sept. 17, 201b
PROD. MGR BBB
DRAWN BY EP
CHECKED BY
SHEET TITLE SHEET #
Pro, ject 4
Data �
Floor Pian
w
�
QN
LU
sm
O
�
�
o
Q
Om
LU�
O
�
OL
�
O
�
a
D_
DATE Sept. 17, 201b
PROD. MGR BBB
DRAWN BY EP
CHECKED BY
SHEET TITLE SHEET #
Pro, ject 4
Data �
Floor Pian
IN
MATGH EX 15T I NCS
BATHROOM SECTION Ah,
SGALE : 1/2 11 - 1 1-0
11
5 1_0 11
FLOOR FRAMING i=L4N
WALL BEL014
NEW 24X12 FO TING
W/2 #5 DONT. EBAR
NEW 2X6 FLOGIR
JOIST @ IC " 0+.
NEW 2X12 FLO(�R
JOIST 9 16" O+.
BATHROOMI
BELON
REPAIR FINISHES
AS REQUIRED
REVISFI)
NOV - 7 2018
1
Gp° c: , y
REVISION DATE
I/I/18
I/5/18
DATE Sept. 1-1, 2018
g
PROJ. MGR BBB
DRAWN BY EP
CHECKED BY
SHEET TITLE SHEET #
Framing
Plan,
5ection, g12
Deta i
8
CD
C\JN
q (y)
.
H
0_j
0)U_
a
U
a
°w
�m
�
�
aU
Q
0
N
DATE Sept. 1-1, 2018
g
PROJ. MGR BBB
DRAWN BY EP
CHECKED BY
SHEET TITLE SHEET #
Framing
Plan,
5ection, g12
Deta i