Loading...
1 FLEET LANDING BV ROW18-0037 ROW PERMIT rS ''\1i, RIGHT OF WAY PERMIT PERMIT NUMBER `'4' ,.- f ROW 18-0037 c,i> „ r, CITY OF ATLANTIC BEACH OF V~ 800 SEMINOLE ROAD ISSUED: 12/27/2018 usty>r. EXPIRES: 3/27/2019 ATLANTIC BEACH. FL 32233 MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. NOTICE: In addition to the requirements of this permit,there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies,or federal agencies. JOB ADDRESS: PERMIT TYPE: DESCRIPTION: VALUE OF WORK: 1 FLEET LANDING BV RIGHT OF WAY SINGLE OR TWO AT &T RIGHT OF WAY $0.00 FAMILY RIGHT OF WAY TYPE OF REAL ESTATE j ZONING: BUILDING USE SUBDIVISION: CONSTRUCTION: NUMBER: GROUP: 169397 0200 SECTION LAND COMPANY: ADDRESS: CITY: STATE: ZIP: AT&T OWNER: ADDRESS: ! CITY: STATE: ZIP: NAVAL CONTINUING CARE RETIREMENT 1 FLEET LANDING BLVD ATLANTIC BEACH FL 32233-4599 FOUNDATION INC WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF 'COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. 1 PUBLIC WORKS ON SITE RUNOFF INFORMATIONAL Notes: All runoff must remain on-site during construction. Issued Date: 12/27/2018 1 of 2 rS'"`'iv RIGHT OF WAY PERMIT PERMIT NUMBER J" 1 x), II, ,:..- s CITY OF ATLANTIC BEACH su ROw18-0037 ?\t41 �V� 800 SEMINOLE ROAD ISSUED: 12/27/2018 10-I19, ATLANTIC BEACH. FL 32233 EXPIRES: 3/27/2019 2 PUBLIC WORKS ROLL OFF CONTAINER INFORMATIONAL Notes: Roll off container company must be on City approved list(Advanced Disposal,Realco Recycling,Shapells,Inc.,Republic Services,Donovan Dumpsters, Phillips Containers). Container cannot be placed on City right-of-way. 3 PUBLIC WORKS RIGHT OF WAY RESTORATION INFORMATIONAL Notes: Full right-of-way restoration,including sod,is required. 4 PUBLIC WORKS ADDITIONAL COMMENTS PUBLIC WORKS INFORMATIONAL Notes: Any damage done to City infrastructure must be repaired by Contractor. FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT TOTAL: Issued Date: 12/27/2018 2 of 2 ;5�..1,yri, City of Atlantic Beach APPLICATION NUMBER 4' Building Department (To be assigned by the Building Department.) `�' 800 Seminole Road /�? �] -0 Atlantic Beach, Florida 32233-5445 ���w I J l Phone(904)247-5826 • Fax(904)247-5845 / 118 on cY E-mail: building-dept@coab.us Date routed: I ( z City web-site: http://www.coab.us APPLICATION REVIEW AND TRACKING FORM Property Address: l r--L7 Como jkpc Department_ review required Yes No 1 Planning &zo�Building ‘sl-Applicant: � €- T. llw� 1.---- ( n Tree Administrator Project: 13 u R( e_O 6 C O. A 6[ (: Flic Works Public Utilities ` Public Safety Fire Services Review fee $ Dept Signature Other Agency Review or Permit Required Review or Receipt Date of Permit Verified By Florida Dept. of Environmental Protection Florida Dept. of Transportation St.Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS Reviewing Department First Review: ['Approved. Denied. J2Not applicable (Circle one.) Comments: I ;9',. of ' NING &ZONINGl°-16_ r8 Reviewed by: - Date: TREE ADMIN. Second Review: ❑Approved as revised. ❑Denied. ❑Not applicable PUBLIC WORKS Comments: •UBLIC UTILITIES PUBLIC SAFETY Reviewed by:_ Date: FIRE SERVICES Third Review: Approved as revised. ❑Denied. Not applicable Comments: Reviewed by: Date: Revised 05/19/2017 01.Anr.4., City of Atlantic Beach D,....:4,...._ot d.r.» APPLICATION NUMBER Js t, Building Departmenry assigned by the Building Department.) `' 800 Seminole Road �w I S2` _ ��3 �� Atlantic Beach, Florida 32233-5445 °C'1 1 2 2113 i'� 6 7 Phone (904)247 5826 Fax(904)247-5845 CV \coil 9:? E-mail: building-dept@coab.us routed: I V - fi g City web-site: http://www.coab.us �� APPLICATION REVIEW AND TRACKING FORM Property Address: I EL. T LA/0Q m.y Department review required Yes No I Buildin Applicant: IC-C t ` tanning &Zoning j RFT( Tree Administrator Project: 13 U R( En e c_2__ 0 A�c (, , blic Works -----) �u61ic Utilities - Public Safety Fire Services Review fee $ Dept Signature Other Agency Review or Permit Required Review or Receipt Date of Permit Verified By Florida Dept. of Environmental Protection Florida Dept. of Transportation St.Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS Reviewing Department First Review: Approved. ['Denied. ['Not applicable (Circle one.) Comments: NING &ZONING Reviewed b • Date:/0./7-J TREE ADMIN. Second Review: A roved as revised. ❑ pp ❑Denied. ❑Not applicable PUBLIC WORKS Comments: 'UBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: FIRE SERVICES Third Review: ['Approved as revised. (Denied. ❑Not applicable Comments: Reviewed by: Date: Revised 05/19/2017 aS.1_,`v'f,r, City of Atlantic Beach �j� APPLICATION NUMBER �`� Building Department ��.•ii (To be assigned by the Building Department.) . ;s,� �i J ,C � 800 Seminole Road �+T � Row 1, . yrPhonte 04c24715826 3Fax3 5445 4 247 58 O`/ �2 ( � Ud3 7 ( ) ( ) P../.0109'i• E-mail: building-dept@coab.us �Q18 • Date routed: I /1 z 1 8 City web-site: http://www.coab.us APPLICATION REVIEW AND TRACKING FORM Property Address: l FLEET L cf j101 Department review required Yes No Building Applicant: - anning &Zoning Tree Administrator f.Project: I D UR( 0 Ft e 0_ Ate)t C, ublic Works ublic i sties -Public Safety Fire Services Review fee $ Dept Signature G Other Agency Review or Permit Required Review or Receipt Date of Permit Verified By Florida Dept. of Environmental Protection Florida Dept. of Transportation St.Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS Reviewing Department First Review: ❑Approved. ❑Denied. Not applicable (Circle one.) ommens: � /. � Comments: u'�'l't �I�-o�'r� or , I I NTNG & ZONING-":), (--"--14-'1"------ Reviewed by: - Date: /Q -/CV/r TREE ADMIN. Second Review: Approved as revis . Denied. ❑Not applicable PUBLIC WORKS Comments: 'UBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: FIRE SERVICES Third Review: ❑Approved as revised. I 'Denied. ❑Not applicable Comments: Reviewed by: Date: Revised 05/19/2017 ,(.0.1141.4, i. A .�, RIGHT-OF-WAY/ EASEMENT PERMIT _.,;:,r v Permit#Issued by the City of Atlantic Beach PERMITTEE RESPONSIBLE FOR NOTIFYING 811 AND OBTAINING UTILITY LOCATES Job Address 1 FLEET LANDING BLVD Phone 904-777-9052 ext 258 Permittee AT&T 83E68292N Tony Pellegrini - Carlos Garcia Email rbonts@truenetcommunications.com Requesting Permission to Construct Placing buried fiber cable by trench and bore Please see plans for additional information. Location(Reference to Cross-Street) Mayport Rd and Fleet Landing Blvd • Permittee declares that prior to filing this application they have ascertained the location of all existing utilities, both aerial and underground and the accurate locations are shown on the sketches. • Whenever necessary for the construction,repair,improvement,maintenance,safe and efficient operation, alteration or relocation of all,or any portion of said street or easement as determined by the Director of Public Works,any or all said poles,wires,pipes,cables or other facilities and appurtenances authorized hereunder,shall be immediately removed from said street or easement or reset or relocated hereon as required by the Director of Public Works and at the expense of the Permittee unless reimbursement is authorized. • All work shall meet City of Atlantic Beach or Florida Department of Transportation Standards and be performed under the supervision of Richard Yeater (Project Superintendent) with Company Name Danella Construction Corp of FL Phone 904-575-0070 • All materials and equipment shall be subject to inspection by the Director of Public Works. • All city property shall be restored to its original condition as far as practical,in keeping with City specifications and the manner satisfactory to the City. • A sketch of plans covering details of this installation,as well as a copy of a recent survey shall be made a part of this permit. Calculations showing any increase in impervious area on owner's lot or in the City right-of-way are to be included with this application. • The permittee shall commence actual construction in good faith within 60 days. If the beginning date is more than 60 days from date of permit approval then permittee must review the permit with the Director of Public Works to make sure no changes have occurred in the area that would affect the permitted construction. • It is understood and agreed that the rights and privileges herein set out are granted only to the extent of the City's right,title and interest in the land to be entered upon and used by the holder,and the holder will,at all times, assume all risk of and indemnify,defend and save harmless the City of Atlantic Beach from and against any and all loss,damage and cost of expenses arising in any manner of the exercise or attempted exercises by the holder of the aforesaid rights and privileges. • The Director of Public Works shall be notified twenty-four(24)hours prior to starting work and again immediatelydiupon completion. %ve. ,//-' Date /y/e//8 Permittee(signed in presence of Notary Public) STATE OF FLORIDA,COUNTY OF DUVAL The foregoing instrument( was acknowledged this I O day of 0 C4-) bE r ,20 ( 8 , Coy l r(D 5 lJ o (C t ,who personally appeared before me and (printed name of Permittee) ac,.wledged that he/she ' ed the instrument voluntarily for the purpose expressed in it. _• n �4AS Personally Known V Si_• ature, • • • ' , ' •_ . • .. Produced Identification(Type) BRENDA A.PAUSCHE MY COMMISSION#PP9378S 1 aM1e EXPIRES:Novmmbar 19,2019 PERMIT TO PLACE FIBER—OPTIC CABLE IN THE RIGHT OF WAY OF �`1 'i VICINITY MAP ., =N!A= 1TY �, E ATLA \ TIC BEA : — 1W' -I 6 VO ALONG W FLEET LANDING BLVD 0 F\EEZ `PNNGO� L MAINTENANCE OF TRAFFIC PLANS INCLUDED WITH DRAWING SYMBOL LEGEND ASSISI LN CONSTRUCTION NOTES: Tagosed C> 0 Drattden PROP I) SIDEWALK TO BE REMOVED AND REPLACED AS NEEDED O (21• CBL FOR BORE AND CORE. AERIAL CABLE EX MH —e—Q— —B ® BIM CABLE 2) RESTORATION PER FLDOT STANDARDS 3) UTILITY LOCATIONS (TELEPHONE AND NON-TELEPHONE) —BJ— —BJ— BUR JOINT•TRENCR ARE TO BEST 1NFORMATION AND APPROXIMATE ONLY. • O e5TPaE SEE OWNERS & CONTRACTORS FOR VERIFICATION OF EXACT LOCATION PRIOR TO WORK OPERATI ONS. * * puce POLE 4) NOTIFY FOOT INSPECTOR 2 FULL BUSINESS DAYS BEFORE _,( --.< LOW u OJT BEGINNING WORK 5) RESTORE ALL EXCAVATIONS TO ORIGINAL OR —Pe —� PUSH BRACE BETTER. _A_� ___A-4— / coELLRC 6) ALL TRENCHES WILL BE OPENED AND MAINTAINED CO to ENuoLAE FOLLOWING CURRENT AUM AND FOOT STANDARD PLANS. = WNCLE BORE DETAIL: TYPICAL BORE MAX.REAMER SIZE: 4' I I I S RECOMMENDED THAT AND D1 GGI NG, SOFT, Q SOFT GIGGING. VACUUM EXCAVATION ETC. BE USED I- 1 I---1 PRHiCBOJT IN THE 24' TOLERANCE ZONE TO EXPOSE UNDERGROUND SETBACK DISTAKE: SETBACK DISTANCE, 4•X4'X5' FACI LI TIES. CA_MK� AM R CABLE HAREEM t' 11 —a{ [ I I IPI? I VI NG 7) CALL SUNSH]NE STATE ONE CALL FLORI DA. I NC �ti^ �� AERYL SVC IRE NT AT 811 TO REQUEST A LOCATE OF ANY UNDERGROUND ( ,.. W FACILITIES AT YOUR EXCAVATION SI TE. •—B-- --8-- BUILD SVC OE w 8) CONTRACTOR TO PROVIDE A NOTICE OF COMMENCEMENT ••—e+-- ---u-- S411-TRENCH SVC ENTRY ANGLE, EXIT ALE, TO THE PERMIT AGENCY ENGI NEERI NG DEPARTMENT 48 HOURS PRI OR TO BEG!NNI NG CONSTRUCT]ON. • N/A BOR J� MALES �� 9) MAI NTAI N 1 8' VERTI CAL CLEARANCE. 6' HORI ZONTAL v,,,,,,,,/1 N/A OJT PAVEMENT CLEARANCE BETWEEN EXISTING UTILITIES AND 36' I__. COVER. `__1 N/A SPLCOC PIT CAaro®N CALL BEFORE YOU DIG 1 0) ALL WORK PERFORMED WI THIN THE FOOT RI GHT-OF-WAY 2SS'Ia N/A TRENCH IENBOEPIN SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS • OF THE FOOT DESIGN STANDARDS, THE LATEST EDITION Volts to Ground`/ DIAL OF THE FICATIONSSPEC! FOR ROAD AND BRIDGE 14.4 KV ;i1` 811 CONSTRUCTION AND THE CURRENT UTILITY ACCOMMODATION MANUAL. PERMI TEE SHALL NOT BEGIN A DIRECTIONAL BORE ACROSS A STATE ROAD UNTIL A FOOT INSPECTOR TTSE JOIST USE POWER CDWANT TWO FULL BUS.DAYS BEFORE YOU DIG IS PRESENT AT THE JOB SI TE AND AGREES THAT PROPER I t JEA ELECT BUSIED ' 4fMX'M'SRS5 PREPARATIONS HAVE BEEN MADE. .. 1a.� C0 �'Pt ' '1i PROPOSED TELEPHONE FACILITIES ..,STAIN PROPER pTER CLEARANCE 511=701.21V`"'"' +` 11) 24' MI NI MUM TI ON FROM EXI STING STORM ORAL NS. 201 8 UAM MI NI MUM MUM DEPTH REOUI REMENTS SHALL ST1 LL ON RIGHT OF WAY OF BE ENFORCED. ATLANTIC BEACH I2) REPLACE SIDEWALK JOINT TO JOINT PER CURRENT DESIGN STANDARD I NDEX NO. 310. W FLEET LANDING BLVD SCOPE OF WORK. MAINTFNFNCF [1F TRAFFIC NOTE TO PERMITTING AGENCY. Euroxlm PLACE NEW FIBER-OPTIC CABLE904241 IN FDOT RIGHT OF WAY. REFER TO WORKERS WILL UTILIZE THE BELOW INFORMATION IS THE ORIGINAL DRAFT PERSON WORKPRINTS FOR ADDITIONAL DETAILS FDOT M.O.T. 602 WHO HAS DETAILED FIELD KNOWLEDGE OF THE PROPOSED Designer WORK TO BE PERFORMED ON THIS PERMIT REQUEST AND PellegrIn],Tony SHOULD BE THE FIRST POINT OF CONTACT WITH QUESTIONS REGARDING THESE FIELD CONDITIONS AND/OR CORRECTIONS pram 904-727-1546 TO THIS PERMIT REQUEST. Autnorizotton RYAN STANLEY 83E68292N NOTE: OTHER CABLES OMITTED FOR CLARITY q04-806-8104 Deg. I 0 \`1'/ — N/A — ROAD WORK AHEA1 END ROAD WORK A 0 a a b I b A B Taper Length•15L Wm�• See Table ll /�///////// END Table II ROAD ROAD WORK• Te.erLength-Shoulder WORK /, Device Spacing-Taper Device Spacing-Tangent 500' e> S..Table I See Table I Speed 16L(e) AHEAD Iftf (mph) 6' 10' 12' Hetes 111•11LP: � •Ilii Shklr, Shirk. SNdr. FUM 25 28 35 42 Table I 30 40 50 60 L. ' Device Spacing 35 55 66 82 60 Mao.Diann Between Devices 16.1 40 72 60 107 Speed Cones or Type I or Type II 45 120 150 150 (mph) Tubular Markers Bn an da r Drumsor 50 133 167 200 DISTANCE BETWEEN SIGNS Pa^•I•arom'^a 55 147 183 220 Taper Tangent Taper Tangent Speed Spacing(6.) 60 160 200 240 L•WS A B 25 25 50 25 50 40 mph o Has 200 200 30 to 45 25 50 30 50 85 173 217 260 45 mph 350 350 70 187 233 280 5010 70 25 50 50 100 50 mph or greater 500 500 IF minimum.hou0.r width 'Midway between sign. yid•Length 08 Halder leper In feel SYMBOLS GENERAL NOTES DURATION NOTES W.math oftotal soUlds,Infeet(camblf.dpaved and unpaved width) ® Work Ansa 1. When lour or more won veNdes enter the through lnttic lanes Ina one hour period o bas 1.Signs and channellxing devices may be omitted B a6 of the following (e.dudthg eslab6Yig and terminating to wok area).the advanced FLAGGER dpi shall be substituted condition.are met: 5•Posted speed time(mph) for the WORKERS sign.Foe location of baggers and FLAGGER signs.ate Ines 102-603. •. WOW operation are 60 minutes or Nu. ■ Channellbng Device(See Index 1028001 b, Vehldes N the work area have Ngb-Inlenolny,mating,flashing, 2. SHOULDER WORK sign may be used as an altem.te to the WORKER symbol sign only on the side osdlledng,or strobe lights op.rMing. Wok Zoe Sign vANire the shoulder wont I.being performed. A T T S E as Lane k antibtlon.Okedbn of Trades 3. When.old.road Intersect.the Nghw.y vl0ln the TTC zone,additional TTC dnce.MW be pined thacoaeance with other applicable TCZ Index.. PROPOSED TELEPHONE FACILITIES ON RIGHT OF WAY OF 4. For general TCC requirements and additional Infonotion,refer to Index 102.000. CONDITIONS ATLANTIC BEACH WHERE ANY VEHICLE.ECIUIPAIENi, WORKERS OR THEIR ACTIVITIES ENCROACH THE AREA CLOSER W FLEET LANDING BLVD THAN 15'BUT NOT CLOSER THAN 7 TO THE EDGE OF TRAVEL WAY. Exchagen 904241 a Designer: 11 PellegrInl,Tony LAST = m DESCIIIPTION: FY 2018-19 INDEX SHEET pt O REVISION FD TWO-LANE, TWO-WAY, WORK ON SHOULDER 904-727-1546 11/01/17 `> STANDARD PLANS 102-602 I of 1gr Authorization 83E68292N Dog. 2 of _ CALL BEFORE YOU DIG pp®s.®EXISTING AT&T m® m BURIED CABLES E !CCM p \'t'/ DIAL ®�®�® 249' PROPOSED BORE w FLL00KING EAST BLVD SYMBOL LEGEND �` 811 ®� ®W/ 2" HDPE CONDUIT Nowt F' • Wb' / ,\ 1 I 60 -28'—. Q PNO FULL BUS.DAYS BEFORE YOU DIG CABLE ®65' PROPOSED BORE N.-. O O N.3 rj!�TT �y"Qf;'n��!�� �y W/ 2" HDPE CONDUIT m m ¢ _Y_— —Y J GUYED CABLE g''�R•+XtCLI'ih- 1 1 �8• —8�— —BA— OUR JOINT-TIEICII ®55' PROPOSED BORE t • 0 W/ 2" HDPE CONDUIT r 1 OST POLE 0 444' PROPOSED AT&T BURIED 24-FIBER 0 * * POSEY POLE OPTIC CABLE TO BE PLACED VIA DIRECTIONAL BORE (48" MIN DEPTH) ®117' PROPOSED BORE 3 v .4 --4--4.‹. —.4( MOON Y Gln &MECHANICAL TRENCH(30" MIN DEPTH) WI 2" HDPE CONDUIT e.f i -+-IM —4—R8 PM YULE I a a ..-i\-- __Al — EICLOSUE x g W W SS## +.0 tEl MOM Q = WHOLE ISH I TME/CpOUT rA-MKR CA-MKR CABLE NOW .....-4..-4„„.... .ivy AMYL SVC DIX ij.' 7 w I m X / / -e- - --e-. BURIED SVD E I I R >48•• •----_ --_„-- JpEIq SVC a-TM I 100 I �T >>•.4 ' Iva MK X13' - ! 75' J 12'— i/ 8 f! 1 I i I ENTERS CITY 6.7,1 [/////7 Kn CUT PAVEMENT -R/W--—J I I ; RIGHT OF WAY / t- e A SPLCYY MT ill L--I I i R/W--- -r- --, s� 2N'�fi7') WA TIEICX LEWOEPTN I I FLEET LANDING BLVD W e "3/ I I e it` g/ �/ J BOC 1,,� I I .1 - 3' W W W w a a + to LII / Ts'' EXITS CITY .—-— -—---—-— '—-—-—-—- --3.--- --'-•-- J RIGHT OF WAY I I ����� �� a cif s� ..... .E�N-E�rA�iIM4 �'`3 I I l.:3 myTrr��a,.a-�.-.��am .�.=� !cmAT;.:z.�-4-- cc���� Q efcsaV 54 IS0 I 8' 6110111111111111111M.. "-V.:114 Wilt t>t m II T -R/W-- -r CD BOC a _I,j_ J_ m1!61 ♦ Cf3COMM 80C -. O ') ! 8 0 s;i 28' 0/W .j BOC A T T S E -R/ J I 0+ll I Sri J PROPOSED TELEPHONE FACILITIES D I 0*131 1 3 I ONATLANTCIGHT FBEACH WAY OF h 3'! 1 -< ! Eu I j 0 m W FLEET LANDING.BLVD I j j m� k• o� EaU Doge ( `I\0+08 I m 904241 I0 j Designer. 1 I PellegrTnT,Tony nIPtainm \` 0+60 0 904-727-1546 - 15' I i Authorization xi v+.c.� AN OL A &T 83E68292N - . D.Q. ___3_ or _L. o 'AI I f BORE DETAIL: TYPICAL BORE SETBACK DISTANCE: 14 J. 4s Rin ENTRY ANGLE: 16* vewlGc Volts to Ground 14.4 KV JOINT USE POWER COMPANY JEA ELECT BURIED MAINTAIN PROPER POWER CLEARANCE SCOPE OF WORK: PLACE NEW FIBER-OPTIC CABLE IN FDOT RIGHT OF WAY. REFER TO WORKPRINTS FOR ADDITIONAL DETAILS NOTE: OTHER CABLES OMITTED FOR CLARITY PERMIT TO PLACE FIBER-OPTIC CABLE_ IN THE RIGHT OF WAY OF �CITY OF ATLANTIC B[ACH ALONG W FLEET LANDING BLVD SIZE: 4' SETBACK DISTANCE: 4' X4' X5' P! CEI VI NG XIT ANGLE: 16' WORKERS WILL UTILIZE FDOT M.O.T. 602 MAINTENANCE OF TRAFFIC PLANS INCLUDED WITH DRAWING CONSTRUCTION NOTES: 1) SIDEWALK TO BE REMOVED AND REPLACED AS NEEDED FOR BORE AND CORE. 2) RESTORATION PER FLOOT STANDARDS 3) UTILITY LOCATIONS ( TELEPHONE AND NON -TELEPHONE) ARE TO BEST INFORMATION AND APPROXIMATE ONLY. SEE OWNERS & CONTRACTORS FOR VERIFICATION OF EXACT LOCATION PRIOR TO WORK OPERATIONS. 4) NOTIFY FOOT INSPECTOR 2 FULL BUSINESS DAYS BEFORE BEGINNING WORK 5) RESTORE ALL EXCAVATIONS TO ORIGINAL OR BETTER. 6) ALL TRENCHES WILL BE OPENED AND MAINTAINED FOLLOWING CURRENT AUM AND FOOT STANDARD PLANS. IT IS RECOMMENDED THAT AND DIGGING, SOFT, SOFT DIGGING. VACUUM EXCAVATION ETC. BE USED IN THE 24' TOLERANCE ZONE TO EXPOSE UNDERGROUND FACILITIES. 7) CALL SUNSHINE STATE ONE CALL FLORIDA, INC AT 811 TO REQUEST A LOCATE OF ANY UNDERGROUND FACILITIES AT YOUR EXCAVATION SITE. 8) CONTRACTOR TO PROVIDE A NOTICE OF COMMENCEMENT TO THE PERMIT AGENCY ENGINEERING DEPARTMENT 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. 9) MAINTAIN 18' VERTICAL CLEARANCE, 6' HORIZONTAL CLEARANCE BETWEEN EXISTING UTILITIES AND 36' COVER. 1 0) ALL WORK PERFORMED WITHIN THE FOOT RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS OF THE FOOT DESIGN STANDARDS. THE LATEST EDITION OF THE SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND THE CURRENT UTILITY ACCOMMODATION MANUAL. PERMI TEE SHALL NOT BEGIN A DIRECTIONAL BORE ACROSS A STATE ROAD UNTIL A FOOT INSPECTOR IS PRESENT AT THE JOB SITE AND AGREES THAT PROPER PREPARATIONS HAVE BEEN MADE. 1 1) 24' MINIMUM SEPERATI ON FROM EXISTING STORM DRAINS. 2018 UAM MINIMUM DEPTH REOUI REMENTS SHALL STILL BE ENFORCED. 1 2) REPLACE SIDEWALK JOINT TO JOINT PER CURRENT DESIGN STANDARD INDEX NO. 310. NOTE TO PERMITTING AGENCY: SYMBOL LEGEND ALL BEFORE YOU DIG Exlsurp DIAL 811 TWO FULL BUS. DAYS BEFORE YOU DIG T IS THE CONTRACTORS RESPONSIBILITY TO CONTACT TILITY COMPANIES PRIOR TO ANY CONSTRUCTION AS HE LOCATION OF UTILITIES SHOWN ON THIS PLAT ARE PPROXIMATE AND POSSIBLY INCOMPLETE. THEREFORE ERTIFICATION TO THE LOCATION OF ALL IXAERGROJND JTILITIES 15 WITHHELD. WORKERS WILL UTILIZE FDOT M.O.T. 602 MAINTENANCE OF TRAFFIC PLANS INCLUDED WITH DRAWING CONSTRUCTION NOTES: 1) SIDEWALK TO BE REMOVED AND REPLACED AS NEEDED FOR BORE AND CORE. 2) RESTORATION PER FLOOT STANDARDS 3) UTILITY LOCATIONS ( TELEPHONE AND NON -TELEPHONE) ARE TO BEST INFORMATION AND APPROXIMATE ONLY. SEE OWNERS & CONTRACTORS FOR VERIFICATION OF EXACT LOCATION PRIOR TO WORK OPERATIONS. 4) NOTIFY FOOT INSPECTOR 2 FULL BUSINESS DAYS BEFORE BEGINNING WORK 5) RESTORE ALL EXCAVATIONS TO ORIGINAL OR BETTER. 6) ALL TRENCHES WILL BE OPENED AND MAINTAINED FOLLOWING CURRENT AUM AND FOOT STANDARD PLANS. IT IS RECOMMENDED THAT AND DIGGING, SOFT, SOFT DIGGING. VACUUM EXCAVATION ETC. BE USED IN THE 24' TOLERANCE ZONE TO EXPOSE UNDERGROUND FACILITIES. 7) CALL SUNSHINE STATE ONE CALL FLORIDA, INC AT 811 TO REQUEST A LOCATE OF ANY UNDERGROUND FACILITIES AT YOUR EXCAVATION SITE. 8) CONTRACTOR TO PROVIDE A NOTICE OF COMMENCEMENT TO THE PERMIT AGENCY ENGINEERING DEPARTMENT 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. 9) MAINTAIN 18' VERTICAL CLEARANCE, 6' HORIZONTAL CLEARANCE BETWEEN EXISTING UTILITIES AND 36' COVER. 1 0) ALL WORK PERFORMED WITHIN THE FOOT RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS OF THE FOOT DESIGN STANDARDS. THE LATEST EDITION OF THE SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND THE CURRENT UTILITY ACCOMMODATION MANUAL. PERMI TEE SHALL NOT BEGIN A DIRECTIONAL BORE ACROSS A STATE ROAD UNTIL A FOOT INSPECTOR IS PRESENT AT THE JOB SITE AND AGREES THAT PROPER PREPARATIONS HAVE BEEN MADE. 1 1) 24' MINIMUM SEPERATI ON FROM EXISTING STORM DRAINS. 2018 UAM MINIMUM DEPTH REOUI REMENTS SHALL STILL BE ENFORCED. 1 2) REPLACE SIDEWALK JOINT TO JOINT PER CURRENT DESIGN STANDARD INDEX NO. 310. NOTE TO PERMITTING AGENCY: SYMBOL LEGEND p'aoase0 Exlsurp Dawl0kin AERIAL CABLE — e // — B /! BURIED CABLE -BJ— — BUR JOINT -TRENCH BJ O BST POLE POWER POLE --•� ANCHOR & GUY --4— pg —E— pB PUSH BRACE ENCLOSURE �a ZQ ENCLOSURE MANHOLE PPE/CONDUIT AG MKR r CA-MKR, CABLE MARKER -�,^�► . ��' AERIAL SVC WIRE — B — — - — B — BURIED SVC WIRE - —ea— - - - —ej— - JOINT -TRENCH SVC -- - - -- N/A BORE N/A CUT PAVEMENT r - -' L__I N/A SPLICING PIT N/A TRENCH LENoDEPTH THE BELOW INFORMATION IS THE ORIGINAL DRAFT PERSON WHO HAS DETAILED FIELD KNOWLEDGE OF THE PROPOSED WORK TO BE PERFORMED ON THIS PERMIT REQUEST, AND SHOULD BE THE FIRST POINT OF CONTACT WITH QUESTIONS REGARDING THESE FIELD CONDITIONS AND/OR CORRECTIONS TO THIS PERMIT REQUEST. RYAN STANLEY q04 -80G -B104 ATTSE 11 OSED TELEPHONE FACILITIES ON RIGHT OF WAY OF ATLANTIC BEACH W FLEET LANDING BLVD 904241 Designer: Pellegrini,Teny 904-727-1546 Authorization: 83E68292N DWg. I of 3 a END ROAD WORK Lt' I A ROAD WORK AHEAD sPEEuIINo I�LF111 OOED WEN WORKERS PRESENT DISTANCE BETWEEN SIGNS "SpacdingSpeed40 mph or Tess 45 mph 50 mph or greater Midway between signs. SYMBOLS ® Work Area ■ Channelizing Device (See Index 102-600) Taper Tangent Taper Tangent Work Zone Sign 25 50 25 50 Lane Identification + Direction of Traffic LAST Z DESCRIPTION: 0 REVISION v 11/01/17 ccW LI' B ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ c ■ ■ Taper Length = Y3L Work Area See Table II Device Spacing -Taper Device Spacing -Tangent See Table I See Table I Table I Device Spacing Speed (mph) Max. Distance Between Devices (ft.) Type I or Type II Cones or Barricades or Vertical Tubular Markers Panels or Drums Taper Tangent Taper Tangent 25 25 50 25 50 30 to 45 25 50 30 50 50 to 70 25 50 50 100 GENERAL NOTES 1. When foJ or more work vehicles enter the through traffic lanes in a one hour period or less (excluding est blishing and terminating the work area), the advanced FLAGGER sign shall be substituted for the WORKRS sign. For location of flaggers and FLAGGER signs, see Index 102-603. 2. SHOULD -R WORK sign may be used as an alternate to the WORKER symbol sign only on the side where the sho Ider work is being performed. 3. When a silde road intersects the highway within the TTC zone, addiflonal TTC devices shall be placed in acco dance with other applicable TCZ Indexes. 4. For general TCZ requirements and additional information, refer to Index 102-600. FY 2018-19 F�� STANDARD PLANS ROAD WORK AHEM A —J 10 b o END ROAD WORKII 500' DURATION NOTES 1. Signs and channelizing devices maybe omitted if all of the following conditions are met: a. Work operations are 60 minutes or less. b. Vehicles in the work area have high-intensity, rotating, flashing, oscillating, or strobe lights operaflng. Table II Taper Length - Shoulder Speed (mph) 8' Shldr. 10' Shldr. 12' Shldr. Notes 25 28 35 42 L= WS' 60 30 40 50 60 35 55 68 82 40 72 90 107 45 120 150 180 L=WS 50 133 167 200 55 147 183 220 60 160 200 240 65 173 217 260 70 187 233 280 8' minimum shoulder width 16L= Length of shoulder taper in feet W = Width of total shoulder in feet (combined paved and unpaved width) S = Posted speed limit (mph) CONDITIONS WHERE ANY VEHICLE, EQUIPMENT, WORKERS OR THEIR ACTIVITIES ENCROACH THE AREA CLOSER THAN 15' BUT NOT CLOSER THAN T TO THE EDGE OF TRAVEL WAY. INDEX SHEET TWO-LANE, 'TWO-WAY, WORK ON SHOULDER 102-602 1 Of 1 — N/A — ATTSE 3ROPOSED TELEPHONE FACILITIES ON RIGHT OF WAY OF ATLANTIC BEACH W FLEET LANDING BLVD Exchange: 904241 Designer: Pellegrini.Tony Phone: 904-727-1546 Authorization: 83EG8292N Dwg. 2 of 3 CALL BEFORE YOU DIG OFULLDIAL 811 S BEFORE YOU DIG "" THE CVmlWlOAS RESPONSIBILITY TO CONTACT IMITr CO=IES PRIOR TO IM CMTOXTIOR AS THE LO '0" OF uT�ITIES STORIN ON THIS RAT ARE APPAOX"WE Alp pOSSft BiORETE. TIETiiOi CERT CAIES TO THE LOCA OF ALL tMEAM O 293337 EXISTING AT&T 30 34 38 BURIED CABLES 31 35 39 32 36 O444' PROPOSED AT&T BURIED 24 -FIBER OPTIC CABLE TO BE PLACED VIA DIRECTIONAL BORE (48" MIN DEPTH) &MECHANICAL TRENCH (30" MIN DEPTH) Wo I � n I 100' -13' 75' I I -R/W- -- i I i i I BOC I ---—-— -— -— - — --- Ln 000 I BO S/ I I 8 31 32 -R/W----i I 0+41 I I, I 0+�l I 3 I D 3'! I 19 I I I o 0+08 1 0 13e 1 I I I I I 5' AXI I Wo MAN 01 f 0 I o I � � T-- 12' I I I I I I I I I I AT&T I o to 35 249' PROPOSED BORE W/ 2" HDPE CONDUIT ®65' PROPOSED BORE W/ 2" HDPE CONDUIT ®55' PROPOSED BORE W/ 2" HDPE CONDUIT ® 117' PROPOSED BORE W/ 2" HDPE CONDUIT W FLLOOKI IG OEASTBLVO 60' v -28' 3 3 0 � m m � I I I 48• I I I I I I I I I I I I I I 3' 1 I I I I I I I I I .6os I as I I a I I x x I I a I ww O a m / INTERS CITY > > 6;�Z IGHT OF WAY ----------------------------R/W--- -t- ------- -------------------- FLEET LANDING BLVD W B B 38 3'.7,,, r- ml+s3' COMM CONC o/W WI 28' I J I WALL -------------- --� E J 1 JI / I EXITS CITY mJ RIGHT OF WAY I * 3 I I COMM BOC ------ CONC--- 0/W SYMBOL LEGEND Prop W Ex►sMV Dasalplar► AERIAL CABLE —B /! — B f! BURIED CABLE BJH _BJ— BUR JOINT -TRENCH Q BST POLE * / + 3 -----------+------- w +- + - - l - -+- Ln +- cn / -- 60'– -------N - ----- Ln OD D N V V PPE/CONDUIT AC MKR ► CA-MKR _ N AERIAL SVC WIRE r- ml+s3' COMM CONC o/W WI 28' I J I WALL -------------- --� E J 1 JI / I EXITS CITY mJ RIGHT OF WAY I * 3 I I COMM BOC ------ CONC--- 0/W SYMBOL LEGEND Prop W Ex►sMV Dasalplar► AERIAL CABLE —B /! — B f! BURIED CABLE BJH _BJ— BUR JOINT -TRENCH Q BST POLE * POWER POLE ANCHOR A GUY p8 —f PB PUSH BRACE ENCLOSURE ENCLOSURE MANHOLE PPE/CONDUIT AC MKR ► CA-MKR _ CABLE MARKER AERIAL SVC WIRE BURIED SVC WIRE - —sj— - - —8+—' JOINT -TRENCH SVC — — — — — — N/A BORE ® N/A CUT PAVEMENT — — + N/A SPLICING PIT 2�•p(�� N/A TRENCH LENODEPTH ATTSE PROPOSED TELEPHONE FACILITIES ON RIGHT OF WAY OF ATLANTIC BEACH W FLEET LANDING BLVD 904241 Designer: Pellegrinijony Phone: 904-727-1546 Authorization: 83E68292N Dwg. 3 of 3