Loading...
1650 E PARK TER - R.O.W. 0....t`' . RIGHT OF WAY PERMIT PERMIT NUMBER i�J� - `% ROW 18-0047 CITY OF ATLANTIC BEACH JiV 800 SEMINOLE ROAD ISSUED: 1/4/2019 r�4oli19% ATLANTIC BEACH. FL 32233 EXPIRES:4/4/2019 MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. IALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. NOTICE: In addition to the requirements of this permit,there may be additional restrictions applicable to this property that may be found in the public records of this county,and there may be additional permits required from other governmental entities such as water management districts,state agencies,or federal agencies. 1 JOB ADDRESS: PERMIT TYPE: DESCRIPTION: VALUE OF WORK: 1650 E PARK TER RIGHT OF WAY SINGLE OR TWO JEA - FOR TEMP SERVICE IN FAMILY RIGHT OF WAY PULL BOX $0.00 TYPE OF REAL ESTATE ZONING: BUILDING USE I SUBDIVISION: CONSTRUCTION: NUMBER: GROUP: 172020 0308 SELVA MARINA UNIT 07 a COMPANY: ADDRESS: CITY: STATE: ZIP: JEA OWNER: ADDRESS: CITY: STATE: I ZIP: Sean Traynor 1952 W. Sevilla Blvd. ATLANTIC BEACH FL 32233-5824 WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. LIST OF CONDITIONS Roll off container company must be on City approved list. Container cannot be placed on City right-of-way. 1 PUBLIC WORKS ON SITE RUNOFF INFORMATIONAL Notes: All runoff must remain on-site during construction. 2 PUBLIC WORKS RIGHT OF WAY RESTORATION INFORMATIONAL Notes: Full right-of-way restoration,including sod,is required. Issued Date: 1/4/2019 1 of 2 rs"'% RIGHT OF WAY PERMIT PERMIT NUMBER 'Ja'�x:..'* °; ROW18-0047 ''�,.,. CITY OF ATLANTIC BEACH . ISSUED: 1/4/2019 800 SEMINOLE ROAD �:%;119% EXPIRES: 4/4/2019 ATLANTIC BEACH. FL 32233 3 PUBLIC UTILITIES UNDERGROUND WATER SEWER UTILITIES INFORMATIONAL Notes: Avoid damage to underground water and sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is needed,call 247-5878. 4 PUBLIC UTILITIES UTILITY MAP INFORMATIONAL Notes: See attached Utility Map. DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT TOTAL: Issued Date: 1/4/2019 2 of 2 fr RIGHT-OF-WAY/EASEMENT PERMIT APPLICATION **ALL INFORMATION City of Atlantic Beach HIGHLIGHTED IN GRAY IS rr 800 Seminole Road,Atlantic Beach, FL 32233 REQUIRED. PERMITTEE RESPONSIBLE FOR NOTIFYING 811 AND OBTAINING UTILITY LOCATES Job Address f 63-0 Po i I-e✓r t(- - Permit Number 1:-"\ Ow l — 004 Contractor Information Company J{%# ,f, Qualifying Agent Address 2-1 c✓est (4 UVY/� SO City ,)4X State Pi Zip 32,2V Phone Email State Certification/Registration# Architect Phone Email Engineer R • ,„„„0.coh Phone 6 r-X 29 3 Email ,crir„1 2 bOjeo, . coo-7 Workers Compensation Insurers OR Exempt❑Expiration Date • Permittee declares that prior to filing this application they have ascertained the location of all existing utilities,both aerial and underground and the accurate locations are shown on the sketches. • Whenever necessary for the construction,repair,improvement,maintenance,safe and efficient operation,alteration or relocation of all,or any portion of said street or easement as determined by the Public Works Director,any or all said poles, wires,pipes,cables or other facilities and appurtenances authorized hereunder,shall be immediately removed from said street or easement or reset or relocated hereon as required by the Public Works Director and at the expense of the Permittee unless reimbursement is authorized. • All work shall meet City of Atlantic Beach or Florida Department of Transportation Standards and be performed under the supervision of .Misses— (Project Superintendent) with(Company Name) T 4 Phone 66.S- 77g 3 • All materials and equipment shall be subject to inspection by the Public Works Director. • All city property shall be restored to its original condition as far as practical,in keeping with City specifications and the manner satisfactory to the City. • • A sketch of plans covering details of this installation,as well as a copy of a recent survey shall be made a part of this permit. Calculations showing any increase in impervious area on owner's lot or in the City right-of-way are to be included with this application. • The permittee shall commence actual construction in good faith within days. If the beginning date is more than 60 days from date of permit approval then permittee must review the permit with the Public Works Director to make sure no changes have occurred in the area that would affect the permitted construction. • It is understood and agreed that the rights and privileges herein set out are granted only to the extent of the City's right, title and interest in the land to be entered upon and used by the holder,and the holder will,at all times,assume all risk of and indemnify,defend and save harmless the City of Atlantic Beach from and against any and all loss,damage and cost of expenses arising in any manner of the exercise or attempted exercises by the holder of the aforesaid rights and privileges. • The I' or; ir.•-c or shall be notified 24 hours prior to starting work and again immediately upon completion. Date 10!Mr' Permittee(signed in presence of 'otary Public) STATE OF FLORIDA,COUNTY OF DUVAL The foregoing instrument was acknowledged this day of ,20 by ,who personally appeared before me and (printed name of Permittee) acknowledged that he/she signed the instrument voluntarily for the purpose expressed in it. ( )Personally Known Signature of Notary Public,State of Florida ( )Produced Identification(Type) H:\Applications&Fornas\Word Documents\201801001 Right-of-Way Easement Permit Application.decx Revis on Date:10/1/18 s f:�J'J City of Atlantic Beach c APPLICATION NUMBER c r ��,� Building Department C�j ` (To be assigned by the Building Depart{ment.) r: - 800 Seminole Road R W l Od L 7 r_ Atlantic Beach, Florida 32233-5445 nEC 3 1 2018 tL Phone(904)247-5826• Fax(904) 5 [ -4� `P3 �? E-mail: building-dept@coab.us Date routed: t City web-site: http://www.coab.us BY APPLICATION REVIEW AND TRACKING FORM t �scçi (\ r-- Property Address: < (�(S ��(Z � Department review required Yes No Building Applicant: , (--"Pning &Zonin W` 11 Tree Administrator Project: Rtp,,,,--, n (- Pc -Patslic or ( t(2-Put3hc 0 1'1116 is a ety Fire Services 'Review fee $ 25-- - Dept Signature Cid ale Other Agency Review or Permit Required Review or Receipt Date of Permit Verified By Florida Dept.of Environmental Protection Florida Dept. of Transportation St.Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLI ION STATUS Reviewing Department First Review: Approved. ❑Denied. ❑Not applicable (Circle one.) Comments: BUILDING 24 PLANNING &ZONINGReviewed by: r Date: - 3- / TREE ADMIN. Second Review: ['Approved as revis d. ['Denied. ['Not applicable PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: FIRE SERVICES Third Review: ❑Approved as revised. ❑Denied. ❑Not applicable Comments: Reviewed by: Date: Revised 05119/2017 0-40,-,?4\. RIGHT-OF-WAY/EASEMENT PERMIT APPLICATION **ALL INFORMATION < , City of Atlantic Beach HIGHLIGHTED IN GRAY IS `" 800 Seminole Road,Atlantic Beach,FL 32233 REQUIRED. PERMITTEE RESPONSIBLE FOR NOTIFYING 811 AND OBTAINING UTILITY LOCATES Job Address f 63-0 Pose-l6 Jr�efE. f \Permit Number ow ( �3 — oo4� ( Contractor Informationrr Company J F)q. Qualifying Agent • Address 2,1 Lie iy ( ' " ' SOL'.. City TAX State FL Zip 3?"?..-a Z Phone Email State Certification/Registration# Architect Phone Email /` Phone G6s'?993 Email Siy,,1 bl!�i, at. 00� '� Engineer R - J f ✓t^�SC�Y� . Workers Compensation Insurers OR Exempt❑Expiration Date • Permittee declares that prior to filing this application they have ascertained the location of all existing utilities,both aerial and underground and the accurate locations are shown on the sketches. • Whenever necessary for the construction,repair,improvement,maintenance,safe and efficient operation,alteration or relocation of all,or any portion of said street or easement as determined by the Public Works Director,any or all said poles, wires,pipes,cables or other facilities and appurtenances authorized hereunder,shall be immediately removed from said street or easement or reset or relocated hereon as required by the Public Works Director and at the expense of the Permittee unless reimbursement is authorized. • All work shall meet City of Atlantic Beach or Florida Department of Transportation Standards and be performed under the /� a""i (Project Superintendent) supervision of R. .0unn with(Company Name) ;7" '4 Phone 46r- YI,3 • All materials and equipment shall be subject to inspection by the Public Works Director. • All city property shall be restored to its original condition as far as practical,in keeping with City specifications and the • manner satisfactory to the City. • • • • A sketch of plans covering details of this installation,as well as a copy of a recent survey shall be made a part of this permit. Calculations showing any increase in impervious area on owner's lot or in the City right-of-way are to be included with this application. • • The permittee shall commence actual construction in good faith within days. If the beginning date is more than 60 days from date of permit approval then permittee must review the permit with the Public Works Director to make sure no changes have occurred in the area that would affect the permitted construction. • It is understood and agreed that the rights and privileges herein set out are granted only to the extent of the City's right, title and interest in the land to be entered upon and used by the holder,and the holder will,at all times,assume all risk of and Indemnify,defend and save harmless the City of Atlantic Beach from and against any and all loss,damage and cost of expenses arising in any manner of the exercise or attempted exercises by the holder of the aforesaid rights and privileges. • Th I' or; 9'.-c or shall be notified 24 hours prior to starting work and again Immediately upon completion.et Date 17/311 is Permittee(signed in presence of 'otary Public) STATE OF FLORIDA,COUNTY OF DUVAL 20 The foregoing Instrument was acknowledged this day of ,who personally appeared before me and by (printed name of Permittee) acknowledged that he/she signed the instrument voluntarily for the purpose expressed in it. [ I Personally Known Signature of Notary Public,State of Florida ( ]Produced Identification(Type) H:\Applications&Forms\Word Documents\201801401 Right-of-Way Easement Permit Application.docx Revision Date:10/1/18 _I 11 L .�Y �`f•y • t,. :' 1. t oF', r ;.. . 'r• L ,fi r ,' c •1 -- •.XV tee 3, ,..,,,,,. ,..„,,_,,, e , , - ' ! '� , `, . .. ,•r5,4 ♦ -•:-.N {"r t�.?:1.5.1,,....../ ,'. ii,:aisw: .4„."7-.44:' c.'10)...., 4;1'1 ,":' may'• y +< --� ,....z.7, k.:: s j.t 1 y dfe-y 1 1, 3 .7, ♦, .i�w Sr.?:X T - 1:11—;. ....1.1:-'1,\''''.:75..-11.-i.., e. . "tib ° t•"_ ..t:i. " ° 4 r ® $. ®. f t'a+ =' (. d • `�� '1 �; y�► 7 ' l sof,{':.,,. i, ' yg ++d ,ri A sx.'. .. .s •} Se t i t"-'2— -.. „,,.., ' . ci Ca it ., . ' ,...7 . \\'* 0 . . . . l `�1 ° ^ t • IW/ IF- b „1. 1640 • a: . SEA OATS DR .1 ENGINEERING DESIGN . ORACLE PERMIT MAXIMO DATE REL PROJECT#:36715 N.O.: 8005212 WO#: 30378244 CONST: 12/28/18 CIR. TREE TRIMMING SUB-STA: NEPTUNE BEACH N.O.: 565 REQ'D:NO CELL ENGINEER:Robert Simpson N.O.: N/A ZIP CODE: N/A CUSTOMER! SVC PHONE LOCATION: 1635 PARK TERR E./DIRECT BORE 3" 563 CENTER: SSSC N.O.:665.7793 1 1 , STA 1, Y# 1635 PARK TERR E./ DIRECT ' I BORE 3" TO STA 2, PULL IN 4/OURD MAKE UP TEMP SERVICE. 1657 .-. 50B rn • STA 2, H# 1650 PARK TERR E./ MAKE UP • TEMP SERVICE IN PULL BOX. LA til ***** THIS IS FOR A NEW HOME BUILD IN ATLANTIC BEACH ***** - • 1 STA 1IIIIIIIIIIIIIIIII Q` 1 5 • 1 4) o • i ' 1635 N 50B 70 F •w I w • 1 � • 1 I 00 0 I 7> T- 1 ' a•.{o�� 4 N e .L� • • N STA2 M • { 116.- 1623 50B 1636 1 1 1 5 • a. • N i G 0 t 1 PARK TE Ei SEA OATS DR ----------------------- coe. I\ JE.11 CUE Reports Estimate Number:36715 1650 PARK TERR E./DIRECT BORE Estimate Type:SR Contract:022-15-HM UG FY19 SECONDARY Estimate Version: By: SIMPRB • MWO#/Task:30381634 Required Date: Oracle Project#:8005212 Estimated On: 12/28/2018 Cost Estimate Materials JEA Contractor 1.New Material Cost(w/sales tax) $163.60 $163.60 2.Transformer Cost(w/sales tax) $0.00 $0.00 3.Returned Material Salvage Value $0.00 $0.00 Labor 4.Crew Time $1,282.41 $1,188.03 5.Extraordinary Costs $0.00 $0.00 JEA Overhead 6.Fringe Benefits(54.56%of lines 4&7) $852.12 $152.44 7.Engineering Costs(Variable%of line 4) $279.40 $279.40 8.Project Equipment Costs(40%of total equipment costs) $758.29 $0.00 9.Material Handling(8.30%of lines 1&2) $13.58 $13.58 10.Inspection(6.84%of line 4) $0.00 $81.26 11.Total Cost of Project $3,349.41 $1,878.31 12.Work Order Estimate(Line 11 minus line 8,9,&10) $2,577.54 $1,864.73 13.Billable Equipment Depreciation(60%of total equipment costs) $1,137.43 $0.00 14.Billing Estimate(Including Transformer Cost)(Lines 11+13+(58.71%of 4&7)) $5,403.78 $2,042.35 15.Billing Estimate(W/O Transformer Cost)(Lines 11+13+(58.71%of 4&7)-Line 2) $5,403.78 $2,042.35 Time Estimate Crew Hours Total Manhours 10.28 41.13 Jf CUE Reports Estimate Number:36715 1650 PARK TERR El DIRECT BORE Estimate Type:SR Contract:022-15-HM UG FY19 SECONDARY Estimate Version: By: SIMPRB MWO#/Task:30381634 Required Date: Oracle Project#:8005212 Estimated On: 12/28/2018 CU Detail Station: 01 T# 1635 PARK TERR E. Build Transfer Remain In Place Remove DIR-BORE*3 70 HANDDIG 5 UCL9*3 1 USC*4/0T 75 UST*4/0T 3 Station: 2 1650 PARK TERR E. Build Transfer Remain in Place Remove HANDDIG 5 UCL9*3 1 USS*4/0 2 UST-1 1 JEA CUE Reports Estimate Number:36715 1650 PARK TERR E./DIRECT BORE Estimate Type:SR Contract:022-15-HM UG FY19 SECONDARY Estimate Version: By: SIMPRB MWO#/Task:30381634 Required Date: Oracle Project#:8005212 Estimated On: 12/2812018 Conductor, Conduit and Pipe Detail Quantities From Station To Station CU Build Transfer Remain Remove 01 2 DIR-BORE`S 70 0 0 0 01 2 USC`4/0T 75 0 0 0 JEA CUE Reports Estimate Number:36715 1650 PARK TERR E./DIRECT BORE Estimate Type:SR Contract:022-15-HM UG FY19 SECONDARY Estimate Version: By: SIMPRB MWO#lTask:30381634 Required Date: Oracle Project#:8005212 Estimated On: 12/28/2018 Material Summary Item Quantity Item Number Item Description 6 BOLMH007 BOLT, MACHINE, 1/2"X 1-1/2", HEX HEAD,TIN PLATED BRONZE FOR • MECHANICAL CONNECTIONS ONLY(GRADE 8) 100 EACH PER BOX/BAG 75 CAIUS001 CABLE,4/0 URD, UNDERGROUND SERVICE,"REGIS OR SWEETBRIAR"XLP INSULATION, 600 VOLT,TRIPLEX 1000' MINIMUM REEL LENGHT 3 CNNTL001 TERMINAL LUG,ALUMINUM COMPRESSION, STACKING TYPE LUG, 4/0 STR. 2 CODEP004 ELBOW, PVC, CONDUIT, 3",90-DEGREE 36"SWEEP-RADIUS,SCH-40, WITH INTEGRAL BELL END 6 NUTBC500 NUT, 1/2"-13, HEX,SILICON BRONZE HS, NC ASTM-B99***PACKAGE OF 50 OR 100 EACH*** NO SUBSTITUTE 2 SPLKT006 SPLICING AND REPAIR KIT, SUBMERSIBLE, SECONDARY VOLTAGE, #6AWG-350KCM W/EPDM 6 WASLO023 WASHER,LOCK, SHAKE PROOF, 1/2"BOLT SIZE, BRONZE INTERNAL TEETH, TIN PLATED 100-EACH PER BOX/BAG I JGA CUE Reports Estimate Number:36715 1650 PARK TERR E./DIRECT BORE Estimate Type:SR Contract:022-15-HM UG FY19 SECONDARY Estimate Version: By: SIMPRB MWO#/Task:30381634 Required Date: Oracle Project#:8005212 Estimated On: 12/28/2018 CU Summary Bu CU Namg Quantity Description DIR-BORE*3 70 DIRECTIONAL BORE 3" HANDDIG 10 NO DESCRIPTION... UCL9*3 2 INSTALLATION OF CONDUIT ELL USC*4/0T 75 NO DESCRIPTION... USS*410 2 SECONDARY SPLICE UST*4/0T 3 SEC TERM LUGS,4/0T UST-1 1 SECONDARY CONNECTIONS