1 OCEAN BLVD COMM18-0037GENERAL CONDITIONS GENERAL SITE CONDITIONS 1. ALL WORK SHALL COMPLY WITH APPLICABLE FEDERAL, STATE AND LOCAL ADOPTED CODES, ORDINANCES, THE FOLLOWING GENERAL CONDITIONS SHOULD BE STRICTLY FOLLOWED BY ALL CONTRACTORS AT THE PROJECT SITE. REGULATIONS, LAWS, STATUTES, GUIDELINES AND REQUIREMENTS OF BUILDING AND FIRE AUTHORITIES HAVING JURISDICTION. ANY 1. A COPY OF THESE RULES MUST BE READ BY ALL CONTRACTORS, EMPLOYEES OF CONTRACTORS OR AGENTS OF VARIANCES IN INTERPRETATION FROM THE ABOVE MENTIONED GOVERNING FACTORS SHALL BE WITH THE WRITTEN CONTRACTORS AND POSTED ON THE JOB SITE AT ALL TIM S. CONSENT OF THE GOVERNING JURISDICTION. ALL CONTRACTORS AND SUBCONTRACTORS SHALL BE PROPERLY + LICENSED IN THE LEGAL JURISDICTION AND WITH ALL OTHER GOVERNING AUTHORITIES WHERE THE WORK IS TO 2. BUILDING PERMITS MUST BE POSTED ON THE JOB SITE AT ALL TIMES. BE DONE. , 3. THE GENERAL CONTRACTOR MUST KEEP A RECORD SET OF PERMITTED PLANS ON-SITE AT ALL TIMES. ANY FIELD 2. THE GENERAL CONTRACTOR AND THE SUBCONTRACTORS SHALL CAREFULLY STUDY ALL CONTRACT DOCUMENTS AND ADJUSTMENTS SHALL BE NOTED ON A FIELD SET OF DRAWINGS AND GIVEN TO THE OWNER AT THE CLOSE OF THE Q No ACQUIRE A THOROUGH UNDERSTANDING OF THE PROJECT AND THE WORK REQUIRED TO ACHIEVE THE DESIGN PROJECT. INTENT AS SHOWN IN THE CONTRACT DOCUMENTS. ¢ �c� 4. NO COOKING OF ANY KIND WILL BE ALLOWED ON THE SITE. >� 3. ALL CONSTRUCTION, INCLUDING MEP/FP IS TO CONFORM TO THE AMERICANS WITH DISABILITIES ACT AND LOCAL h- ACCESSIBILITY CODES AND ORDINANCES. THE STRICTEST PROVISIONS SHALL GOVERN. 5. NO INTERVIEWING OF JOB APPLICANTS OR SUB -CONTRACTORS WILL OCCUR ON-SITE WITHOUT PRIOR APPROVAL BY i- w E N PROPERTY MANAGEMENT AND PRIOR SCHEDULED APPOINTMENT. Q 4. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO THOSE DETAILED. WHERE SPECIFIED DIMENSIONS, DETAILS U. ° 6 L, OR DESIGN INTENT 6. ALL WORK AREAS SHOULD BE CLEANED DAILY OF TRASH, DEBRIS AND NON -USEFUL MATERIALS. FAILURE TO DO SC N CANNOT BE DETERMINED DUE TO HIDDEN CONDITIONS, CONSULT THE ARCHITECT PRIOR TO PROCEEDING WITH THE WILL RESULT IN THE OWNER PM PROVIDING THIS SERVICE AND BACK CHARGING THE CONTRACTOR ACCORDINGLY. Q ° 3 v) vS WORK. CONTRACTORS WILL BE REQUIRED TO MONITOR ALL TRAFFIC AND WORK THROUGH THE SERVICE ELEVATOR LOBBIES y^ AND CORRIDORS TO ENSURE THAT DUST AND DEBRIS ARE NOT TRACKED INTO PUBLIC AREAS. 'u oo 5. SUBCONTRACTORS FOR EACH TRADE ARE ADVISED THAT INFORMATION PERTINENT TO THEIR WORK MAY OCCUR OR of Lo co BE REFERENCED, IN OTHER PORTIONS OF THE CONTRACT DOCUMENTS. REFER TO ARCHITECTURAL, MECHANICAL, 7. ALL SUBCONTRACTORS WILL USE RUBBER WHEELED CARTS, HAND TRUCKS AND TOOL CHESTS, ETC. WHEN MOVING O ELECTRICAL, PLUMBING, FIRE PROTECTION AND ALL OTHER CONSULTANT'S DRAWINGS FOR ADDITIONAL INFORMATION MATERIALS THROUGH THE BUILDING OR REMOVING TRASH FROM THE BUILDING. IF ACCESS TO THE WORK AREA PERTINENT TO THEIR CONTRACT. ALL PROJECT NOTES ARE TO BE REVIEWED AND APPLIED TO RELATED BUILDING NECESSITATES TRAVEL THROUGH COMMON CORRIDORS, THE FINISHES SHOULD BE PROTECTED BY THE PLACEMENT OF COMPONENTS. PROJECT NOTES WILL APPEAR ON VARIOUS SHEETS FOR DIFFERENT SYSTEMS AND MATERIALS. MASONITE PANELS ALONG THE ROUTE. TILE, CARPET OR WALL DAMAGE WILL BE THE SUBCONTRACTOR'` ALL SHEETS ARE TO BE REVIEWED AND NOTES ON ANY ONE SHEET ARE TO BE APPLIED ON RELATED DRAWINGS RESPONSIBILITY. AND DETAILS ON ANY OTHER SHEET, AS APPLICABLE. 8. NO STORAGE OF SUPPLIES OR TRASH WILL BE ALLOWED I THE AREA. 6. THE CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION DRAWINGS ARE OF EQUAL IMPORTANCE WITH THE ARCHITECTURAL DRAWINGS IN DEFINING THE WORK OF THE CONTRACT DOCUMENTS. IT IS 9. IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY TO RE OVE OR RE-ROUTE EXISTING ELECTRICAL CONDUITS AND THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK WITH THE ARCHITECTURAL DRAWINGS BEFORE THE PIPES AS REQUIRED PER THE SCOPE OF WORK. INSTALLATION OF ANY OF THE TRADES WORK. SHOULD THERE BE A DISCREPANCY BETWEEN THE ARCHITECTURAL AND THE ENGINEERING DRAWINGS, IT SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR 10. CORING OF STRUCTURAL ELEMENTS IS NOT PERMITTED WITHOUT PRIOR APPROVAL FROM THE OWNER OR ARCHITECT. CLARIFICATION PRIOR TO INSTALLATION OF SAID WORK. ANY WORK INSTALLED IN CONFLICT WITH THE Q� M ARCHITECTURAL DRAWINGS OR OTHER TRADES, SHALL BE CORRECTED BY THE CONTRACTOR AT THEIR EXPENSE 11, NO STORAGE OF FLAMMABLE SUBSTANCES WILL BE ALLOWED IN THE BUILDING UNLESS APPROVED BY BUILDING (Y� AND AT NO ADDITIONAL COST TO THE OWNER OR THE ARCHITECT. MANAGEMENT AND IN ACCORDANCE WITH APPROVED CITY ND/OR NATIONAL BUILDING CODES AND REGULATIONS. N 7. ARCHITECTURAL DRAWINGS TAKE PRECEDENCE OVER ENGINEERING DRAWINGS FOR ELECTRICAL AND COMMUNICATION 12. ACCEPTABLE CONSTRUCTION BARRICADES AND LOCKABLE DORS MUST BE MAINTAINED AND USED TO CONTROL NOISEG� o N OUTLETS AND LIGHT FIXTURE LOCATIONS. GENERAL CONTRACTOR TO NOTIFY ARCHITECT OF ANY DISCREPANCIES. AND DUST POLLUTION TO A MINIMUM LEVEL. ALL COMMON AREAS MUST BE KEPT CLEAN AND MAINTAINED. Z > M CONSTRUCTION PARTITION BARRIERS TO HAVE A VINYL BASE AND TRIM AT THE TOP TO CONTROL DUST. Q W J S. AT ANY PENETRATIONS THROUGH FIRE -RATED ASSEMBLIES BY NEW OR EXISTING DUCTWORK, CONDUIT, PIPING, ETC., PENETRATIONS SHALL BE SEALED WITH UL -APPROVED DESIGNS AND MATERIALS TO MAINTAIN THE RATING OF 13, THERE WILL BE NO SIGNAGE POSTED ON PERIMETER BARRICADES ERECTED FOR DURATION OF CONSTRUCTION. USE THE ASSEMBLY. OF DUST MATS AT ALL EXISTS IS REQUIRED. BARRICADE SHALL BE PAINTED THE BASE BUILDING COLOR, UNO. D _� 14, THE CONTRACTOR SHALL PROTECT SMOKE DETECTION DEVICES IN THE AREAS WHERE PRODUCTION OF DUST WILL 0 DIMENSIONING OCCUR. NOTIFY THE BUILDING ENGINEER WHEN PROTECTION IS IN PLACE SO IT MAY BE CHECKED. Ln ca 1. PARTITIONS ARE DIMENSIONED TO THE FINISHED FACE OF THE WALL UNO. 15. ANY PROCEDURE THAT EMITS NOXIOUS FUMES (I.E., CARPET LAYING, USE OF OIL-BASED PAINT, ETC.) MUST BE7 W PERFORMED AT A TIME AND PLACE DETERMINED BY BUILDING MANAGEMENT. co 2. PARTITION THICKNESS AND CONSTRUCTION ARE DESIGNATED BY PARTITION TARGET SYMBOLS. REFER TO PARTITION Q DETAILS FOR REQUIREMENTS. 16, ADDITIONAL OWNER SPECIFICATIONS, SAFETY RULES AND R=GULATIONS SHALL APPLY AND WILL BE STRICTLY ADHERED W 1 1 ��J POSITIONED TO PRIOR TO THE START OF ANY WORK PERFORMED AT THIS PROPERTY. OWNER SAFETY RULES AND REGULATIONS Q 1 u1 3. DOOR OPENINGS THAT ARE NOT DIMENSIONALLY LOCATED ARE TO BE CENTERED BETWEEN WALLS OR MAY INCLUDE ADDITIONAL INSURANCE REQUIREMENTS IF WORKING ON OR NEAR AREAS AS DESIGNATED BY OWNER. WITH ONE JAMB 4" (FROM ADJACENT WALL TO INSIDE FACE OF FINISHED JAMB) OR COLUMN AS SHOWN ON THEW COORDINATE WITH OWNER'S PROJECT MANAGER. 0 PLANS AND/OR DETERMINED BY THE DETAILS. V Z 17. GENERAL CONTRACTOR SHALL PROVIDE SECURE CONSTRUCTION BARRIERS DURING CONSTRUCTION SO THAT ALL 0 W 4. WHEN UN -DIMENSIONED PARTITIONS APPEAR IN CONJUNCTION WITH DOOR OPENINGS, THE DOOR WIDTH AND DOOR BUSINESS MAY CONTINUE WITH LITTLE DISTURBANCE. GENERAL CONTRACTOR TO ENSURE SAFE PASSAGE FOR ALL FRAME DETAILS PEOPLE ACCESSING THE BUILDING. THE PATH TO THE EXISTING FIRE EXIT SHALL BE KEPT CLEAR AND ACCESSIBLE W DETERMINE THE LOCATION OF ADJACENT WALL AND FRAMES. DURING ALL PHASES OF CONSTRUCTION. 0 Z 5. ALL DIMENSIONS SHALL BE VERIFIED AND COORDINATED WITH THE WORK OF OTHER TRADES. 18, GENERAL CONTRACTOR TO COORDINATE ALL PHASES OF CONSTRUCTION SO THAT OPERATIONS MAY BE NOTIFIED # 0 PRIOR TO THE START OF A CONSTRUCTION PHASE. CONTRACTOR SHALL SUBMIT A CONSTRUCTION PHASING PLAN T 6. DO NOT SCALE DRAWINGS. ANY DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE- THE BUILDING MANAGEMENT FOR REVIEW AND APPROVAL TO THE START OF CONSTRUCTION. ARCHITECT PRIOR TO CONSTRUCTION. �RIOR 19. GENERAL CONTRACTOR TO CONTACT MAINTENANCE SUPERVISOR TO ARRANGE ACCESS TO THE BUILDING AND SITE TO t 7. ALL DIMENSIONS TO ELECTRICAL AND PLUMBING FIXTURES ARE TO THE CENTERLINE OF FIXTURE, UNO. CONFIRM SITE CONDITIONS PRIOR TO BID SUBMITTAL 8. DUE TO VARIATIONS IN FIELD CONDITIONS, ALL DIMENSIONS SHOULD BE FIELD VERIFIED BY CONTRACTOR. ANY20. GENERAL CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL FIELD CONDITIONS PRIOR TO BID SUBMITTAL AND IDENTIFY SEAL: DISCREPANCIES SHALL ANY CONFLICTS IN THE DRAWINGS WITH FIELD CONDITIONSI BID SUBMITTAL WITHOUT CLARIFICATION AND INSPECTION P�E 0P BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT PRIOR TO CONSTRUCTION. SHALL BE CONSIDERED INCOMPLETE AND NOT IN COMPLIANCE WITH CONSTRUCTION DOCUMENTS AND SPECIFICATIONS. 5 ,.••'"•""'''•.<p GE M' �'•.'Q,. NO CHANGE ORDERS WILL BE PERMITTED FOR FIELD CONDITIONS UNLESS APPROVED BY THE ARCHITECT AND q MECHANICAL. ELECTRICAL AND PLUMBING OWNER'S PROJECT MANAGER. 1. REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS OF ALL FLOOR DRAINS OR IN -FLOOR ELECTRICAL OUTLETS 21. EXISTING UTILITIES ARE TO BE MAINTAINED DURING CONSTRUCTION. GENERAL CONTRACTOR iS TO NOTIFY BUILDING MANAGEMENT OF ANY DISTURBANCES AND PROVIDE ADEQUATE INTERIM UTILITIES. 2. THE CONTRACTOR SHALL VERIFY AND COORDINATE ALL OPENINGS AND SLEEVES THROUGH FLOORS, CEILINGS, AS • .• ROOFS, WALLS 22. HOT WORK IS TO BE AUTHORIZED AND PERFORMED IN ACCORDANCE WITH BUILDING MANAGEMENT RULES & 9F0•A STRUCTURAL MEMBERS AND ARCHITECTURAL ELEMENTS WITH CIVIL, LANDSCAPE, ARCHITECTURAL, STRUCTURAL, REGULATIONS MECHANICAL, PLUMBING, FIRE PROTECTION, ELECTRICAL AND ANY OTHER DISCIPLINE, DRAWINGS, SPECIFICATIONS AND EXISTING CONDITIONS. 23. GENERAL CONTRACTOR WILL BE REQUIRED TO VERIFY THE LOCATION OF EXISTING UTILITIES, PIPING, CONDUITS, WIRING, ETC. IN OR UNDER THE FLOOR SLAB PRIOR TO CUTTING, CORING OR DRILLING. GENERAL CONTRACTOR TO 3. COORDINATE PLACEMENT OF ALL CEILING ELEMENTS WITH MECHANICAL, ELECTRICAL AND FIRE PROTECTION REVIEW ALL MODIFICATIONS TO EXISTING STRUCTURE PRIOR TO BEGINNING THE WORK WITH THE ARCHITECT AND THE INSTALLER. WHERE DISCREPANCIES EXIST BETWEEN DRAWINGS AND INSTALLATION, CONSULT THE ARCHITECT PRIOR OWNER'S PROJECT MANAGER, TO PROCEEDING. 24. GENERAL CONTRACTOR SHALL BECOME FAMILIAR WITH AND ADHERE TO ALL PROCEDURES, REQUIREMENTS, RULES & 4. ALL EQUIPMENT INSTALLED IN RETURN AIR PLENUMS SHALL BE APPROVED BY THE APPROPRIATE GOVERNING REGULATIONS IMPOSED BY OWNER AND BASE BUILDING MANAGEMENT AND INCORPORATE THIS INFORMATION INTO THE AGENCY FOR COMPLIANCE WITH GOVERNING BUILDING CODES. BID PACKAGE. CONTACT ALL RELEVANT AUTHORITIES AND BUILDING OWNER'S REPRESENTATIVE W/ANY COMMENTS OR z QUESTIONS PRIOR TO SUBMITTING A BID. IN THE CASE OF CONFLICT WITH ARCHITECTURAL GENERAL CONDITIONS, C) FIRE PROTECTION NOTES MOST STRINGENT PROVISION SHALL GOVERN. 1. CONTRACTOR SHALL EXAMINE THE DRAWINGS AND VISIT THE SITE TO DETERMINE THE FULL EXTENT OF THE WORK 25. DELIVERIES OF MATERIAL AND REMOVAL OF CONSTRUCTION DEBRIS SHALL BE COORDINATED WITH PROPERTY'S cn o REQUIRED. CONTRACTOR SHALL ALSO CONSULT WITH THE LOCAL AUTHORITIES TO DETERMINE THE LOCAL CODE - REQUIREMENTS. SUBMISSION OF A BID SHALL BE CONSTRUED AS CONCLUSIVE EVIDENCE THAT THE BIDDER HAS REPRESENTATIVE. DO NOT INTERFERE WITH THE OPERATION OF THE>PROPERTY. COMPLIED WITH THE ABOVE. 26. CUTTING OF, OR MODIFICATIONS TO, THE BUILDING STRUCTURE ARE NOT PERMITTED OUTSIDE OF THE BUILDING w � 2. ALL MATERIAL, EQUIPMENT, METHODS OF INSTALLATION AND OTHER LIKE ITEMS SHALL BE IN STRICT ACCORDANCE PROJECT SCOPE WITHOUT PRIOR WRITTEN APPROVAL FROM THE OWNER. BUILDING PUBLIC AREAS, INCLUDING � WITH THE APPLICABLE REQUIREMENTS OF THE LOCAL FIRE PROTECTION JURISDICTION. ALL MATERIAL AND FLOOR, CEILING, WALL OR MECHANICAL CHASES MAY NOT 13E USED AS A RACEWAY SYSTEM. o EQUIPMENT SHALL BE UL LABELED AND FACTORY MUTUAL APPROVED. IN THE EVENT OF CONFLICT, THE MOST 27. GENERAL CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE BASE BUILDING MANAGEMENT COMPANY REGARDING LLJ cn STRINGENT TO GOVERN. SECURITY. REQUIREMENTS. ALL COSTS FOR ADDITIONAL SECURITY SHALL BE TAKEN UPON BY THE CONTRACTOR. _ 3. SPRINKLER CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE FIRE DEPARTMENT AS WELL AS CONCERNED PARTIES OF ANY TEMPORARY DISRUPTION OF SERVICES AS REQUIRED TO COMPLETE THE PROJECT. ANY 28, IF A PORTION OF WORK MUST BE DONE 1N OTHER SPACE TO RUN UTILITIES, DUCTS, ETC. PRIOR APPROVAL MUST � � TEMPORARY PROVISIONS REQUIRED SHALL BE THE SPRINKLER CONTRACTORS RESPONSIBILITY. BE OBTAINED FOR ACCESS TO THAT SPACE FROM THE BUILDING . MANAGEMENT. � o 4. FIRE PROTECTION SUB -CONTRACTOR SHALL SUBMIT REQUIRED DOCUMENTS AND OBTAIN NECESSARY APPROVALS 29. NO MATERIALS, SUPPLIES, TOOLS, LADDERS OR OTHER EQUIPMENT WILL BE PROVIDED BY THE BUILDING FROM AUTHORITIES HAVING JURISDICTION. MANAGEMENT. GENERAL CONTRACTOR AND SUB -CONTRACTORS MUST PROVIDE THEIR OWN EQUIPMENT TO PERFORM THE WORK AS REQUIRED. , 18-047 5. FIREPROOFING REQUIREMENTS SHALL COMPLY WITH APPLICABLE CODES AND REGULATIONS. 30. THE HIRING OF WORKERS MAY BE EITHER UNION OR NON --UNION EMPLOYEES. THEY MUST WORK COHESIVELY. CHECKED BY UNION CONTRACTORS SHALL NOT SOLICIT FOR MEMBERSHIP WHILE ON SITE. AEF/SHG MISCELLANEOUS NOTES DRAWN BY 1. ALL FLOOR ELEVATIONS ARE TO TOP OF STRUCTURAL CONCRETE SLAB OR TOP OF SUB -FLOOR SHEATHING, LINO 31, THE OWNER RESERVES THE RIGHT TO REVISE AND SUPPLEMENT THE FOREGOING RULES AND REGULATIONS AS LAP REQUIRED BY THE CONDITIONS OF THE PROJECT. SHEET TITLE 2. ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED FROM EACH OTHER TO AVOID MOLECULAR BREAKDOWN. GENERAL CONDITIONS 3. GENERAL CONSTRACTOR IS RESPONSIBLE FOR ALL MATERIAL TAKEOFFS. CONTRACTOR SHALL COORDINATE ALL REQUIRED MATERIAL QUANTITIES WITH ARCHITECTURAL, MEP, FP AND ALL OTHER DRAWINGS. FINAL MATERIAL SHEET N0. TAKEOFFS SHALL NOT BE LIMITED TO ANY SINGLE DISCIPLINE. CONTRACT ADMINISTRATION PROCEDURES 1. FOR SUBMITTAL PROCEDURES, SEE SPECIFIC TERMS OF CONSTRUCTION CONTRACT. 1 INTENT OF CONSTRUCTION DOCUMENTS 1. WORK OF THIS PROJECT COMPRISES NEW CONSTRUCTION AND/OR RENOVATIONS TO THE PROPERTY AS DESCRIBED ON THE TITLE SHEET AND PROJECT DESCRIPTION FOUND THEREIN. 2. ALL CIVIL, STRUCTURAL ARCHITECTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION AND PLUMBING ELEMENTS ALONG WITH OTHER ITEMS INDICATED IN THE CONSTRUCTION SET COMPRISE THE SCOPE OF WORK AND ARE REQUIRED FOR THE COMPLETE EXECUTION OF THE PROJECT: 3. ALL WORK SHALL CONFORM WITH NATIONAL, STATE AND LOCAL REQUIREMENTS. 4. IT SHALL BE THE DUTY OF THE GENERAL CONTRACTOR (HEREAFTER "GC") TO VERIFY ALL DIMENSIONS AND ELEVATIONS GIVEN ON THE DRAWINGS RELEVANT TO THE WORK AND TO REPORT ANY ERRORS OR INCONSISTENCIES TO THE ARCHITECT BEFORE SUBMITTING A PROPOSAL. IT WILL BE CONSTRUED BY THE OWNER THAT THE GC HAS EXAMINED AND FAMILIARIZED THEMSELVES WITH THE SITE. IGNORANCE OR FAILURE ON THE PART OF THE GC OR ANY OF THE SUBCONTRACTORS TO EXAMINE THE SITE WILL NOT BE ACCEPTED AS JUSTIFICATION FOR CLAIMS TO EXTRA OR ADDITIONAL PAYMENT ABOVE CONTRACT PRICE. 5. PROJECT SCHEDULING SHALL BE DETERMINED BY THE OWNER'S PROJECT MANAGER (HEREAFTER "OWNER'S PM") AND PROPERTY MANAGEMENT. 6. A DETAILED CONSTRUCTION SCHEDULE, PREPARED BY THE GC SHALL BE INCLUDED IN THE PROPOSAL. SPECIAL REQUIREMENTS, LONG -LEAD ITEMS, PRODUCT DELIVERY DATES, ANTICIPATED DATES OF INSPECTIONS AND ANY OTHER MILESTONE DATES AFFECTING THE PROJECT SHALL ALSO BE INCLUDED IN THE TIMELINE. 7. PRE -CONSTRUCTION SITE ACCESS SHALL BE COORDINATED BY OWNER'S PM. ALL GC'S REPLYING TO REQUESTS FOR PROPOSALS SHALL ATTEND ONE MEETING. 8. GC TO COORDINATE LOW VOLTAGE, SECURITY AND A/V SYSTEM INSTALLATIONS WITH ARCHITECTURAL AND MEP DRAWINGS. ARCHITECT AND MEP ENGINEER ARE RESPONSIBLE FOR LOCATIONS OF CONNECTIONS AND DIMENSIONS ONLY. ALL LOW VOLTAGE, SECURITY AND A/V SYSTEM EQUIPMENT IS THE RESPONSIBILITY OF THOSE VENDORS AND SHALL BE COORDINATED BY THE GC WITH THE OWNER'S PM. 9. GC TO COORDINATE ALL CONSTRUCTION WITH OWNER'S PM AND BUILDING SUPERVISOR OF PROJECT COMPLEX. GC TO COOPERATE WITH OWNER'S PM AND BUILDING SUPERVISOR FOR ALL ACCESS AND SCHEDULING OF CONSTRUCTION REQUIRED IN THIS CONTRACT. CODES, PERMITS AND SAFETY 1. PLANS WILL BE PREPARED FOR SUBMITTAL TO THE CITY BUILDING DEPARTMENT BY THE THE ARCHITECT. THE GC SHALL OBTAIN AND PAY FOR ALL PERMITS IN COORDINATION WITH ARCHITECT. THE COST SHALL BE SUBMITTED TO THE OWNER AS REIMBURSABLE COST. GC SHALL SCHEDULE AND OBTAIN ALL INSPECTIONS AND SHALL BE RESPONSIBLE FOR OBTAINING THE NECESSARY OCCUPANCY CERTIFICATES REQUIRED FROM THE LOCAL BUILDING DEPARTMENT ABD OTHER GOVERNING AUTHORITIES. 2. GC SHALL BE RESPONSIBLE FOR THE SAFETY OF ALL PEOPLE ON OR NEAR THE CONSTRUCTION SITE DURING THE CONSTRUCTION PERIOD. GC SHALL MAINTAIN ALL' MEANS OF EGRESS FROM THE BUILDING OR AFFECTED BUILDING PORTIONS SURROUNDING THIS SCOPE OF WORK. THIS SHALL BE DONE IN COMPLIANCE WITH ALL STATE AND LOCAL CODES, ORDINANCES AND/OR REGULATIONS IN COORDINATION WITH OWNER. 3. METHODS OF CONSTRUCTION AND ERECTION OF MATERIALS SHALL CONFORM TO INDUSTRY BEST PRACTICES AND STANDARDS SET FORTH BY OWNER. 4. PROVIDE TEMPORARY EMERGENCY LIGHTING AND EXIT SIGNS DURING CONSTRUCTION AS DESIGNATED BY THE LOCAL FIRE DEPARTMENT. 5. GC SHALL INFORM ALL CONSTRUCTION PERSONNEL OF THE PROPER ROUTES, SPEEDS AND PROCEDURES FOR TRANSPORTING EQUIPMENT AND MATERIALS TO THE CONSTRICTION SITE. GC SHALL INFORM CONSTRUCTION PERSONNEL OF ALL RESTRICTIONS TO MOVEMENT OF. EQUIPMENT OR PERSONNEL WITHIN THE PROPERTY OPERATIONS ON A DAILY AND/OR HOURLY BASIS IN COORDINATION WITH THE OWNER'S PM. PROTECTION OF WORK AND PROPERTY 1. GC SHALL USE EVERY PRECAUTION TO BRACE AND OTHERWISE SUPPORT AND SECURE THE STRUCTURAL FRAME ,j WALLS FLOORS AND ROOF DURING THE CONSTRUCTION OF THE WORK. GC SHALL ALSO PROVIDE EVERY AND ALL SAFEGUARDS AND PROTECTION AGAINST ACCIDENTS, INJURY AND DAMAGE TO PERSONS AND PROPERTY INCLUDING ADJOINING PROPERTIES. 2. GC SHALL BE RESPONSIBLE FOR HIS/HER WORK AND EVERY PART THEREOF, INCLUDING ALL MATERIALS, TOOLS, APPLIANCES AND PROPERTY OF EVERY DESCRIPTION USED THROUGHOUT THE PROJECT. 3. GC SHALL BE AWARE OF PROPERTY BUSINESS. CONSTRUCTION SOUNDS SHALL BE KEPT TO A MINIMUM. GC SHALL COORDINATE SCHEDULING OF ALL NOISE RELATED WORK WITH THE OWNER'S PM OR BUILDING ENGINEER. 4. GC SHALL PROVIDE TEMPORARY PROTECTION FOR INSTALLED PRODUCTS AND CONTROL TRAFFIC IN IMMEDIATE AREA. 5. GC SHALL PROVIDE PROTECTION FOR STORED MATERIALS AND PROTECT ITEMS FROM CHEMICALLY INJURIOUS MATERIALS, STANDING OR RUNNING WATER AS WELL AS ANY ADJACENT VEHICULAR TRAFFIC. 6. GC SHALL PROVIDE TEMPORARY, INSULATED, WEATHER -TIGHT CLOSURES OF OPENINGS IN EXTERIOR SURFACES TO PROVIDE ACCEPTABLE WORKING CONDITIONS AND PROTECTION FOR MATERIALS TO ALLOW FOR TEMPORARY HEATING AND TO PREVENT ENTRY. 7. GC SHALL PROVIDE PROTECTIVE COVERINGS AT ANY OR ALL EXISTING BUILDING ELEMENTS THAT COULD BE DAMAGED BY THE CONSTRUCTION PROCESS, INCLUDING MOVEMENT OF HEAVY OBJECTS OR CONSTRUCTION TRAFFIC. 8. GC SHALL PROVIDE SECURITY PROGRAM AND FACILITIES TO PROTECT WORK, EXISTING FACILITIES AND OWNER'S OPERATIONS FROM UNAUTHORIZED ENTRY, VANDALISM AND THEFT. GC TO COORDINATE WITH OWNER'S EXISTING SECURITY PROGRAM. 9. GC MAY STORE MATERIALS WITHIN THE CONSTRUCTION LIMITS OF WORK AREAS AND WITHIN LOADING LIMITS OF STRUCTURE. NO STORAGE WILL BE PERMITTED IN NON -WORK AREAS. STORAGE OF FLAMMABLE MATERIALS SHALL ONLY BE IN APPROVED CONTAINERS IN APPROVED LOCATIONS. GC SHALL OBTAIN AND PAY FOR USE OF ADDITIONAL STORAGE OR WORK AREAS NEED FOR OPERATIONS UNDER THIS CONTRACT, SUPERVISOR AND PERSONNEL 1. ONLY SKILLED, THOROUGHLY TRAINED AND EXPERIENCED WORK PERSONS SHALL BE EMPLOYED ON THE PROJECT. WHEN REQUIRED BY OWNER, GC SHALL DISCHARGE ANY PERSON WHO TRESPASSES OR WHO IS, IN THE OPINION OF THE OWNER'S PM, DISORDERLY, DANGEROUS, INSUBORDINATE INCOMPETENT OR OTHERWISE OBJECTIONABLE. THESE PERSONS SHALL NOT BE RE-EMPLOYED NOR SHALL THE GC EMPLOY ANY PERSON WHO HAS BEEN DISCHARGED BY ANOTHER SUBCONTRACTOR UPON THE ORDER OF THE OWNER'S PM. 2, GC SHALL GIVE PERSONAL SUPERVISION TO THE WORK USING HIS/HER BEST SKILL AND ATTENTION. THE GC SHALL KEEP A COMPETENT SITE SUPERINTENDENT AND NECESSARY ASSISTANTS ON SITE. THE SITE SUPERINTENDENT SHALL BE THE REPRESENTATIVE OF THE GC AND ALL DIRECTIONS GIVEN BY THIS DESIGNATED PERSON SHALL BE AS BINDING AS IF GIVEN BY THE GC. COMMUNICATION DELIVERED TO THE SITE SUPERINTENDENT BY THE OWNER'S PM SHALL BE AS BINDING AS IF DELIVERED TO THE GC. CUTTING AND PATCHING 1. GC SHALL COORDINATE ANY CUTTING OF EXISTING STRUCTURE, SIZE AND LOCATIONS OF HOLES, ETC. REQUIRED BY THE SCOPE OF WORK WITH ANY AND ALL SUBCONTRACTORS. EACH SUBCONTRACTOR SHALL LEAVE ALL CHASES, HOLES AND/OR OPENINGS IN WALLS, PARTITIONS, ETC. STRAIGHT, TRUE AND OF PROPER SIZE. IN THE CASE OF SUBCONTRACTORS FAILURE TO PROVIDE COORDINATED OPENINGS, HE/SHE SHALL CUT THEM AFTERWARDS AT THEIR OWN EXPENSE. NO EXCESSIVE CUTTING WILL BE PERMITTED. NO STRUCTURAL MEMBERS SHALL BE CUT WITHOUT DIRECTION FROM THE STRUCTURAL ENGINEER. 2. AFTER NEW WORK HAS BEEN INSTALLED IN CHASES, HOLES AND/OR OPENINGS,. EACH SUBCONTRACTOR SHALL CAREFULLY CLOSE OPENINGS TO THE SATISFACTION OF THE OWNER'S PM AND AS REQUIRED TO MAINTAIN FIRE SEPARATIONS OR RATED CONSTRUCTION. ALL OPENINGS SHALL BE CLOSED PER ARCHITECTURAL, STRUCTURAL OR MEP ENGINEERING DETAILS AND SPECIFICATIONS. 3. IF CUTTING OF SLAB IS REQUIRED BY THE SCOPE OF WORK, GC TO CONFIRM THAT NO OBSTRUCTIONS ARE PRESENT. SITE INSPECTION METHODS FOR THE SLAB SHALL INCLUDE DRILLING OF PILOT HOLES AID/OR X-RAY OF AFFECTED SLAB AREAS TO LOCATE STRUCTURAL REBAR OR PRE/POST TENSIONING. GENERAL SPECIFICATIONja MAINTENANCE OF WORK AREA 1. AT THE COMPLETION OF WORK, GC SHALL CLEAR AWAY AND REMOVE ANY CONSTRICTION EQUIPMENT WASTE, DUMPSTERS, SCAFFOLDING, ETC. FROM WORK AND PRIVATE AREAS. GC SHALL LEAVE THE PREMISES AND THE WORK IN PERFECT ORDER AND REPAIR, THE ROOMS SHALL BE LEFT BROOM CLEAN AND READY TO USE. 2. GC SHALL CLEAN ALL DOORS, WINDOW GLASS, FLOORS, CARPETS AND OTHER SURFACES SOILED DURING CONSTRUCTION. GC SHALL REPAIR OR REPLACE ANY ITEMS OR SURFACES DAMAGED AS A RESULT OF THE CONSTRUCTION. 3. GC SHALL PROVIDE A DUMPSTER IN COORDINATION WITH OWNER'S PM AT LOCATION APPROVED BY LOCAL GOVERNING AUTHORITY. 4. GC SHALL BE RESPONSIBLE FOR CLEANUP OF DEBRIS, RUBBISH, CONTAINERS OVER -SPRAY, ETC., RESULTING FROM CONSTRUCTION OPERATIONS, ON A DAILY BASIS. GC SHALL PROVIDE AND PAY FOR TRASH CONTAINERS AND DISPOSAL. FAILURE BY GC TO CLEAN PROPERLY OR TO PLACE DEBRIS IN CONTAINERS IN A TIMELY MANNER SHALL RESULT IN ONE OR MORE OF THE FOLLOWING ACTIONS: 4.1. OWNER'S PM WILL CLEAN THE GC'S DEBRIS AND BAFK CHARGE THE GC FOR THE WORK INVOLVED. 4.2. OWNER'S PM CAN REQUIRE MORE EXTENSIVE CLEANING AS DETERMINED BY PROJECT CIRCUMSTANCES. 4.3. OWNER'S PM WILL DIRECT GC TO 'REMOVE/RETRIEVE ANY CONSTRUCTION MATERIAL WHICH HAS BLOW OFF SITE. PLANS AND SPECIFICATIONS 1. THESE SPECIFICATIONS AND THE ACCOMPANYING DRAWINGS ARE INTENDED TO DESCRIBE AND PROVIDE A FINISHED PLACE OF OCCUPANCY. THE GC UNDERSTANDS THAT EXECUTION OF THE WORK SHALL BE COMPLETE IN EVERY DETAIL. THE GENERAL CONTRACTOR WILL BE HELD RESPONSIBLE TO PROVIDE ALL LABOR AND MATERIALS NECESSARY FOR THE ENTIRE COMPLETION OF THE WORK. GC SHALL NOT AVAIL THEMSELVES OF ANY UNINTENTIONAL ERROR OR OMISSION, SHOULD SUCH BE FOUND IN THE DRAWINGS OR SPECIFICATIONS. BEFORE PROCEEDING WITH THE WORK, GC TO NOTIFY ARCHITECT, IN WRITING, OF ANY INCONSISTENCIES. ANY WORK INSTALLED INCORRECTLY OR IN CONFLICT WITH ARCHITECTURAL DRAWING SET SHALL BE CORRECTED BY THE GC AT NIS/HER EXPENSE AND AT NO ADDITIONAL COST TO THE OWNER. 2. GC SHALL COORDINATE CFCI (CONTRACTOR FURNISHED/C NTRACTOR INSTALLED) ITEMS WITH OFCI (OWNER FURNISHED/CONTRACTOR INSTALLED) ITEMS, AS REQUIRE . 3, NO SUBSTITUTIONS OF MATERIAL SPECIFICATIONS FROM C CI OR OFCI ITEMS WILL BE ALLOWED WITHOUT PRIOR APPROVAL FROM OWNER OR ARCHITECT. CONTACT ARC ITECT AND/OR OWNER'S PM IN THE CASE OF DISCONTINUED OR IMMEDIATELY UNAVAILABLE ITEMS. 4, NO RESPONSIBILITY, EITHER DIRECTOR OR IMPLIED, IS AS UMED BY OWNER FOR OMISSIONS OR DUPLICATIONS BY THE GC OR SUBCONTRACTORS DUE TO REAL OR ALLEGED ERRORS IN SPECIFICATIONS. 5. DURING CONSTRUCTION, GC SHALL SUBMIT QUESTIONS REGARDING THE PROPER INTERPRETATION OF PLANS AND/OR SPECIFICATIONS IN A TIMELY MANNER, ARCHITECT SHALL MAKE DECISIONS ON ALL POINTS BROUGHT UP BY THE GC ON MATTERS RELATING TO THE INTERPRETATION OF THE LANS SPECIFICATIONS. RESPONSES SHALL BE RELAYED IN WRITING, WITHIN A REASONABLE PERIOD OF TIME. IF TH CONTRACTOR FAILS TO MAKE REQUESTS FOR CLARIFICATION, THERE WILL BE NO RECOURSE FOR THE CC TO PURSUE REPARATIONS. 6. SHOULD ANY DISPUTE ARISE AS TO THE QUALITY OR FITNESS OF MATERIALS, WORKMANSHIP OR INTERPRETATION OF PLANS AND/OR SPECIFICATIONS, THE DECISION SHALL REST WITH ARCHITECT. DECISIONS SHALL BE BASED ON CUSTOMARY INDUSTRY BEST PRACTICES AND STANDARDS OF CARE. 7. GC TO COORDINATE THE WORK OF ALL SUBCONTRACTORS ON THE JOB TO PREVENT CONFLICTS DURING CONSTRUCTION. ADDITIONAL WORK CAUSED BY A LACK OF COORDINATION BETWEEN THE SUBCONTRACTORS SHALL NOT BE AT THE OWNER'S EXPENSE. 8. ARCHITECTURAL DRAWINGS SHALL TAKE PRECEDENCE OVER ENGINEERING DRAWINGS FOR LIGHT FIXTURES, POWER AND/OR COMMUNICATION OUTLET LOCATIONS. GC TO NOTIFY ARCHITECT OF CONFLICTS BEFORE INSTALLATION OF WORK. 9. IF HIDDEN CONDITIONS FROM EXISTING BUILDING ELEMENTS ARE FOUND THAT WILL OBSTRUCT THE PROPER EXECUTION OF THE DESIGN INTENT, GC TO NOTIFY THE ARCHITECT AND OBTAIN CLARIFICATION BEFORE CONTINUING WITH THE WORK. 10. UNLESS OTHERWISE STIPULATED, THE GC SHALL PROVIDE AND PAY FOR ALL UTILITIES, MATERIALS, LABOR EQUIPMENT, TRANSPORTATION AND OTHER FACILITIES NECESSARY FOR THE EXECUTION OF THE WORK. 11. UNLESS OTHERWISE STIPULATED, NO ALLOWANCE OR COMPENSATION WHATSOEVER SHALL BE DUE OR PAID TO THE GC FOR ANY EXCAVATIONS, EMBANKMENTS OR OTHER WORK OR STRUCTURES THAT HE/SHE MAY MAKE TO FACILITATE NIS/HER WORK. UTILITIES ALL WORK ON EXISTING BUILDING SYSTEMS REQUIRING SHUTDOWN WILL BE COORDINATED WITH OWNER'S PM, BUILDING MANAGEMENT AND BUILDING ENGINEER. ELECTRICITY & LIGHTING 1. GC SHALL ARRANGE WITH OWNER AND UTILITIES AND PAY FOR ALL COSTS REQUIRED FOR DISTRIBUTION OF TEMPORARY LIGHTING AND POWER DURING THE TERM OF BUILDING CONSTRUCTION UNDER THIS CONTRACT. THE PROPERTY WILL PROVIDE POWER AT EXISTING SOURCES. 2. PERMANENT LIGHTING MAY BE USED DURING CONSTRUCTION. HEAT & VENTILATION 1, GC TO MAINTAIN SPECIFIED CONDITIONS FOR CONSTRUCTION OPERATIONS TO PROTECT MATERIALS AND FINISHES FROM DAMAGE DUE TO TEMPERATURE AND HUMIDITY. 2. GC TO PROVIDE PROPER VENTILATION AND FILTERING TO ENCLOSED AREAS TO DISPERSE HUMIDITY AND TO PREVENT ACCUMULATIONS OF DUST, FUMES, VAPORS AND GASES. MECHANICAL ELECTRICAL & PLUMBING 1. GC SHALL COORDINATE SCOPE OF WORK WITH ALL ENGINEERING PROFESSIONS AND TRADES CONTRIBUTING TO THE ENTIRETY OF THE CONTRACT DOCUMENT SET. GC SHALL IMMEDIATELY INFORM ARCHITECT AND OWNER OF ANY CONFLICTS WITH STRUCTURAL ELEMENTS, MEP DRAWINGS, ETC, BEFORE PROCEEDING WITH THE WORK. 2. COORDINATE PLACEMENT OF ALL CEILING ELEMENTS WITH MECHANICAL, ELECTRICAL AND FIRE PROTECTION SUB -CONTRACTORS. WHERE DISCREPANCIES EXIST BETWEEN DRAWINGS AND INSTALLATION, CONSULT THE ARCHITECT PRIOR TO CONTINUING WITH THE WORK. 3. ALL EQUIPMENT INSTALLED IN RETURN AIR PLENUMS SHALL BE APPROVED BY THE APPROPRIATE GOVERNING AGENCY FOR COMPLIANCE WITH CODE. 4. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONED LOCATIONS OF ALL FLOOR DRAINS. FIRE PROTECTION 1. ALL FIRE PROTECTION SYSTEMS WILL BE REWORKED TO ACCOMMODATE THE NEW PLAN LAYOUT. THE REVISED SPRINKLER SYSTEM SHALL BE DESIGNED AND INSTALLED BY A LICENSED FIRE PROTECTION CONTRACTOR IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF THE NFPA, THE PROPERTY'S RISK INSURER AND ALL GOVERNMENTAL AGENCIES HAVING JURISDICTION ON THE PREMISES AND THE LOCAL FIRE MARSHALL. 2. NO SENSORS OR SMOKE DETECTORS SHALL BE REMOVED OR RENDERED IN OPERABLE WITHOUT PRIOR WRITTEN AUTHORIZATION FROM FIRE DEPARTMENT. 4 SPRINKLER CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE FIRE DEPARTMENT AS WELL AS OWNER'S PM AND BUILDING SUPERVISOR OF ANY TEMPORARY DISRUPTION OF SERVICES REQUIRED TO COMPLETE THE PROJECT. ANY TEMPORARY PROVISION SHALL BE THE RESPONSIBILITY OF THE SPRINKLER CONTRACTOR. 4. SPRINKLER CONTRACTOR SHALL SUBMIT COMPREHENSIVE SHOP DRAWINGS AND CALCULATIONS TO OWNER'S FIRE AND LIFE SAFETY DEPARTMENT AND LOCAL GOVERNING AUTHORITIES TO OBTAIN APPROVAL BEFORE ANY INSTALLATION CAN BEGIN. SPRINKLER CONTRACTOR WILL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS. APPROVED DRAWINGS MUST BE KEEP ON THE JOB SITE DURING CONSTRUCTION 5. ALL PENETRATIONS OF DUCTWORK, CONDUIT, PIPING AND OTHER WORK THROUGH FIRE -RATED ASSEMBLIES SHALL BE SEALED WITH UL -APPROVED DESIGNS AND MATERIALS TO MAINTAIN THE RATING OF THE ASSEMBLY. FIREPROOFING, FIRE SEPARATION AND FIRESTOPPING SHALL COMPLY WITH APPLICABLE CODES AND REGULATIONS. SHOP DRAWINGS AND SUBMITTALS 1. REPRODUCTION OF ANY PORTION OF THE ARCHITECTURAL CONTRACT DRAWINGS FOR RESUBMITTAL AS SHOP DRAWINGS IS PROHIBITED. SHOP DRAWINGS PRODUCED IN THIS MANNER WILL BE REJECTED AND RETURNED. 2. SUBMIT SHOP DRAWINGS AT LEAST 15 BUSINESS DAYS BEFORE DATE THAT REVIEWED SUBMITTALS WILL BE NEEDED. SHOP DRAWINGS SHALL BEAR THE GC'S STAMP OF APPROVAL WHICH SHALL CONSTITUTE CERTIFICATION THAT THE GC HAS VERIFIED ALL FIELD MEASUREMENTS, CONSTRUCTION CRITERIA, MATERIALS AND SIMILAR DATA AND HAS CHECKED EACH DRAWING FOR COMPLETENESS, COORDINATION AND COMPLIANCE WITH THE CONTRACT DOCUMENTS. SUBMIT THREE SETS OF PRINTS OR ONE PDF. TWO MARKED UP SETS OF PRINTS WITH COMMENTS BY ARCHITECT WILL BE RETURNED OR A MARKED UP PDF WITH COMMENTS WILL BE RETURNED. 3. NO SUBSTITUTIONS OF MATERIAL SPECIFICATIONS FROM CFCI OR OFCI ITEMS WILL BE ALLOWED WITHOUT PRIOR APPROVAL FROM OWNER OR ARCHITECT. CONTACT ARCHITECT AND/OR OWNER'S PM IN THE CASE OF DISCONTINUED OR IMMEDIATELY UNAVAILABLE ITEMS. INTERIOR ARCHITECTURAL WOODWORK 1. SUBMIT PRODUCT DATA, SHOP DRAWINGS, FINISH SAMPLES, FROM INITIAL VERIFICATION THROUGH FINAL SELECTION OF EACH MATERIAL - E AL THROUGH PROJECT ESTABLISHED SUBMITTAL PROCEDURES 2. FINISH SAMPLES FOR ALL EXPOSED AREAS OF CASEWORK TO BE PROVIDED TO ARCHITECT FOR APPROVAL PRIOR TO CONSTRUCTION. 3, PROVIDE PRODUCT DATA FOR PANEL PRODUCTS, HIGH PRESSURE DECORATIVE LAMINATE, ADHESIVE FOR BONDING PLASTIC LAMINATE, FIRE RETARDANT TREATED MATERIALS AND FINISHING MATERIALS AND PROCESSES. 4. PROVIDE SHOP DRAWINGS FOR ALL CABINETRY SYSTEMS AND ITEMS, IN SCALE AND COORDINATED WITH ADJOINING SYSTEMS AND TRADES. 5. AWI QUALIFICATION DATA SHALL BE PROVIDED FOR THE INSTALLER AND THE FABRICATOR. QUALITY ASSURANCE 1. REFERENCED STANDARDS: ARCHITECTURAL WOODWORK INSTITUTE, PREMIUM GRADE PRODUCTS 1. SEE FINISH SCHEDULE FOR INFORMATION ON WOOD SPECIES AND CUTI VENEER MATCHING PATTERN AND METHOD OF FINISH 2. SEE FINISH SCHEDULE FOR INFORMATION ON HIGH PRESSURE DECORATIVE LAMINATE 3. SEE CABINETRY DETAILS FOR INFORMATION ON WOOD PRODUCTS USED IN CONSTRUCTION OF MILLWORK. MINIMUM REQUIREMENTS ARE AS FOLLOWS: 2.1 HARDBOARD: AHA 135.4 2.2 MEDIUM DENSITY FIBERBOARD: ANSI' A208.2, GRADE MD 2.3 PARTICLE BOARD: ANSI A208.2, GRADE M-2 2.4 SOFTWOOD PLYWOOD: DOC PS 1, MEDIUM DENSITY OVERLAY 2.5 VENEER -FACED PANEL PRODUCTS (HARDWOOD PLYWOOD): HPVA HP -1. 4. THERMOSET DECORATIVE PANELS: PARTICLEBOARD OR MEDIUM DENSITY FIBERBOARD FINISHED WITH THERMALLY FUSED, MELAMINE - IMPREGNATED DECORATIVE PAPER COMPLYING WITH LMA SAT -1. 5. 1USE FORMULATIONS THAT DO NOT BLEED THROUGH OR CAUSE DISCOLORATIONS FIRE RETARDANT TREATED MATERIALS 1. ALL INTERIOR ARCHITECTURAL WOODWORK BACKING PANELS AND BLOCKING TO BE FIRE RETARDANT TREATED MDF AND TO BE IDENTIFIED/STAMPED AS SUCH. 2. USE MATERIALS COMPLYING WITH TESTS INDICATED AND AUTHORITIES HAVING JURISDICTION. 2.1 IDENTIFY FIRE RETARDANT TREATED MATERIALS WITH APPROPRIATE CLASSIFICATION MARKING OF UL TESTING AGENCY 2.2 COMPLY WITH ANSI A208.1, FLAME SPREAD INDEX 25, SMOKE DEVELOPED INDEX OF 450 OR LESS PER ASTM E84 2.3 FIRE RETARDANT TREATED LUMBER AND PLYWOOD BY PRESSURE PROCESS: LUMBER AWPA C20, PLYWOOD - AWPA C27 0. INTERIOR TYPE A b. KILN -DRY MATERIALS BEFORE AND AFTER TREATMENT TO LEVELS REQUIRED FOR UNTREATED MATERIALS 2.4 FIRE RETARDANT PARTICLEBOARD AND FIBERBOARD: COMPLY WITH ANSI A208.1, FLAME SPREAD INDEX 25, SMOKE DEVELOPED INDEX OF 450 OR LESS PER ASTM E84 3, SEE HARDWARE SCHEDULE FOR HARDWARE SPECIFICATIONS 4. ALL MATERIALS PROVIDED FOR FABRICATION SHALL BE PREMIUM GRADE INTERIOR WOODWORK PER AWI 5. WOOD MOISTURE CONTENT PER AWI 6. ALL WOODWORK/PANELING SHALL BE TREATED WITH MATERIALS TO INSURE COMPLIANCE WITH APPLICABLE FLAME SPREAD AND SMOKE DEVELOPMENT RATING REQUIREMENTS 7. SAND FIRE RETARDANT TREATED WOOD LIGHTILY TO REMOVE RAISED GRAIN ON EXPOSED SURFACES BEFORE FABRICATION 8. EASE WOODWORK EDGES, CORNERS OF CABINETS AND EDGES OF SOLI WOOD (LUMBER) MEMBERS AND RAILS 16" 9. COMPLETE FABRICATION INCLUDING ASSEMBLY, FINISHING AND HARWARE APPLICATION TO MAXIMUM EXTENT POSSIBLE BEFORE SHIPPING TO PROJECT SITE. INSTALL IN LENGTHS TO MINIMIZE JOINTS AND SEAMS UNLESS OTHERWISE NOTED, 10. SHOP CUT OPENINGS TO MAXIMUM EXTENT POSSIBLE TO RECEIVE HARDWARE, APPLIANCES, ETC. SEAL ALL CUT EDGES TO MATCH SURROUNDING FINISH. 11. INSTALL GLASS TO COMPLY WITH APPLICABLE REQUIREMENT IN DIVISION 8, GLAZING AND PER GANA "GLAZING MANUAL" i 12. FLUSH WOOD PANEL PRODUCTS TO COMPLY WITH SECTION 200, AWI 13. SEE FINISH SCHEDULE FOR VENEER GRAIN DIRECTION, MATCHING OF ADJACENT VENEER LEAVES, PANEL MATCHING METHOD AND OR VERTICAL PANEL MATCHING METHOD 14. PROVIDE FINISHED END PANELS ON WOOD VENEERED PANELS WITH ENDS ABUTTING INTO A WALL OR ADJOINING CASE, END PANEL IS TO BE FACED WITH THE SAME MATERIAL AS THE EXTERIOR FACE OF THE CASE TO WHICH IT IS APPLIED. PLASTIC LAMINATE CABINETS I 1. CONSTRUCTION TYPE TO FOLLOW AWI ARCHITECTURAL CABINETS, SECTION 400 2. SEE FINISH SCHEDULE FOR FINISH SELECTIONS AND MANUFACTURERS DRYWALL SUSPENSION SYSTEM FLAT CEILINGS - MAIN TEES SHALL BE SPACED A MAXIMUM OF 48" ON CENTER AND SUPPORTED BY HANGER WIRES SPACED A MAXIMUM OF 4 " M 8 ON CENTER ANDA SPECIFIED RESISTANCE IR S EC IED BY UL FIRE RESTS A CE D ECTORY. ATTACHING HANGER WIRES DIRECTLY TO STRUCTURE ABOVE. CROSS TEES SHALL BE SPACED PER MANUFACTURER'S RECOMMENDATIONS AND AS SPECIFIED BY UL FIRE RESISTANCE DIRECTORY. ATTACH GYPSUM PANELS TO THE SUSPENSION SYSTEM MAIN RUNNERS, CROSS TEES AND CROSS CHANNELS WITH CONVENTIONAL GYPSUM PANEL FASTENERS SPACED 8" O.C. AT PERIPHERY OF GYP PANELS AND LOCATED "' FROM PANEL EDGES AND SPACED 12" OC IN THE FIELD. TRANSITIONS OR CHANGES IN ELEVATION WITH GYP BD. SOFFITS WHEN CONSTRUCTION STEPPED SOFFITS, BRACING OF THE DRYWALL SUSPENSION SYSTEM AND/OR ADDITIONAL HANGER WIRES MAY BE NECESSARY TO ENSURE STABILITY AND STRUCTURAL PERFORMANCE DURING AND AFTER DRYWALL ATTACHMENT. THE MAXIMUM VERTICAL SOFFITS HEIGHT IS 48". (MAXIMUM UNSUPPORTED DRYWALL AREA SHALL NOT EXCEED 48" X 24"). INTERMEDIATE CROSS TEES ARE NOT NECESSARY WHEN BULKHEAD DIMENSIONS DO NOT EXCEED 24". CROSS TEE SPACING IN HORIZONTAL SOFFIT PLAN IS NOT TO EXCEED 24". INTERMEDIATE CROSS TEES MAY BE NECESSARY TO MAINTAIN VISUALLY ACCEPTABLE DRYWALL PLANES AND DRYWALL CORNERS. HANGER WIRE NOTES - HANGER WIRES ARE REQUIRED WITHIN 12" ON BOTH SIDES OF A PIVOTED SPLICE CUP. AT LEAST 1 HANGER WIRE IS REQUIRED WITHIN 12" OF A TRANSITION CLIP. LIMITATIONS - DO NOT SUPPORT WIRES FROM MECHANICAL AND/OR ELECTRICAL EQUIPMENT OCCURRING ABOVE THE CEILING CEILING NOTES - SEE USG "DRYWALL/STEEL FRAMED SYSTEMS BROCHURE, SA 923". SPACING OF DRYWALL GRID IS DESIGNED TO SUPPORT DEAD LOAD ONLY. CONTROL JOINTS - PROVIDE CONTROL JOINT NO. 093 WHICH HAS A 32' GROUND FOR DRYWALL, SEE RCP FOR LOCATIONS. UPHOLSTERED FURNITURE UPHOLSTERED FURNITURE TO BE FABRICATED PER OWNER'S BRAND STANDARDS. SIGNAGE 1. ALL SIGNAGE IS FURNISHED BY OWNER AND INSTALLED BY GC. OWNER SHALL PROVIDE ALL SIGNAGE SPECIFICATIONS AND SCHEDULE IN COORDINATION WITH SIGNAGE MANUFACTURER, AS REQUIRED. 2. ALL SIGNAGE, WHICH IS KEY TO DESIGN INTENT, IS NOTED IN ARCHITECTURAL ELEVATIONS FOR MOUNTING HEIGHTS AND DISTANCES FROM OTHER VERTICAL SURFACES ONLY 3. ANY SIGNAGE REQUIRING ELECTRICAL CONNECTIONS IS ALSO SHOWN IN ARCHITECTURAL ELEVATIONS FOR MOUNTING HEIGHT AND DISTANCES FROM OTHER VERTICAL SURFACES ONLY 4. IN ALL 'OTHER ARES THAT ARE NOT ELEVATED, SIGNAGE IS TO BE INSTALLED PER THE DIRECTION OF THE RH PROJECT MANAGER. SEE SERIES T SHEETS FOR GENERAL ADA MOUNTING HEIGHT GUIDELINES. ARTWORK & ARTIFACTS FOR PUBLIC SPACES 1. ARTWORK + ARTIFACTS FOR PUBLIC SPACES ARE PROVIDED BY THE OWNER AND INSTALLED BY THE GC. OWNER AND GC TO COORDINATE INSTALLATION 2, PROVIDE ARTWORK WITH 3 -POINT SECURITY HARDWARE FOR SECURE MOUNTING AND ATTACHMENT TO WALL SURFACES. HEALTH CODE SPECIFICATIONS 1. ALL FOOD SERVICE EQUIPMENT AND INSTALLATON SHALL COMPLY WITH THE CURRENT EDITION OF THE HEALTH DEPARMTNET AND OTHER GOVERNING CODES. 2. ALL FOOD SERVICE EQUIPMENT, FABRICATED ITEMS AND THEIR INSTALLATION SHALL MEET NATIONAL SANITATION FOUNDATION (NSF) REQUIREMENTS. 3. ALL STATIONARY EQUIPMENT AND FIXTURES TO BE SEALED TO THE WALL OR ADJACENT EQUIPMENT. USE ALUMINUM COLOR SEALANT AT STAINLESS STEEL AND CLEAR AT ALL OTHER. 4. ALL EQUIPMENT SHALL BE ON 6" NSF APPROVED LEGS OR HEAVY SYNTHETIC CASTERS OR CURBS W/ $" RADIUS SANITARY COVE. 5. TABLE MOUNTED EQUIPMENT THAT IS NOT PORTABEL, SHALL BE MOUNTED ON LEGS NO LESS THAN 4" IN HEIGHT OR SEALED TO THE T BLE OR COUNTER. PORTABLE EQUIPMENT IS CONSIDERED TO BE LESS THAN 75 LBS. WITH NO RIGID UTILITY CONFECTIONS. 6. RAISED FLOOR PLATFOR'IS ARE NOT ACCEPTABLE WHERE WASTE CONNECTIONS ARE COVERED AND CANNOT BE ADEQUATELY SEALED INLACE 7. ALL UTILITY LINES SHALL BE ELEVATED AT LEAST 6" OFF THE FLOOR AND ONE HALF INCH FROM THE WALLS 8. ALL FLOOR DRAINS, HUB DRAINS AND FLOOR SINKS ACCEPTING INDIRECT WASTE OR CONDENSATE SHALL HAVE MINIMUM ONE INCH AIR GAP 9. 8" HIGH SPLASH GUARDS SHALL BE INSTALLED AT HAND SINKS WHEN FOOD CONTACT SURFACES, VEGETABLE OR THREE COMPARTMENT SINKS ARE WITHIN A DISTANCE OF 18" HORIZONTALLY. SPLASH GUARDS SHALL BE SECURELY FASTENED AND BE EASILY CLEANABLE. 10. LAMP GUARDS OR SL VES, SOLID PLASTIC LENSES OR APPROVED COATING BULBS SHALL BE USED ON ALL LIGHTING IN EQUIPME OR OVER FOOD CONTACT AREAS 11. FLOORS IN 'FOOD PREPARATION, FOOD STORAGE, UTENSIL WASHING AND JANITORIAL AREAS SHALL MEET HEALTH DEPARTMENT REQUIREMENTS AND SHALL HAVE COVED BASE 12. EACH COLD STORAGE UNIT SHALL BE PROVIDED WITH THERMOMETERS SCALED IN FIVE DEGREE F INCREMENTS 13. WALLS AND CEILINGS IN FOOD PREPARATION, FOOD STORAGE, UTENSIL WASHING AND JANITORIAL AREAS SHALL BE APPROVED NON-ABSQEBENT, DURABLE AND EASILY CLEANABLE MATERIALS. MATERIALS IN WET AREAS SHALL BE MOISTURE RESISTANT 14. ALL PLUMBING, ELECTRICAL AND GAS LINES` SHALL BE CONCEALED WITHIN THE BUILDING STRUCTURE TO THE GREATEST EXTENT POSSIBLE 15. FLOOR SINKS UNDER EQUIPMENT SHALL BE EASILY ACCESSIBLE FOR CLEANING AND SERVICING 16. ALL FLOOR TILE TO BE SMOOTH UNDER ALL EQUIPMENT AND WALKWAYS TO HAVE A LIGHT TEXTURE ONLY 17. CLEANING CHEMICALS AND INSECTICIDES SHALL BE STORED IN SEPARATE SHELVING AWAY FROM FOOD AREAS 18. ARRANGE FOR INSPECTIONS AS REQUIRED FROM GOVERNING AGENCIES AS REQUIRED TO COMPLETE THE WORK 19. ALL SINKS IN THE FOOD FACILITY MUST BE PROVIDED WITH HOT WATER (MIN. 120 DEG. F) AND COLD RUNNING WATER UNDER PRESSURE AND WILL HAVE A PREMIXING FAUCET CAPABLE OF SUPPLYING WARM WATER FOR MINIMUM OF 10 SECONDS 20. A HAND SINK SHALL BE PROVIDED IN EACH FOOD PREPARATION AREA WITH SINGLE SERVICE TOWEL AND SOAP DISPENSER SINK SHALL P - 21. A MOP B PROVIDED COMPLETE WITH BUILT-IN VACUUM BREAKER FAUCET 22. 3 -COMPARTMENT SINK SHALL BE PROVIDED WITH MIXING VALVE FAUCETS CAPABLE OF REACHING EACH COMPARTMENT 23. A MINIMUM OF 50 FOOT CANDLES, 215 LUX OF LIGHT MEASURED 30" OFF THE FLOOR, SHALL BE PROVIDED IN ALL FOOD PREPARATION PACKAGING AND PROCESSING AREAS A WHERE AND W E E UTENSILS ARE CLEANED. 24, A MINIMUM OF 20 FOOT CANDLES, 108` LUX OF LIGHT MEASURED 30" OFF THE FLOOR, SHALL BE PROVIDED IN ALL FOOD STORAGE, REACH -IN REFRIGERATORS AND UTENSIL STORAGE ROOMS 25. A MINIMUM OF 20 FOOT CANDLES, 108 LUX OF LIGHT MEASURED 3" OFF THE FLOOR SHALL BE PROVIDED' IN TOILET & DRESSING ROOMS AND IN ALL AREAS DURING GENERAL CLEANUP ACTIVITIES 26. ALL SHELVING OVER WET AREAS (SINKS, MOPS, ETC.) SHALL BE STAINLESS STEEL Q so cq0.7Q °O r W U p Q " cr_ `� a o N l.! Q® �o tA yo Lu ocy� o� CC 100 O I SEAL: gin'•_ '"U016.9 - 2: "0169 • z < 0 • un • • < 1• U SEAL: gin'•_ '"U016.9 - 2: "0169 18-047 CHECKED BY AEF/SHG DRAWN BY LAP SHEET TITLE SPECIFICATIONS I SHEET NO. T2.1 z 0 U LLJ w 0 a w cn w � o o z 18-047 CHECKED BY AEF/SHG DRAWN BY LAP SHEET TITLE SPECIFICATIONS I SHEET NO. T2.1 A. GENERAL 1. ALL NOTES ARE DIRECTIONS TO THE CONTRACTOR BEFORE STARTING EACH PORTION OF THE WORK, AND THROUGHOUT THE COURSE OF THE WORK, CAREFULLY STUDY AND COMPARE THE WORK AND THE VARIOUS CONTRACT DOCUMENTS RELATIVE TO THAT PORTION OF THE WORK; AS WELL AS THE INFORMATION FURNISHED BY THE OWNER. FIELD MEASUREMENTS SHALL BE TAKEN OF ANY EXISTING CONDITION AT THE SITE WHICH IS AFFECTED BY THE NEW WORK. THE CONTRACTOR SHALL PROMPTLY REPORT TO THE OWNER'S REPRESENTATIVE ANY ERRORS, INCONSISTENCIES, CONFLICTS, OR OMISSIONS DISCOVERED BY OR MADE KNOWN TO THE CONTRACTOR AS A REQUEST FOR INFORMATION IN SUCH FORM AS THE OWNER'S REPRESENTATIVE MAY REQUIRE. FAILURE TO REPORT A CONFLICT IN CONTRACT DOCUMENTS SHALL BE DEEMED EVIDENCE THAT CONTRACTOR HAS ELECTED TO PROCEED IN A EXPENSIVE MANNER. 2. IF A DIMENSIONAL DISCREPANCY EXISTS, CONTRACTOR SHALL TAKE FIELD MEASUREMENTS FOR PROPER FABRICATION AND INSTALLATION OF WORK. UPON COMMENCEMENT OF ANY ITEM OF WORK, CONTRACTOR SHALL BE RESPONSIBLE FOR DIMENSIONS RELATED TO SUCH ITEM OF WORK AND SHALL MAKE ANY CORRECTIONS NECESSARY TO MAKE WORK PROPERLY FIT AT NO ADDITIONAL COST TO OWNER. 3. BEFORE ORDERING ANY MATERIAL OR DOING ANY WORK, CONTRACTOR SHALL VERIFY DIMENSIONS AND CHECK CONDITIONS IN ORDER TO ASSURE HIMSELF/HERSELF THAT THEY PROPERLY REFLECT THOSE -ON THE DRAWINGS. ANY INCONSISTENCY SHALL BE BROUGHT TO ATTENTION OF THE OWNER'S REPRESENTATIVE. IN THE EVENT THAT DISCREPANCIES OCCUR BETWEEN ORDERED MATERIAL AND ACTUAL CONDITIONS, OF WHICH OWNER'S REPRESENTATIVE WAS NOT NOTIFIED BEFOREHAND, COSTS TO CORRECT SUCH DISCREPANCIES SHALL BE BORN BY THE CONTRACTOR. 4. IF COMPLIANCE WITH TWO OR MORE STANDARDS 1S SPECIFIED AND THE STANDARDS ESTABLISH DIFFERENT OR CONFLICTING REQUIREMENTS FOR MINIMUM QUANTITIES OR QUALITY LEVELS, COMPLY WITH THE MOST STRINGENT REQUIREMENT. REFER UNCERTAINTIES AND REQUIREMENTS THAT ARE DIFFERENT, BUT APPARENTLY EQUAL, TO OWNER'S REPRESENTATIVE FOR A DECISION BEFORE PROCEEDING. 5. THE QUANTITY OR QUALITY LEVEL SHOWN OR SPECIFIED SHALL BE THE MINIMUM PROVIDED OR PERFORMED. THE ACTUAL INSTALLATION MAY COMPLY EXACTLY WITH MINIMUM QUANTITY OR QUALITY SPECIFIED, OR IT MAY EXCEED THE MINIMUM WITHIN REASONABLE LIMITS. TO COMPLY WITH THESE REQUIREMENTS INDICATED NUMERIC VALUES ARE MINIMUM OR MAXIMUM, AS APPROPRIATE, FOR THE CONTEXT OF REQUIREMENTS. REFER UNCERTAINTIES TO OWNER'S REPRESENTATIVE FOR A DECISION BEFORE PROCEEDING. 6. BY SUBMITTING A BID, PROPOSAL, OR COST, THE CONTRACTOR REPRESENTS THAT (A) IT HAD READ AND UNDERSTOOD THE CONTRACT DOCUMENTS AND SUBMITTED ITS BID, PROPOSAL, OR COST ON THE BASIS OF THOSE DOCUMENTS; AND (B) IT HAD STUDIED AND COMPARED THE CONTRACT DOCUMENTS WITH EACH OTHER AND HAD REPORTED TO THE OWNER'S REPRESENTATIVE ANY CONFLICTS; ERRORS, INCONSISTENCIES, OR AMBIGUITIES DISCOVERED. FAILURE TO REPORT CONFLICTS, ERRORS, INCONSISTENCIES, OR AMBIGUITIES IN CONTRACT DOCUMENTS SHALL BE DEEMED EVIDENCE THAT CONTRACTOR HAS ELECTED TO PROCEED IN A EXPENSIVE MANNER. 7. HATCHED OR SHADED AREAS INDICATED AREAS NOT IN CONTRACT (NIC). 8. THE TERM "PROVIDES" MEANS TO FURNISH, TRANSPORT, RECEIVE, INSTALL, CONNECT START UP, AND WARRANTY. 9. ALL ITEMS ARE ASSUMED TO BE CONTRACTOR PROVIDED AND CONTRACTOR (CFCI) INSTALLED UNLESS NOTED OTHERWISE (UNO) AS OWNER FURNISHED CONTRACTOR INSTALLED (OFCI). REFER TO FF&E SPECIFICATIONS & LEGENDS FOR CONFIRMATION. 10.ITEMS INDICATED THUS "NIC" ARE NOT IN CONTRACT. 11.ITEMS INDICATED THUS "OFCI" ARE OWNER FURNISHED CONTRACTOR INSTALLED. 12.ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH ALL CURRENT APPLICABLE LOCAL CODES, REGULATIONS, STANDARDS, ORDINANCES, AND AUTHORITIES HAVING JURISDICTION. 13.ALL CONSTRUCTION AND MATERIALS FOR THE PROJECT SHALL BE NEW AND CONFORM TO THE BUILDING STANDARD SPECIFICATION, UNO. 14.000RDINATE THE WORK OF OWN EMPLOYEES AND SUBCONTRACTORS TO ENSURE COMPLIANCE WITH THE SCHEDULE. 15.SUBMIT CONFIRMATIONS WITH DELIVERY DATES OR ORDERS, MATERIALS, AND EQUIPMENT, OR ANY LONG -LEAD TIME ORDER ITEMS TO THE OWNER'S REPRESENTATIVE. 16.ALL ' REQUESTS FOR SUBSTITUTIONS OF 'ITEMS SPECIFIED SHALL BE SUBMITTED, IN WRITING TO THE OWNER'S REPRESENTATIVE. SUBSTITUTIONS SHALL ONLY BE CONSIDERED IF IT BETTER SERVES THE FACILITY, IT HAS A MORE ADVANTAGEOUS DELIVERY DATE AND/QR A LESS PRICE (WITH CREDIT TO THE OWNER) SHALL BE PROVIDED WITHOUT SACRIFICING QUALITY, APPEARANCE AND FUNCTION. 17.UNDER NO CIRCUMSTANCES SHALL THE OWNER'S REPRESENTATIVE BE REQUIRED TO PROVE THAT A PRODUCT- PROPOSED FOR SUBSTITUTION IS, OR IS NOT, OF EQUAL QUALITY TO THE PRODUCT ORIGINALLY SPECIFIED. 18.SUBMIT SAMPLES OF ALL FINISHES TO THE OWNER'S REPRESENTATIVE FOR APPROVAL PRIOR TO PERFORMING' ANY WORK RELATED TO SUCH FINISHES. 19.PROVIDE ALL MANUFACTURED ITEMS, MATERIALS AND EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURER'S WRITTEN SPECIFICATIONS AND INSTRUCTIONS. 20. ALL WORK SHALL COMPLY WITH ACCESSIBILITY STANDARDS AND GUIDELINES APPLICABLE TO THE PROJECT LOCATION. MAINTAIN COPIES OF THE APPLICABLE STANDARDS AND GUIDELINES AND NOTIFY OWNER'S REPRESENTATIVE SHOULD CONFLICTS BETWEEN THE DRAWINGS, STANDARDS AND GUIDELINES, OR SITE CONDITIONS OCCUR PRIOR TO PURCHASE, FABRICATION, AND INSTALLATION. 21. SCHEDULING OF WORK BY THE GENERAL CONTRACTOR SHALL BE SUBMITTED AT THE TIME OF BID, BASED ON THE OWNER RULES AND REGULATIONS AND OPERATIONAL HOURS AND TIMES CONSTRUCTION IS NOT PERMITTED. THE RULES AND REGULATIONS SHALL BE PART OF BID DOCUMENT AND SHALL BE FURTHER REVIEWED DURING PREBID/PRECONSTRUCTION MEETING. 22. THE USE OF ANY MATERIALS CONTAINING ASBESTOS IN NEW WORK IS PROHIBITED. 23. COORDINATE WITH BUILDING ENGINEER TO INTEGRATE NEW CONSTRUCTION WITH EXISTING ENERGY MANAGEMENT SYSTEM. 24. BEFORE BEGINNING WORK, INSPECT THE EXISTING BUILDING AND DETERMINE THE EXTENT OF EXISTING FINISHES, SPECIALTIES, CASEWORK, EQUIPMENT, AND OTHER ITEMS WHIIICH SHALL BE REMOVED AND REINSTALLED IN ORDER TO PERFORM THE WORK UNDER CONTRACT. 25. THE DRAWINGS SHOW PRINCIPLE AREAS WHERE WORK SHALL BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL, WORK MAY ALSO BE NECESSARY IN AREAS NOT SHOWN ON THE DRAWINGS DUE TO CHANGES AFFECTING EXISTING MECHANICAL, OWNER'S GENERAL NOTES ELECTRICAL, PLUMBING, OR OTHER SYSTEMS. SUCH INCIDENTAL WORK IS ALSO A PART OF THIS CONTRACT. INSPECT THOSE AREAS, A\ID ASCERTAIN WORK NEEDED AND DO THAT WORK IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS, AT NO ADDITIONAL COST. 26. PROTECT EXISTING STRUCTURES SURROUNDING THE CONTRACT AREA. DAMAGE TO EXISTING STRUCTURES OR EQUIPMENT SHALL 13E REPAIRED AT NO ADDITIONAL COST TO THE OWNER. 27. EXISTING SURFACES DISTURBED BY DEMOLITION OR NEW CONSTRUCTION SHALL BE PATCHED AND FINISHED TO MATCH ADJACENT SURFACES. EXTEND NEW FINISHES CORNER TO CORNER. 28. IF DURING THE COURSE OF THE WORK, ANY SUSPECTED HAZARDOUS MATERIAL INCLUDING, BUT NOT LIMITED TO, ASBESTOS, LEAD PAINT, PCB'S ENCOUNTERED, CEASE WORK IMMEDIATELY IN THE AREA WHERE THE MATERIAL IS ENCOUNTERED, AND NOTIFY THE OWNER'S REPRESENTATIVE IN WRITING. DO NOT RESUME WORK IN THE AFFECTED AREA UNTIL THE HAZARDOUS MATERIAL HAS BEEN ABATED IN ACCORDANCE WITH GOVERNING LEGAL REGULATION. 29. SALVAGEABLE ITEMS AND EXCESS STOCK SHALL BE RETURNED TO THE OWNER. B. FIELD VERIFICATION 1. VERIFY EXISTING CONDITIONS AND NOTIFY OWNER'S REPRESENTATIVE OF CONFLICTING CONDITIONS PRIOR TO COMMENCEMENT OF WCRK. 2. INSPECT ALL ARCHITECTURAL DETAILING IN THE EXISTING SPACE. THE DESIGN INTENT IS THAT THE DETAILING AND MATERIALS OF ALL NEW COMPONENTS SHALL MATCH EXISTING AND SHALL BE CONSTRUCTED ACCORDINGLY UNO. ADDITIONAL DETAILS MAY BE REQUIRED. IN SUCH CASE, SUBMIT PROPOSED DETAIL TO THE OWNER'S REPRESENTATIVE FOR APPROVAL. 3. FIELD VERIFY EXISTING MILLWORK, WOOD SPECIES, AND OTHER DETAILS THAT ARE SPECIFIED AS "MATCH EXISTING" TO INSURE T-1AT NEW COMPONENTS MATCH EXISTING WHEN SPECIFIED. 4. FIELD VERIFY ALL CEILING AND PLENUM SPACES TO INSURE THAT LIGHT COVES, RECESSED CEILINGS AND SOFFITS, RECESSED LIGHTING, PROJECTION SCREENS, OTHER RECESSED ELEMENTS OF THE DESIGN AND NEW DUCTWORK OR DEVICES HAVE REQUIRED CLEARANCES PRIOR TO PLACING ORDERS. 5. FIELD VERIFY LOCATION OF EXISTING CEILING DEVICES (SUCH AS SPRINKLERS, DOOR SWINGS, DIFFUSERS, LIGHTS OR MECHANICAL DUCTWORK) THAT WILL INTERFERE WITH THE INSTALLATION OF NEW LIGHTING AND OTHER DESIGN ELEMENTS AND RELOCATE AS REQUIRED. C. DEMOLITION 1. EXISTING FLOOR, CEILING AND ALL FINISHES TO REMAIN IN ALL AREAS WHERE THERE IS NO CONSTRUCTION. IN AREAS OF CONSTRUCTION, PATCH AND REPAIR SURFACES TO MATCH EXISTING FINISHES AS INDICATED. 2. NEW WALLS ARE SHOWN SHADED. DOUBLE LINE WALLS; WITHOUT POCHE, ARE EXISTING TO REMAIN. DASHED LINES INDICATE MATERIAL OR EQUIPMENT TO BE REMOVED:` 3. PATCH, TEXTURE, AND PAINT WHERE RELOCATED OR REMOVED OUTLETS, FIXTURES AND DEVICES WERE LOCATED. 4. REMOVAL OF MATERIAL FROM THE BUILDING SHALL BE DONE IN SUCH A MANNER AS TO PREVENT DAMAGE TO EXTERIOR STRUCTURES, ADJACENT STRUCTURES OR STRUCTURES BELOW. 5. NOTIFY OWNER'S REPRESENTATIVE PRIOR TO REMOVAL OF MATERIAL OR EQUIPMENT NOT INDICATED ON DRAWINGS TO BE REMOVED. 6. PRIOR TO DEMOLITION, COORDINATE WITH OWNER AL ITEMS TO BE STORED FOR REUSE. 7. WHERE EXISTING CONSTRUCTION IS REMOVED, REPAIR, PATCH AND PREPARE REMAINING SURFACES TO PROVIDE A SOUND SUBSTRATE IN AN EVEN PLANE FOR NEW CONSTRUCTION AND FINISHES, PER THE RECOMMENDATIONS OF THE FINISH MANUFACTURER. 8. EXISTING SURFACES DISTURBED BY DEMOLITION SHALL BE PATCHED AND FINISHED TO MATCH ADJACENT SURFACES. 9. REPAIR DAMAGED WALL FINISH WHERE ARTWORK AND MIRRORS WERE REMOVED TO MATCH EXISTING. D. CONSTRUCTION STRUCT ON ADMINISTRATION I. CONSTRUCTION ADMINISTRATION SERVICES ARE ADMINISTERED BY THE OWNER'S DESIGNATED REPRESENTATIVE (OWNER'S REP.) IF THE TERMS ARCHITECT OR DESIGNER IS USED IN THESE DOCUMENTS IN ITEMS RELATED TO CONSTRUCTION PHASE, THEY SHALL BE INTERPRETED TO MEAN OWNER'S REP. THE FOLLOWING INCLUDING, BUT NOT LIMITED TO, SHALL BE SUBMITTED TO THE OWNER'S REP: SUBMITTALS, SHOP DRAWINGS, AND PRODUCT DATA, RFI'S, REQUESTS FOR SUBSTITUTIONS, APPLICATIONS FOR PAYMENTS, AND ETC. - 2. SHOP DRAWINGS SHALL CLEARLY SHOW FRAMING AND ELEMENTS OF EVERY MILLWORK ITEM. REVIEW, APPROVE AND _AFFIX STAMP TO SHOP DRAWINGS PRIOR TO SUBMITTAL TO THE OWNER'S REP. -I 3. OWNER'S REP SHALL REQUIRE AT LEAST THREI- WORKING DAYS IN ORDER TO ANSWER RFI'S DURING CONSTRUCTION PERIOD. E. FLOORS 1. LEVEL ALL FLOORS BEFORE ADDING NEW FLOCR SURFACE. 2. WHERE EXISTING CARPET OR HARD SURFACE FLOOR IS REMOVED, PATCH AND LEVEL SLAB TO RECEIVE NEW CARPET AND PAD OR HARD URFACE. REPAIR EXISTING FLOOR WHEREVER EXISTING IMPERFECTIONS WOULD TELEGR PH THROUGH NEW CARPET, PADDING, ETC. GRIND ALL ROUGH SPOTS AND FILL DEPRESSIONS. 3. APPLY GROUT RELEASE PRIOR TO GROUTING. (KEEP GROUT RELEASE OUT OF JOINTS.) SEAL POROUS GROUT A MINIMUM OF TWO TIMES AND FOLLOW THE MANUFACTURER'S RECOMMENDATIONS. 4. INSPECT AND ACCEPT SUBSTRATE PRIOR TO INSTALLATION OF FLOOR FINISH. INSPECTION SHALL INCLUDE, BUT NOT BE LIMITED TO, MOISTURE, CURING COMPOUNDS, GREASE, OIL, FLATNESS OF FLOCR-ACCORDING TO MANUFACTURER'S WRITTEN INSTRUCTIONS, CRACKS, AND DAMAGE THAT MAY CAUSE DEFECT AND NON -ADHERENCES OF FINISHES. INSTALLATION OF FINISHES CONSTITUTES ACCEPTANCE OF SUBSTRATE. 5. IF TILE FLOORS ARE REPLACED IN BATHROOMS, INSTALL NEW WAX RING AT TOILET. F. PARTITIONS AND WALLS 1. ALL PARTITIONS SHALL EXTEND FROM FLOOR 10 STRUCTURE ABOVE, EXCEPT WHERE NOTED OR SHOWN OTHERWISE. 2. EXTEND ALL SOUND RATED PARTITIONS TO THE STRUCTURE ABOVE TO PREVENT SOUND TRANSMISSION. PROVIDE 4-1/4» LBS DENSITY GLASS FIBER INSULATION SHAPED TO FIT THE VOID ABOVE THE PARTITION WHERE AIRBORNE SOUND CAN PENETRATE SPACES. PROVIDE SEALANT AT TOP AND BOTTOM ON BOTH SIDES OF PARTITION AND AT ALL PENETRATIONS. 3. UNO, NEW PARTITIONS SHALL BE 5/8" FIRE RATED GYPSUM BOARD EACH SIDE OF 3-5/8", 25 GA METAL STUDS, AT 16" OC , BUILT TIGHT TO STRUCTURAL' DECK, AND FILLED WITH 3-1/2: FIBERGLASS BATT" INSULATION TO STRUCTURE ABOVE. 4. NONCOMBUSTIBLE CONSTRUCTION: (A) THE INTERIOR FINISH OF WALLS AND CEILING IN EXITS AND CORRIDOR IN ANY WORK AREA SHALL COMPLY WITH THE REQUIREMENT OF THE STATE BUILDING CODE. (B) FURRING STRIPS NOT EXCEEDING 1-3/4" SHALL BE APPLIED DIRECTLY AGAINST SUCH CONSTRUCTION. (C) FINISH MATERIAL SHALL BE ATTACHED TO NONCOMBUSTIBLE BACKING OR FURRING STRIPS. 5. VERIFY IF EXISTING WALLS TO BE DISTURBED OR REMOVED ARE FIRE RATED PARTITIONS. IF SO, REPLACE WITH NEW PARTITION AND DOORS AS REQUIRED TO RETAIN ORIGINAL RATING. PENETRATIONS E ETRATIONS THROUGH ONE HOUR OR GREATER FIRE RATED CONSTRUCTION WALL AND FLOOR ASSEMBLIES SHALL BE SEALED WITH APPLICABLE LISTED UL THROUGH -PENETRATION FIRE -STOP SYSTEMS. 6. MAINTAIN THE INTEGRITY OF ALL FIREPROOFING EXISTING IN THE AREAS INCLUDED IN THE SCOPE OF WORK. FIREPROOF ALL NEW PENETRATIONS GENERATED BY THE WORK DESCRIBED IN THESE DRAWING IN ACCORDANCE WITH CURRENT LOCAL APPLICABLE CODES AND AUTHORIZES HAVING JURISDICTION. 7. DIMENSIONS ARE TO FINISH FACE OF PARTITIONS UNO. 8. PROVIDE BLOCKING FOR ALL WALL MOUNTED ITEMS INCLUDING, BUT NOT LIMITED TO PLUMBING FIXTURES, TOILET ACCESSORIES, CABINETS; SHELVING, LADDERS, LIGHT FIXTURES, DRAPERY AND KITCHEN EQUIPMENT. GRAB BAR SHALL WITHSTAND 250 LBS PULL. 9. ALL WALL SUPPORTED CASEWORK, GRAB BARS, DOOR HARDWARE, ACCESSORIES AND EQUIPMENT SHALL BE ANCHORED TO FIRE RETARDANT TREATED 2X WOOD BLOCKING ANCHORED BETWEEN STUDS. BLOCKING SHALL BE CONTINUOUS AND LOCATED AT BOTH THE BOTTOM AND TOP OF THE ITEM. NO EXTRA MONIES SHALL BE AWARDED FOR FAILURE TO PROVIDE SAID BLOCKING AND THE SUBSEQUENT INSTALLATION AFTER THE WALL FINISHES HAVE BEEN APPLIED, VERIFY ANY ITEMS, I IN QUESTION WITH THE OWNER'S REPRESENTATIVE PRIOR TO CLOSING UP THE WALL. 10.INSPECT AND ACCEPT SUBSTRATE PRIOR TO INSTALLATION OF WALL FINISH. DURING THE BIDDING PROCESS, PROVIDE UNIT COST FOR REPLACEMENT OF ANY DRYWALL EXHIBITING MAJOR MOISTURE OR OTHER DAMAGE AND REPLACE WITH KILZ, SO AS TO CREATE A SOUND SMOOTH AND EVEN SUBSTRATE FOR THE ACCEPTANCE' OF THE NEW FINISH. 11.WHERE EXISTING CONSTRUCTION SHALL BE REMOVED; RBPAIR, PATCH AND PROTECT SURFACES TO CREATE A SOUND SUBSTRATE (IN A FLUSH PLANE) FOR NEW CONSTRUCTION AND FINISHES AS RECOMMENDED BY THE FINISH MANUFACTURER. REPAIR HOLES AT ALL LOCATIONS WHERE WALLS HAVE BEEN DAMAGED OR ARTWORK AND MIRRORS HAVE BEEN REMOVED. CAULK ALL DIFFERENT FINISH TRANSITIONS. 12.EXPANSION JOINTS IN FINISHED AREAS EXPOSED TO VIEW SHALL BE COVERED WITH EXPANSION JOINT COVERS APPROPRIATE FOR FINISHED SURFACES WHETHER FLOOR, CEILING, WALL OR JUNCTIONS THEREOF AND SHALL BE SUBMITTED TO AND APPROVED BY OWNER. 13.VERIFY EXISTING STRUCTURAL IN CONFLICT WITH THE WORK. EXISTING STRUCTURE SHALL NOT BE CUT WITHOUT WRITTEN APPROVAL OF THE STRUCTURAL ENGINEER. G. CEILINGS 1. ALL CEILING DEVICES SUCH AS (SPRINKLERS, LIGHTS SMOKE DETECTORS, SPEAKERS AND OTHER DEVICES SHALL BE CENTERED IN THE CEILING TILES AND ALIGNED WITH EACH OTHER, UNO. H. DOORS AND FRAMES 1. VERIFY THAT ALL NEW DOORS FOR PUBLIC ACCESS MEE THE CURRENT HANDICAP ACCESSIBILITY REQUIREMENTS. (A) INTERIOR THRESHOLDS SHALL BE NO HIGHER THAN 1/2' AFF. THRESHOLDS HIGHER THAT '/" SHALL BE BEVELED AT 1:2. (B) DOOR HANDLES SHALL BE LEVER TYPE IF DOORS HAVE LATCHES AND/OR CLOSERS. PUSH/PULLS SHALL BE USED ON DOORS THAT DO NOT HAVE A LATCHING MECHANISM. ALL DOOR HARDWARE SHALL BE MOUNTED NO HIGHER THAN 48" AFF. (C) IF A DOOR HAS A CLOSER, THEN THE SWEEP PERIOD OF THE CLOSER SHALL BE ADJUSTED TO THAT FROM AN OPEN POSITION OF 70 DEGREES, THE DOOR SHALL TAKE AT LEAST THREE SECONDS TO MOVE 3" FROM THE LATCH, MEASURED TO THE LEADING EDGE OF THE DOOR. (D) THE MAXIMUM FORCE REQUIRED FOR PUSHING OR PULLING OPEN A DOOR SHALL BE FIVE LBS. 2. WHERE LABELED DOORS ARE REQUIRED, PROVIDE LABELS ON DOORS AND FRAMES. 3. HOLLOW METAL FRAMES SHALL BE ANCHORED TO THE STRUCTURAL FLOOR WITH A MINIMUM OF TWO ANCHOR BOLTS. 4. NEW DOOR FRAMES IN STUD PARTITIONS SHALL BE MINIMUM HALF-FILLED WITH GROUT FOR SOUND -DAMPENING BEFORE SETTING IN PLACE. 5. WHERE PLASTER ABUTS METAL FRAMES, PROVIDE CASING' BEADS, AND CAULK BETWEEN CASING BEAD AND METAL FRAME. I 6. HOLLOW METAL FRAMES IN MASONRY WALL SHALL BE FILLED WITH GROUT. CAULK AROUND BOTTOM OF DOOR FRAMES IN ALL WET AREAS I 7. REPLACE SMOKE SEALS WHERE GUESTROOM DOORS ARE REPAINTED AND HAVE SMOKE SEALS: L FINISHES 1. VWC NOTES: (A) WHERE NEW VWC IS TO BE INSTALLED, REMOVE ALL EVEN SUBSTRATE. (B) SIZE ALL WALL SURFACES PRIOR TO INSTALLATION OF NEW VWC. (C) CAULK ALL JOINTS BETWEEN NEW VWC AND CEILING, DOOR FRAMES, MILLWORK OR ANY OTHER DISSIMILAR FINISHES. SUBMIT CAULK COLOR TO MATCH VWC FOR APPROVAL. (D) CAULK ALL JOINTS BETWEEN NEW VWC AND CEILING, DOOR FRAMES, MILLWORK OR ANY OTHER DISSIMILAR FINISH. CAULK COLOR TO MATCH VWC. 2. WHERE VWC SHALL BE INSTALLED, THE STANDARD AMOUNT OF WALL PREPARATION FOR EACH ROOM (THAT IS DONE PRIOR TO THE INSTALLATION OF VWC) SHALL BE 50% OF THE WALL SURFACE, IF THE AMOUNT SPECIFIED EXCEEDS OR REDUCES, ADJUSTMENTS SHALL BE PROVIDED ACCORDINGLY. 3. DO NOT PAINT SPRINKLER HEADS OR COVERS. 4. REMOVE, CLEAN AND PAINT ALL DIFFUSERS, GRILLES AND DEVICES IN WALLS OR CEILING THAT RECEIVE NEW FINISHES. PAINT SHALL MATCH NEW SURROUNDING FINISHES. 5. PREPARATION AND PASTE OF VINYL WALLCOVERING SHALL BE TREATED WITH APPROPRIATE ANTI -MILDEW RESISTANT AGENTS. VWC SEAMS SHALL BE SEALED TO PREVENT TEARING. NOTE: VERTICAL SEAMS OF VINYL WALLCOVERING SHALL NOT OCCUR WITH IN 6" OF ANY CORNERS: 6. UNENGAGED COLUMNS WITHIN OPEN SPACES SHALL BE FINISHED WITH SAME MATERIALS SCHEDULED FOR WALLS UNO SHOWN OR DETAILED: 7. ALL PROPOSED PAINT SHALL BE LOW VOC (LESS THAN 50G/LITER) AND LOW ODOR. 8. THE PAINT COVERAGE AND FINISH SHALL BE AS FOLLOWS UNO: (PRIMERS SHALL BE USED WHEN MIXING THE PAINT BASE. SUBMIT SAMPLES FOR APPROVAL) a. WALLS: WALL REQUIRING PAINT SHALL INCLUDE PRIMER WITH TWO COATS OF PAINT AND SHALL BE INSTALLED PER INDUSTRY STANDARDS. THE PAINT SHALL BE LATEX/SATIN FINISH U.N.O. b. CEILING: SMOOTH CEILING FINISHES SHALL BE A LEVEL FOUR OR FIVE SMOOTH FINISH REQUIREMENT TO INCLUDE ONE COAT PRIMER WITH LIKE TEXTURED TWO COATS OF PAINT. APPLICATION METHOD SHALL BE SPRAY APPLIED WITH ZERO NAP ROLLER ON FINAL COAT. THE PAINT SHALL BE LATEX/FLAT FINISH. c. CEILING: TEXTURED/HEAVY POPCORN CEILINGS (FOR EXISTING TEXTURE CEILINGS) SHALL RECEIVE ONE COAT PRIMER (TINTED TO NEW COLOR) WITH ADEQUATE COVERAGE REQUIRED TO COVER THE EXISTING TEXTURE --SPRAY APPLICATION SHALL BE- TYPICAL. THE PAINT SHALL BE A LATEX/FLAT FINISH. d. DOORS & DOOR FRAMES: PAINTED OR STAINED DOORS SHALL RECEIVE PROPER COVERAGE TO ADEQUATELY COVER EXISTING FINISH. DOOR FRAMES SHALL BE STAINED OR PAINTED THE SAME AS THE DOORS, UNLESS NOTED OTHERWISE, IF PAINTED, THE PAINT SHALL BE ALKYD ENAMEL WITH A SEMI -GLOSS FINISH. e. HVAC/WALL GRILLS: EXISTING GRILLS SHALL BE PAINTED A COLOR TO MATCH THE VWC. THE PAINT SHALL BE ALKYD ENAMEL WITH A SEMI -GLOSS FINISH. f. HINGES: EXISTING HINGES NOT CURRENTLY PAINTED SHALL REMAIN AS EXISTING METAL FINISH. EXISTING PAINTED HINGES SHALL BE PAINTED OVER WITH A NEW COLOR TO MATCH FRAME. g, TRIM (MILLWORK): PAINTED OR STAINED MILLWORK SHALL RECEIVE PROPER COVERAGE TO ADEQUATELY COVER EXISTING FINISH. STAINED TRIM/MILLWORK SHALL BE STRIPPED TO BARE WOOD WITH MINIMUM OF TWO COATS AND A FINAL STAIN AND 1-2 COATS OF CLEAR SEALER (THE DESIRED FINISH SHALL BE CONFIRMED PER PROJECT), UNLESS MATCHING EXISTING. IF PAINTED, THE FINISH SHALL BE A SEMI -GLOSS. h. HANDRAILS: PAINTED HANDRAILS SHALL RECEIVE PROPER COVERAGE TO ADEQUATELY COVER THE EXISTING FINISH. THE PAINT SHALL BE AN ENAMEL/ELECTROSTICALLY APPLIED. J. STRUCTURAL 1. NOT USED K. MECHANICAL/ELECTRICAL/LIGHTING/PLUMBING 1. PROVIDE MECHANICAL, ELECTRICAL, PLUMBING, GAS, FIRE ALARM AND SPRINKLER SYSTEMS COORDINATION. PROVIDE DESIGN AND INSTALLATION OF ALL SYSTEMS INCLUDED IN THE SCOPE OF WORK IN THESE DOCUMENTS. DESIGN SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES AND STANDARDS, AND AUTHORITIES HAVING JURISDICTION WHERE THE PROJECT IS LOCATED. PROVIDE SEALED AND SIGNED DESIGN DOCUMENTS, AND OBTAIN ALL REQUIRED PERMITS. 2. CONTRACTOR TO PROVIDE ALL MECHANICAL & CHEMICAL FASTENERS. L. MECHANICAL 1. REPLACE RUSTED OR DAMAGED HVAC DIFFUSERS AND GRILLES WITH UNITS OF EQUAL AIRFLOW CHARACTERISTICS. 2. PENETRATIONS THROUGH ONE HOUR OR GREATER FIRE RATED CONSTRUCTION SHALL COMPLY WITH LISTED UL THROUGH -PENETRATION. FIRE STOP SYSTEMS APPROPRIATE FOR SIZE OF DUCT PENETRATION. 3. FIRE DAMPERS AND FIRE AND SMOKE DAMPERS SHALL BE INSTALLED AS REQUIRED BY APPLICABLE CODE AND AUTHORITIES HAVING JURISDICTION IN ALL DUCT PENETRATIONS OF ONE HOUR OR GREATER FIRE RATED CONSTRUCTION. FIRE AND FIRE AND SMOKE DAMPERS SHALL BE INSTALLED IN ACCORDANCE WITH THEIR LISTING AND MANUFACTURERS WRITTEN INSTRUCTIONS AND RECOMMENDATIONS. ALL DAMPERS SHALL COMPLY WITH THE APPLICABLE UL 555 FOR THE TYPE OF DAMPER AND SHALL BEAR THE LABEL OF AN APPROVED TESTING AGENCY. SEAL: mw OFFC o .p ARp0169 Ir C, FR`rD ARG C� _ 1� o o� }_00 -00x CC N >o 0 W V N Q LL a •mr I- a 0 N �^ W 'oma �o 0� cc •• SEAL: mw OFFC o .p ARp0169 Ir C, FR`rD ARG • z i CC N 0 •mr I- • • •• cn < SEAL: mw OFFC o .p ARp0169 Ir C, FR`rD ARG 18-047 CHECKED BY AEF/SHG DRAWN BY LAP SHEET TITLE OWNER'S GENERAL NOTES SHEET N0. T2.2 z 0 I- clU cn o w 0 0 w V) w o 0 z 18-047 CHECKED BY AEF/SHG DRAWN BY LAP SHEET TITLE OWNER'S GENERAL NOTES SHEET N0. T2.2 OWNER'S GENERAL NOTES (CONTINUED) M.ELECTRICAL MOUNTING HARDWARE. IF ARTWORK IS INSTALLED USING SECURITY MOUNTING HARDWARE 1. WHEN INSTALLING OUTLET BOXES IN EXISTING ONE HOUR OR GREATER FIRE RATED WITHOUT RECEIVING DESIGNER APPROVAL FIRST, THEN THE CONTRACTOR SHALL BE HELD - CONSTRUCTING, MAINTAIN THE FIRE RATED ASSEMBLY PER CURRENT UL GUIDELINES FOR RESPONSIBLE FOR REPAIR OF ALL WALLCOVERING THAT HAS BEEN DAMAGED BY HOLES. WALLS AND PARTITION ASSEMBLIES. A FULL STRIP OF WALLCOVERING WILL BE REQUIRED FOR REPAIR PATCHING HOLES 2. VERIFY STRUCTURAL SYSTEM OF THE FLOORS PRIOR TO CORE DRILLING OF NEW WILL NOT BE ACCEPTED. OUTLETS 5. INSTALL ALL EXISTING & NEW LIGHT FIXTURES AND ELECTRICAL APPLIANCES BY ¢_ No 3. WHERE ELECTRICAL ITEMS ARE BEING REMOVED OR ABANDONED DISCONNECT RELATED PLUGGING ITEMS INTO ELECTRICAL OUTLETS TO ENSURE PROPER WORKING WIRING FROM THE ELECTRICAL CIRCUIT PANEL. ALL NEW ELECTRICAL OUTLETS SHALL ORDER. CONCEAL ALL ELECTRICAL CORDS TO DECORATIVE LAMPS, TV'S CLOCK RADIOS Q oP BE 18" AFF UNO. ETC. CONTRACTOR SHALL TUCK CORDS ALONG THE WALL BASE, BEHIND LEGS AND 4. WHERE FLOORS HAVE BEEN CORE DRILLED FOR NEW ELECTRICAL DEVICES, MAKE APRONS ON FURNITURE AND USE ZIP-TIES TO NEATLY WRAP CORDS ~ PROVISIONS TO INVESTIGATE EXISTING CONDITIONS AND REQUIREMENTS IN OCCUPIED 6. THE CONTRACTOR SHALL DOCUMENT AND REPORT TO THE OWNER ANY DAMAGES ~ N a SPACES BELOW THE FLOOR. IN THESE SPACES, PROTECT PROPERTY AND BRING IMMEDIATELY UPON RECEIPT OF GOODS. ANY DAMAGES NOT REPORTED COULD BE _w L U� 'O't T DISTURBED AREAS AND FINISHES BACK TO THE OWNER'S EXISTING CONDITIONS. CHARGED BACK TO THE CONTRACTOR FOR REPAIR AND REPLACEMENT. < " ° V Q `m 5. WHERE FLOOR OUTLETS ARE NOTED, PROVIDE A FLUSH STYLE POKE-THRU DEVICE FOR 7. CONTRACTOR SHALL REVIEW AND CONFIRM QUANTITIES ON ALL OWNER FURNISHED �' f� POWER AND/OR COMMUNICATION MATERIALS, FURNITURE, FIXTURES, AND EQUIPMENT. ALL QUANTITIES SHALL BE VERIFIED '� W o� 6. NEW LIGHT SWITCHES SHALL BE 48" AFF LINO AND COORDINATED WITH FURNITURE DURING THE BID PHASE AND ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER S� FIXTURES AND ARTWORK LOCATIONS. IMMEDIATELY, NO LATER THAN AT THE START OF CONSTRUCTION. f 7. NEW THERMOSTATS SHALL BE 48" AFF UNO AND COORDINATED WITH FURNITURE 8. THE OWNERS SHALL PROVIDE STORAGE FOR ALL OFCI AND CFCI MATERIALS, FURNITURE, o FIXTURES AND ARTWORK LOCATIONS. FIXTURES AND EQUIPMENT. DELIVERY TERMS, CONDITIONS AND INCLUDING PROJECT INSTALLATIONF SPECIFIC DETAILS SHALL BE IDENTIFIED DURING THE PRE-BID PHASE OF THE PROJECT. I A P WIRES .CONDUIT AND JUNCTION BOXES FOR 0 8. PROVIDE ALL PULL , <• TELEPHONE, COMPUTER AND DATA, TELEVISION AND CABLE BY OWNER. DETAILS SHALL BE MADE AVAILABLE TO ALL CONTRACTORS DURING THE PRE-BID PHASE 9. COORDINATE LOCATION OF ALL WALL DEVICES INCLUDING THERMOSTATS, STROBES, FIRE OF THE PROJECT; REFER TO THE PROJECT COORDINATOR/MANAGER FOR MORE DETAILS. ALARMS, LIGHT SWITCHES AND FIRE EXTINGUISHERS WITH INSTALLATION OF ARTWORK, DO 9. DURING RENOVATIONS, THE PROPERTY SHALL BE. RESPONSIBLE FOR THE REMOVAL OF NOT CENTER ANY DEVICES ON MAJOR WALLS THAT WILL INTERFERE WITH ARTWORK THE TV'S, ALARM CLOCKS; MICROWAVES, AND REFIGERATORS. IF STORING THE Q LOCATIONS. ARTWORK LOCATIONS ARE SHOWN ON FLOOR PLANS AND ARE TYPICALLY EQUIPMENT DURING THE RENOVATION, ALL SHALL BE BUBBLE WRAPPED TO PROTECT CENTERED ON THE WALL, UNO. IIF THERE IS A CONFLICT WITH A NEW DEVICE AND THEM DURING TRANSITION AND STORAGE. Ln fM ARTWORK, THE DEVICE SHALL BE RELOCATED TO ACCOMMODATE THE ARTWORK AT NO N ADDITIONAL COST TO THE OWNER. R. GRAPHICS Q Q N 10.WHERE NEW ELECTRICAL DEVICES ARE INSTALLED, USE WHITE. ALL VISIBLE OUTLETS, 1. REMOVE EXISTING SIGNAGE IN PUBLIC AREAS (IfJCLUDING DOORS, WALLS, CEILING z M > DEVICES, & COVER PLATES SHALL BE WHTIE, UNO. WHEN REFERRING TO A DEVICE IT MOUNTS) PRIOR TO INSTALLATION OF VINYL WALLCOVERING. VERIFY WITH OWNER IF Q W J SHALL INCLUDE THE COVER PLATE & THE PLUG/SOCKET. NEW (OFCI) OR EXISTING SIGNAGE SHALL BE INSTALLED. IF THE SIGNAGE IS NEW, _j L.L_ 11.IF IT IS SPECIFIED TO ADD AN ADDITIONAL ELECTRICAL OUTLET WHEN POSSIBLE KEEP COORDINATE WITH OWNER TO ASSURE THAT NEW SIGNAGE LOCATIONS ARE PER OWNER EXISTING OUTLET AND PIG-TAIL NEW OUTLET TO AN EXISTING OUTLET CLOSEST TO STANDARDS AND MEET ALL CODES, RETAIN EXISTING SIGNAGE UNTIL NEW SIGNAGE IS O O THE NEW LOCATION. MATCH EXISTING OUTLET DESIGN AND COLOR, UNO. ON SITE. V 12.VOICE/DATA/LOW VOLTAGE CABLE TO BE PULLED BY GC AND TERMINATED AT THE 2. IF NEW SIGNAGE IS NOT ON SITE AT TIME OF INSTALLATION, THEN REINSTALL EXISTING U0 m Q FINAL LOCATION AS INDICATED ON THE DRAWINGS. THE CLOSET FOR TERMINATION SHALL SIGNAGE IN A TEMPORARY MANNER THAT IT CAN BE REMOVED WITHOUT DAMAGE TO THE rr z L.LJ BE TERMINATED BY THE PROPERTY AT THE TIME OF PRE-BID. WALLS, UNTIL NEW SIGNAGE ARRIVES. Q m z U N. LIGHTING S. FINAL CLEANINGQ U 1. OWNER SHALL PROVIDE ALL BULBS FOR ALL LIGHT FIXTURES INCLUDING OFCI FIXTURES. 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ON-SITE CLEANING AT THE END OF W 0 �- 2.. ASSEMBLE AND INSTALL ALL OWNER FURNISHED AND CONTRACTOR INSTALLED LIGHT EACH DAY; WORK TO KEEP CONSTRUCTION DEBRIS FROM BUILDING UP, KEEP MATERIAL U z FIXTURES AND BULBS. AND TOOLS SECURED SAFELY AND NEATLY AWAY FROM THE WORK ZONES AND SECURED L1J 0 < 3. REL-AMP, REBALLAST AND CLEAN LENS OF EXISTING LIGHTING AS REQUIRED WHERE NOT OVERNIGHT. z J �.� OPERATIONAL. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FINAL CLEANING AT THE END OF EACH L1J 0 FZ 4. EXIT LIGHTS AND EMERGENCY LIGHTING SHALL BE INSTALLED ALONG PATHS OF EGRESS PHASE AND JUST PRIOR TO CONDUCTING A PUNCH LIST. CONTRACTOR TO PROVIDE A z Q AND IN ROOMS, TO OBTAIN LIGHTING LEVELS REQUIRED BY APPLICABLE LOCAL CONSTRUCTION CLEAN-UP THAT WOULD REMOVE ALL FOREIGN DUST PARTICLES. ALL O GOVERNING CODES AND AUTHORITIES HAVING JURISDICTION. FURNITURE, FIXTURES AND EQUIPMENT SHALL BE CLEANED. THE CARPET AND 5. AT ALL FULL SERVICE HOTELS DIMMING ALL LIGHTING SHALL BE A STANDARD ITEM I FLOORING CLEANED AND VACUUMED. ALL TRASH AND DEBRIS SHALL BE REMOVED. ALL THE LIGHTING IS IN THE PUBLIC VIEW. THE DIMMING SHALL INCLUDE ANY UNDER FURNISHING'S SHALL BE PLACED IN THEIR PROPOSED LOCATIONS, READY FOR SET-UP COUNTER BAR LIGHTING, ALL CEILING LIGHTING EXCEPT FOR 2' X 2' MEETING SPACE AND TURNED OVER TO THE PROPERTY. ALL NEW MATERIALS SHALL BE SET FOR USE LIGHTING AND GUESTROOM CORRIDORS. AS PROPOSED WITH ALL PRODUCT STICKER REMOVED AND ATTACHED TO PRODUCT DATA SEAL: DOCUMENTS TO HAND OVER TO THE OWNER. O. INTERIOR ARCHITECTURAL COUNTERTOPS, CARPENTRY, & MILLWORK prE OF p�GE M! s.<Q 1. INSTALL IN ACCORDANCE WITH MANUFACTURERS PRINTED INSTRUCTIONS AND/OR T. MISCELLANEOUS 1. DAILY LOGS AND WEEKLY REPORTS: APPROVED SHOP DRAWINGS. I 9 mr �iv 2. CONDITION WOODWORK TO PREVAILING HUMIDITY CONDITIONS IN INSTALLATION a. CONTRACTOR SHALL PROVIDE DAILY REPOR-FS SENT TO THE PROJECT COORDINATOR c� : ► � .AVERAGE AREAS BEFORE INSTALLATION. AT THE END OF EACH DAY TO IDENTIFY ALL TRADES, WORKER COUNTS, WORK0.0., °°lss3 3. INSTALL TRUE IN LINE AND PLANE, LEVEL RIGID AND SOLIDLY ADHERED. COMPLETED PER DAY, WEATHER AND OPEN ISSUES PENDING ISSUES OR ISSUES;° R '•• �•'��'" 9 ••••••��•• DISCARD CARPENTRY UNITS OR MATERIAL WITH DEFECTS THAT MIGHT IMPAIR QUALITY OF NEEDING TO BE RESOLVED.' 4. D Fp A R CNi WORK AND UNITS THAT ARE TOO SMALL TO FABRICATE WORK WITH MINIMUM JOINTS OR b. IN ADDITION TO DAILY REPORTS, WEEKLY REPORTS SHALL BE RELEASED TO THE OPTIMUM JOINT ARRANGEMENT.. PROJECT COORDINATOR SUMMARIZING THE WEEKS EVENTS AND SHALL BE d 5. INSTALL FASTENERS WITHOUT SPLITTING OF WOOD AND PREDRILL AS NECESSARY. SUBMITTED BY END OF BUSINESS EVERY WEDNESDAY. 6. INSTALL WOOD WORK TO COMPLY WITH AWI SECTION 1700 FOR A CUSTOM GRADE. c. PROJECT PHOTO'S SHALL BE A PART OF ALL REPORTS TO IDENTIFY PROGRESS 7. ALL SEAMS IN MILLWORK, PANELING AND OTHERWISE SHALL BE CONCEALED BEHIND AND ISSUES ENCOUNTERED EACH DAY. MOLDING OR SHALL BE SEQUENCED FOR THE APPEARANCE OF SYMMETRY. THERE SHALL 1. ALL EXISTING SITE UTILITIES SHALL REMAIN FOR THE USE BY THE CONTRACTOR ONLY BE NO NOTICEABLE MISMATCHES WITHIN AN AREA. FOR TYPICAL POWER OF CONSTRUCTION EQUIPMENT, TOOLS AND PROPERTY o COMPONENTS. CONTRACTOR SHALL PROVIDE ANY AND ALL TEMPORARY POWER a_ P. LIFE SAFETY CONDITIONED AIR WITH APPROPRIATE GFCI PROTECTION NEEDED FOR COMPLIANCE WITH N 1. SPRINKLER AND FIRE ALARM SYSTEMS SHALL BE COORDINATED, DESIGNED AND OSHA-TEMPORARY CONSTRUCTION LIGHTING, AND ANY OTHER REQUIRED UTILITIES INSTALLED BY A CONTRACTOR LICENSED IN THE STATE WHERE THE PROJECT IS NEEDED TO PERFORM THEIR SCOPE OF WORK SAFELY AND IN COMPLIANCE WITH CITY LOCATED, NEW INSTALLATIONS SHALL BE COMPATIBLE WITH THE EXISTING SYSTEMS AND GOVERNMENT REGULATIONS SUCH AS ANSI AND OSHA STANDARDS AND ALL AND SHALL BE DESIGNED IN ACCORDANCE WITH CURRENT LOCAL APPLICABLE CODES, ASSOCIATED COSTS SHALL BE INCLUDED IN THE CONTRACTORS BASE BID. 0 SEALED AND SIGNED AND APPROVED BY AUTHORITIES HAVING JURISDICTION. PROVIDE 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFORMING TO ALL SAFETY POLICIES LLJ SEALED AND SIGNED DOCUMENTS AND OBTAIN- ALL REQUIRED PERMITS. AND STANDARDS AND COMPLY WITH OSHA, ANSI AND ALL STATE GOVERNMENTAL 2. UNLESS NOTED OTHERWISE, EXISTING STROBE LIGHTS ARE TO REMAIN, VERIFY THAT STANDARDS. THE CONTRACTOR SHALL KEEP AT LEAST ONE COPY OF THEIR COMPANY LOCATIONS MEET ALL CODES. SAFETY PROGRAM AVAILABLE FOR REVIEW BY THE OWNER. ANY VIOLATIONS SHALL BE Q CORRECTED WITHOUT DELAY. CONTRACTOR SHAL_ KEEP RECORDS OF DAILY SITE Q. FURNITURE, FIXTURES, AND EQUIPMENT CONDITIONS TO SHOW COMPLIANCE. ° 1. NOT USED 2. COORDINATE WITH OWNER'S REPRESENTATIVE THE DELIVERY OF OWNER FURNISHED 78-047 CHECKED BY ITEMS. CONTRACTOR SHALL COORDINATE AND PLACE ALL OFCI MATERIALS FROM OWNER'S WAREHOUSE OR DIRECT SHIPPED ORDERS. ORDERS SHALL BE REQUESTED IN AEF/SHG DRAWN BY WRITING WITH SUFFICIENT NOTICE TO SATISFY WAREHOUSE AND/OR DELIVERY SOURCE. CONTRACTOR IS RESPONSIBLE FOR CONFIRMING AND SCHEDULING ALL DELIVERIES IN LAP PROPER SEQUENCE AND AS NEEDED TO ACCOMPLISH THE PROJECT SCHEDULE. THE sHEET TITLE CONTRACTOR SHALL BE RESPONSIBLE FOR DOCUMENTING ALL QUANTITIES THROUGHOUT OWNER'S GENERAL NOTES THE PROJECT AS REQUIRED. 3. THE FOLLOWING ITEMS ARE OWNER FURNISHED AND CONTRACTOR INSTALLED (OFCI): SHEET No, W/ALLCOVERING, CARPET, CARPET PAD, CASEGOODS, SEATING, WINDOW TREATMENTS, C=CORATIVE LIGHTING, ARTWORK, ACCESSORIES, LIGHT BULBS , REFRIGERATORS AND I-_ AFES. - 4. °JLESS INTERIOR DESIGNER IS ON SITE TO LOCATE ART AT TIME OF INSTALLATION, TZE0 C DNTRACTOR SHALL INSTALL ALL ARTWORK USING A WIRE HANGER, TAKE PHOTOGRAPH, AND SEND TO DESIGNER FOR APPROVAL PRIOR TO INSTALLING ART USING SECURITY ACCESSIBILITY AND EGRESS PLAN SCALE : 1/8" = 1'-0" a % PLAN NORTH ACTUAL NORTH PLAN LEGEND HATCH LEGEND — - ...... ......EGRESS PATH OF TRAVEL _T -• --.._.._.._ ; , ; ', � N.I.C. OCCUPANCY CALCULATIONS* MAXIMUM FLOOR AREA ALLOWANCES PER OCCUPANT BASED ON 2012 INTERNATIONAL BUILDING CODE TABLE 1004.1.2 CALCULATED AREA NET SQ.FT. PER MAX. # OF ROOM OR SPACE FUNCTION OF SPACE (NET SQ.FT.) PERSON PERSONS WOMEN'S LOCKER CHANGING ROOM, TOILET FACILITIES, STEAM ROOM 475 SQ.FT. 50 9 ROOM AND SHOWER WOMEN'S WHIRLPOOL THERAPUTIC POOL 377 SQ.FT. 50 7 TOTAL OCCUPANCY FOR WOMEN'S SPA FACILITIES: 16 * OCCUPANCY NOTES: SCOPE OF WORK INCLUDES UPGRADING FINISHES AND PLUMBING FIXTURES. DOES NOT RESULT IN ANY CHANGE TO EXISTING OCCUPANCY. DOOR CAPACITY CALCULATIONS DOOR NUMBER ROOM OR SPACE MEANS OF EGRESS CAPACITY FACTOR REQUIRED SIZING PROVIDED SIZING (SECTION 1005.3.1 & 1005.3.2)* (INCHES) (INCHES) COMPLIES D1 STAIR CORRIDOR 16 OCCUPANTS (0.2) 3.2" 36" V/ D2 SPA ENTRY 16 OCCUPANTS (0.2) 3.2" 36" / D3 F OMENITIS SPA 16 OCCUPANTS (0.2) 3.2" 36" * DOOR CAPACITY NOTE: REFER TO THE OCCUPANCY CALCULATIONS CHART ABOVE FOR FURTHER INFORMATION ON THE OCCUPANT FACTORS USED FOR THE DOOR CALCULATIONS CHART ACCESSIBILTY + EGRESS PLAN KEY NOTES RESTROOM CALCULATIONS O1 WOMEN'S LOCKER ROOM: WOMENS' LOCKER ROOM OCCUPANCY: 9 GUESTS REQ'D EXIT WIDTH: 32" BASED ON 2012 INTERNATIONAL BUILDING CODE TABLE 2902.1 ACTUAL EXISTING WIDTH: 34" WOMEN'S RESTROOM MAX EGRESS TRAVEL DISTANCE: 250 FT (TABLE 1017.2) FIXTURE PER CODE # EXISTING COMPLIES ACTUAL EGRESS TRAVEL DISTANCE: ±110' COMMON PATHS OF TAVEL: 4'-5" WATER 1 PER 65 2 OLOCATION OF PRIMARY ENTRY/EXIT CLOSETS GUESTS IES 1 PER 200 3 O LAVATORIES LOCATION OF SECONDARY ENTRY/EXIT GUESTS t SEAL: SSP -VE '•Op, •'AGEM.S'.0 rn� 16 z 0 v cn � o w w 0 L_ 0 w cn cn � w � o 0 z IE:11IZY1 CHECKED BY AEF/SHG DRAWN BY LAP SHEET TITLE ACC AND EGRESS PLAN SHEET NO Im v ® M 0 CCN Z > M Q W J LL 0 0 1 u UO) cn Z w m Z w U U w F- U®z 0zQ Lu w0 F- Z Q O SEAL: SSP -VE '•Op, •'AGEM.S'.0 rn� 16 z 0 v cn � o w w 0 L_ 0 w cn cn � w � o 0 z IE:11IZY1 CHECKED BY AEF/SHG DRAWN BY LAP SHEET TITLE ACC AND EGRESS PLAN SHEET NO Im LTROA MA I A 0 & 2 1 X014 l:�a:i:��Z�]A ■�]aAL olN We1►1 SCALE 1/2" = V-0" PLAN NORTH ACTUAL NORTH DEMOLITION FLOOR PLAN KEY NOTES OREMOVE ALL CARPET AND TILE FLOORING THROUGHOUT LOCKER ROOM AND RESTROOM TAKING CARE NOT TO DAMAGE EXISTING WOOD BASE. PREPARE FOR NEW TILE FLOORING. (D REMOVE BENCH IN SHOWER, ALL GLASS SHOWER DOORS AND GLASS WALL PARTITION. OREMOVE ALL PLUMBING FIXTURES IN SHOWER STALLS. OREMOVE ALL FINISHES IN SHOWER STALLS. REMOVE ANY MOLD /MILDEW TO THE EXTENT NECESSARY TO START WITH A CLEAN AREA. Q o0 — o� OREMOVE CUBBIES AT EXISTING TOWEL STATION. STORE AND PROTECT ¢ °° 5 DURING CONSTRUCTION. CUBBIES TO BE REINSTALLED. DEMOLISH STONE COUNTERTOP AT TOWEL STATION, TAKING CARE NOT t- TO DAMAGE EXISTING CUBBIES AND MILLWORK. I � o N 6:g- - ch O REMOVE STONE COUNTERTOP, SINK AND FAUCET AT LOCKER ROOM LL VANITY. cc Ho o Q m3 OLOCKER ROOM MIRRORS TO BE RELOCATED AND VANITY CASEWORK TO No a 7 .^ BE MODIFIED TO MEET REQUIRED ADA CLEARANCES. SEE 2/A3.0 w oa SK Loco g0 REMOVE EXISTING STONE COUNTERTOP, SINK AND FAUCET AT VANITY O IN LARGE RESTROOM. OREMOVE EXISTING VANITY AND MIRROR IN LARGE .RESTROOM. MIRROR SHALL BE REINSTALLED WITH NEW VANITY CASEWORK. STORE DURING CONSTRUCTION. 10 REMOVE BENCH IN LOCKER ROOM TO ALLOW FOR RELOCATED LOCKERS. COORDINATE STORAGE/DISPOSAL OF BENCH WITH HOTEL MANAGEMENT. 11 REMOVE ANY EXISTING ART, ACCESSORIES, OR ELEMENTS REQUIRED FOR NEW CONSTRUCTION AND FINISHES. Q. M M DEMOLISH FLOORING TO WHIRLPOOL AREA ENTRY. WHIRLPOOL AREA Li L N � FINISHES TO REMAIN: � N 13 REMOVE EXISTING LOCKERS IN MEN'S LOCKER ROOM TO BE z / m RELOCATED TO WOMEN'S LOCKER ROOM. GC TO PROTECT LOCKERS Q w DURING RELOCATION. u— � 4 .CAP EXISTING POWER AND REMOVE OUTLETS ABOVE COUNTERTOP AND �! � PATCH WALL TO ALLOW FOR RELOCATION OF MIRROR. ^ u5 NO WORK OUTSIDE LOCKER ROOM. (�� w z w Q m Z w V W U F= v®z ®wQ LU z z~ O Q SEAL: 5� P! E, Op .• GE •C-) o z 0 a v cn o w 0 0 w cn cn rn w � o a z 18-047 CHECKED BY AEF/SHG DRAWN BY LAP SHEET TITLE DEMOLITION PLAN SHEET NO. STANDARD SHOWER PLUMBING SCHEDULE CFCI P-02 3 -FUNCTION SHOWER CONTROLS 1 CFCI P_02a SHOWER CONTROL ROUGH VALVE 1 CFCI P-03 WALL BAR 1 CFCI P -03a HOSE OUTLET @ WALL BAR 1 CFCI P -03b HANDSHOWER @ WALL BAR 1 CFCI P-04 SHOWER SPRAY MODULE 3 CFCI P -04a SHOWER SPRAY ROUGH 3 CFCI P-015 IRAINDANCE SHOWER HEAD 1 CFCI P -05a STANDARD SHOWER ARM 1 CFCI P-07 WALL NICHE 1 CFCI PL -01 WALL DRAIN SYSTEM 1 P-08 LOCATION FINISH SCHEDULE )MEN'S LOCKER ROOM RESP. CATEGORY TAG MATERIAL )MEN'S LOCKER ROOM OFCI FLOORING TI -01 ! FLOOR TILE MEN'S LOCKER ROOM MEN'S LOCKER ROOM CFCI TR -01 FLOOR TRANSITION WOMEN'S LOCKE ROOM MEN'S LOCKER ROOM CFCI PAINT PT -01 PAINT @ WALLS )MEN'S LOCKER ROOM CFCI PT -02 PAINT @ CEILING WOMEN'S LOCKER ROOM MEN'S LOCKER ROOM CFCI SOLID SURFACE PL -01 LAMINATE LOCATION MEN'S LOCKER ROOM CFCI SS -01 QUARTZ COUNTERTOP 1 MEN'SLOCKER ROOM OF"" WALL TILE TI -02 TILE @ SHOWER SIDE WALLS 1 MEN'S LOCKER ROOM OFCI TI -03 TILE @ SHOWER BACK WALLS AND CEILING MEN'S LOCKER ROOM 1 MEN'S LOCKER ROOM CFCI WOOD WD -01 TEAK WOOD LOCATION LOCKER ROOM EQUIPMENT SCHEDULE ROOM PLUMBING MEN'S LOCKER ROOM CFCI EQ -03 ACCESS PANEL 1 WOMEN'S LOCKE ROOM MEN'S LOCKER ROOM LOCKER ROOM CASEWORK SCHEDULE w °- o o � MEN'S LOCKER ROOM CFCI CW -01 VANITY CASEWORK; 1 WOMEN'S LOCKE ROOM CFCI MEN'S LOCKER ROOM CFCI CW -02 SHOWER SEAT WOMEN'S LOCKE ROOM P-01 a MEN'S LOCKER ROOM ADA RESTROOM EQUIPMENT SCHEDULE WOMEN'S LOCKER ROOM MEN'S LOCKER ROOM RESP. TAG ITEM OTY. LOCATION MEN'S LOCKER ROOM CFCI P-20 ADA RESTROOM SINK 1 WOMEN'S LOCKE ROOM MEN'S LOCKER CFCI P-21 ADA RESTROOM FAUCET 1 WOMEN'S LOCKE ROOM ROOM CFCI EQ -01 36" GRAB BAR 1 WOMEN'S LOCKE ROOM MEN'S LOCKERWOMEN'S ROOM CFCI EQ -02 42" GRAB BAR 1 LOCKE ROOM r2PLUMBING FIXTURE LOCATIONS V„F„ FLOOR PLAN KEY NOTES OINSTALL LOCKERS TAKEN FROM MEN'S LOCKER ROOM ON CURVED WALL ADJACENT TO EXISTING LOCKERS. PROVIDE TRIM PANELS AS REQUIRED TO ACHIEVE A FINISHED LIKE -NEW LOOK. OINSTALL NEW QUICK DRAIN SHOWER SYSTEM IN BOTH SHOWERS. SEE DETAIL 1/A3.0. OINSTALL NEW TILE FLOORING THROUGHOUT SHOWERS, RESTROOMS, AND LOCKER ROOM UP TO WHIRLPOOL AREA WHERE TILE FLOORING IS TO REMAIN. INSTALL SCHLUTER STRIP AT FLOOR TRANSITION. OINSTALL NEW COUNTERTOP, SINK AND FAUCET AT LOCKER ROOM VANITY. EXISTING MIRROR DOES NOT MEET ADA HEIGHT REQUIREMENTS AND MUST BE MOVED DOWN TO MEET REQUIRED CLEARANCES. SEE 2/A3.0 FOR REQUIRED CLEARANCES HEIGHTS. 50 CONSTRUCT NEW RESTROOM VANITY WITH REQUIRED ADA HEIGHTS AND CLEARANCES. INSTALL NEW COUNTERTOP, NEW SINK AND FAUCET. RELOCATE EXISTING MIRROR TO MEET REQUIRED ADA HEIGHTS AND CLEARANCES. REPAIR EXISTING WALL TILE AS REQUIRED TO ACHEIVE LIKE NEW CONDITION. SEE 2/A3.0 FOR CASEWORK DETAIL. OTO MEET ACCESSIBLITY REQUIREMENTS, ENSURE THAT THE CENTERLINE OF EXISTING TOILET IS 16-18" FROM SIDE WALL AND TOILET HAS ADA REQUIRED SEAT HEIGHT OF 17-19". INSTALL GRAB BARS AT TOILET.. REFER TO 8 AND 9/A2.0 FOR REQUIRED MOUNTING HEIGHTS, 7D INSTALL NEW TILE IN BOTH SHOWERS AT WALL AND CEILING. TI -02 TO BE APPLIED TO SIDE WALLS. TI -03 TO BE INSTALLED ON BACK WALL AND CEILING. SEE ELEVATIONS A1.2 FOR MORE DETAILS. OCONSTRUCT NEW WALL -MOUNTED BENCH IN STEAM SHOWER. SEE 3 AND 4/A3.0 FOR DETAILS. OINSTALL NEW PLUMBING FIXTURES IN SHOWERS. SEE 2/A1:0, 3/A1.0 AND SHEET A2.0 FOR LOCATIONS. 10 INSTALL NEW GLASS PARTITION WALL AND GLASS SHOWER DOORS. 11 PAINT WALLS AND CEILING TO MATCH EXISTING TO BRING TO LIKE -NEW CONDITION IN LOCKER ROOM AND RESTROOMS. 12 REINSTALL ANY ART AND ACCESSORIES REMOVED FOR CONSTRUCTION. 13 REPLACE EXISTING RELOCATED LOCKERS FROM MEN'S LOCKER ROOM WITH NEW LOCKERS TO MATCH EXISTING. 14 INSTALL NEW QUARTZ COUNTERTOP AT EXISTING CASEWORK. REINSTALL TOWEL CUBBIES ATOP CASEWORK AND TOUCH UP AS REQUIRED FOR LIKE NEW APPEARANCE. 15 INSTALL NEW DUPLEX OUTLET ABOVE COUNTERTOP DRY PORTION OF EXISTING LOCKER ROOM VANITY. OUTLET COVERS TO BE WHITE. 16 2" WALL DRAIN CONNECTION. REFER TO SHEET A5.0 FOR PIPING PLANS. 1 STEAM GENERATOR ABOVE CEILING. FIELD VERIFY FINAL LOCATION. REFER TO SHEET A5.0 FOR PIPING PLANS. 18 INSTALL NEW CEILING ACCESS PANEL IN EXISTING ACCESS LOCATION ABOVE RESTROOM TO ENLARGE OPENING AND PROVIDE EASIER MAINTENANCE FOR STEAM GENERATOR. 1 g PROVIDE 10OA2P. DISCONNECT SWITCH ABOVE THE CEILING FOR CONNECTION FOR STEAM GENERATOR. EXTEND 2 #4 TO A 70A2P CIRCUIT BREAKER LOCATED IN AN EXISTING ADEQUETLY SIZE 120/208V DISTRIBUTION PANEL. COORDINATE WITH THE BUILDING ENGINEER. 20 PROVIDE POWER AND CONTROL WIRING AS REQUIRED FOR MICRO -TOUCH CONTROL AND STEAM HEAD AS PART OF THE STEAM GENERATOR SYSTEM. 21 MODIFY/REPLACE EXISTING W, CW, AND HW PIPING AS REQUIRED TO CONNECT NEW FIXTURE. PROVIDE TMV FOR HW SUPPLY TO FIXTURE. 22 LOCATION OF EXISTING EXHAUST IN CEILING. 23 INSTALL SWITCH TO CONTROL EXHAUST FAN IN STEAM ROOM. INSTALLATION HEIGHT AND STYLE OF COVER PLATE TO MATCH EXISTING. SEAL: E"Op'c E ••• . 0 rn; \ �•v 3 .A R C`��� STEAM ROOM PLUMBING SCHEDULE w °- o o � z 0 cn o RESP. TAG ITEM QTY. LOCATION CFCI P-01 nro 1 WOMEN'S LOCKER ROOM CFCI P-01 a RAINSHOWER ROUGH 1 WOMEN'S LOCKER ROOM • CFCI P-02 3 -FUNCTION SHOWER CONTROLS < •• CFCI P-02� SHOWER CONTROL ROUGH VALVE 1 WOMEN'S LOCKER ROOM Lu 0 WALL BAR 1 WOMEN'S LOCKER ROOM • LU 0 P -03a HOSE OUTLET @ WALL BAR 1 WOMEN'S LOCKERLu ROOM ', CFCI P -03b SEAL: E"Op'c E ••• . 0 rn; \ �•v 3 .A R C`��� STEAM ROOM PLUMBING SCHEDULE w °- o o � z 0 cn o RESP. TAG ITEM QTY. LOCATION CFCI P-01 SQUARE OVERHEAD RAINSHOWER 1 WOMEN'S LOCKER ROOM CFCI P-01 a RAINSHOWER ROUGH 1 WOMEN'S LOCKER ROOM CFCI P-02 3 -FUNCTION SHOWER CONTROLS 1 WOMEN'S LOCKER ROOM CFCI P-02� SHOWER CONTROL ROUGH VALVE 1 WOMEN'S LOCKER ROOM CFCI P-03 WALL BAR 1 WOMEN'S LOCKER ROOM o CFCI P -03a HOSE OUTLET @ WALL BAR 1 WOMEN'S LOCKERLu ROOM CFCI P -03b HANDSHOWER @ WALL BAR 1 WOMEN'S LOCKER ROOM oz CFCI. P-04 SHOWER SPRAY MODULE 3 WOMEN'S LOCKERROOM 18-047 CFCI P -04a SHOWER SPRAY ROUGH 3 WOMEN'S LOCKER ROOM CHECKED BY AEF/SHG CFCI P-06 STEAM GENERATOR 1 WOMEN'S LOCKER ROOM DRAWN BY LAP CFCI P -06a STEAM CONTROL 1 WOMEN'S LOCKER ROOM SHEET TITLE FLOOR PLAN CFCI P -06b STEAM VALVE 1 WOMEN'S LOCKERROOM SHEET NO. A1.0 CFCI P-07 WALL NICHE 1 WOMEN'S LOCKER ROOM CFCI P-08 WALL DRAIN SYSTEM 1 WOMEN'S LOCKER ROOM LOCKER ROOM VANITY PLUMBING SCHEDULE CFCI P-09 VANITY SINK 2 WOMEN'S LOCKER ROOM CFCI P-10 VANITY FAUCET 2 WOMEN'S LOCKER ROOM �8'-0" A.F.F. FINISHED CEILING P-05 P -05a P-02 P -02a ��0�'-0" A.F.F. FINISHED FLOOR 8'-0" A.F.F. FINISHED CEILING P -06a F r SHOWER ELEVATION SCALE : 1/2)) = 1'-0" 0 Ln i 0'-0" A.F.F. FINISHED FLOOR 8'-0' 0'�0 FINISHE EQ EQ SCHEDULE P -03a P -01a P -03b STEAM - --- I. i i V-7» l ROOM CATEGORY i i 6 I LOCATION RESP. TAG ITEM P -04a `— FLOORING TI -01 F - '- —1 i I ---1 — i I EQ EQ EQ CFCI P-01 a i I I I Lc PAINT I I PAINT @WALLS WOMEN'S LOCKER ROOM CFCI P-02 3 -FUNCTION SHOWER CONTROLS 1 WOMEN'S LOCKER ROOM. SHOWER ELEVATION SCALE : 1/2)) = 1'-0" 0 Ln i 0'-0" A.F.F. FINISHED FLOOR 8'-0' 0'�0 FINISHE EQ EQ P-01 SCHEDULE P -03a P -01a P -03b STEAM - --- I. i i V-7» l ROOM CATEGORY i i 6 i LOCATION RESP. TAG ITEM P -04a `— FLOORING TI -01 F - '- —1 I P-01 ---1 1 i I EQ EQ EQ CFCI P-01 a RAINSHOWER ROUGH I P-01 SCHEDULE P -03a P -01a P -03b STEAM I P-02 ROOM CATEGORY P -02a i LOCATION RESP. TAG ITEM P -04a `— FLOORING i ililli i 1� � : rivang 1 1 g ��� SCALE : 1/2" = 1'-0" P-08 3'- 10 SHOWER ELEVATION SCALE : 1/211 = 1'0" P-03 SCHEDULE P -03a P -03b STEAM P-08=�,_\\ 2'-0" P-03 P -03a P -03b P-07 I M CUSTOM TEAK WALL MOUNTED SEAT CW -02 HW -01 TYR. HW 02 I Awl I W, iffl � � 11 lion WFIFTION V A2.0 SCALE 1/2" = 1'-0" 3) EO EQ , N/ -/, - - SCHEDULE I STEAM I I I I i ROOM CATEGORY TAG i LOCATION RESP. TAG ITEM I � I I 1 L4. `— FLOORING TI -01 F - WOMEN'S LOCKER ROOM I P-01 SQUARE OVERHEAD RAINSHOWER 1 i EQ EQ EQ EQ CFCI P-01 a RAINSHOWER ROUGH 1 WOMEN'S LOCKER ROOM PAINT PT -01 PAINT @WALLS WOMEN'S LOCKER ROOM CFCI P-02 3 -FUNCTION SHOWER CONTROLS 1 WOMEN'S LOCKER ROOM. 1 WOMEN'S LOCKER PAINT @ CEILING WOMEN'S LOCKER CFCI P -02a SHOWER CONTROL ROUGH VALVE 1 WOMEN'S LOCKER PT -02 M/ ROOM OFCI TI -02 TILE @ SHOWER SIDE WOMEN'S LOCKER CFCI P -03b HANDSHOWER @ WALL BAR 1 WOMEN'S LOCKER `\_� ' E N Q WALLS \ ; ROOM u_ :z F m WALL TILE CFCI P-04 SHOWER SPRAY MODULE 3 WOMEN'S LOCKER w �-- N Q 3 OFCI TI -03 TILE @ SHOWER BACK WOMEN'S LOCKER ROOM J) I WALLS AND CEILING ROOM CFCI P -04a SHOWER SPRAY ROUGH 3 WOMEN'S LOCKER o z q^ w o$ P-03 P -03a P -03b P-07 I M CUSTOM TEAK WALL MOUNTED SEAT CW -02 HW -01 TYR. HW 02 I Awl I W, iffl � � 11 lion WFIFTION V A2.0 SCALE 1/2" = 1'-0" 3) EO EQ , N/ -/, - - SCHEDULE I STEAM I I I I i ROOM CATEGORY TAG MATERIAL LOCATION RESP. TAG ITEM I � I I 1 L4. `— FLOORING TI -01 F - WOMEN'S LOCKER ROOM I P-01 SQUARE OVERHEAD RAINSHOWER 1 i EQ EQ EQ EQ SHOWER ELEVATION 1 -U REOUINEU MIN. FINISH RESP. OFCI 3) CFCI CFCI CFCI SCHEDULE ROOM STEAM ROOM PLUMBING SCHEDULE ROOM CATEGORY TAG MATERIAL LOCATION RESP. TAG ITEM QTY. LOCATION FLOORING TI -01 FLOOR TILE WOMEN'S LOCKER ROOM CFCI P-01 SQUARE OVERHEAD RAINSHOWER 1 WOMEN'S LOCKER ROOM TR -01 FLOOR TRANSITION WOMEN'S LOCKER ROOM CFCI P-01 a RAINSHOWER ROUGH 1 WOMEN'S LOCKER ROOM PAINT PT -01 PAINT @WALLS WOMEN'S LOCKER ROOM CFCI P-02 3 -FUNCTION SHOWER CONTROLS 1 WOMEN'S LOCKER ROOM. 1 WOMEN'S LOCKER PAINT @ CEILING WOMEN'S LOCKER CFCI P -02a SHOWER CONTROL ROUGH VALVE 1 WOMEN'S LOCKER PT -02 STEAM ROOM ELEVATION SCALE : 112" = 1'-0" EXTERIOR SHOWER ELEVATION /0`8� ADA RESTROOM_ ELEVATION SCALE : 1/2" - 1'-0" 16-18" HOLD 5-0" HOLD ADA RESTROOM ELEVATION A2.0 SCALE 1/2" = 1'-0" a RELOCATE MIRROR IN EXISTING VANITY CASEWORK MODIFIED TO ORDER TO ACHEIVE MEET ACCESSIBILITY REQUIREMENTS. SEE z REQUIRED 40" AT 2/A3.0 ADA COMPLIANT CLEARANCES. THIS I CD REFLECTIVE SURFACE VANITY CASEWORK NOT TO BE REFINISHED, R TILE RESULT DR UNITY 3S-01 1 x z Q � L>- RELOCATED DUPLEX LEP-21 P-20 CW -01 SECTION �-, SCALE : 112" = V-0" ROOM ROOM _..-. Vn o ---- Q No CFCI PL -01 LAMINATE WOMEN'S LOCKER CFCI P-03 �� WALL BAR 1 WOMEN'S LOCKER `� "N w ROOM ROOM CFCI SOLID SURFACE SS -01 QUARTZ COUNTERTOP WOMEN'S LOCKER CFCI P -03a HOSE OUTLET @ WALL BAR 1 WOMEN'S LOCKER >: > ° z ROOM ROOM OFCI TI -02 TILE @ SHOWER SIDE WOMEN'S LOCKER CFCI P -03b HANDSHOWER @ WALL BAR 1 WOMEN'S LOCKER ' E N Q WALLS ROOM ROOM u_ :z F m WALL TILE CFCI P-04 SHOWER SPRAY MODULE 3 WOMEN'S LOCKER w �-- N Q 3 OFCI TI -03 TILE @ SHOWER BACK WOMEN'S LOCKER ROOM J) I WALLS AND CEILING ROOM CFCI P -04a SHOWER SPRAY ROUGH 3 WOMEN'S LOCKER o z q^ w o$ - ---- ---- CHECKED BY ROOM o� CFCI WOOD WD -01 TEAK WOOD WOMEN'S LOCKER CFCI P-06 STEAM GENERATOR 1 WOMEN'S LOCKER °C O ROOM _z ROOM SHEET TI STANDARD + STEAM ROOM DOOR HARDW CFCI P-o6a STEAM CONTROL 1 WOMEN'S LOCKER L� ROOM RESP TAG ITEM OTY. CFCI P -06b STEAM VALVE 1 WOMEN'S LOCKER DUPLEX P-20 92 , (ris A ow, 4wr& ROOM CFCI H -01A SHOWER DOOR- DOOR FII�NEL 1 CFCI P-07 WALL NICHE 1 WOMEN'S LOCKER ROOM CFCI 08 WALL DRAIN SYSTEM 1 WOMEN'S LOCKER ROOM CFCI H—o1B SHOWER DOOR— DOOR PANEL 1 STANDARD SHOWER PLUMBING SCHEDULE a- c!1 iYi M CFCI P-02 3 -FUNCTION SHOWER CONTROLS 1 WOMEN'S LOCKER ROOM N ID N � CFCI H-02 SHOWER DOOR- FIXED PANEL 1 CFCI. P -02a SHOWER CONTROL ROUGH VALVE 1 WOMEN'S LOCKER 7 Z M -ROOM Q W J CFCI P-03 WALL BAR 1 WOMEN'S LOCKER ROOM LJ_ CFCI H-03 SHOWER DOOR SYSTEM- SEAL 3 CFCI P -03a HOSE OUTLET @WALL BAR 1 WOMEN'S LOCKER ROOM T CFCI H-04 FRAMELESS SHOWER SYSTEM- U CHANNELS VIF J_ 1 1 WOMEN'S LOCKER CFCI P -03b HANDSHOWER @WALL BAR 1 `./ CFCI H-05 FRAMELESS SHOWER SYSTEM- 4 ROOM W HINGES CFCI P-04 SHOWER SPRAY MODULE 3 WOMEN'S LOCKER Z W CFCI H-06 FRAMELESS SHOWER SYSTEM- 3 ROOM m CLAMPS CFCI P -04a SHOWER SPRAY ROUGH 3 WOMEN'S LOCKER ROOM 7 L WV CFCI H-07 FRAMELESS SHOWER SYSTEM- DOOR PULLS 2 Q U CFCI P-05 RAINDANCE SHOWER HEAD 1 WOMEN'S LOCKER ROOM V--� -- V Z CFCI P -05a STANDARD SHOWER ARM 1 WOMEN'S LOCKER ROOM ® W Q CFCI P-07 WALL NICHE 1 WOMEN'S LOCKER W Z j -- ROOM CFCI P-08 WALL DRAIN SYSTEM 1 WOMEN'S LOCKER Z Q - ROOM O CUSTOM TEAK WALL LOCKER ROOM CASEWORK SCHEDULE MOUNTED SEAT. SEE 3/A3.0 FOR MORE 1 CFCI CW -01 VANITY CASEWORK 1 WOMEN'S LOCKER INFORMATION. ROOM -- CW -02 CFCI CW -02 SHOWER SEAT 1 WOMEN'S LOCKER SEAL: HW -01 ROOM HW -02 TYP. ADA RESTROOM EOUIPMENT SCHEDULE 5�p��E•�� - RESP. TAG ITEM QTY. LOCATION ��, �• • 9�,�, ; C CFCI P-20 ADA RESTROOM SINK 1 WOMEN'S LOCKER G1 • r ROOM --; '�'�'•' Op x6832 ' ti CFCI P-21 ADA RESTROOM FAUCET 1 WOMEN'S LOCKERROOM �� • : .• �4 %� •A F� R C'�� CFCI EQ -01 36" GRAB BAR 1 WOMEN'S LOCKER ROOM CFCI EQ -02 42" GRAB BAR 1 WOMEN'S LOCKER STEAM ROOM ELEVATION SCALE : 112" = 1'-0" EXTERIOR SHOWER ELEVATION /0`8� ADA RESTROOM_ ELEVATION SCALE : 1/2" - 1'-0" 16-18" HOLD 5-0" HOLD ADA RESTROOM ELEVATION A2.0 SCALE 1/2" = 1'-0" a RELOCATE MIRROR IN EXISTING VANITY CASEWORK MODIFIED TO ORDER TO ACHEIVE MEET ACCESSIBILITY REQUIREMENTS. SEE z REQUIRED 40" AT 2/A3.0 ADA COMPLIANT CLEARANCES. THIS I CD REFLECTIVE SURFACE VANITY CASEWORK NOT TO BE REFINISHED, R TILE RESULT DR UNITY 3S-01 1 x z Q � L>- RELOCATED DUPLEX LEP-21 P-20 CW -01 SECTION �-, SCALE : 112" = V-0" � Vn o w 0 z w � w �-- I I o z 18-047 - ---- ---- CHECKED BY AEIFAf*-IG DRAWN BY a _z SHEET TI L� SHEET NO. P-21 RELOCATED DUPLEX P-20 92 , (ris A ow, 4wr& SEE MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR COMPLETE INSTALLATION DETAILS AND REQUIREMENTS FOR WALL DRAIN SYSTEM 2'-0" TILE TI -03 AND MORTAR BED 1" FURRING APPLIED TO WALL FRAMING 1/2" CEMENT BOARD AT SHOWER WALLS \k' QUICK DRAIN USA WALL DRAIN VERTICAL INSTALLATION PANEL SECURED TO FRAMING BACKER BOARD QUICK DRAIN USA WALL DRAIN ADJUSTMENT PANEL QUICK DRAIN USA WALL DRAIN FLANGE LIQUID WATERPROOFING AND ATOP BODY REINFORCEMENT TAPE TO BE QUICK DRAIN USA WALL DRAIN BODY WITH APPLIED PRIOR TO INSTALLATION HORIZONTAL FLANGE SET AT LOWEST EDGE OF WALL OR FLOOR FINISHES. OF SLOPE REFER TO MANUFACTURER'S ---- – - -- --_- TILE, MORTAR, TILE–IN COVER BEYOND INSTALLATION INSTRUCTIONS, INSTALL PER MANUFACTURER'S `fl INSTRUCTIONS /, CONNECT DRAIN TO WASTE PIPE WITH NO–HUB CONNECTION TI -01 FLOOR TILE a a � � ,. HEIGHT OF WASTE PIPE TO BE CALCULATED PER a - DISTANCE OF FLOOR SLOPE. REFER TO MANUFACTURER'S - rL INSTRUCTIONS CENTER OF WASTE PIPE TO BE FLUSH WITH FRONT FACE OF WALL FRAMING 6"MAX 11" MIN SCALE : 1-1/2" = 1'-0" 1-3/16 1/8" G. DRAINA( BENCH FRAMINI Dl::IIFA Ll T1 CT�� TYP. /ERTICAL SUPPORT 4LL AS REQUIRED CW -02 STEAM ROOM BENCH SECTION SCALE : 1-1/21' = 1'-0" GC TO CONFIRM BOTTOM OF 04 REFLECTIVE SURFACE OF MIRROR IS 40" MAX ABOVE FLOOR FINISH o- �a P-21 8" –co co �x Fpa� N P-20 2 1/ N SS -01 WITH EASED EDGE u- BLOCKING AS REQUIRED � PL -01 Q j O 3 0 e Of /0j / h O ; PL -01 W REQUIRED ADA SINK CLEARANCES T1 CT�� TYP. /ERTICAL SUPPORT 4LL AS REQUIRED CW -02 STEAM ROOM BENCH SECTION SCALE : 1-1/21' = 1'-0" CW-01/TYP VANITY CLEARANCES STEAM RO SCALE : 1" = 1'-0" i � CW_ 02 STEAM ROOM BENCH M DOOR SECTION / SCALE : 1-112" = 1'-0 PROVIDE BLOCKING IN CEILING AS REQUIRED. INSTALL TOP CHANNEL PER MANUFACTURERS INSTALLATION DIRECTION. INSTALL BOTTOM CHANNEL PER MANUFACTURERS INSTALLATION DIRECTION. FIXED GLASS PANEL SECTION SCALE : 1" = 1'-0" REQUIRED 16" TEAK BATTENS TYP. IPPORTS ,RTITION SHOWER DOOR SECTION 04 — o- �a z 0 –co co �x Fpa� N CW-01/TYP VANITY CLEARANCES STEAM RO SCALE : 1" = 1'-0" i � CW_ 02 STEAM ROOM BENCH M DOOR SECTION / SCALE : 1-112" = 1'-0 PROVIDE BLOCKING IN CEILING AS REQUIRED. INSTALL TOP CHANNEL PER MANUFACTURERS INSTALLATION DIRECTION. INSTALL BOTTOM CHANNEL PER MANUFACTURERS INSTALLATION DIRECTION. FIXED GLASS PANEL SECTION SCALE : 1" = 1'-0" REQUIRED 16" TEAK BATTENS TYP. IPPORTS ,RTITION SHOWER DOOR SECTION `-IEET NO 04 — o- �a z 0 –co co �x Fpa� H-wgo N a_ u- s oa Q j O 3 0 e Of (n h O W o0 o� o� C.c Loco O o Q V Q M o CC N � a. Z m Q W J LL- � � Z 0 0 u Lnm< 0 Z Lu Qm w Z W U Q u N w 0 I- v z 0z< W � 67 W � W 0 �-- z < o 0 `-IEET NO z 0 a_ Of o w a. 0 0 w N � 67 W � � o 0 z 18-047 CHECKED BY AEF/SHG DRAWN BY LAP SHEET TITLE DETAILS `-IEET NO STEAM GENERATO WITH INTEGRAL SAFE PAN 1 /2" STEAM HEAD NOTE: REFER TO MANUFACTURER'S INSTALLATIONS INSTRUCTIONS FOR RECOMMENDATIONS ON PIPING, INSULATION, ETC. A5.0 SCALE NTS 1/2" V 1/2" CW I 3/4" DRAIN 3" WASTE RECEPTOR 1 1/2" W TO BURIED SANITARY LINE 1 " CW (15 FU) 1" HW (15 FU) 1/2" V 1/2" I WALL OUTLET 3/4 SHOWER W/VB HEAD CO 2 2 4" W (6 DFU) SHOWER (3) SHOWER _ WALL ND SPRAY MODULES U U DRAINS 1 /2„ AND TRIM NOTE: CONNECT TO NEAREST EXISTING ADEQUATELY SIZED WASTE AND VENT THERMOSTATIC 3—FUNCTION PIPING. PROVIDE CLEAN—OUTS AS MODULE AND TRIM REQUIRED BY CODE. K2 SHOWER PIPING PLAN �.Al�.lSCALE NTS m: 1" CW (15 FU)_ 1" HW (15 FU) 1/211 V _ 1/2 WALL 3/417 OUTLET RAIN W/VB HEAD CO T 4" W (6 DFU) HAND 2" 2" SHOWER (3) SHOWER WALL SPRAY MODULES U U DRAINS 1 /2" AND TRIM NOTE: CONNECT TO NEAREST EXISTING ADEQUATELY SIZED WASTE AND VENT THERMOSTATIC 3—FUNCTION PIPING. PROVIDE CLEAN—OUTS AS MODULE AND TRIM REQUIRED BY CODE. STEAM SHOWER PIPING PLAN �7SCALE NTS SEAL: �E OFF C M S �®�9t3 01693 r V F' 'e© ARG oo _o^ a 10o o� z 0 > -� Q oF—E 0 ry n? u - � t° s Q h 3 3 o 0 Ln �o y� W 'oma �rn V) cn c o CLQ v) M ® N cl- z�m Q W —j Of 0 J Lt_ D 0 0 u Ln m Q czW 0 Q m Z W v W V) v� u®z pz W Q W 0Q �. z 00 O SEAL: �E OFF C M S �®�9t3 01693 r V F' 'e© ARG z 0 cn o w cl- Of 0 0 W V) 00 ;W ,o 0 z 18-047 CHECKED BY AEF/SHG DRAWN BY LAP SHEET TITLE PIPING PLANS SHEET N0. A5.0 I GENERAL NOTE5 - ALL GONTRAGTOR5 I. DRAWING5 ARE GENERALLY DIAGRAMMATIC. ROUTING OF PIPING, DUCTWORK, CONDUITS, RACEWAYS, ETC, A5 SHOWN ON DRAWINGS, DOES NOT INTEND TO SHOW EVERY RISE, DROP, OFFSET, FITTING NOR EVERY 5TRUCTURAL ELEMENT THAT MAY BE ENCOUNTERED DURING THE INSTALLATION OF TH15 WORK. CONTRACTOR 5HALL MAKE ANY REQUIRED CHANGES FROM THE GENERAL ROUTING 5HOWN OKI THESE ORAWING5, 5UGH A5 OFFSETS, BENDS OR CHANGES IN ELEVATION DUE TO COORDINATION WITH THE WORK OF OTHER TRADES AND BUILDING CON5TRUCTION. ALL CHANGES SHALL BE MADE WITHOUT ADDITIONAL C05T TO THE OWNER OR DELAY IN GOMPLETION DATE OF THE PROJECT. 2. IT 15 INTENDED THAT EQUIPMENT SHALL BE LOCATED SYMMETRICALLY WITH THE ARCHITECTURAL ELEMENTS OF THE BUILDING, NOTWITHSTANDING THE FACT THAT LOCATIONS INDICATED BY THESE DRAWINGS MAY BE DISTORTED FOR CLEARNESS OF PRESENTATION. 3. CONTRACTOR SHALL CHECK DRAWINGS OF OTHER TRADES TO VERIFY THAT 5PACE5 IN WHICH THEIR WOW WILL BE INSTALLED ARE CLEAR OF OBSTRUCTIONS. WORK SHALL BE INSTALLED TO MAINTAIN MAXIMUM HEADROOM AND SPACE CONDITION AT ALL POINTS IN THE BUILDING. WHERE HEADROOM OR SPACE: CONDITIONS APPEAR INADEQUATE, CONTRACTOR SHALL NOTIFY ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE INSTALLATION OF THEIR WORK. 4. CONTRACTOR 5HALL FURNISH OTHER TRADES ADVANCE INFORMATION AND/OR SHOP DRAWINGS ON LOCATIONS AND 51ZF-5 Of: PIPING, DUCTWORK, CONDUIT, RACEWAYS, EQUIPMENT, FRAMES, BOXES, SLEEVES AND OPENINGS, ETC. NEEDED FOR THEIR WORK TO PERMIT OTHER TRADES AFFECTED TO INSTALL THEIR WORK PROPERLY AND WITHOUT DELAY. 5. WHERE THERE 15 EVIDENCE THAT WORK OF ONE TRADE WILL INTERFERE WITH WORK OF OTHER TRADES, ALL TRADES SHALL MEET ON JOB 51TE TO WORK OUT SPACE CONDITIONS AND MAKE SATISFACTORY ADJUSTMENTS TO INSTALLATION OF THE NEW WORK. CONTRACTORS SHALL VERIFY EXACT LOCATION5 OF ALL DEVICES AND EQUIPMENT WITH FIELD CONDITIONS, 5HOP DRAWINGS, AND WORK OF OTHER TRADES PRIOR TO ROUGH -IN. CONTRACTOR SHALL BE RESPONSIBLE, AT HIS OWN EXPENSE, FOR THE REMOVAL AND REINSTALLATION OF ANY PART OF THEIN? WORK IF 5AME WAS INSTALLED WITHOUT CONSULTING WITH OTHER TRADES BEFORE INSTALLING THEIR WORK. 6. CONTRACTOR SHALL PROVIDE SLEEVES IN BEAMS, FLOORS, COLUMNS AND WALLS A5 5HOWN CMI THE DRAWINGS, A5 REQUIRED BY JOB 51TE CONDITIONS, AND/CM2 A5 SPECIFIED, WHEN INSTALLING THEIR WORK. ALL BEAMS AND COLUMNS WHICH ARE REQUIRED TO BE SLEEVED SHALL 13E CUT AND REINFORCED AS REQUIRED BY FIELD CONDITIONS AND LOCATIONS AND 51ZE5 SHALL BE CHECKED AND APPROVED BY ARCHITECT BEFORE CONTRACTOR CUTS ANY STRUCTURAL BUILDING MEMBER. 7. THE 5EQUENCE F012 THE INSTALLATION OF ALL WORK SHALL BE COORDINATED BETWEEN CONTRACTOR AND IN STRICT ACC(RRDA 4CE WITH ARCHITECT/ENGINEER AND OWNERS STIPULATION AS CALLED FOR IN THE SPECIFICATION AND/OR AS DIRECTED. 5. CONTRACTOR SHALL REFER TO THE ARCHITECTURAL AND STRUCTURAL CONTRACT DRAWINC75 (BEFORE 5UBMITTING H15 BID) TO FAMILIARIZE HIMSELF WITH THE EXTENT OF THE GENERAL CONTRACTOR WORK, CEILING HEIGHTS AND CLEARANCE FOR INSTALLING H15 WORK. 9. CONTRACTOR 5HALL BE RESPONSIBLE FOR ALL CORING, CUTTING, PATCHING, REPAIRING, REFINISHING AND REMOVAL/REPLACEMENT OF NEW OR EXI5TING BUILDING CONSTRUCTION REQUIRED TO ACCOMMODATE THE INSTALLATION OR REMOVAL OF THEIR WORK. ALL PATCHING, REPAIRING AND REFINISHING WORK SHALL BE PERFORMED BY TH05E REGULARLY INVOLVED IN THAT TRADE AND SHALL MATCH THE ADJACENT CONSTRUCTION AS CLOSELY AS POSSIBLE. CARE SHALL BE TAKEN 50 A5 NOT TO DAMAGE ANY EXISTING BUILDING CONSTRUCTION OR ITEMS THAT ARE TO REMAIN. ANY EXISTING FINISHES THAT ARE DAMAGED DURING THE INSTALLATION OF' NEW WOW OR REMOVAL OF EXISTING WORK SHALL BE REPAIRED, REPLACED AND PAID FOR BY THE INSTALLING CONTRACTOR, TO THE SATISFACTION OF THE ARCHITECT AND OWNER. REFER TO ARCHITECTURAL PRAWINC5 FOR EXISTING BUILDING CONSTRUCTION THAT 15 TO REMAIN AND, THEREFORE, SUBJECT TO PATCHING, REPAIRING, REFINISHING, AND RENAL/REPLACEMENT. 10. CONTRACTOR SHALL BE RE5PON5115LE FOR HI5 OWN CLEAN UP DURING CON5TRUGTION. IF CONTRACTOR FAILS TO PROVIDE SUCH GLEAN -UP, THE ARCHITECT/ENGINEER WILL DIRECT ANOTHER CONTRACTOR TO PERFORM THE CLEAN UP AND THE NEGLIGENT CONTRACTOR SHALL PAY THE ASSOCIATED BACK CHARGES AS DEEMED APPROPRIATE BY THE ARCHITECT/ENGINEER. 11. CONTRACTOR SHALL INSTALL ALL AUXILIARY SUPPORTING STEEL AS REQUIRED FOR THE SUPPORTING OF THEIR PIPING, DUCTWORK, CONDUIT, TANKS, EQUIPMENT, ETC. ALL SUPPORTING STEEL FOR ITEMS ABOVE A 51-15PENDED CEILING 5HALL BE FROM BUILDING STRUCTURAL MENOER5 ONLY. 12. UNLESS INDICATED OTHERWISE, THE ARCHITECT/ENGINEER MAKES NO REPRESENTATION AS TO WHETHER OR NOT ANY HAZARDOUS OR CONTAMINATED MATERIALS (INCLUDING BUT NOT LIMITED TO ASBESTOS, PGB'5, CONTAMINATED 5011-5, ETC.) ARE PRESENT WITHIN THE EXISTING BUILDING OR ON THE SITE. WORK SHOWN ON THE DRAWINGS AND/OR INDICATED IN THE SPECIFICATIONS SHALL NOT BE CONSTRUED TO CALL FOR CONTACT WITH ANY OF THESE MATERIALS. IF THESE MATERIALS ARE ENCOUNTERED OR 5U5PECTED, THE CONTRACTOR SHALL NOT DISTURB THEM AND SHALL CONTACT THE ARCHITECT/ ENGINEER IMMEDIATELY. 13. CONTRACTOR SHALL STORE ALL MATERIALS AND EQUIPMENT 5HIPPED TO THE 51TE IN A PROTECTED AREA. IF MATERIAL 15 5TCRED OUTSIDE OF THE BUILDING, IT MUST BE 5TORED OFF THE GROUND A MINIMUM OF 51X INCHES (0 SET ON 6 X 6 PIANK5 AND/ OR WOOL) PALLETS. ALL MATERIAL AND EQUIPMENT MUST BE COMPLETELY COVERED WITH WATERPROOF TARP5 OR VI5QUIN. ALL PIPING AND DUCTWORK WILL HAVE THE ENDS CLO5ED TO KEEP OUT DIRT AND OTHER DEBRIS. NO EQUIPMENT WILL BE ALLOWED TO BE STORED ON THE 51TE UNLE55 IT 15 51T'rING ON WOOD PLANKS AND COMPLETELY PROTECTED WITH WEATHERPROOF COVERS. 14. THE DRAWINGS, 5CHEDULE5 AND 5PECIFICATION5 HAVE BEEN PREPARED USING ONE MANUFACTURER FOR EACH PIECE OF EQUIPMENT AS THE DA515 FOR DIMEN51ONAL DE51GN. IF THE CONTRACTOR PURCHASES EQUIPMENT LISTED AS A SPECIFIED ACCEPTABLE MANUFACTURER BUT 15 NOT THE 5CHED.ILED MANUFACTURER USED FOR THE BASE DESIGN, THE CONTRACTOR 5HALL BE RESPONSIBLE FOR CHECKING ALL THE DIMEN510N5 OF THE EQUIPMENT TO VERIFY THAT IT WILL FIT IN THE SPACE SHOWN ON THE DRAWINGS. MINOR DEVIATIONS IN DIMENSIONS WILL BE PB3AITTED, PROVIDED THE RATINGS NEET TH05E SHOWN ON THE DRAWINGS AND EQUIPMENT WILL PHYSICALLY FIT INTO THE SPACE ALLOCATED WITH SUITABLE ACCESS AROUND EQUIPMENT FOR OPERATION AND MAINTENANCE ON THE EQUIPMENT. 15. WHEN EQUIPMENT 15 SUBMITTED FOR REVIEW AND DOES NOT MEET THE PHYSICAL 51ZE OR ARRANGEMENT OF THAT SCHEDULED ANID SPECIFIED, CONTRACTOR SHALL PAY FOR ALL ALTERATIONS REQUIRED TO ACCOMMODATE SUCH EQUIPMENT AT NO ADDITIONAL COST TO OWNER. CONTRACTOR WILL AL50 PAY ALL COSTS FOR ADDITIONAL WORK REQUIRED BY OTHER CONTRACTORS, OWNER, ARCHITECT OR ENGINEER TO MAKE CHANGES WHICH WOULD ALLOW THE EQUIPMENT TO FIT IN THE SPACE AND FUNCTION AS INTENDED. 16. CONTRACTOR 5HALL FIELD VERIFY THE 51ZE OF EXISTING OPENINGS, WINDOWS, DOORS, CORRIDORS, ROOMS, ETC. FOR ACCESS OF THE NEW EQUIPMENT INTO OR REMOVAL OF EXISTING EQUIPMENT FROM THE BUILDING. IF OPENINC75 ARE TOO SMALL FOR ACCESS THEN CONTRACTOR 5HALL, AT H15 OWN EXPENSE, PROVIDE NEW O2 ENLARGED OPENINC75 AND RE5TORE 5AME TO ORIGINAL 51ZE AND CONDITION. CONTRACTOR MAY ELECT TO ORDER THE EQUIPMENT DI5A55EM6LED AND/M WITH SPLIT HOU5ING FOR ENTRANCE INTO THE EXISTING SPACE OR BUILDING. CONTRACTOR 5HALL REASSEMBLE EQUIPMENT AFTER IT 15 IN THE SPACE AT HI5 OWN EXPENSE. C = 50 N I rJ 11460o 9 1 EelN PROVIDE COMPLETE PLUMBING 5Y5TEM READY FOR USE A5 ITEMIZED, BUT NOT LIMITED TO, A5 FOH OW5: DEMOLITION, REMOVAL, AND ALTERATIONS OF EXISTING SYSTEMS AND EQUIPMENT AS REQUIRED, THOUGH NOT SPECIFICALLY INDICATED, TO ACCOMMODATE THE PROP05ED WORK. SEE ARCHITECTURAL PRAWINC75 FOR EXTENT OF DEMOLITION AND FIELD VERIFY EX15TING CONDITIONS. WASTE AMC) VENT PIPING SYSTEM WITH CONNECTION TO EVERY FIXTURE AND DEVICE. HOT AND GOLD WATER PIPING 5Y5TEM WITH CONNECTION TO EVERY FIXTURE AND DEVICE. PLUMBING FIXTURES, DEVICES, AND EQUIPMENT. SEE ARCHITECTURAL DRAWINGS FOR SPECIFICATIONS. THERMAL INSULATION. RECEIVE AND INSTALL STEAM GENERATOR AND RELATED ACCE55ORIE5. RELATED WOW 8Y OTHER TRADE5 STEAM GENERATOR AND RELATED ACGE55ORIE5. ELECTRIC POWER WIRING. PLUME5ING INSTALLATION NOTE5 PROP05AL SHALL INCLUDE SPECIFIED MATERIALS ONLY. SHOULD THE CONTRACTOR WISH TO SUBSTITUTE MATERIALS, EQUIPMENT OR MANUFACTURERS, IT SHALL BE DONE BY STATING EACH SUBSTITUTION AND ITS PRICE ADJU5TMENT. WORK 5HALL BE PERFORMED IN ACCORDANCE WITH CODES AND AUTHORITIES HAVING JUR15DICTICNN INCLUDING ADA GUIDELINES. WORK SHALL BE PERFOOVIED IN A NEAT WORKMANLIKE MANNER. PROCURE REQUIRED PERMITS AND INSPECTIONS. TH15 TRADE SHALL DO ITS OWN CUTTING AND PATCHING - TRENCHING AND BACKFILLING. CONFER WITH THE OTHER TRADES IN THE COORDINATION OF TH15 WORK FOR CLEARANCE5, CHASES, RECE55E5 AND OPENINGS REQUIRED. THESE DRAWINC75 ARE TO BE USED FOR BIDDING ONLY. ROUGH --IN AMC) FINAL CONNECTION SHALL BE MADE FROM APPROVED EQUIPMENT DRAWINGS ONLY. GUARANTEE THE WORK TO BE FREE FROM DEFECTIVE WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1) YEAR FROM DATE OF FINAL CERTIFICATE. ANY REPAIRS OR REPLACEMENT DURING TH15 PERIOD SHALL BE MADE WITHOUT COST TO THE OWNER. PROVIDE ESCUTCHEON PLATES AT WALLS OF FINISHED AREAS. FIXTURE AND EQUIPMENT CONNECTIONS SHALL BE MADE WITH CHROME PLATED 5UPPLIE5 WITH STOPS. EXPOSED WASTE PIPING SHALL BE CHROME PLATED. WHERE COPPER PIPE CONNECTS TO FERROUS PIPE USE 15OLATING UNIONS. WATER PIPING ABOVE GROUND SHALL BE TYPE L COPPER W/ LEAD FREE JOINTS. WATER PIPING BELOW GROUND SHALL BE TYPE K COPPER WITH 51L-FO55 SOLDER JOINTS OR CEMENT LINED DUCTILE IRON WITH PUSH JOINTS. SUSPENDED WASTE AND VENT SHALL BE CODE APPROVED PIPE AND FITTINC75 (NO DWV COPPER) AND BE SIMILAR TO EXISTING. BURIED WASTE SHALL BE CODE APPROVED PIPE, FITTINC75 AND BE 51MILAR TO EXISTING. PVC PIPE 5HALL NOT BE INSTALLED IN CEILINGS USED AS PLE:NUM5. COORDINATE WITH MECHANICAL CONTRACTOR LOCATIONS OF PLENUM CEILING AREAS. INSULATE HOT WATER AND COLD WATER PIPING EXCEPT FOR INDIVIDUAL FIXTURE SUPPLIES. INSULATION SHALL BE 1/2" THICK FIBERGLASS 5ECTIONNAL PIPE INSULATION WITH RAMS RETARDANT JACKET FOR NON -CIRCULATING SYSTEMS AND SHALL BE I" THICK FIBERGLA55 SECTIONAL PIPE INSULATION WITH FLAME RETARDANT JACKET FOR AUTOMATIC -CIRCULATING HOT WATER 5Y5TEM5. INSULATE EXP05ED WASTE, COLD, AND HOT WATER PIPING BELOW WHEELCHAIR LAVATORIES WITH TRUEBRO INSULATION KITS (WHITE). SUPPORTS FOR IN51JLATED PIPING SHALL INCLUDE THE INSULATION AND HAVE GALVANIZED PROTECTION 5HIELD5. PROVIDE ACCE55 PANELS WHERE REQUIRED FOR SERVICING DEVICES AND EQUIPMENT LOCATED ABOVE INAGGE55IDL.E CEILINGS OR BEHIND INACCESSIBLE WALLS. COORDINATE 51ZE5 AND LOCATIONS WITH ARCHITECT, THE FOLLOWING ITEMS 5HALL REQUIRE SUBMITTAL FOR REVIEW (6 COPIES} PLUMBING FIXTURES AND EQUIPMENT. PLUMDINC 5YME50L L15T DERNITION5 DISCONNECT DISCONNECT EQUIPMENT/DEVIGE CONNECTION. WITHDRAW 5ERVICE(5) BEYOND ADJACENT SURFACE AND CAP. ALLOW ENOUGH ROOM TO FINISH OPENING 51MILAIR CL TO ADJACENT SURFACE. 5ERVIGE(5) THRU FLOOR SHALL BE WITHDRAWN INTO () 5PAGE BELOW. 5ERVICE(5) THRU CEILING SHALL BE WITHDRAWN INTO CEILING SPACE. GAP 5ERVICE(5) EXCEPT WHERE IT 15 TO BE EXTENDED FOR A NEW M SERVICE CONNECTION. DOME5TIG WATER AND SANITARY PIPING DEAD ENDS SHALL ® BE LIMITED TO 2'-0" (MAX). REMOVE 5LEEVE5 WHERE THEY EX15T AND HOLES Z ® N FILLED AND FIN15H REPAIRED BY THE GENERAL CONTRACTOR. CONDUIT IN 5LAB5 nj SHALL BE CUT OFF BELOW ADJACENT FIN15H AND SHALL HAVE WIRING WITHDRAWN Q Q M TO NEXT AGCE551BLE OPENING WHERE OTHER EQUIPMENT OR DEVICES ARE W J SERVED OR TO THE PANEL WHERE ONLY TH15 EQUIPMENT/DEVICE 15 SERVED. J CONDUIT AND WIRING ABOVE GRADE 5HALL BE REMOVED BACK t0 PANEL OR LL - POINT OF ORIGIN.® D IN MULTI -TENANT BUILDINGS WHERE SERVICES ARE CONTINUED IN A SPACE ORV SPACES THAT ARE PART OF ANOTHER TENANT, REMOVE 5ERVICE(5) t0 ITS W TERMINATION IN A SPACE CONTROLLED BY THE PROP05FD TENANT OR TO A N Z LU SPACE CONTROLLED BY THE LANDLORD/MANAGEMENT. COORDINATE THESE 1.�. Q co TERMINATIONS WITH LANDLORD/MANAGEMENT. % W U REMOVAL V Q MATERIALS/EQUIPMENT/DEVICE5 TO BE REMOVED AND NOT RELOCATED OR STORED < z A5 WELL A5 CON5TRUCTION MATERIAL -5 ACCUMULATED DURING THE REMOVAL W W Q WORK 5HALL BE REMOVED AND DISPOSED OF AT THE EXPENSE OF THE V Z J RESPECTIVE TRADE. BLANK UP OPENINC75 THAT ARE TO BE ABANDONED IN® 0 Q EXISTING WALLS THAT REMAIN. OUST CONTROL W IN GENERAL, THE DUST CONTROL SHALL BE PROVIDED AND MAINTAINED BY THE GENERAL CONTRACTOR. TH15 TRADE SHALL COORDINATE ITS WORK WITH THE GENERAL CONTRACTOR WITH RESPECT TO DUST CONTROL IN THE AREA INDICATED FOR NEW WORK. SPECIAL CONTROL FOR HEALTH AND SAFETY OF WORKE125, FOR WORK OUT5IDE THE AREA REGARDED A5 THE NEW WORK AREA, AND A5 REQUIRED BY SPECIAL GONDITION5 5HALL BE BY TH15 TRADE. INTERRUPTION OF 5ERVIGE5 SEAL: 11-19-18 WORK THAT REQUIRES INTERRUPTION OF 5ERVIGE5 TO PORTIONS OF THE BUILDING •0.11414ts,11% OTHER THAN AREAS IN WHICH THE WORK 15 TO BE ACCOMPLI5HEO SHALL BE .o` r1S N :,! i�'••, COORDINATED WITH THE BUILDING MANAGEMENT AND ACCOMPLISHED DURING THE NIGHTTIME OR ON WEEKENDS AND AT NO ADDITIONAL COST. 74120 GENERAL NOTES ''d�'OF j`` ° ,!Ft 0 Ft 1`o xip,, REVIEW EX15TING CONDITIONS AND INCLUDE NECE55ARY CHANGES A5 A a+1A4 PART OF THE BID. INFORM U5ER5 OF DIFFERENCES. (E) EX15TING EQUIPMENT/DEVICE TO REMAIN. (ER) EX15TING EQUIPMENT/DEVICE TO BE REMOVED. TH15 TRADE SHALL 015GONNEGT THE 5ERVICE(5). (END) DISCONNECT EXISTING EQUIPMENT/DEVICE AND ALTER SERVICES FOR NEW EQUIPMENT/DEVICE AT THE 5AME LOCATION. (ERR) EXISTING EQUIPMENT/DEVICE TO BE REMOVED AND RELOCATED. TH15 TRADE SHALL D15CONNECT THE 5ERVICE(5), CLEAN AND MAKE NECE55ARY Z REPAIRS OR ADJUSTMENTS AS REQUIRED TO FACILITATE THE INSTALLATION AT THE NEW LOCATION. o O a (ENL) NEW LOCATION FOR EXISTING EQUIPMENT/DEVICE TO BE REMOVED AND u RELOCATED. EXTEND SERVICES IN WALL/BELOW FLOOR/ABOVE CEILING AS z N REQUIRED TO NEW LOCATION. 5 p M (ED) D15GONNECT EQUIPMENT/DEVICE CONNECTION(5). WITHDRAW SERVICES a m BEYOND ADJACENT SURFACE AND CAP. ALLOW ENOUGH SPACE TO FIN15H O OPENING 51MILAR TO ADJACENT SURWAGE. o 0 (EA) EX15TING EQUIPMENT/DEVICE/5ERVIGE TO BE ABANDONED. DISCONNECT � � 5ERVICE(5). ELECTRICAL CONDUITS SHALL HAVE WIRING WITHDRAWN t0 Cnn <Nn NEAREST ACGE55115LE BOX AND BLANK UP ABANDONED OPENING. E= EX15TING EQUIPMENT TO BE REMOVED. rn sa CONNECT TO EXISTING. o 00 0 O z PROJECT N0. 18-047 CHECKED BY KK DRAWN BY SHEET TITLE PLUMBING SPECIFICATIONS AN DETAILS SHEET N0. 6592.01 POD KENNETH L. KRAUS P.E. # 74120 306 Oak Grove Drive PM040 Wauconda, IL 60084 T(847)719-1708 F(847)719-1738 Plumbing o0o Mechanical o0o Electrical UNDERGROUND SANITARY SEWER RD ROOF DRAIN 1 UNDERGROUND STORM SEWER FD FLOOR DRAIN ® SUSPENDED SEWER D5 DOWNSPOUT - - - - - - VENT HB H05E BIB - COLD WATER 5F 51LL FAUGET - - - - HOT WATER WM WASHING MACHINE - - - - - HOT WATER RETURN DW DISHWASHER Dd GATE VALVE D15P DISPOSAL N CHECK VALVE 050 OPEN SITE DRAIN K^ BALANCING COCK F5 FLOOR SINK Irl BUTTERFLY VALVE UR URINAL `t CN -0 UNION MB MOP BA51N 4 oa m BALL VALVE WB WASHER BOX VTR VENT THRU ROOF H5 HAND SINK ` x ° WC WATER CLOSET FD/F FLOOR DRAIN WITH FUNNEL o g L LAVATORY DF DRINKING FOUNTAIN ¢ a BT BATH TUB FDT FOOTING DRAIN TILE 1 L ° 5H SHOWER TMV THERM05TATIC MIXING VALVE Q K5 KITCHEN 51NK GT GREASE TRAP N �o 55 SERVICE 51NK WH WATER HEATER CD wcj o 5 SINK IM ICE MAKER o EWC ELECTRIC WATER COOLER 5P SAFE PAN noo LT LAUNDRY TUB FU/W5FU WATER SUPPLY FIXTURE UNITS Q GO CLEANOUT DFU DRAINAGE FIXTURE UNITS` WCO WALL CLEANOUT REF REFRIGERATOR - XXX EQUIPMENT TAG - SEE SCHEDULE ON KITCHEN DRAWINGS DERNITION5 DISCONNECT DISCONNECT EQUIPMENT/DEVIGE CONNECTION. WITHDRAW 5ERVICE(5) BEYOND ADJACENT SURFACE AND CAP. ALLOW ENOUGH ROOM TO FINISH OPENING 51MILAIR CL TO ADJACENT SURFACE. 5ERVIGE(5) THRU FLOOR SHALL BE WITHDRAWN INTO () 5PAGE BELOW. 5ERVICE(5) THRU CEILING SHALL BE WITHDRAWN INTO CEILING SPACE. GAP 5ERVICE(5) EXCEPT WHERE IT 15 TO BE EXTENDED FOR A NEW M SERVICE CONNECTION. DOME5TIG WATER AND SANITARY PIPING DEAD ENDS SHALL ® BE LIMITED TO 2'-0" (MAX). REMOVE 5LEEVE5 WHERE THEY EX15T AND HOLES Z ® N FILLED AND FIN15H REPAIRED BY THE GENERAL CONTRACTOR. CONDUIT IN 5LAB5 nj SHALL BE CUT OFF BELOW ADJACENT FIN15H AND SHALL HAVE WIRING WITHDRAWN Q Q M TO NEXT AGCE551BLE OPENING WHERE OTHER EQUIPMENT OR DEVICES ARE W J SERVED OR TO THE PANEL WHERE ONLY TH15 EQUIPMENT/DEVICE 15 SERVED. J CONDUIT AND WIRING ABOVE GRADE 5HALL BE REMOVED BACK t0 PANEL OR LL - POINT OF ORIGIN.® D IN MULTI -TENANT BUILDINGS WHERE SERVICES ARE CONTINUED IN A SPACE ORV SPACES THAT ARE PART OF ANOTHER TENANT, REMOVE 5ERVICE(5) t0 ITS W TERMINATION IN A SPACE CONTROLLED BY THE PROP05FD TENANT OR TO A N Z LU SPACE CONTROLLED BY THE LANDLORD/MANAGEMENT. COORDINATE THESE 1.�. Q co TERMINATIONS WITH LANDLORD/MANAGEMENT. % W U REMOVAL V Q MATERIALS/EQUIPMENT/DEVICE5 TO BE REMOVED AND NOT RELOCATED OR STORED < z A5 WELL A5 CON5TRUCTION MATERIAL -5 ACCUMULATED DURING THE REMOVAL W W Q WORK 5HALL BE REMOVED AND DISPOSED OF AT THE EXPENSE OF THE V Z J RESPECTIVE TRADE. BLANK UP OPENINC75 THAT ARE TO BE ABANDONED IN® 0 Q EXISTING WALLS THAT REMAIN. OUST CONTROL W IN GENERAL, THE DUST CONTROL SHALL BE PROVIDED AND MAINTAINED BY THE GENERAL CONTRACTOR. TH15 TRADE SHALL COORDINATE ITS WORK WITH THE GENERAL CONTRACTOR WITH RESPECT TO DUST CONTROL IN THE AREA INDICATED FOR NEW WORK. SPECIAL CONTROL FOR HEALTH AND SAFETY OF WORKE125, FOR WORK OUT5IDE THE AREA REGARDED A5 THE NEW WORK AREA, AND A5 REQUIRED BY SPECIAL GONDITION5 5HALL BE BY TH15 TRADE. INTERRUPTION OF 5ERVIGE5 SEAL: 11-19-18 WORK THAT REQUIRES INTERRUPTION OF 5ERVIGE5 TO PORTIONS OF THE BUILDING •0.11414ts,11% OTHER THAN AREAS IN WHICH THE WORK 15 TO BE ACCOMPLI5HEO SHALL BE .o` r1S N :,! i�'••, COORDINATED WITH THE BUILDING MANAGEMENT AND ACCOMPLISHED DURING THE NIGHTTIME OR ON WEEKENDS AND AT NO ADDITIONAL COST. 74120 GENERAL NOTES ''d�'OF j`` ° ,!Ft 0 Ft 1`o xip,, REVIEW EX15TING CONDITIONS AND INCLUDE NECE55ARY CHANGES A5 A a+1A4 PART OF THE BID. INFORM U5ER5 OF DIFFERENCES. (E) EX15TING EQUIPMENT/DEVICE TO REMAIN. (ER) EX15TING EQUIPMENT/DEVICE TO BE REMOVED. TH15 TRADE SHALL 015GONNEGT THE 5ERVICE(5). (END) DISCONNECT EXISTING EQUIPMENT/DEVICE AND ALTER SERVICES FOR NEW EQUIPMENT/DEVICE AT THE 5AME LOCATION. (ERR) EXISTING EQUIPMENT/DEVICE TO BE REMOVED AND RELOCATED. TH15 TRADE SHALL D15CONNECT THE 5ERVICE(5), CLEAN AND MAKE NECE55ARY Z REPAIRS OR ADJUSTMENTS AS REQUIRED TO FACILITATE THE INSTALLATION AT THE NEW LOCATION. o O a (ENL) NEW LOCATION FOR EXISTING EQUIPMENT/DEVICE TO BE REMOVED AND u RELOCATED. EXTEND SERVICES IN WALL/BELOW FLOOR/ABOVE CEILING AS z N REQUIRED TO NEW LOCATION. 5 p M (ED) D15GONNECT EQUIPMENT/DEVICE CONNECTION(5). WITHDRAW SERVICES a m BEYOND ADJACENT SURFACE AND CAP. ALLOW ENOUGH SPACE TO FIN15H O OPENING 51MILAR TO ADJACENT SURWAGE. o 0 (EA) EX15TING EQUIPMENT/DEVICE/5ERVIGE TO BE ABANDONED. DISCONNECT � � 5ERVICE(5). ELECTRICAL CONDUITS SHALL HAVE WIRING WITHDRAWN t0 Cnn <Nn NEAREST ACGE55115LE BOX AND BLANK UP ABANDONED OPENING. E= EX15TING EQUIPMENT TO BE REMOVED. rn sa CONNECT TO EXISTING. o 00 0 O z PROJECT N0. 18-047 CHECKED BY KK DRAWN BY SHEET TITLE PLUMBING SPECIFICATIONS AN DETAILS SHEET N0. 6592.01 POD KENNETH L. KRAUS P.E. # 74120 306 Oak Grove Drive PM040 Wauconda, IL 60084 T(847)719-1708 F(847)719-1738 Plumbing o0o Mechanical o0o Electrical