Loading...
253 ROYAL PALMS DR DEMO18-003810'-0" LEGEND EXISTING WALL PARTITION TO REMAIN. - - - - - - - - WALL PARTITION TO BE REMOVED. 8'-0' 6 4'10' 1. 81-0. 6 16'-0" 1 7 9 DUCTWORK TO REMAIN THIS AREA 8'-0' 22 GENERAL. DEMOLITION NOTES A. CHECK MECHANICAL AND ELECTRICAL, DRAWINGS PRIOR TO DEMOLITION WITH REGARD TO K. REMOVE ALL EXISTING PLUMBING FIXTURES, FITTINGS AND PIPING AS SCHEDULED FOR UTILIZING ANY EXISTING WIRING, LINES COMPONENTS ETC. DEMOLITION AND AS REQUIRED BY PARTITION DEMOLITION AND NEW CONSTRUCTION. MODIFY B. PROVIDE TRASH CONTAINER AS REQUIRED AT LOCATION TO SUIT LANDLORD. REMOVE DEBRIS EXISTING PIPING AS REQUIRED BY NEW CONSTRUCTION, OR IF NOT REQUIRED, TERMINATE AND DAILY AND HAUL FROM THE SITE AT TIME TO SUIT LANDLORD. CAP OFF AT WET STACK. C. NOTIFY ARCHITECTS IMMEDIATELY OF ANY DISCREPANCIES OR UNFORESEEN ITEMS NOT SHOWN L. REMOVE EXISTING FLOOR FINISHES SCHEDULED FOR REMOVAL AND AS REQUIRED BY PARTITION ON DRAWINGS. DEMOLITION AND NEW CONSTRUCTION. D. ALL REMOVED MATERIAL, NOT OTHERWISE DESIGNATED, AND ALL DEBRIS BECOMES THE M. REMOVE ALL CONSTRUCTION DEBRIS FROM AREA. REPAIR ALL ADJACENT DAMAGED SURFACES, PROPERTY OF THE CONTRACTOR, WHO SHALL REMOVE IT FROM THE SITE. AS NECESSARY. PREPARE ALL DAMAGED SURFACES FOR FINISHES AS SCHEDULED OR REFINISH E. G.C. SHALL NOT DEMOLISH ANY LOAD BEARING WALLS OR CONSTRUCTION THAT WILL TO MATCH EXISTING FINISH, REPLACE DAMAGED CEILING TILES; REPAIR OR REPLACE DAMAGED CEILING GRID COMPROMISE THE STRUCTURAL INTEGRITY OF THE EXISTING SPACE. G.C. TO NOTIFY THE ARCHITECT IMMEDIATELY OF ANY STRUCTURAL CONCERNS DURING CONSTRUCTION. N. PROVIDE A SMOOTH, NEAT, CONTINUOUS APPEARANCE WHERE DEMOLITION WORK MEETS ADJACENT EXISTING WORK. REMOVE EXISTING FINISHES AS REQUIRED TO PROVIDE NEAT, F. EXISTING EQUIPMENT 140T BEING USED MUST BE COMPLETELY REMOVED / DISPOSED OF STRAIGHT SEAMS AND TRANSITIONS BETWEEN EXISTING AND MATCHING NEW FINISHES. PROPERLY. NOTHING CAN BE ABANDONED ABOVE THE CEILING. 0, REPLACE OR RELOCATE, IN ACCORDANCE WITH LOCAL CODES, ALL FIRE SUPPRESSION AND FIRE G. REMOVE ALL EXISTING INTERIOR PARTITIONS, DOORS AND DOOR FRAMES SCHEDULED FOR ALARM EQUIPMENT DISTURBED BY DEMOLITION WORK. MAINTAIN INTEGRITY OF FIRE SUPPRESSION DEMOLITION. REMOVE ALL MILLWORK, EQUIPMENT, ETC. ATTACHED TO PARTITIONS SCHEDULED AND FIRE ALARM SYSTEMS. FOR DEMOLITION. P. IN THE CASE THAT THE EXISTING, CABLE LINE, PHONE LINE & BLOCK, T-1 LINE AND DATA H. REMOVE EXISTING ACOUSTIC CEILING GRID AND TILES, LIGHT FIXTURES, AND GYPSUM CABLING ARE PRESENT, G.C. SHALL SALVAGE AND REWORK TO FACILITATE NEW INSTALLATION. WALLBOARD SOFFITS 16 SCHEDULED FOR DEMOLITION AND AS REQUIRED BY PARTITION GC IS RESPONSIBLE TO VERIFY IF EXISTING INCOMING PHONE SERVICE LOCATION IS TO BE DEMOLITION AND NEW CONSTRUCTION WORK. MAINTAIN EXISTING CEILING WIRE HANGERS FOR RE—USED. COORDINATE WITH OWNER AS REQUIRED. FUTURE USE. I. REMOVE EXISTING ELECTRICAL DEVICES, OUTLETS, TELEPHONE AND DATA JACKS AND THERMOSTATS IN PARTITIONS SCHEDULED FOR DEMOLITION. MODIFY EXISTING WIRING AS REQUIRED BY NEW CONSTRUCTION OR, IF NOT REQUIRED, TERMINATE AND CAP OFF AT NEAREST PANEL OR SOURCE ABOVE CEILING. J. REMOVE EXISTING HVAC CEILING DIFFUSERS AND RETURN GRILLES AS SCHEDULED FOR DEMOLITION AND AS REQUIRED BY PARTITION DEMOLITION AND NEW CONSTRUCTION. MODIFY EXISTING DUCTWORK IS REQUIRED BY NEW CONSTRUCTION OR IF NOT REQUIRED, TERMINATE AND CAP OFF SUPPLY AND RETURN DUCTS AT NEAREST SOURCE ABOVE CEILING. Lo. 8' LANDLORD DEMO. SHEET NOTES 1. INTERIOR WALL PARTITION TO BE REMOVED, 2. STRUCTURAL COLUMN TO REMAIN. 3. MILLWORK TO BE REMOVED IN ITS ENTIRETY. 4. DOOR AND FRAME TO BE REMOVED. 5. LOCKERS AND BENCH TO BE REMOVED IN ITS ENTIRETY. 6. FLOOR FINISHES TO BE REMOVED THROUGH OUT SPACE. SLAB TO BE PREPARED TO RECEIVE NEW FINISHES AS SCHEDULED, 7. CEILING TO BE REMOVED, 8, REMOVE LIGHT FIXTURES, MECHANICAL DIFFUSERS, GRILLES, ETC. TO ALLOW FOR NEW CONSTRUCTION. REFER TO ELECTRICAL AND MECHANICAL DRAWINGS FOR NEW WORK. 9. ANY FLOOR DRAINS (VIF) TO BE REMOVED. CAP LINES BELOW SLAB, PATCH / REPAIR SLAB FOR NEW FLOOR FINISHES. 10. GC TO REMOVE ALL HVAC DUCTWORK, DIFFUSERS, ETC. AS REQUIRED; REFER TO MECHANICAL DRAWINGS FOR FURTHER INFORMATION 11. REMOVE PLUMBING FIXTURE, CAP LINES AND PATCH/REPAIR FLOOR AS REQUIRED TO PREPARE FOR NEW FLOOR FINISH. 12. MOP SINK TO BE REMOVED. 13. DRINKING FOUNTAIN TO BE REMOVED. REMOVE & CAP ALL LINES AS REQUIRED. 14. WATER HEATER TO BE REMOVED. 15. STAIR SYSTEM TO REMAIN. 16. DOOR(S) TO REMAIN; GC TO REPLACE DOOR HARDWARE & VERIFY DOORS ARE IN GOOD WORKING ORDER. 17. FIRE RISER AND INCOMING DOMESTIC WATER SERVICE/ BACKFLOW TO REMAIN; REFER TO PLUMBING DRAWINGS. 18. ELECTRICAL PANELS TO BE REMOVED; REFER TO ELECTRICAL DRAWINGS. 19. CONCRETE CURB/ SIDEWALK AREA TO REMAIN. 20. STOREFRONT TO REMAIN. TENANT DEMO. SHEET NOTES 21, STOREFRONT SYSTEM & DOORS TO BE REMOVED; PATCH / REPAIR AREA FOR NEW FINISHES. 22. REMOVE PORTION OF EXTERIOR WALL SYSTEM IN ITS ENTIRETY; PATCH / REPAIR AREA FOR NEW FINISHES. I �TYP. L JJ LI I II III III III 4 4 6 9 7 10 I II II 8 I II III II II L J L II I J -44 s it 10 9 6 9 7 7 10 10 IIII III 8 8 L----- — — --- i L -- — --— — — — — — — — — — — — — —— — — — — — — — — — — — I- - - - - - - - - - - - - - - - - - - - - — - - -------- — — II IIIIII II =_________==--- u u 6 7 10 8 4 — — — — — — — — — — — — — — — — __JI 13 UN /\\ I I I 8 44 II 6 IA\ II 9 10 8 L of I 0011 x Coll Pe- - - - - - - - - - - 7F_ 7 17— T — — — — T_ 7 L — _-----_— I I_— I+— — — — — — — ---------------------------------------------------- L _J Al L _J LI u 6 7 9 9 10 I.. III I 810 111 -i _j I I L I- T- T T_ T- T_ T_ IIT7777T�_­I 6 L L :L :L L -L-1 9 V, 7 10 )> 11 a LL I I N I L 7-- I \ / I cl', X X I Typ. 01 FLOOR PLAN EwwMw_ 3/16" = 1'-0" NORTH 210 S. Market St., Troy, OH 45373 p 937.760.3884 mtwiss@gomtstudio.com w o z 0 ILL cu W Z 4 si an 0 = P7, L) Z < Lu co Q; H cn Lc) Z ISSUED / REVISED DATE ISSUED FOR PERMIT/BID 11.30.18 Demolition Floor Plan D-101 LEGEND EXISTING WALL PARTITION TO REMAIN. _. _ _ _ _ _ _ WALL PARTITION TO BE REMOVED. GENERAL DEMOLITION NOTES A. CHECK MECHANICAL AND ELECTRICAL DRAWINGS PRIOR TO DEMOLITION WITH REGARD TO UTILIZING ANY EXISTING WIRING, LINES COMPONENTS ETC. B. PROVIDE TRASH CONTAINER AS REQUIRED AT LOCATION TO SUIT LANDLORD. REMOVE DEBRIS DAILY AND HAUL FROM THE SITE AT TIME TO SUIT LANDLORD. C. NOTIFY ARCHITECTS IMMEDIATELY OF ANY DISCREPANCIES OR UNFORESEEN ITEMS NOT SHOWN ON DRAWINGS. D. ALL REMOVED MATERIAL, NOT OTHERWISE DESIGNATED, AND ALL DEBRIS BECOMES THE PROPERTY OF THE CONTRACTOR, WHO SHALL REMOVE IT FROM THE SITE. E. G,C. SHALL NOT DEMOLISH ANY LOAD BEARING WALLS OR CONSTRUCTION THAT WILL COMPROMISE THE STRUCTURAL INTEGRITY OF THE EXISTING SPACE. G.C. TO NOTIFY THE ARCHITECT IMMEDIATELY OF ANY STRUCTURAL CONCERNS DURING CONSTRUCTION. F. EXISTING EQUIPMENT NOT BEING USED MUST BE COMPLETELY REMOVED / DISPOSED OF PROPERLY. NOTHING CAN BE ABANDONED ABOVE THE CEILING. G. REMOVE ALL EXISTING INTERIOR PARTITIONS, DOORS AND DOOR FRAMES SCHEDULED FOR DEMOLITION. REMOVE ALL MILLWORK, EQUIPMENT, ETC. ATTACHED TO PARTITIONS SCHEDULED FOR DEMOLITION. H. REMOVE EXISTING ACOUSTIC CEILING GRID AND TILES, LIGHT FIXTURES, AND GYPSUM WALLBOARD SOFFITS AS SCHEDULED FOR DEMOLITION AND AS REQUIRED BY PARTITION DEMOLITION AND NEW CONSTRUCTION WORK. MAINTAIN EXISTING CEILING WIRE HANGERS FOR FUTURE USE. I. REMOVE EXISTING ELECTRICAL DEVICES, OUTLETS, TELEPHONE AND DATA JACKS AND THERMOSTATS IN PARTITIONS SCHEDULED FOR DEMOLITION. MODIFY EXISTING WIRING AS REQUIRED BY NDV CONSTRUCTION OR, IF NOT REQUIRED, TERMINATE AND CAP OFF AT NEAREST PANEL OR SOURCE ABOVE CEILING. J. REMOVE EXISTING HVAC CEILING DIFFUSERS AND RETURN GRILLES AS SCHEDULED FOR DEMOLITION AND AS REQUIRED BY PARTITION DEMOLITION AND NEW CONSTRUCTION. MODIFY EXISTING DUCTWORK AS REQUIRED BY NEW CONSTRUCTION OR IF NOT REQUIRED, TERMINATE AND CAP OFF SUPPLY AND RETURN DUCTS AT NEAREST SOURCE ABOVE CEILING. (D_ K. REMOVE ALL EXISTING PLUMBING FIXTURES, FITTINGS AND PIPING AS SCHEDULED FOR DEMOLITION AND AS REQUIRED BY PARTITION DEMOLITION AND NEW CONSTRUCTION. MODIFY EXISTING PIPING AS REQUIRED BY NEW CONSTRUCTION, OR IF NOT REQUIRED, TERMINATE AND CAP OFF AT WET STACK. L. REMOVE EXISTING FLOOR FINISHES SCHEDULED FOR REMOVAL AND AS REQUIRED BY PARTITION DEMOLITION AND NEW CONSTRUCTION. M. REMOVE ALL CONSTRUCTION DEBRIS FROM AREA. REPAIR ALL ADJACENT DAMAGED SURFACES, AS NECESSARY. PREPARE ALL DAMAGED SURFACES FOR FINISHES AS SCHEDULED OR REFINISH TO MATCH EXISTING FINISH. REPLACE DAMAGED CEILING TILES; REPAIR OR REPLACE DAMAGED CEILING GRID, N. PROVIDE A SMOOTH, NEAT, CONTINUOUS APPEARANCE WHERE DEMOLITION WORK MEETS ADJACENT EXISTING WORK. REMOVE EXISTING FINISHES AS REQUIRED TO PROVIDE NEAT, STRAIGHT SEAMS AND TRANSITIONS BETWEEN EXISTING AND MATCHING NEW FINISHES. 0. REPLACE OR RELOCATE, IN ACCORDANCE WITH LOCAL CODES, ALL FIRE SUPPRESSION AND FIRE ALARM EQUIPMENT DISTURBED BY DEMOLITION WORK, MAINTAIN INTEGRITY OF FIRE SUPPRESSION AND FIRE ALARM SYSTEMS. P. IN THE CASE THAT THE EXISTING, CABLE LINE, PHONE LINE & BLOCK, T-1 LINE AND DATA CABLING ARE PRESENT, G.C. SHALL SALVAGE AND REWORK TO FACILITATE NEW INSTALLATION, GC IS RESPONSIBLE TO VERIFY IF EXISTING INCOMING PHONE SERVICE LOCATION IS TO BE RE -USED. COORDINATE WITH OWNER AS REQUIRED. I� 12'-0' 8'-0" 5'-6" II II I 1 II II II II II II II II II II II II II II II II 4 II 6 II 5 7 II II II II II II I I II II I I --T1 II l 10 u i 1. INTERIOR WALL PARTITION TO BE REMOVED. 2. STRUCTURAL COLUMN TO REMAIN. 3. DOOR AND FRAME TO BE REMOVED, 4. FLOOR FINISHES TO BE REMOVED THROUGH OUT SPACE. SLAB TO BE PREPARED TO RECEIVE NEW FINISHES AS SCHEDULED. 5. CEILING TO BE REMOVED. 6. REMOVE LIGHT FIXTURES, MECHANICAL DIFFUSERS, GRILLES, ETC. TO ALLOW FOR NEW CONSTRUCTION. REFER TO ELECTRICAL AND MECHANICAL DRAWINGS FOR NEW WORK. 7. GC TO REMOVE ALL HVAC DUCTWORK, DIFFUSERS, ETC. AS REQUIRED; REFER TO MECHANICAL DRAWINGS FOR FURTHER INFORMATION 8. STAIR SYSTEM TO REMAIN. 9. DOORS) TO REMAIN; GC TO REPLACE DOOR HARDWARE & VERIFY DOORS ARE IN GOOD WORKING ORDER. 10. EXISTING GUARD RAIL AND HANDRAIL SYSTEM TO REMAIN. TENANT DEMO. SHEET NOTES 11. REMOVE PORTION OF EXTERIOR WALL SYSTEM IN ITS ENTIRETY, PATCH / REPAIR AREA FOR NEW FINISHES. 01 DEMOLITION MEZZANINE PLAN IR 3/16" = 1,-0" NORTH 210 S. Market St., Troy, OH 45373 p 937.760.3884 mtwiss@gomtstudio.com U tet J O co 2 ♦� 0 U O '^ C'7 N Q U c: 3� 0 Z' W V �, L_ S X S O M V5J O L d U) W iZ O 0 ILL c caW �Z Q J IL M M N 0 N > M J J m V- U 2 Z W m Q M z �gti Q ISSUED / REVISED DATE ISSUED FOR PERMIT/BID 11.30.18 M 00 Lu M Z r Lu 0 w I. 0 fn Demolition Mezzanine Plan D-102 10'-0" 4'1O" , 8. LEGEND EXISTING WALL PARTION TO REMAIN. _ _ _ _ WALL PARTITION TO BE REMOVED. 16'-C' DUCIWG@( TO REMAM THIS ARFJ► GENERAL DEMOLITION NOTES A. CHECK MECHANICAL AND ELECTRICAL DRAWINGS PRIOR TO DEMOLITION WITH REGARD TO K. REMOVE ALL EXISTING PLUMBING FIXTURES, FITTINGS AND PIPING AS SCHEDULED FOR UTILIZING ANY EXISTING WIRING, LINES COMPONENTS ETC. DEMOLITION AND AS REQUIRED BY PARTITION DEMOLITION AND NEW CONSTRUCTION. MODIFY B. PROVIDE TRASH CONTAINER AS REQUIRED AT LOCATION TO SUIT LANDLORD, REMOVE DEBRIS EXISTING PIPING AS REQUIRED BY NEW CONSTRUCTION, OR IF NOT REQUIRED, TERMINATE AND DAILY AND HAUL FROM THE SITE AT TIME TO SUIT LANDLORD. CAP OFF AT WET STACK. C. NOTIFY ARCHITECTS IMMEDIATELY OF ANY DISCREPANCIES OR UNFORESEEN ITEMS NOT SHOWN L REMOVE EXISTING FLOOR FINISHES SCHEDULED FOR REMOVAL AND AS REQUIRED BY PARTITION ON DRAWINGS. DEMOLITION AND NEW CONSTRUCTION. D. ALL REMOVED MATERIAL, NOT OTHERWISE DESIGNATED, AND ALL DEBRIS BECOMES THE M. REMOVE ALL CONSTRUCTION DEBRIS FROM AREA. REPAIR ALL ADJACENT DAMAGED SURFACES, PROPERTY OF THE CONTRACTOR, WHO SHALL REMOVE IT FROM THE SITE. AS NECESSARY. PREPARE ALL DAMAGED SURFACES FOR FINISHES AS SCHEDULED OR REFINISH TO MATCH EXISTING FINISH. REPLACE DAMAGED CEILING TILES; REPAIR OR REPLACE DAMAGED E G.C. SHALL NOT DEMOLISH ANY LOAD BEARING WALLS OR CONSTRUCTION THAT WILL CEILING GRID. COMPROMISE THE STRUCTURAL INTEGRITY OF THE EXISTING SPACE. G.C. TO NOTIFY THE ARCHITECT IMMEDIATELY 0= ANY STRUCTURAL CONCERNS DURING CONSTRUCTION. N. PROVIDE A SMOOTH, NEAT, CONTINUOUS APPEARANCE WHERE DEMOLITION WORK MEETS ADJACENT EXISTING WORK, REMOVE EXISTING FINISHES AS REQUIRED TO PROVIDE NEAT, F. EXISTING EQUIPMENT NOT BEING USED MUST BE COMPLETELY REMOVED / DISPOSED OF STRAIGHT SEAMS AND TRANSITIONS BETWEEN EXISTING AND MATCHING NEW FINISHES. PROPERLY. NOTHING CAN BE ABANDONED ABOVE THE CEILING. 0. REPLACE OR RELOCATE, IN ACCORDANCE WITH LOCAL CODES, ALL FIRE SUPPRESSION AND FIRE G. REMOVE ALL EXISTING INTERIOR PARTITIONS, DOORS AND DOOR FRAMES SCHEDULED FOR ALARM EQUIPMENT DISTURBED BY DEMOLITION WORK. MAINTAIN INTEGRITY OF FIRE SUPPRESSION DEMOLITION. REMOVE ALL MILLWORK, EQUIPMENT, ETC. ATTACHED TO PARTITIONS SCHEDULED AND FIRE ALARM SYSTEMS. FOR DEMOLITION. P. IN THE CASE THAT THE EXISTING, CABLE LINE, PHONE UNE & BLOCK, T-1 UNE AND DATA H. REMOVE EXISTING ACOUSTIC CEILING GRID AND TILES, LIGHT FIXTURES, AND GYPSUM CABLING ARE PRESENT, G.C. SHALL SALVAGE AND REWORK TO FACILITATE NEW INSTALLATION. WALLBOARD SOFFITS AS SCHEDULED FOR DEMOLITION AND AS REQUIRED BY PARTITION GC IS RESPONSIBLE TO VERIFY IF EXISTING INCOMING PHONE SERVICE LOCATION IS TO BE DEMOLITION AND NEW CONSTRUCTION WORK. MAINTAIN EXISTING CEILING WIRE HANGERS FOR RE -USED. COORDINATE WITH OWNER AS REQUIRED. FUTURE USE. I. REMOVE EXISTING ELECTRICAL DEVICES, OUTLETS, TELEPHONE AND DATA JACKS AND THERMOSTATS IN PARTITIONS SCHEDULED FOR DEMOLITION. MODIFY EXISTING WIRING AS REQUIRED BY NEW CONSTRUCTION OR, IF NOT REQUIRED, TERMINATE AND CAP OFF AT NEAREST PANEL OR SOURCE ABOVE CEILING. J. REMOVE EXISTING HVAC CEILING DIFFUSERS AND 'RETURN GRILLES AS SCHEDULED FOR DEMOLITION AND AS REQUIRED BY PARTITION DEMOLITION AND NEW CONSTRUCTION. MODIFY EXISTING DUCTWORK AS REQUIRED BY NEW CONSTRUCTION OR IF NOT REQUIRED, TERMINATE AND CAP OFF SUPPLY AND RETURN DUCTS AT NEAREST SOURCE ABOVE CEILING. 12'1 0" 8'-0" 22 22 LANDLORD DEMO. SHEET NOTES' 1. INTERIOR WALL PARTITION TO BE REMOVED. 2. STRUCTURAL COLUMN TO REMAIN, 3. MILLWORK TO BE REMOVED IN ITS ENTIRETY. 4. DOOR AND FRAME TO BE REMOVED. 5. LOCKERS AND BENCH TO BE REMOVED IN ITS ENTIRETY. 6. FLOOR FINISHES TO BE REMOVED THROUGH OUT SPACE. SLAB TO BE PREPARED TO RECEIVE NEW FINISHES AS SCHEDULED. 7. CEILING TO BE REMOVED. B. REMOVE LIGHT FIXTURES, MECHANICAL DIFFUSERS, GRILLES, ETC. TO ALLOW FOR NEW CONSTRUCTION. REFER TO ELECTRICAL AND MECHANICAL DRAWINGS FOR NEW WORK. 9. ANY FLOOR DRAINS (VIF) TO BE REMOVED, CAP LINES BELOW SLAB, PATCH / REPAIR SLAB _ FOR NEW FLOOR FINISHES. 10. GC TO REMOVE ALL HVAC DUCTWORK, DIFFUSERS, ETC. AS REQUIRED; REFER TO MECHANICAL DRAWINGS FOR FURTHER INFORMATION 11. REMOVE PLUMBING FIXTURE, CAP LINES AND PATCH/REPAIR FLOOR AS REQUIRED TO PREPARE FOR NEW FLOOR FINISH. 12, MOP SINK TO BE REMOVED. 13. DRINKING FOUNTAIN TO BE REMOVED. REMOVE & CAP ALL LINES AS REQUIRED. 14. WATER HEATER TO BE REMOVED. 15. STAIR SYSTEM TO REMAIN. 16. DOOR(S) TO REMAIN; GC TO REPLACE DOOR HARDWARE & VERIFY DOORS ARE IN GOOD WORKING ORDER, 17. FIRE RISER AND INCOMING DOMESTIC WATER SERVICE/ BACKFLOW TO REMAIN; REFER TO PLUMBING DRAWINGS. 18. ELECTRICAL PANELS TO BE REMOVED; REFER TO ELECTRICAL DRAWINGS. 19. CONCRETE CURB/ SIDEWALK AREA TO REMAIN, 20. STOREFRONT TO REMAIN. TENANT DEMO. SHEET NOTES 21. STOREFRONT SYSTEM & DOORS TO BE REMOVED; PATCH / REPAIR AREA FOR NEW FINISHES. 22. REMOVE PORTION OF EXTERIOR WALL SYSTEM IN ITS ENTIRETY; PATCH / REPAIR AREA FOR NEW FINISHES. 210 S. Market St., Troy, OH 45373 p 937,760.3884 mtwiss@gomtstudio.com 0v J O co -1-� 0 coi j V/ 9 U � 3 � z @� CL 0 to L� �0 zom U I U) o a yj 2'' 1 II II ( II I I TYP.LL —J ,� ,.I L JJ j II III I II I I <// III III 4 4 Fr I I I / I I \, -�,j I 7 9 I I I 10 I I I II II 8 I I II II I IN III I - I — — — —� — — — L __JL I I4 1 I I 1 Ip 1 II I I 6 9 </� �! 7 6 I 6 110 II I 7 9 I 7 9 I I 8 II 8 10 1j a 10 i I I II I� III I IL =___=� --'L -- ____ _____________________ __ ___ — — _______________ �r- ir _j Li II II II II L u it ii In i4 6 9 u in 10 —-------- �---� --IIII ------- IF— JL L_—_—_ J -vA �—�— —�—�J►IIIIIIIIIIIIII 6 4 4 9(D-7 4 11 10 8 E-1 I zll DOI I 7 — co Twq II - 4 f 4 II — — — — — I I I IT I --I � I+ I -1 I L— ------------- -- - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — - - — — — — — — — — — — — — — — — — — — — _ I II It_J I _ I it J L----- _ u I I 6 I I I I 6 L I 7 9 I III I 7 9 I - j 8 10 I:>) 1 I 8 10 I I ==-1—� -�rrrrTr�l1 _ -=� — � 1T77T 7 TTi I 6 IL t�L-� LL�t�L-i I _ _ I 9 ____ I -------- I �-- — i t —� 1 10 IJ1 II <\1 II I 1 -------/ I I ----- I-----��- 1 ,_--- , I --------- I I 1 I I n —;T__TF__7IT__7� �x� I I �x� I� �l I �x� I I ��x� J dulls.I I TYP• l� II I I V�_ 3 I _ 1 01 FLOOR PLAN Q 3/16'° = I'_0" NORTH O M M W ?M 4-Z mU_ o ~ UU +, Lim uCC W Q m U_ �Z Q .g L ISSUED f REVISED DATE ISSUED FOR PERM' -/BID 11.30.18 Demolition Floor Plan D-101 0 w m z F- 0 W 0 w CL 0 0 U) 210 S. Market St., Troy, OH 45373 p 937.760.3884 mtwiss@gomtstudio.com LO J O co 0. C A U Cl) V! Q Q) 0 z CL — U �UL� x C O U U) m Vn/ b G a OF F( ,p EL D. T,V, S AR99141 ISSUED! REVISED DATE ISSUED FGR PERMITIBID 11.30.18 LO Cl) O 00 Lu m Z 0 W 0 X CL 0 0 r Demolition Mezzanine Plan D-102 LO N co co N W N co J 0 _ U u- C � W m W U CD Z Z Q L Q ISSUED! REVISED DATE ISSUED FGR PERMITIBID 11.30.18 LO Cl) O 00 Lu m Z 0 W 0 X CL 0 0 r Demolition Mezzanine Plan D-102