Loading...
586 Timber Bridge Lane ERES18-0248 early power releaseEarly Power Agreement & Release `•ALLINFORINATION -:HI6Hu6I ib IN •'' City of Atlantic Beach Building Department efuyis REgtiineo, .. --,. ; 800 Seminole Rd, Atlantic Beach, FL 32233 Phone: (904) 247-5826 Email: Building-Dept(Mcoab.us PERMIT M. JOB ADDRESS: Q. T �I�r ��% LY1.-1SERMICE TYPE:F✓ OVERHEAD ❑ UNDERGROUND Electric power is requested now under the conditions and terms of this fully executed Agreement and Release, We, the undersigned General Contractor and Electrical Contractor, understand and agree: 1. "Early Power" Is purely for our construction convenience, it is not required by Codes, and does not substitute for Final Inspections or the CO (Certificate of Occupancy) that must be Issued before occupancy, and as such Is at the discretion of the Building Official. 2. The City of Atlantic Beach will make a special inspection prior to the early power energizing. All rough inspections must have prior Approval, including meter base connections. 3. Occupancy or use of the new construction before a formal CO constitutes fraudulent use of the early electric service. Such action is expressly prohibited and penalized by The City of Atlantic Beach Ordinances. A violation of this Agreement shall result in a request for prompt removal of electric service after a twenty-four hour notice. 4. "Early Power" release authority is the Electrician and/or the Contractor and must not occur before: a. Equipment, devices and fixtures are installed (or blanked off) safely. b. Panel is complete with breakers and cover, and (labeling required at final inspection). c. Service connection and grounding is complete. d. The electric system has safely passed through electrical check. e. Meter can is permanently marked with address. f. Temporary address numbers displayed (Permanent numbers are required for CO). 5. This fully completed form Is to be submitted to the Building Department by hand, mail or fax. 6. Future such Agreements will not be accepted from those who violate any one of the above items. CONTRACTOR NAME: CONTRACTOR SIGNAT ELECTRICIAN NAME:. ELECTRICIAN SIGNATURE: DATE: <L* Pagel of 2 Updated 10/17/18