AGENDA ITEM: Stormwater Master Plan
SUBMITTED BY: Robert S. Kosoy, P.E.
Director of Public Works
DATE: February 15, 2002
BACKGROUND: We solicited a readvertisement for Request for Proposals (RFP) for
the Stormwater Master Plan, and on February 13, 2002, we
received six proposals. The response to the original advertisement
in November, 2001 yielded only two responses, from Aikenhead &
Odom, Inc., and Stanley Consultants. Preliminary discussions with.
both firms indicated that the Hopkins Creek Basin (Aquatic
Gardens, Royal Plans, and Donner Subdivision) would need to be
modeled, in order to provide a more realistic 10-year Capital
Improvement Program.
The six firms submitting proposals on the readvertisement were:
Aikenhead & Odom, Inc.
Camp, Dresser & McKee
Environmental Consulting & Technology, Inc.
Jones Edmunds & Associates, Inc.
Taylor Engineering, Inc.
Stanley Consultants
After staff evaluation, the top three firms were:
15` - Camp, Dresser & McKee
2"a - Jones Edmunds & Associates, Inc.
3`a - Taylor Engineering
RECOMMENDATION: Authorize staff to begin negotiations with the top-ranked firm,
Camp, Dresser & McKee, for preparation of the Stormwater
Master Plan.
ATTACHMENT: Evaluation of Proposals Rating Sheet
Proposals are on file with the City Clerk's
REVIEWED BY CITY MANAGER:
EVALUATION OF PROPOSALS FOR THE STORMWATER MASTER PLAN
Engineering Firm Staff Competence and Avallabliity Similar References Project Current Financial Rates Evaluation
(25%) Project (10%) Approach Workload w/Audit and
.Experience (20•/.) (~5%) Summary& Fees RSK DVK PN Avg
(20%.) Insurance (5%)
(5°~ )
SUBMITTED PRIOR Neil Aikenhead, P.E. -Project Manager 42.50 28.00 18.00 34.00 27.00 8.50 7.00 82.50 82.50 165.00
PROPOSAL: Fred Odom, P.E. -Principal In Charge
Aikenhead & Odom, Inc. Robert Edmunds -CAD Manager and GIS Specialist
5730 Bowden Road,
Ric Locquiao, P.E. -Projecl Drainage Engineer 6 Provided Financial -Yes
Suite 200 Mike Yuro, P.E. -Project Production Manager References Insurance -Yes
Jacksonville, FL Charlie Tran, E.I. - Stormwater Design Engineer checks have
(904) 636-5432 Sam Kadi, P.E. -Traffic Advisor been -
(NO CHANGES TO STAFF FROM FIRST RFP) completed.
Camp, Dresser & McKee Don Maurer, P.E., DEE -Officer-in-Charge 46.25 37.00 20.00 37.00 25.50 9.50 8.00 93.75 89.50 183.25
8659 Baypine Road, Patrick Victor, P.E. -Projecl Manager
Suite 200 Michael F. Schmidt, P.E.-Technical Review Committee -
Jacksonville, FL 32256
Steve Sedgwick, P.E., DEE- Tech. Review Committee Financial-.Yes
Errol Bos-Technical Review Committee 12 Provided Insurance-Yes
Edward Kura-GIS/Mapping
Eric Grimison-GIS/Mapping
Mario F. Chavez, P.E. -Facility Planning and CIP
Jose Guzman -Facility Planning and CIP
Patrick Victor, P.E. - Stormwater Master PIaNNPDES -
Shayne Wood - Stortnwater Master PIaNNPDES
Environmental Martin Smithson -Project Mgmt. Asst. QAlOC 42.50 34.00 16.00 32.00 25.50 9.00 9.00 83.75 84.25 168.00
Consulting & Frank Marshall, Ph.D., P.E. -Project Manager
Technology, Inc. Ivan Chou, P.E.-Task Manager, Modeling
6410 Southpoint -Staff: Fagerstrom, E.I. -Marshall, Ph.D., P.E.
Parkway, Suite 120. Robert Bennett, P.E. -Task Manager, GIS Mapping -
Jacksonville, FL 32216 Staff: DePedro, Seibel, Bell - 23 Provided Financial -Yes
(904)
' Sanjiv Sinha, Ph.D., P.E., -Task Manager, BMP Insurande -Yes
EvaluatioNCost Estimating
Staff: Naleway, P.E., Stokes, P.E. NO FAX
Martin Smithson -Task Manager Financing/Grant NUMBERS
Options
Staff: Provost, P.E.
Robert Naleway, P.E. -Task Manager, Master Plan
U
i
~ ~
pdat
ng
Slaff: Gove, A.LC.P., Stokes, P.E., Bennett, P.E. td ~
~
z
~d
v
~c y
I J ~
(n y
ti
O W
Nd
Engineering Firm Staff Competence and Availability Similar References ~ Project Current Financial Rates Evaluation
(25%) Project (10%) Approach Workload wlAudit and
Experience (20 %) (15%) Summary 8 Fees RSK DVK PN Avg
(20%) Insurance (5%)
(5%)
Jones Edmunds 8 Brian Hepburn, M.P. . -Client Contact 43.25 39.00 18.00 34.00 27.00 9.50 6.00 89.00 87.75 176.75
Associates, Inc. Karen Falkenberry, P.E. -Project Manager; Stortnwater
1100 Cesery Blvd. Planning/Modeling 5Provided Financial-Yes
Jacksonville, FL 32211 Rick Ferreira, P.E. - QAIQC
(904)744267 Brett Cunningham, P.E.-Stormwater; Planning/ Insurance-Yes
Modeling;NPDES Permitting
Mark Nelson, P.E.-GIS/CADD
Dale Roberts-GIS/CADD
Debra Segal, M.S. -Ecologist
B.J. Bukata, M.S. -Ecologist
Terti Lowery, B.S. - Commun'dy Outreach
Local Surve r, as needed
Taylor Engineedng, Inc. Terty Hull, P.E. -Project Manager. 50.00 33.00 14.00 31.00 27.00 9.00 9.00 87.50 85.50 173.00
9000 Cypress Green Dr., Michael DelCharco, P.E. - Co-Project Manager
Suite 200 Dr. Bmce Taylor, P.E.-Quality Assurance 29 Provided Financial-Yes
Jacksonville, FL 32256 Dr. Mark Gosselin, P.E. -Quality Assurance
. Ken Craig, P.E.-GIS Database Development Insurance-Yes
Dr. Alexandra Carvalho -GIS & Mapping _
Dr. Steve Schoop-Water Quality Analysis
Michael Cochrane, P.E. -Cost Estimatin -
SUBMITTED PRIOR George McGregor, P.E.-Project Manager/GIS 42.00 30.00 18.00 30.00 26.50 7.50 10.00 83.50 80.50 164.00
PROPOSAL: Will Stewart, P.E. -Principal In Charge
Edc Huskey, P.E. -Project Engineer 6 Provided Financial -Yes
Stanley Consultants Amin Ahmed, P.E. -Civil Engineedng
9250 Baymeadows Artefio Cartagena, E.I. - CiviUDreinage Analysis 8 Insurance - No -
Road, Suite 440 Design ~ Reference
Jacksonville, FL 32256 Shawn Waldeck, P.E. -Structures checks have
(904) 737-7225 Renaud Oliver, E.1. -Drainage Design been
Ian McAllister-Quality Control completed.
Donald Mixon-CADD
Ed Slattery-Quality Control
(ADDED CHERYL JOHNSON, P.E, OF ENGINEERING
METHODS & APPLICATIONS, FOR THE
STORM WATER ROUTING AND MODELING
EFFORTS TO THE FIRST RFP
~a
~~
~z
~~
~ H
N ti7
UI~
N
- O 00
C d
N