Exh 8AAGENDA ITEM 8A MARCH 11, 2002 CITY OF ATLANTIC BEACH. CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Professional Engineering Services for CDBG Project Sewer Extension on Dora Street and Church Road SUBMITTED BY: Donna Kaluzniak, Utility Director Sonya Doerr, Community Development Director yj'~J DATE: March O1, 2002 BACKGROUND: Funds from the Fiscal Year 2001-2001 Community Development Block Grant (CDBG) were provided for design of sewer extensions in the CDBG tazget area. Two areas in need of additional sewer mains are Dora Street and an azea of Church Road between George Street and Mealy Street We requested Edwards Engineering, Inc., one ofthe engineering firms awarded a cont~uing contract, to provide us with a cost proposal for engineering of this project. The scope of services includes a site survey and investigation of the existing conditions, geotechnical work, design drawings and specifications and contract documents. The cost to provide the above. services, as proposed, is not to exceed $16,680.50. As such, the City will only be billed for actual hours and expenses up to that amount. This fee represents approximately 10% of the estimated construction cost, which would be on the low to average range for a small project of this nature. BUDGET: A total of $19,737.44 was budgeted for this project as one project activity in the Special Revenue Community Development Block Grant Fund total of 157,050.00. (Acct. No. 110- 1005-515.83-00) RECOMMENDATION: Authorize Edwards Engineering, Inc. to perform the engineering services for the CDBG Project -Sewer Extension on Dora Street and Church Road, for an amount not to exceed $16,680.50. ATTACHMENTS: Proposal from Edwazds Engineering dated January 30, 2002. REVIEWED BY CITY ~C. January 30, 2002 Ms. Donna Kaluzniak City of Atlantic Beach Department of Public Utilities 1200 Sandpiper Lane Atlantic Beach, FL 32233 RE: Sewer Extension Church Road and Dora Streets Deaz Ms Kaluzniak: 9550 Regency Square Boulevard, Suite 1118 Jacksornille, Florida 32225 phone~04)725-4220 f~c (904)725-4219 emal: edena(a~fdn.com from the desk of AGENDA ITEM 8A MARCH 11, 2002 ~~~`. ~ ~00~ In follow-up to your request, we aze pleased to present this letter proposal to design a sewer extension along the referenced routes. Thank you for the opportunity for Edwazds Engineering (EE) to provide professional engineering services for this project. BACKGROUND The City of Atlantic Beach proposes to construct six-inch sewer mains along Church and Dora Streets. The limits of the project aze: Church Road from George Street to Mealy Street connecting in the pazk and Dora Drive from a small creek east to the end of the road, between two houses and connect on Francis Street. The line along Church Road will connect to a manhole in the park to serve Church Road. The line along Dora Drive will traverse between two homes at the East end of Dora Dive and connect to an existing line in the Francis Street right-of--way. There is an existing water line that runs between the aforementioned houses. The sewer line will follow this same route. The City intends to purchase an easement over this route to cover both the water and sewer lines. As requested, this proposal includes prepazation of design documents and permitting. SCOPE Based on the above information, we offthe following scope of services. Task I -Preliminary Engineering Prior to initiating design, several items need addressed. Specifically, those variables associated with the property that needed to be investigated in order to minimize unknowns later in the project. Ma Dona Kaluzniak January 30,2002 Page 2 of 3 AGENDA ITEM 8A MARCH I1, 2002 1. EE will contract with a land surveyor to obtain right-of--way and topographical surveys for the project. EE will coordinate with the surveyor to obtain the required information for the design. EE personnel will convert the survey information into a usable format suitable for use in producing design drawings for the project. The surveyor will prepare a map and legal description for purchase of an easement over the existing water line and proposed sewer line between the homes on Francis Street. 2. EE will contract with a geotechnical engineering consultant to obtain soil borings for the project to determine the underlying soil conditions and any bedding prepazation that may be required. EE will coordinate with the geotechnical engineer to obtain the required information for the design. 3. EE will meet with representatives of the City and visit the site and determine a route required to complete the lines. 4. EE will make recommendations to the City's project manager with respect to specifics of the design including routes, locations, etc. Task II -Final Engineering & Permitting After the initial items are complete and the City and EE have an agreement for the specific design route and location, EE will begin fmal engineering that will consist of the following: 1. EE will design the sewer main for the proposed route chosen by the City of Atlantic Beach. We anticipate the plans can be accomplished on seven sheets (details, erosion protection, etc.). The design drawings will include: a) Horizontal and vertical location of the main; b) Existing features which must be avoided; c) Manhole locations; d) Material requirements; and e) Maintenance of Traffic. 2. EE will prepare quantity take-offs and engineer's opinion of probable costs. 3. EE will submit the plans and contract documents to the City for review and correct the plans as requested. We understand that the submittals will be at the following stagest 30%, 60%, 90% and 100%. Task IV -Route Survey See attached proposal from Ghiotto and Associates for land surveying services. EDWARDS ENGINEERING AGENDA ITEM 8A MARCH 11, 2002 Ms. Dona I{atuzniak -~ January 30,2002 Page 3 of 3 Task V - Geotechnical Investigation See attached proposal from Universal Engineering Sciences for geotechnical engineering services. FEES We have attached a detailed breakdown of anticipated hours for your reference. SCHEDULE We anticipate the survey and design time to be two to three months (for 90% submittal). This includes anticipating rapid turn-azound of the 30% and 60% reviews by the City. We understand that this project is being funded by CBDG funds and will meet the schedule for these foods. If you find this proposal acceptable, please indicate by issuing a purchase order under our master contract. If you have any questions, please call. Sincerely, EDWARDS ENGINEERING ~/ //~~~ /` Gray S. Edwazds, P.E. President Attachments: Proposal for land surveying (Ghiotto and Associates; Inc.) Proposal for geotechnical engineering services (Universal Engineering Sciences) EDWARDSENGINEERING EDWARDS ENGINEERING, INC. 9550 REGENCY SQUARE BLVD., SUITE 1118 JACKSONVILLE, FL 32225 (904) 725-4220 FAX: (904) 725-4219 SEWER EXTENSIONS Church Road from George Street to Mealy Street and and Do ra Drive East of Mayport Road, Small Creek to Francis Street HOURLY RATES Principal 41.67 Project manger 30.70 Design Engineer 26.52 DesignerRechnician 22.73 CADD 18.94 field Inspector 20.63 Clerical .13.26 TASK PRINCIPAL PROJECT DESIGN DESIGNER/ CADD FIELD CLERICAL TOTAL LABOR EXPENSES TOTAL MANAGER ENGINEER TECHNICIAN OPERATOR INSPECTOR HOURS COSTS COSTS Preliminary Engineering 4 - 8 8 2 22 1,623.38 7,823.38 Flnal Engineering 6 32 24 62 4,639.20 4,639.20 Permitting 4 4 337.70 337.70 Contract OOCUmants 8 8 16 967.12 967.12 SUBTOTAL 7,b8L40 Survey 6 508.55 4,900.00 5,406.55 Geatechnlcal 4 337.70 1,200.00 1,537.70 Sofl Dlge 2 168.85 1,500.00 1,668.85 Mlsc (Blueprints, mileage, elc.i 0.00 500.00 500.00 TOTAL 10 62 0 0 32 0 10 104 8,580.50 8,100.00 16,680.50 Gl t~1 z ~c x~ N F+ ~i O O ~ N AGENDA ITEM 8A MARCH 11, 2002 =GHIOT'O ':9 flSSOCI'flTES RDBECen~cdPdm ' h }ti .L ~: Taiinazy 3I, 2002 ~~~~,~.~~~~ Mr.~Gray.Edwazds „ FEB 1 0 2002 „` .Edwards Engmeeriiig ~~ --~. 9550 Regency Square Blvd. ---_.- "'a' :3Snite`1118 x~[:], r Jac~sonurlle, FL 32225 . 4i > ' RE ~ ~ ATLANTIC BEACH PROPOSAL ~~ t " ~~,~1~~CHURCH AND DORA STREETS txm ~ t ~„~~~ ~ ~z ,• x~`'~' ' ~Deart"Gray, ~~ ~~ ~~~`~``X~y` We ~~pleased to submit the following proposal for professional surveying and mapping ,~ ~`~ w ~ e~rv~ces on the abouerefexenced.prolects. #~~~ ~We4understand the s~~c,ope "of~serwices to be as follows , ~~~iz'`c f»-a wy. ~; ~~c$3~ ~. r ~„~-.,~,..'~" ""aav f"a`~ "' ,~ h~~ ~~" ; ~ ~,,~~~ Church~S~xeet, from Mealy Street to George Street, provide a topographic survey a~u,~.~~ ,~ ~, ~ showing the £ollowmg lnforniatron. „;yx~ ~*" ;~ > a) Locatron of all above ground features including such things as pavement, fences,'~bove~ground utilities, driveways, sidewalks, etc. ~~ s~~~~ ~~~~~ b) Cross-sections at 50 foot intervals. h ~ ~~~ = `- c) Coordinate with you andAi antic Beach Public Works to show location of underground utilities. From site. inspection, there appeazs to be a fiber optic cable runriingalong the southerly side' of the roadway for the length of the project. No `. other utilities were noticed.; d) Stake andreference a base hne,of survey for future construction. e) Location of an existing sanitary`manhole near the ball field in Donnor Park. r~' Information will also include mver~Celevations, pipe size and material. Provide topographic information on a path approximately 20 feet in width, from Church. ~ ~-'~:= St. to the manhole. f) Deliver signed and sealed prints of the survey along with an electronic copy of the suiey im a DWG format. TOTAL FEE -:$2,900.00 N fl T I 0 N H L L 4 C E R T I f l E 0 S U N V E 4 0 H S d M fl P P E R S 2426 PNI6IPS NW4. ~ .1OCN60NVILLE. FLOOIOO 32207 ~ [904j 006-0071 1 FOX [904] 006-7174 ~ WWW.GHIOTTO.COM Mr. Gray Edwards Edwards Engineering. Page 2 AGENDA ITEM 8A MARCH 11, 2002 2) Dora Street, from the creek crossing. east of Mayport ltd. to Francis St., provide a topographic survey showing the following information: a) Location of creek and culvert for a distance of 25 feet beyond edge of pavement north and south of Dora Street. b) Location of pavement of Dora Street c) Location of all above ground features along an existing foot path running southeasterly from the end of pauement, then easterly to Francis Street. Area of coverage shall be 50 feet, 25 feet each side of approximate centerline. d) Location of two residences. along the west side of Francis St. e) Location of topcgr~phic features within the right, of way. of Francis Street; 50 feet each side of where foot path enters Francis. f} Location of apparent property lines so that an easemerit description can be prepared for the proposed route. g) Location of existing sanitary manholes north and south of where foot path enters Francis St. h) Deliver signed and sealed prints of the survey along with an electronic copy of the survey in a DWG format. Also deliver a map and pazcel description of the proposed route suitable for recording. TOTAL FEE _ $2,000.00 I trust this is the information you need at this time. Thank you for another opportunity to work with you and your firm. Sincerely, GHIOTTO & ASSOCIATES, INC. ~2~~~ Philip M. Ghiotto President PMG/bp ~~~~ C.\DOCS\PROPOSAC.~adaMic beach EDWARDS ENG.wpd AGENDA ITEM 8A MARCH 11, 2002 UNIVERSAL ENGINEERING SCIENCES Consulten~ In: GeotechNcal Engineering • EnWronmEncal Sciences - OORStfUGtlOn MSeriak Testing -Threshold InspaRion January 23, 2002 Edwards Engineering, Inc. 9550 Regency Square Boulevard Suite 1118 Jacksonville, Florida 32225 Attention: Mr. Gray Edwards, P.E. OYCOS In • Jacksonville • Daytona Beach • DeBary • St. Augustine • OfWndo • Gainesville • Fort Myers • RocWcdgo • West Palm Beach • Ocala • Tdmpa • Mody+wod Subject: PROPOSAL FOR GE07ECHNICAL ENGINEERING SERVICES Church Street & Dora Street Gravity Sewer Atlantic Beach, Florida UES Proposal No. 2002)-036 Dear Mr. Edwards: As requested, Universal Engineering Sciences (UES j is pleae ell to provide this proposal to perform the geotechnical exploration and engineering sere ices for the subject project. PROJECT INFORMATION Project information wzs provided to us in yurtransmittal dated ,lanuary 21, 2002. We were provided with a copy of an Undated, untitled plan far the projE. ~t which shows the existing roadways adjacent to the site and the alignment of t ~e proposed water main improvements. We understand the proposed improvements wiliconsist of crmstructing a gravity-sewer along Church Street between Mealy Road and George Street along Dora Street from the creek crossing east of Mayport Road to Francis Street. The approximate lengths of the sewer lines will be 1,000 feet and 500 feet, respect)vely. PROPOSED GEOTECHNICAL EXPLOhtAT10N The objective of this geotechnical exploration is to provide suY!cient site and subsurface information to evaluate the subsurface conditions at the site with respect to the proposed water main construction. 5561 Florida Mining Boulevard South Jacksonville, Florida 32257 (90~+) 296-0757 Ft(X (904) 296-0748 AGENDA ITEM 8A MARCH 11, 2002 UES Proposal:No. 2002)-036 January 23, 2002 Field Exploration -Based on our understanding of the project information and as requested by Mr. Edwards, we propose to perform five aucler borings in the proposed construction areas {3 along Church Street and 2 along Dora Street) to depths of 10 feet. It is assumed the borings wilt not be performed through exis ing pavement. Laboratory Testing -Laboratory classification and index pro ~erty tests will be performed as necessary on selected snit samples obtained from the exl loration. The testing will be performed tc better define the materials encountered in the c-:xptoration and tU determine their strength/compressibility characteristics. ~naineering 5erviees - A geotechnical engineer, registere~,i in the State of Florida, will direct the geotechnical exploration and provide an engineerir 3 analysis and evacuation of fhe site and subsurface conditions with respect to the piannEd construction and imposed loading conditions. The results of the recommended exploration and engineering study will be presented in a report containing the foNowing: A brief discussion of our understanding of the l Manned construction. 2. A presentatien of the field and laboratory test pr ~cedures used and the data obtained. 3. A presentation of the subsurface conditions in,auding subsurface profiles, estimated seasonal high groundwater, an"i estimated geotechnical engineering properties (as necessary}. 4. A geotechnical engineering evaluation ofthe sits: and subsurface.conditions with respect to the planned construction. 5. Recommendations for site preparation and earthwork construction for the proposed constriction. COMRENSATION FORSERVPCES Based an the scope of the geotechnical exploration, the proposed laboratory testing, and the engineering services outlined above, we propose to r:omplete the geotechnical exploration and engineeringservicesforalumpsumfeeof51,204.00. Wewillcontactyou immediafely if we encounter subsurface conditions which could require (1) the borings to be performed to deeper depths, {2) additional borings or of rer field testing, and/or (3) additional engineering analysis/evaluation and studies outside' the scope of this proposal. Attached is the Fee Schedule (Exhibit 1) with the applicable :.mit rates for this project. AGENDA ITEM SA MARCH 11, 2002 SCHEDULING AND AUTHORIZATON UES Proposal No. 2002)-036 January 23, 2002 We can initiate the geotechnical exploration within five days r) `notification to proceed with the field work to be completed in one day. As soon as all fle'~d and laboratory tests have been completed and reviewed by the geotechnical enclineer, .verbal results and recomm endations can be provided. The written report shoulc then be available within two weeks of formal authorization to proceed. We have inGuded a short form authorization agreement. In order to authorize these services, please execute this document and return one copy to our office. We appreciate this opportunity to provide this proposal tc~ perform the geotechnicai exploration forthis project. if you have any questions concern Ong this proposal ar if we can serve you in any other way, please contact us. Respectfully submitted, UNIVERSAL 1~NCyINEERWG SCIENCES ~~(~~ Stephen R. Weaver, P.E. Senior Engineer SRW/JSPJam attachments J re .Pruett PG~ E~ " Y S~ Branch Manager i ~t I AGENDA ITEM 8A MARCH 11, 2002 EXHIBIT I Geotechnical Exploration Propo:-.al Church Street and Dora Street Gravitiar Sewer Atlantic Beach, Florida UES Proposa{ No. 2002)-036 January 23, 2002 ~, /~M`6 fi~ Y ~a/F YS` fHy. YSP~1 ~ ~AK ~ hAr' fA~~ir~ 44iS ~~.~ S ~~f N ~' L%~~ Gt" ry r°~' %h'.H1R 14.19+ ~ Z ~`S /L P% 94~ ` 6 + ~1 ~ ~ ry ~y '1 , a~ f[ ~ ~ . >x+t S . (d\ L 3 F' L% ., tY Z, yy X'Sg4~ <F P': Y!!yKyk ( ~.~y F fi A~~y~~ W .'t 4 4 I74~ '~~ i r y~/I t ~µ d~ ~i/ ~ i ~ lk~ ~ ~ ~ '~~ ~ ' ~ " ' :w a . h i .•`; 1~ Ww y fi 3 A «~F f~,x y +? o L i >' a>zq .' 'F ~15 .t „A.~. .ray ~S <5 ,o.e . ~i' „"rc' ~ a 7 ? r , '~ . . . ., .. . .. . . .< . . . PROFESSIONAL SERVICES Senior Project Engineer 5 hours $80.00 $400.00 Technical Secretary 1 hours $30.00 $30.00 Drafting 2 hours ~ $35.00 $70.00 fi,Z .yd;' it Le ~p3 fi's-fi'~~ ~ S' S r q .~ N.Su~ ii y.ux ~,Y4 r uK 5rln'T '~' s~"x"a ~u'Y`Y~~ T '<+ti ' ~ » " ~ ~ , p a ~~.'PT: n 7 t. " ++ Y'}".'~ ar`3 ]>< c T~"" ~ t S k ~ . , i s u aN, s.,. .... t.,,~ u ., ,Z:.'+ 7, .n.t.,.~~< x ..a"a,:,..,t . s.: «.'~.7 :.,+s a~>;u ~.,«rf. a': DRILLING SERVICES Mobilization 1 each $200.00 $200.00 Auger Borings (5@10 ft.) 50 feet $7.00 $350,00 t.ub x$'~'S IM~a' y £ ..~ n K 9 ~'~ yVf'~Y 4.., rS, ~~€s.~..'.~ i j Y'l ,;Y> Y ..v:~M l^.. .~ {4A i ~'>~ W is T ~ r t .t., 3 '`:+r r ~rb~ot ~":t. ,~ ~~ a «c ~ ~>v ' 'G' 2 $' rl~ ~ 5 r ' . n ~ ~. f€, ~,.; a w € ~ i. ~ u ..t<.x„ CY, i~ ,aku <..~ ~,. ,:'io r~a.C ,{. E+t< +` sir .k=ayo ~ ~ i. , . LABORATORY TESTING Index Testing 1 lu mp sum $150.00 $150.00 ryry ~IAPW... yM?pi"4M ~ ~~. ~N ~S ~w~q"~dJ+.AM '3. /u M' hE1<y f~^~aF >Hw'.k uf, $Y~J~i fiW~)~k )•~5 {rte Hk~M(tfi` S ft. €~~aN. /n W 4 , ~' ~~4 ~ pp .~`Yi N // ^~i(~ #4 f 1 p ~ }G/f u~+ani ~ ~/ nc [ ' ~ t~ ~ ~ ~ d ~~ •~; Y9 f~Pgnx3 ~ k € ~~~~ ~ c y~ ~ A k,~ W , , . k ~ ! i J~ AOI~. M lY'~' $° '~ Lwws k a"HY S?? ~Yr"~ ~" T ' /S el tla»1 4q fi e/~11 TM„S '~°'„s~r 1e ~ ~?°u i:~~ u kt F R ~ p '~W^' S 4+++tt iY N . n . : . . . .1 , ~ .~+M«+~.. ~ ~.iu~' uw«a.. "°'°"~ m 7 "w&S.e,n'Sw 4 , .. . .: y~. n aRh