Loading...
1 Ocean Blvd. COMM18-0037 dwgs 4CFCI I H-01 BD I SHOWER DOOR— DOOR PANEL 1 r OME ROOM LOCKE CFCI FINISH RESP. OFCI CFCI CFCI CFCI CFCI CFCI OFCI SCHEDULE CATS GORY 1 WOMEN'S LOCKE' ROOM M—PRINT LAMINATE SHOWER: VIF FIXED PANEL DIM: 30-1/8" X 95-7/16" X 7/16" SGP LAMINATED DOOR, WITH M3 EDGE ON EACH SIDEGLASS FINISH— — LO IRON WITH M—PRINT, WHITE GRADIENT (400%-3'/200%-4'/100%-5'/CLEAR ABOVE CFCI H-03 SHOWER DOOR SYSTEM— SEAL FRAMELESS SHOWER SYSTEM— U CHANNELS FRAMELESS SHOWER SYSTEM— HINGES LOCATION LOCKER ROOM MANUFACTURER HORIZON TILE SPECIFICATION /DESCRIPTION HIT 92, WHITE. SMOKE,. DIM: 6" X 36", DCOF: DRY: 0.42, WET: 0.66, USE WITH CUSTOM BUILDING PRODUCTS FUSION PRO SINGLE COMPONENT GROUT #380 REMARKS INSTALL PARALLEL TO VANITY .WITH 1/3 OFFSET,. .CONTACT:. AMBER JONES 214-741-4447 TAG MATERIAL WOMEN'S FLOOR TILE FLOORING TI —01 CFCI WOMEN'S LOCKER ROOM WOMEN'S LOCKER ROOM WOMEN'S LOCKER ROOM WOMEN'SLOCKER WOMEN'S LOCKER :ROOM WOMEN'S LOCKER ROOM SCHLUTER GC'S CHOICE GC'S CHOICE GC'S CHOICE CAMBRIA PANTHEON TO MATCH EXISTING TO MATCH EXISTING TO MATCH EXISTING LAMINATE AT LOCKER ROOM VANITY WHITEHALL, 2CM SLAB, FLAT EASED EDGE 360-2001 PLAYGROUND, WHITE GLOSSY, DIM: 8" X 24", USE WITH CUSTOM BUILDING PRODUCTS FUSION PRO SINGLE COMPONENT GROUT #381 FRAMELESS SHOWER SYSTEM- CLAMPS TR -01 FLOOR TRANSITION PAINT @ WALLS PAINT @ CEILING LAMINATE QUARTZ COUNTERTOP TILE @ SHOWER SIDE WALLS CFCI PAINT PT -01 2 WOMEN'S LOCKE ROOM PT -02 CAULK TO MATCH SOLID SURFACE COLOR, CONTACT: COURTNEY TORNBLOM 972-462-0132 INSTALL VERTICALLY WITH 1/3 OVERLAP ON SIDE WALLS, CONTACT: STEVE LANDRY 469-417=9225 SOLID SURFACE PL -01 SS -01 GPM, CHROME TI -02 OFCI WALL TILE TI -03 TILE @ SHOWER BACK WALLS AND CEILING WOMEN'S LOCKER ROOM HORIZON TILE HIT 74, PATTERN: PALMS GLASS TILE, COLOR: SPRING, FROSTED, DIM: 9.25" X 11.75" MESH MOUNTED, USE WITH CUSTOM BUILDING PRODUCTS FUSION PRO SINGLE COMPONENT GROUT #381, BRIGHT WHITE INSTALL CORNER TO CORNER ON BACK WALL CONTACT: AMBER JONES 214-741-4447 U CFCI WOOD WD -01 TEAK WOOD WOMEN'S LOCKER ROOM WEST MARINE 1-3/16"W x 3/8"D x 42" L TEAK BATTENS, TREATED TO BE WATER RESISTANT` STANDARD + STEAM ROOM DOOR HARDWARE RESP. TAG ITEM QTY. LOCATION MANUFACTURER MODEL/DESCRIPTION REMARKS M—PRINT LAMINATE SHOWER: VIF DOOR DIM: 36" X 95-7/16" X 7/16" SGP LAMINATED DOOR, WITH M3 EDGE ON EACH SIDE, FINISH: LOW IRON WITH M—PRINT; WHITE GRADIENT (400%-3'/ 200%-4'/ 100%-5'/ CLEAR ABOVE NO SUBSTITUTIONS ON VENDOR M3 GLASS TECHNOLOGIES CONTACT: JOSH PRIMMER, (972) 837-8844 CFCI 1 SHOWER DOOR— DOOR PANEL 1 WOMEN'S LOCKER ROOM M3 GLASS TECHNOLOGIES H -01A CFCI I H-01 BD I SHOWER DOOR— DOOR PANEL 1 r OME ROOM LOCKE CFCI H-02 SHOWER DOOR— FIXED PANEL 1 WOMEN'S LOCKE' ROOM M—PRINT LAMINATE SHOWER: VIF FIXED PANEL DIM: 30-1/8" X 95-7/16" X 7/16" SGP LAMINATED DOOR, WITH M3 EDGE ON EACH SIDEGLASS FINISH— — LO IRON WITH M—PRINT, WHITE GRADIENT (400%-3'/200%-4'/100%-5'/CLEAR ABOVE CFCI H-03 SHOWER DOOR SYSTEM— SEAL FRAMELESS SHOWER SYSTEM— U CHANNELS FRAMELESS SHOWER SYSTEM— HINGES 3 WOMEN'S LOCKE ROOM 3/8" FOR FOR 7/16" GLASS, FINISH: CHROME PLATED VIF 4 WOMEN'S LOCKE ROOM WOMEN'S LOCKE ROOM CFCI H-04 HAFELE CFCI H-05 CFCI H-06 FRAMELESS SHOWER SYSTEM- CLAMPS 3 WOMEN'S LOCKE ROOM CFCI H-07 FRAMELESS SHOWER SYSTEM- DOOR PULLS 2 WOMEN'S LOCKE ROOM NO SUBSTITUTIONS ON; VENDOR M3 GLASS TECHNOLOGIES CONTACT: JOSH PRIMMER, (972) 837-8844 NO SUBSTITUTIONS ON VENDOR M3 GLASS TECHNOLOGIES CONTACT: JOSH PRIMMER, (972) 837-8844 STEAM ROOM PLUMBING SCHEDULE RESP. M—PRINT LAMINATE SHOWER: VIF DOOR DIM: 30-3/4" X 95-7/16" X 7/16" SGP LAMINATED DOOR, WITH M3 EDGE ON EACH SIDE, GLASS FINISH- LOW IRO WITH M—PRINT, WHITE GRADIENT (400%-3'/ 200%-4'/ 100%-5'/ CLEAR ABOVE TAG M3 GLASS TECHNOLOGIES M3 GLASS TECHNOLOGIES M—PRINT LAMINATE SHOWER: VIF FIXED PANEL DIM: 30-1/8" X 95-7/16" X 7/16" SGP LAMINATED DOOR, WITH M3 EDGE ON EACH SIDEGLASS FINISH— — LO IRON WITH M—PRINT, WHITE GRADIENT (400%-3'/200%-4'/100%-5'/CLEAR ABOVE LOCATION HAFELE PRODUCT 950.06.680 MODEL/DESCRIPTION GC'S CHOICE 3/8" FOR FOR 7/16" GLASS, FINISH: CHROME PLATED HAFELE 981.53.152, WALL TO GLASS HINGE, 90 DEGREE, FINISH: CHROME PLATED 0 HAFELE 981.53.152, WALL TO GLASS CLAMP SQUARE, FINISH: CHROME PLATED HAFELE 903.01.992, PULL HANDLE SET, STAINLESS STEEL POLISHED NO SUBSTITUTIONS ON; VENDOR M3 GLASS TECHNOLOGIES CONTACT: JOSH PRIMMER, (972) 837-8844 NO SUBSTITUTIONS ON VENDOR M3 GLASS TECHNOLOGIES CONTACT: JOSH PRIMMER, (972) 837-8844 STEAM ROOM PLUMBING SCHEDULE RESP. TAG ITEM QTY. LOCATION z MANUFACTURER MODEL/DESCRIPTION 0 WOMEN'S LOCKER PART # 26253001, RAINDANCE E 400 SQUARE 1—JET SHOWER HEAD TRIM, 2.0 CFCI P-01 SQUARE OVERHEAD RAINSHOWER 1 ROOM HANSGROHE GPM, CHROME P—Ota RAINSHOWER ROUGH 1 WOMEN'S LOCKER HANSGROHE PART # 26254181, FEATURES 1" NPT U CFCI ROOM WOMEN'S LOCKER PART # 10751001, AXOR STARK SHOWER COLLECTION THERMOSTATIC CFCI P-02 3—FUNCTION SHOWER CONTROLS 1 ROOM HANSGROHE 3—FUNCTION TRIM MODULE, 15" X 5", CHROME WOMEN'S LOCKERPART # 10750181, AXOR SHOWER COLLECTION ROUGH, THERMOSTATIC CFCI P -02a SHOWER CONTROL ROUGH VALVE 1 ROOM clw HANSGROHE 3—FUNCTION MODULE, 15" X 5" c WOMEN'S LOCKER PART # 27636000,, UNICA RAINDANCE S WALLBAR;; 36", CHROME, INCLUDES CFCI P-03 WALL BAR 1 ROOM HANSGROHE TECHNIFLEX 63" HOSE WOMEN'S LOCKER PART # 36732001 AXOR SHOWER SOLUTIONS SQUARE WALL OUTLET WITH CFCI P -03a HOSE OUTLET @ WALL BAR 1 ROOM HANSGROHE CHECK VALVE, CHROME w CFCI P -03b HANDSHOWER @WALL BAR 1 WOMEN'S LOCKER HANSGROHE PART # 28514001 RAINDANCE S 1.20 3—JET HANDSHOWER, 2.5 GPM, CHROME ROOM WOMEN'S LOCKERHANSGROHE PART # 28491001, AXOR SHOWER COLLECTION SHOWER MODULE TRIM, 5" X CFCI P-04 SHOWER SPRAY MODULE 3 ROOM 5", CHROME m w WOMEN'S LOCKER PART # 28486181, AXOR SHOWER COLLECTION ROUGH SHOWER MODULE, 5" X CFCI P -04a SHOWER SPRAY ROUGH 3 ROOM HANSGROHE 5 o F77--tt CFCI P-06 STEAM GENERATOR 1 WOMEN'S LOCKER 0 THERMASOL PRO -395 PRO SERIES STEAM GENERATOR z ROOM CFCI P -06a STEAM CONTROL 1 WOMEN'S LOCKER THERMASOL MTMR—PC MICROTOUCH SERIES CONTROL ROOM CFCI P -06b STEAM VALVE 1 WOMEN'S LOCKER THERMASOL INCLUDED WITH STEAM CONTROL ROOM CFCI P-07 WALL NICHE 1 WOMEN'S LOCKER TILE REDI REDI NICHE MODEL RN1614S—BI, DIM: 16''X14" ROOM CFCI P-08 WALL DRAIN SYSTEM 1 WOMEN'S LOCKER QUICK DRAIN USA WALLD72 WALL DRAIN SYSTEM, . LENGTH ADJUSTABLE FROM 26-72" ROOM STANDARD SHOWER PLUMBING SCHEDULE WOMEN'S LOCKERPART # 10751001, AXOR STARK SHOWER COLLECTION THERMOSTATIC CFCI P-02 3—FUNCTION SHOWER CONTROLS 1 ROOM HANSGROHE 3—FUNCTION TRIM MODULE, 15" X 5", CHROME WOMEN'S LOCKERPART # 10750181, AXOR SHOWER COLLECTION ROUGH, THERMOSTATIC CFCI P -02a SHOWER CONTROL ROUGH VALVE 1 ROOM HANSGROHE 3—FUNCTION MODULE, 15" X 5" WOMEN'S LOCKER PART # 27636000;, UNICA RAINDANCE S WALLBAR, 36" CHROME, INCLUDES CFCI P-03 WALL BAR ROOM HANSGROHE TECHNIFLEX 63" HOSE WOMEN'S LOCKERPART # 36732001 AXOR SHOWER' SOLUTIONS SQUARE WALL OUTLET WITH CFCI P -03a HOSE OUTLET @ WALL BAR 1 ROOM HANSGROHE CHECK VALVE, CHROME CFCI P -03b HANDSHOWER @ WALL BAR WOMEN'S LOCKER HANSGROHE PART # 28514001 RAINDANCE S 120 3—JET HANDSHOWER, 2.5 GPM, CHROME ROOM WOMEN'S LOCKER PART # 28491001; AXOR SHOWER COLLECTION SHOWER MODULE TRIM, 5" X CFCI P-04 SHOWER SPRAY MODULE 3 ROOM HANSGROHE 5", CHROME WOMEN'S LOCKER PART # 28486181, AXOR SHOWER COLLECTION ROUGH SHOWER MODULE, 5" X CFCI P -04a SHOWER SPRAY ROUGH 3 ROOM HANSGROHE 5„ P-05 RAINDANCE SHOWER HEAD 1 WOMEN'S LOCKERROOM HANSGROHE PART # 27495001, RAINDANCE S SHOWERHEAD 150 3—JET, 2.5GPM CFCI CFCI P -05a STANDARD SHOWER ARM 1 WOMEN'S LOCKER HANSGROHE PART # 04186003, CHROME," NPT ROOM CFCI ( P-07 WALL NICHE 1 WOMEN'SLOCKER TILE REDI REDI NICHE MODEL RN1614S—BI, DIM: 16"X14" CFCI P-08 ` WALL DRAIN SYSTEM 1 WOMEN'S LOCKER QUICK DRAIN USA WALLD72 WALL DRAIN SYSTEM, LENGTH ADJUSTABLE FROM 26-72" ROOM ADA RESTROOM EQUIPMENT SCHEDULE ITEM OTY. LOCATION MANUFACTURER MODEL/DESCRIPTION RESP. TAG CFCI P-20 ADA RESTROOM SINK 1 WOMEN'S LOCKER ROOM KOHLER K-5400, IRON PLAINS UNDERMOUNT BATHROOM SINK, WHITE, DIM: 17.5"x14.75" STANCE SINGLE HANDLE FAUCET, POLISHED CHROME, DIM: 5-5/16"x 8-1/2"x CFCI P-21 ADA RESTROOM FAUCET 1 WOMEN'S LOCKER ROOM KOHLER 2-5/8 EQ -01 36" GRAB BAR 1 WOMEN'S LOCKER WINGITS INFINITE ELEGANCE, 36" GRAB BAR BLOCKING AS REQUIRED CFCI ROOM CFCI EQ -02 42" GRAB BAR 1 WOMEN'S LOCKER WINGITS INFINITE ELEGANCE, 42" GRAB BAR BLOCKING AS REQUIRED ROOM LOCKER ROOM VANITY PLUMBING SCHEDULE CFCI P-09 VANITY SINK 2 WO=MEN'SM LOCKER KOHLER K-5400, IRON PLAINS UNDERMOUNT BATHROOM SINK, WHITE, DIM: 17.5"x14.75" WOMEN'S LOCKER STANCE SINGLE HANDLE FAUCET, POLISHED CHROME, DIM: 5-5/16"x 8-1 J2"x CFCI P-10 VANITY FAUCET 2 ROOM KOHLER 2-5/8 LOCKER ROOM EQUIPMENT SCHEDULE WOMEN'S LOCKER CB2231870, 36"X36" ACCESS DOOR, DRYWALL BEAD FLANGE, CAM LATCH, CFCI EQ -03 ACCESS PANEL 1 ROOM GLOBAL INDUSTRIESTWWHITE LOCKER ROOM CASEWORK SCHEDULE REMARKS REMARKS MUST PROVIDE REQUIRED ADA CLEARANCES BENEATH. SEE CFCI CW -01 VANITY CASEWORK WOMEN'S LOCKER 1 ROOM BY GC 42"W x 24"D OVERALL, VANITY HEIGHT TO BE 34" WITH NEW COUNTERTOP 10/A2.0 FOR DETAILS. CFCI CW -02 SHOWER SEAT 1 WOMEN'S LOCKER BY GC WALL MOUNTED BENCH, DIM: 42"W x 24"D ROOM CW -02 HARDWARE SCHEDULE WOMEN'S LOCKER RAKKS EHB INSIDE WALL BENCH BRACKET CFCI HW -01 SUPPORT BRACE 1 ROOM CFCI[HW-02 SCREWS 1 WOMEN'S LOCKER GC'S CHOICE MARINE GRADE SCREWS ROOM —00 -00 F— ° W V N U- 'o -°c N � T CC = a O Q o m � � yo Lw oc 800 w. 18-047 CHECKED BY AEF/SHG DRAWN BY LAP SHEET TITLE SCHEDULES SHEET NO. �� i CL z 0 rr D f U o 18-047 CHECKED BY AEF/SHG DRAWN BY LAP SHEET TITLE SCHEDULES SHEET NO. �� i z 0 U o clw c 0 w 0 w cn m w � o F77--tt 0 z 18-047 CHECKED BY AEF/SHG DRAWN BY LAP SHEET TITLE SCHEDULES SHEET NO. �� i STEAM GENERAT0 WITH INTEGRAL SAFE PAN 1/2" V RA rr I --� 1 /2" C W I 3/4" DRAIN 3" WASTE RECEPTOR 1 1/2" W TO BURIED STEAM SANITARY LINE HEAD NOTE: REFER TO MANUFACTURER'S INSTALLATIONS INSTRUCTIONS FOR RECOMMENDATIONS ON PIPING, INSULATION, ETC. 1" CW (15 FU) 1" HW (15 FU) 1 /2„ 112" I- WALL 3/477 OUTLET SHOWER W/VB HEAD CO 4" W (6 DFU) HAND(3) SHOWER 2" 2" SHOWER 7'SPRAY MODULES WALL 1 /2AND TRIM U U DRAINS „ NOTE: CONNECT TO NEAREST EXISTING THERMOSTATIC 3 -FUNCTION ADEQUATELY SIZED WASTE AND VENT MODULE AND TRIM PIPING. PROVIDE CLEAN—OUTS AS REQUIRED BY CODE. 2 SHOWER PIPING PLAN A5.0 SCALE NTS 1 1„ CW (15 FJ) , 1" HW (15 FJ) E 1/2" V 1/2 WALL 3/4 OUTLET RAIN _ W/VB HEAD I CO 4" W (6 DFU) HAND (3) SHOWER 2" 2" SHOWER SPRAY MODULES WALL AND TRIM U U DRAINS 1/2)) NOTE: CONNECT TO NEAREST EXISTING THERMOSTATIC 3—FUNCTION ADEQUATELY SIZED WASTE AND VENT MODULE AND TRIM PIPING. PROVIDE CLEAN—OUTS AS REQUIRED BY CODE. STEAM SHOWER PIPING PLAN A5.0 SCALE : NTS SEAL:ti, �E OF c' P'GE M-94 001693 r G� lei) AR 07 a no o� =x z a N. W ULL ccs°a ° y� wo0 o� 0� L000 0 W o Q V) 0 M ® = �M N z Q W —j J U- -17 OQ V V) CO Q W � z � w Z Lu U Q U W ® � U z 0 W < � w W ® E - z ,o Q O SEAL:ti, �E OF c' P'GE M-94 001693 r G� lei) AR SHEET NO z a o w clOf0 0 w cn � w ,o 0 z 18-047 CHECKED BY AEF/SHG DRAWN BY LAP SHEET TITLE PIPING PLANS SHEET NO DE5GRIPTION OF WORK - PLUME5ING PLUMDING SYMDOL L15T GENERAL NOTE5 - ALL C:ONTRAGTOR5 ----1 UNDERGROUND SANITARY SEWER RD ROOF DRAIN pROVIpE COMPLETE PLUMBING 5Y5TEM READY FOR U5E A5 ITEMIZED, BUT NOT LIMITED TO, A5 FOLLOW5: ---11 UNDERGROUND 5TORM 5EWER FD FLOOR DRAIN I. MAWINC75 ARE GENERALLY DIAGMtvtATIG. ROUTING OF PIPING, DUCTWORK, CONDUITS, DEMOLITION, REMOVAL, AND ALTERATION5 OF EXISTING 5Y5TEM5 AND EQUIPMENT A5 REQUIRED, THOUGH NOT 5U5PENDED SEWER D5 DOWN5POUT RACEWAYS, ETC, A5 SHOWN ON DRAWINGS, DOES NOT INTEND TO SHOW EVERY RISE, DROP, SPECIFICALLY INDICATED, TO AGCOMMOPATE THE PROPOSED WORK. 5EE ARCHITEGTUI2AL DRAWINGS FOR — _ _ _ _ HB H05E BIB OFFSET, FITTING NOR EVERY STRUCTURAL ELEMENT THAT MAY BE ENCOUNTERED DURING EXTENT OF DEMOLITION AND FIELD VERIFY EX15TING CONDITICN•15. — — VENT THE IN5TALLATION OF TH15 WORK. I;ONTRACTOR 5HALL MAKE ANY REQUIRED CHANGES GOLD WATER 5F SILL FAUCET FROM THE GENERAL ROUTING SHOWN ON THE5E DRAWING5, 5UGH A5 OFF5ET5, BEND5 OR VVA5TE ANL) VENT PIPING 5Y5TEM WITH CONNECTION TO EVERY FIXTURE AND DEVICE. — — — — HOT WATER WM WA5HING MACHINE GHANGE5 IN ELEVATION DUE TO GO()RDINATION WITH THE WORK OF OTHER TRADES AND HOT WATER RETURN ©W DISHWASHER BUILDING CON5TRUGTION. ALL C SE5 5HALL BE MADE WITHOUT ADDITIONAL C05T TO THE HOT AND COLD WATER PIPING 5Y5TEM WITH CONNECTION TO EVERY FIXTURE AND DEVICE. GATE VALVE 015P D15PO5AL OWNER OR DELAY IN COMPLETION DATE OF THE PROJECT. 051) OPEN 51TE DRAIN T 15 INTENDED THAT EQUIPMENT 5H0.LL BE LOCATED 5YMv1ETRICALLY WITH THE PLUMBING FIXTURES, DEVICES, AND EQUIPMENT. SEE ARCHITECTURAL DRAWINGS FOR SpEGIFIGATl�15. N CHECK VALVE F5 FLOOR SINK 2 I ICI BALANCING COCK Q oo s ARCHITECTURAL ELECD MENT5 OF THE INUILDING, NOTWITHSTANDING THE FACT THAT LOCATIONS THERMAL IN5ULATION. IFl BUTTERFLY VALVE UR URINAL INDICATED BY THE5E DRAWING5 MAY BE D15TORTED FOR CLEARNE55 OF PRE5ENTATION. I I UNION MOP BASIN Q "� L sa m RECEIVE AND INSTALL STEAM GENERATOR AND RELATED ACCE55ORIE5. BALL VALVE wB WASHER BOX 3. CONTRACTOR SHALL CHECK DRAWINGS OF OTHER TRADES t0 VERIFY THAT 5PACE5 IN H5 HAND 51NK OF WHICH THEIR WORK WILL BE INSTALLED ARE CLEAR OF OB5TRUGTION5. WORK SHALL BE VTR VENT THRU ROOF ~ o IN5TALLED TO MAINTAIN MAXIMUM HIEADROOM AND 5PAGE CONDITION AT ALL POINTS IN THE WG WATER CLOSET FD/F FLOOR DRAIN WITH FUNNEL < °o ICN�IDITION5 APPEAR INADEQUATE, CONTRACTOR L LAVATORY DRINKING FOUNTAIN BUILDING. WHERE HEADROOM OR 5F'ACE CQ SHALL NOTIFY ARCHITECT/ENGINEEK". BEFORE PROCEEDING WITH THE INSTALLATION OF THEIR FDT FOOTING DRAIN TILE `` BT BATH TUB WORK.RELATED WORK DY OTHER TRADE5 TMV THERM05TATIG MIXING VALVE < 5H 5HOWER 4. CONTRACTOR SHALL FURNISH OTHE6? TRADE5 ADVANCE INFORMATION AND/OR 5HOP SCAM GENERATOR AND RELATED AGGE550RIE5. K5 KITCHEN 51NK GT GREASE TRAP Ln No MAWING5 ON LOGATION5 AND 51ZE5 OF PIPING, DUCTWORK, CONDUIT, RACEWAYS, 55 5ERVIC;E 51NK WH WATER HEATER w EQUIPMENT, FRAMES, BOXE50 5LEEVES AND OPENINGS, ETC. NEEDED FOR THEIR WORK TO ELECTRIC POWER WIRING. 5 51NK IM ICE MAKER cc oco PERMIT OTHER TRADES AFFECTED TO IN5TALL THEIR WORK PROPERLY AND WITHOUT DELAY. EWG ELECTRIC WATER COOLER 5P 5AFE PAN 0 `° 5. WHERE THEM 15 EVIDENCE THAT W(N2K OF ONE TRADE WILL INTERFERE WITH WORK OF LT LAUNDRY TUB FU/WSFU WATER SUPPLY FIXTURE UNITS uj O OTHER TRADES, ALL TRADE5 SHALL MEET ON JOB 51TE To WORK OUT SPACE CONDITION5 GO GLEANOUT DFU DRAINAGE FIXTURE UNITS AND MAKE 5AT15FACTORY ADJU5TMENT5 TO IN5TALLATION OF THE NEW WORK. REF REFRIGERATOR GONTRACToR5 SHALL VERIFY EXACT LOGATION5 OF ALL DEVICES AND EQUIPMENT WITH PLUMDING IN5TALLATION NOTE5 wco WALL CLEANOUT CONDITIONS, SHOP DRAWING5, AND WORK of OTHER TRADE5 PRIOR TO ROUGH-IN. XXX EQUIPMENT TAG - SEE SCHEDULE FIELD ON KITCHEN DRAWINGS CONTRACTOR SHALL BE RE5PON51B'ILE, At HI5 OWN EXPENSE, FOR THE REMOVAL AND pROp05AL SHALL INCLUDE SPECIFIED MATERIAL5 ONLY. SHOULD THE CONTRACTOR W15H TO 5UB5TITUTE REINSTALLATION OF ANY PART OF THEIR WORK IF 5AME WA5 IN WITHOUT MATERIALS, EQUIPMENT OR MANUFACTURER5, IT SHALL BE DONE BY STATING EACH 5UB5TITUTION AND ITS DEFINITIONS CON-51-11-TING WITH OTHER TRA5 BEFORE IN5TALLING THEIR WORK. PRICE ADJUSTMENT. b CONTRACTOR SHALL PROVIDE 5LEE1&5 IN 15EAM5, FLOOR5, GOLUMJ5 AND WALLS A5 5HOWN WORK15HALL BE PERFORMED IN ACCORDANCE WITH CoDE5 AND AUTHORITIE5 HAVING JURISDICTION INCLUDING 015GONNEGT ON THE DRAWING5, A5 REQUIRED BY JOB 51TE GONDITION5, AND/OR A5 5PEGIFIED, WHEN ADA GUIDELINES. IN5TALLING THEIR WORK. ALL BEAMLS AND GOLUMN5 WHICH ARE REQUIRED TO BE 5LEEVED D15GONNEGT EQUIPMENT/DEVIGE CONNECTION. WITHDRAW 5ERVICE(5) BEYOND 0. 5HALL BE CUT AND REINFORCED AG REQUIRED BY FIELD GONDITION5 AND LOGATION5 AND W� 5HALL BE PERFORMED IN A NEAT WORKMANLIKE MANNER. ADJACENT SURFACE AND GAP. ALLOW ENOUGH ROOM TO FINISH OPENING SIMILAR 51ZE5 5HALL BE CHECKED AND APPROVED BY ARCHITECT BEFORE CONTRACTOR CUTS ANY TO ADJACENT 5URFAGE. 5ERVICE(5) THRU FLOOR 5HALL BE WITHDRAWN INTO V) 5TRUGTURAL BUILDING MEMDER. PROCURE REQUIRED PERMIT5 AND IN5PECTION5. 5PAGE BELOW. 5ERVICE(5) THRU CEILING SHALL BE WITHDRAWN INTO CEILING FOR THE IN5TALLATION OF ALL WORK SHALL BE COORDINATED BETWEEN TH15 TRADE 5HALL DO ITS OWN GUTTING AND PATCHING -TRENCHING AND BACKFILLING. 5PAGE. GAP 5ERVICE(5) EXCEPT WHERE IT 15 5 IT EXTENDED FORA NEW ® ® M 7 THE SEQUENCE SERVICE CONNECTION. DOMESTIC WATER AND SANITARY PIPING DEAD ENDS SHALL /// GONTRAGTOR AND IN STRICT ACCORDANCE WITH ARCHITECT/ENGINEER AND OWNERS BE LIMITED TO 2'-0" (MAX). REMOVE 5LEEVE5 WHERE THEY EXI5T AND HOLES Z N STIPULATION A5 CALLED FOR IN THE 5PECIFICATION AND/OR A5 DIRECTED. CONFER WITH THE OTHER TRADES IN THE COORDINATION OF TH15 WORK. FOR GLEAI2ANGE5, CHA5E5, RECE55E5 FILLED AND FIN15H REPAIRED BY THE GENERAL CONTRACTOR. CONDUIT IN 5LAB5 Q N AND OPENINC75 REQUIRED. 5HALL BE CUT OFF BELOW ADJACENT FIN15H AND 5HALL HAVE WIRING WITHDRAWN > M B. CONTRACTOR 5HALL REFER TO THE ARCHITECTURAL AND 5TRUGTURAL CONTRACT TO NEXT AGCE551BL.E OPENING WHERE OTHER EQUIPMENT OR DEVICES ARE W J DRAWING5 (BEFORE SUBMITTING H15 BID) TO FAMILIARIZE HIMSELF WITH THE EXTENT OF THE -MESE MAWING5 ARE TO BE U5ED FOR BIDDING ONLY. ROUGH-W AND FINAL CONNECTION 5HALL BE MADE 5ERVED OR TO THE PANEL WHERE ONLY TH15 EQUIPMENT/DEVIGE 15 SERVED. GENERAL CONTRACTOR WORK, CEILING HEIGHTS AND CLEARANCE FOR INSTALLING HIS WORK. FROM APPROVED EQUIPMENT DRAWING5 ONLY. "J � CONDUIT AND WIRING ABOVE GRADE 5HALL BE REMOVED BACK t0 PANEL OR D 9. GONTRAGrOR 5HALL BE RE5PON511 fl E FOR ALL GORING, GUTTING, PATCHING, REPAIRING, GUARANTEE THE WORK TO BE FREE FROM DEFECTIVE WORKMAN5HIP AND MATERIALS FOR A PERIOD OF ONE (1) POINT OF ORIGIN. 0 0 REFINISHING AND 12F OF OF NEW OR EXISTING BUILDING CON5TRUGTION YEAR FROM DATE OF FINAL CERTIFICATE. ANY REPAIRS OR REPLACEMENT DURING TH15 PERIOD 5HALL BE MADE IN MULTI-TENANT BUILDINGS WHERE 5ERVIGE5 ARE CONTINUED INA 5PAGE 0R `% REQUIRED TO ACCOMMODATE THE 1415TALLATION OR REMOVAL OF THEIR WORK. ALL WITHOUT C05T TO THE OWNER. 5PACE5 THAT ARE PART OF ANOTHER TENANT, REMOVE 5ERVICE(5) TO IT5 W m Q PATCHING, REPAIRING AND REFINI51AING WORK 5HALL BE PERFORMED BY TH05E REGULARLYZ LU INVOLVED IN THAT TRADE AND 5HALL MATCH THE ADJACENT GON5TRUGTION A5 CL05ELY PROVIDE ESCUTCHEON PLATES AT WALL5 OF FIN15HED AREAS. TERMINATION IN A 5PAGE CONTROLLED M THE MENT. C TENANT OR TOA nN/ M A5 POSSIBLE. CARE SHALL BE TAI:BJ 50 A5 NOT TO DAMAGE ANY EXISTING BUILDING 5PAGE CONTROLLED BY THE LANDLORD/MANAGEMENT. COORDINATE THE5E I.i.. Q m CONSTRUCTION OR ITEMS THAT ARE TO REMAIN. ANY EX15TING FIN15HE5 THAT ARE FIXTURE AND EQUIPMENT CONNECTIONS 5HALL BE MADE WITH CHROME PLATED SUPPLIES WITH STOPS. TERMINATIONS WITH LANDLORD/MANAGEMENT. Z v U DAMAGED DURING THE IN5TALLATICW OF NEW WORK OR REMOVAL OF EX15TING WORK 5HALL F-XP05FD WASTE PIPING 5HALL BE CHROME PLATED. BE REPAIRED, REPLACED AND PAID FOR BY THE INSTALLING CONTRACTOR, TO THE REMOVALQ ® z 5AT15FACTION OF THE ARCHITECT AND OWNER. REFER TO ARCHITECTURAL DRAWING5 FOR VV1.lE12E COPPER PIPE GONNECT5 TO FERROUS PIPE U5E 15OLATING UNIONS. EX15TING BUILDING GON5TRUCTION THAT 15 TO REMAIN AND, THEREFORE, SUBJECT TO MATERIAL5/EQUIPMENT/DEVICES TO BE REMOVED AND NOT RELOCATED OR STORED w W < PATCHING, REPAIRING, REFNI5HING, AND REMOVAL/REPLACEMENT. WATER PIPING ABOVE GROUND 5HALL BE TYPE L COPPER W/ LEAD FREE JOINTS. A5 WELL A5 GON15TRUCTICN�1 MATERIAL5 ACCUMULATED DURING THE REMOVAL U Z J WORK 5HALL BE REMOVED AND 015PO5ED OF AT THE EXPENSE OF THE 10. CONTRACTOR 5HALL BE RE5PON5115LE FOR HI5 OWN GLEAN UP DURING CON5TRUCTION. IF WAS PIPING BELOW GROUND 5HALL BE TYPE K COPPER WITH 51L-FO55 SOLDER JOINTS OR GEMENT LINED RE5PECTIVE TRADE. BLANK UP OPENINGS THAT ARE TO BE ABANDONED IN ® ® Q CONTRACTOR FAILS TO PROVIDE 5UCH GLEAN-UP, THE ARCHITECT/ENGINEER WILL DIRECT DUCTILE IRON WITH PUSH JOINTS. EX15TING WALL5 THAT REMAIN. ANOTHER CONTRACTOR TO PERFORM THE CLEAN Up AND THE NEGLIGENT CONTRACTOR W SHALL PAY THE A550GIATED BAGbI CHARGES A5 DEEMED APPROPRIATE BY THE SUSPENDED VVAS AND VENT 5HALL BE CODE APPROVED PIPE AND FITTINC75 (NO DWV COPPER) AND BE DUST CONTROL 7 ARCHITECT/ENGINEER. 51MILAR TO EXISTING. Z IN GENERAL, THE DUST CONTROL SHALL BE PROVIDED AND MAINTAINED BY THE 11. CONTRACTOR 5HALL INSTALL ALL AUXILIARY SUPPORTING 5TEEL A5 REQUIRED FOR THE BURIED WA5TE 5HALL BE GODS APPROVED PIPE, FITTING5 AND BE 51MILAR TO EXI5TING. GENERAL CONTRACTOR. THI5 TRADE 5HALL COORDINATE IT5 WORK WITH THE 0 5UppoRTING OF THEIR PIPING, DUCTWORK, GONDUIT, TANK5, EQUIPMENT, ETC. ALL -- R11 GENERAL CONTRACTOR WITH RE5PEGT TO DU5T CONTROL IN THE AREA INDICATED 5UpPORTING STEEL FOR ITEM5 ABOVE A 5U5PENDEED CEILING 5HALL BE FROM BUILDING PVC PIPE 5HALL NOT BE IN5TALLED IN GEILING5 U5ED A5 PLENUMS. COORDINATE WITH MECHANICAL FOR NEW WORK. 5PEGIAL CONTROL FOR HEALTH AND 5AFETY OF WORKERS, FOR 5TRUCTURAL MEMBER5 ONLY. CONTRACTOR LOGATION5 OF PLENUM CEILING AREA5. WORK OUTSIDE THE AREA REGARDED A5 THE NEW WORK AREA, AND A5 REQUIRED BY 5PEGIAL GONDITION5 5HALL BE BY TH15 TRADE. 12. UNLE55 INDICATED OTHERWI5E, THE ARCHITECT/ENGINEER MAKE5 No REPRE5ENTATION A5 IN5ULATE HOT WATER AND GOLD WATER PIPING EXCEPT FOR INDIVIDUAL FIXTURE 5UPPLIE5. INSULATION 5HALL TO WHETHER OR NOT ANY HAZARDOU5 OR CONTAMINATED MATERIALS (INCLUDING BUT NOT BE 1/2" THICK FIBERGLA55 5EGTIONAL PIPE INSULATION WITH FLAME RETARDANT JACKET FOR INTERRUPTION OF 5ERVIGE5 SEAL: 11-19-18 LIMITED TO A513E5TO5, PC65, CONTAMINATED 5011-5, ETC.) ARE PRESENT WITHIN THE NON-GIRGULATING 5Y5TEM5 AND 5HALL BE I" THICK FIBERG4-A55 5EGTIONAL PIPE IN5ULATION WITH FLAME EXISTING BUILDING OR ON THE SITE. WORK SHOWN ON THE DRAWING5 AND/OR INDICATED IN RETARDANT JACKET FOR AUTOMATIC-GIRGULATING HOT WATER 5Y5TEM5. IN5ULATE EXP05ED WA5TE, COLD, WORK THAT REQUIRES INTERRUPTION OF 5ERVIGE5 TO PORTIONS OF THE BUILDING THE SPECIFIGATION5 5HALL NOT BE CON5TRUED TO CALL FOR CONTACT WITH ANY OF AND HOT WATER PIPING BELOW WHEELCHAIR LAVATORIES WITH TRUEBRO IN5ULATION KITS (WHITE). SUPPORTS +`C' )V' ERIALS ARE ENCOUNTERED OR SUSPECTED, THE OTHER THAN AREAS IN WHICH THE WORK 15 TO BE AGGOMPL15HE-D 5HALL BE -EH THE5E MATERIALS' IF THESE MA?I ENGINEER FOR IN5ULATED PIPING 5HALL INCLUDE THE IN5ULATION AND HAVE GALVANIZED PROTECTION 5HIELDS. COORDINATED WITH THE BUILDING MANAGEMENT AND AGGOM1pLISHED DURING THE :` �� 8F'' P+`a-, CONTRACTOR 5HALL NOT D15TURB THEM AND 5HALL CONTACT THE ARCHITECT/ EN NIGHTTIME OR ON WEEKENDS AND AT NO ADDITIONAL C05T. ; 74120 IMMEDIATELY. PROVIDE ACGE55 PANELS WHERE REQUIRED FOR 5ERVIGING DEVICE5 AND EQUIPMENT LOCATED ABOVE INACCE551BLE CEILINGS OR BEHIND INACCE551BLE WALL5. COORDINATE 51ZE5 AND LOCATIONS WITH 13. CONTRACTOR 5HALL STORE ALL ATE2IAL5 AND EQUIPMENT 5HIPPED TO THE 51TE IN A ARCHITECT.®; BTATE of t~#4 PROTECTED AREA. IF MATERIAL 1'5 STORED OUT51M OF THE BUILDING, IT MU5T BE STORED GENERAL NOTES '0 R OFF THE GROUND A MINIMUM OF 51X INCHE5 (0 5ET ON 6 X 6 PL.AWK5 AND/ OR WOOD THE FOLLOWING ITEMS 5HALL REQUIRE SUBMITTAL FOR REVIEW (6 COPIES} REVIEW EXISTING CONDITIONS AND INCLUDE NECESSARY CHANGES A5 A °° ���` pALLET5. ALL MATERIAL AND EQLIIPMENT MU5T BE COMPLETELY COVERED WITH °reer.eelr� WATERPROOF TARPS OR VISQUIN. ALL PIPING AND DUCTWORK WILL HAVE THE END5 PLUMBING FIXTURE5 AND EQUIPMENT. PART OF THE BID. INFORM U5ER5 OF DIFFERENCES. CLOSED TO KEEP OUT DIRT AND OTHER DEBRI5. NO EQUIPMENT WILL BE ALLOWED TO BE (E) EX15TING EQUIPMENT/DEVICE TO REMAIN. 5ToRED ON THE 51TE UNLESS It I5 51TTING ON WOOD PLANK5 AND COMPLETELY PROTECTED WITH WEATHERPROOF GONERS. (ER) EXISTING EQUIPMENT/DEVICE TO BE REMOVED. TH15 TRADE 5HALL 0I5CONNEGT THE 5ERVIGE(5). 14. THE DRAWING5, SCHEDULE5 AND !FECIFICATIOW5 HAVE BEEN PREPARED U51NG ONE (END) DI5GONNEGT EX15TING EQUIPMENT/DEVICE AND ALTER 5ERVIGE5 FOR NEW MANUFACTURER FOR EACH PIECE OF EQUIPMENT A5 THE BA515 FOR DIMEN510NAL DE51GN. IF EQUIPMENT/DEVICE AT THE 5AME LOCATION. THE CONTRACTOR PURCHA5E5 ECIUIPMENT L15TED A5 A SPECIFIED ACCEPTABLE MANUFACTURER BUT 15 NOT THE 5CHEDULED MANUFACTURER U5ED FOR THE BASE DE5194, (ERR) EX15TING EQUIPMENT/DEVICE TO BE REMOVED AND RELOCATED. TH15 THE CONTRACTOR 5HALL BE RE5 M51N-E FOR CHECKING ALL THE DIMEN5ION5 OF THE TRADE 5HALL 015CONNECT THE 5ERVICE(5), GLEAN AND MAKE NECE55ARY Z EQUIPMENT TO VERIFY THAT IT WILL FIT IN THE 5PAGE 5HOWN ON THE DRAWING5. MINOR REPAIR5 OR ADJU5TMENT5 A5 REQUIRED TO FACILITATE THE IN5TALLATION O DEVIATIONN5 IN DIMEN5ICN`I5 WILL eE PERMITTED, PROVIDED THE RATINGS MEET THOSE 5HOWNAT THE NEW LOCATION. ON THE PRAWIN65 AND EQUIPMENT WILL PHY51CALLY FIT INTO THE 5PAGE ALLOCATED WITH a a SUITABLE ACCESS AROUND EQUIPVENT FOR OPERATION af AND MAINTENANCE ON THE (ENL) NEW LOCATION FOR EX15TING EQUIPMENT/DEVICE TO BE REMOVED AND z EQUIPMENT RELOCATED. EXTEND 5ERVIGE5 IN WALL/BELOW FLOOR/ABOVE CEILING A5 o LU REQUIRED TO NEW LOCATION. ' Q- 15. WHEN EQUIPMENT 15 5UBMITTED FOR REVIEW AND DOE5 NOT MEET THE PHY51GAL 51ZE OR M ARRANGEMENT OF THAT 5GHEDUUED AND SPECIFIED, CONTRACTOR 5HALL PAY FOR ALL (ED) D15GONNECT EQUIPMENT/DEVICE GONNEGTION(5). WITHDRAW 5ERVIGE5 a m CK ALTERATIONS REQUIRED TO AGGOAMODATE SUCH EQUIPMENT AT NO ADDITIONAL G05T TO BEYOND ADJACENT 5URFACE AND GAP. ALLOW ENOUGH 5PAGE TO FIN15H OWNER. CONTRACTOR WILL AL50 PAY ALL C05T5 FOR ADDITIONAL WORK REQUIRED BY OPENING SIMILAR TO ADJACENT SURFACE. 0 0 OTHER CONTRACTORS, OWNER, AR'GHITEGT OR ENGINEER TO MAKE CHANGE5 WHICH WOULD (EA) EX15TING EQUIPMENT/DEVIGE/SERVICE TO BE ABANDONED. DISCONNECT w w ALLOW THE EQUIPMENT TO FIT IN THE 5PAGE AND FUNCTION A5 INTENDED, 5ERVICE(5). ELECTRICAL GONDUIT5 5HALL HAVE WIRING WITHDRAWN TO CONTRACTOR 5HALL FIELD VERIFY THE 51ZE OF EXISTING OPENING5, WINDOW5, DOOR5, NEARE5T ACCE55IDLE BOX AND BLANK UP ABANDONED OPENING. CoRRIDOR5, ROOMS, ETC. FOR AGI OF THE NEW EQUIP ENT INTO OR REMOVAL OF � � EXISTING EQUIPMENT FROM THE BUILDING. IF OPENINGS ARE TOO 5MALL FOR AGCE55 THEN C EXISTING EQUIPMENT TO BE REMOVED. w �_ Q ' CONTRACTOR 5HALL, AT HI5 OWN EXPENSE, PROVIDE NEW OR ENLARGED OPENINGS AND CONNECT TO EXISTING. ti 00 RE5TO2E 5AME TO ORIGINAL 51ZE; AND CONDITION. CONTRACTOR MAY ELECT TO ORDER C' THE EQUIPMENT DI5A55EM15LED A1�D/oR WITH SPLIT HOU5ING FOR ENTRANCE INTO THE EX15TING 5PAGE OR BUILDING. CONTRACTOR 5HALL REA55EMBLE EQUIPMENT AFTER IT 15 O z IN THE 5PAGE AT HI5 OWN EXPEN6E. PROJECT NO. 18-047 CHECKED BY KK DRAWN BY SHEET TITLE PLUMBING SPECIFICATIONS AN DETAILS SHEET NO. 6592.01 PO .0 11/19/15 KENNETH L. KRAUS P.E. # 74120 306 Oak Grove Drive PM000 Wauconda, IL 60084 T (847) 719-1708 F (847) 719-1738 Plumbingogo Mechanical ogo Electrical