Exh 4ABUILDING DEPT.MONTHLY ACTIVITY REPORT REPORTING FOR MONTH OF FEBUARY, 2002 COMPARISON: YEAR-TO-DATE FEB. 2001 Vs. YEAR-TO-DATE FEB. 2002 PERMIT TYPE NUMBER OF PERMITS CONSTRUCTION VALUATION TOTAL INSPECTIONS YTp:2001 YTD2002 YTD 2001 YTD 2002 YTD 2001 YTD 2002 SINGLE FAMILY 8 10 $ 2,353,063,00 $ 1,213,206.00 463 526 DUPLEX 0 4 $ - $ 2,400,000.00 REMODELIADDITION 45 28 $ 865,657.00 $ 1,144,786.00 COMMERCIAL 6 1 $ 297,666.00 $ 4,000.00 OTHERS 136 90 $ 15,383.00 $ 168,673.00 TOTAL -195 133 $ 3,531,769.00 $ 4,930,665.00 PERMITS ISSUED MONTH OF FEBUA RY,2002 NO.PERMITS PERMIT GOST INSPECTIONS PERFORMED SINGLE FAMILY 1 $ 2,895.00 $ 119,602.00 BUILDING 56 DUPLEX/T'HOUSES 4 $ 19,807.00 $ 2,400,000.00 CONCRETE 31 ADDITIONlREMODEL 14 $ 2,708.00 $ 358,168.00 ELECTRICAL 57 COMMERCIAL 0 $ - $ - PLUMBING 56 FENCE 7 $ 70.00 $ 17,600.00 MECHANICAL 40 UTILITY 6 $ ),440.00 $ OCC. LIC. 14 ROOFING 14 $ 652.00 $ 54,073.00 TREES 13 SHEDS 0 $ - $ - MISC. 21 GARAGE 0 $ - $ - TOTAL 288 WELLS 2 $ 20.00 $ - SIGNS 2. $ 100.00 $ - ELECTRICAL 24 $ 704.00 $ - PLUMBING 17 $ 661.00 $ - MECHANICAL 18 $ 630.00 $ - SWIMMING POOL 0 - $ - DRIVEWAY 1 $ 25.00 $ 32,000.00 DEMOLITION 1 $ 100.00 $ 5,000.00 CHURCH ADDITION 1 $ 459.00 $ 60,000.00 IRRIGATION/SPRINK. 4 $ 100.00 - TOTAL 114 $ 36,371.00 $ 3,046,443.00 oz ~~ co HY.r N `_j O O N # A Monthly Report for Public Safety Febrrlary Report 2p02 Police Emergency Res Time Reported Crimes Activities Calls for Service : 1694 3425 2108 3911 Arrests. 4 1:17 100 17 Uniform Traffic Cifatibns 406 838 815 . 1394 Training for Police DUI Standartlizi;d Field Sobriety Testing Tes¢r Ihs$ugtof Certifications N1ApD Awards Ceremony Police Fitriess Microsoft Outlook Training Jacksonville Fire and Rescue ~i~e Alarms Fire Response Time Emergency Medical Calls EMS Response Time Code Enforcement 3.833Minutee Feb 21102 Crime V-T-D 2002 Murder/Manslau litef 0 0 Forcible Ra 'e 0 1 Robbe 4 5 A ravated Assault 1 3 Sim le Assautt/Threats: 13 28: Bur la 14 24 Larcen 25 53 Auto Theft 2 7 Total 60 121 FebuarJ o• 200 :Y-fi-D 2002. .Feb-01 Y-T-D 2001 1=Feb Y-T-D 1-Feb Y•T-D # 21 37 9 30 Minutes 5.454 . 4.239 # 59 132 50 .109 Minutes 4.37 4.239 See Attachment ez ~d r ~' 0o H N ~[/LJ O 7 N ~ A a x`,a~'~~'s~'~..~.~~:~raa~`4~.~"~s~"~~~..~~~~~x~.. `~.z~-~J~~ "~T?~t12~t}i~¢A'.?4~R.~~P':kA?tY3 ~??h~, ~z~s'~'~`~;°.~~,~'. w a:+~~ ~'~~.~'~„ '~.".:~xtr,nr~rr~~a`~~-~.'`~~. ~G ~ ~ ~ ~~, ~ ~A ~~ yP~~~ ~8 M@y y Z ~~py¢s~ 2 ~ ~ ~ ~ 't@ 7 Yy ~n W i L+ 4~ ~i0 'L ~ ~ C P~ Js^ O~ CALL WB € ~,- ^ ~, - ~ r. .: .. a s c fis -;i. ..L ti •e 1d CEOENTIFIED < ^~~ +~ _ ~ TOTALB 0 y 1 0 ~~ t ~ ~38 ~ i6 ~~] ~ _7 3 32 80 Y2SI 2 0 ~.. _ . GALLNlB - n' ~.. ;i ~i9.. `,A$ t+s-.+N '&f ~~-A•<~ 13 CE IOENT~IED : ~ .r?e>. Jl .~ . ~ '., . ~* -~?t e~`fi 3'~ ^ , a ~a ; ;.b^ 15] ^~. TOTALS ~,. 0 ~. 1 ~: 0 ~_ ~7 ~ 86 8 11 8 1 W 9 ] 0 0 y ,•,~` ,,, '~QSI TOTAL GILL NiB :.y, . " -.._s. ,<-~,,r ~.•,. ., ~}$.- <_ r ~.. ~.a`~ ;~-- rs~cn.E ~~"~F. 2T GEN)ENlIF1ED zi ~ ~ ~'~, - fi~ ~~ b,~ .~ s, a ~, ~ _ „e:. „xa .;~' 433 TOTALS ~0 - 2 ~1 ~ 2 12d ~ T3 ~ x,18 ~ 15 s_ < .~ _ ~ 7d ~~, 12i ~ ~ ~ T 0 ~ a ~ ,. d r~ ~y N ti'f O pr N 9k A PUBLIC WORKS and PROJECT STATUS REPORT (D)=DESIGN ENGINEER UTILITY (CE&I)=CONSTRUCTION ENGINEER DEPARTMENTS (C)=CONTRACTOR PROJECT DESCRIPTION PROJECT NO. AND INFORMATION STATUS ON 4/1/02 t Core City Stormwater Project CORE99 Design engineer submitted 100% plans and specifications on 1/16/02, and staff (D)=Original by England, Thims & Miller reviewed. Advertisement on 2/17/02 for bids on Core City Project and 8 Preliminary Redesign -100% Revised Preliminary Design by The contractors prequalified. Construction, Engineering & Inspection contract complete R-A-M Professional Group approved on 3/25/02 for GAI Consultants. Bids to be opened on 4/3/02. Sherry Drive Design -100% Re-Design by Aikenhead & Odom complete (C)= Callaway Contracting, Inc. Water changeovers on Sherry Drive completed on 1/25/02. 4'" to 6'" Street closed Sherry Drive Construction - 99%on waterline 75% overall (CE & [) =Public Works for Sherry Drive intermittently beginning 2/11/02 to complete drainage and over-excavation. , Overall Redesign -100% =GAI for Core City - Roadway base construction began from 8'" Street and proceeding south. Downstream Design -100% 2 Buccaneer Wastewater (D)=Gannett Fleming New sludge holding facility design is 100% complete. Awaited recommendations Treatment Plant (C)= on solids handling from Camp, Dresser & McKee prior to advertising for bids. Design of Sludge Facility- (CE&[)=Gannett Flemiug and Public Works Final Report received 7/3/01. Will need modification to sludge tank design to 100% accommodate future thickener. Contract design work approved on 1/14/02. Redesign of Sludge Facility- Design underway. 40% Construction - 0% 3 Atlantic Beach and Buccaneer (DrGee & Jenson Bid opening was 4/25/01. Notice to Proceed extended to 9/4/01 to allow time for Sewer System Improvements (C)=Meadors Constmc[ion Company pump delivery and transfer of superintendent. Construction phase services by Gee (CE&1)= Gee & Jenson and Public Works & Jenson approved by City Commission on 8/27/01. Contractor on site as of Design - 100% complete 10/8/01. Work complete on Force Main from C Station. Work underway a[ Redesign -100% _ Fairway Villas, Park Street and Master Wet Well. Construction-65% 4.a. Mayport Flyover (D)=Pittman, Hartenstein & Assoc. Delivery and installation of steel girders progressing for flyover ramp. Completed Flyover Design -100% JTA steel over Atlantic Blvd. week of 6/25/0 L All steel completed during July, work complete - Connelly & Wicker for Atlantic Beach on elevated roadway continues and six of the nine decks are complete. Large pile Construction -84% complete (C}=Superior Constmc[ion Co. of dirt by the Radio Station has completed its surcharging effort for the pond, and overall, 100%for utility (CE&I)=Public Works is being removed. Pond B on Mayport Rd. is complete. Completion date is relocation JTA (Reynolds, Smith & Hills) 4/14/02. Final inspection to beheld 4/4/02. Utility Design - 100% complete ~z ~y r ~y N trJ O ~y N ~ A 4.6. Mayport Flyover (D)=Bessent, Hammack & Ruckman (BHR) BHR completing proposal and expect authorization from JTA to complete design Plaza Bump by next week. Design expected to take 5 weeks due to surveying needed. Surveying to be scheduled week of 11/5/Ol. Surveying completed in early November, 2001. Received design plans on 2/8/02, and stall is reviewing. 5 Utility Improvements 2000 - (D) =Robert Phillips, P.E. Water main installation complete. Paving scheduled for week of 4/15102. Beach Avenue Water Main (C) = Gmhn May, Inc. (CE&I)=Public Works Design-100%complete Construction - 90%complete 6 Beach Renourishment (D)=Army Corps of Engineers Project has been rescheduled to begin in the winter. Funds were approved by City of Jacksonville on I I/28/00. Start date will be detemtined by Army Corps of Engineers. Received the Technical Review Plans on 9/24/01. Staff has reviewed and there was a Technical Review Conference on 10/4 & 10/5/Ol. Survey field - ~ work completed on 2/4/02 and profiles were delivered on 2/11/02. Teleconference held on 3/29/02 with Army Corps. Commission awarded contract foradditional modeling and reuse feasibility 7 Water Master Plan and (D)=Camp, Dresser & McKee engineering to CDM on t 0/8/01. Logging and repairs of Buccaneer District Wells Consumptive Use Permit complete on 10129/01. Presentation to Commission on 11/12/01. Logging of Renewal three AB wells completed 12/3/01. Response to RAI #1 submitted to SJRWMD Master Plan -100%complete on 1/31/02. RAI #2 received on 2/22(02. CDM completing response due Consumptive Use Permit - 95% 5/22/02. complete Mayport Jr. Enlisted Men (D)=Prosser Hailock ~ Storm drainage is complete. Construction of sanitary sewer is 100% complete, 8 Family Housing - 100 Units (C)=Beneco Enterprises, Inc.. with the exception of the lift station wetwell. Construction of water is 100% ATEM@ complete. Overall project is 65% complete. Design -100% complete Construction-65%complete 9 Upgrade of West End Lift (D)=Waltz &Moye City Commission approved contract with Waltz &Moye to perform engineering Station (C)=Gruhn May, Inc. design on 9/24/01. Permit received 1/2/02. Bids received on 2/27/02. City (CE&I) =Public Warks Commission awarded contract to Gruhn May on 3/11/02. Pre-construction Design -100% complete conference held 3/28/02. Notice to Proceed 4/15/02. Construction - 0%complete yy ~ b7H~ y 0o H N tY O O N ~ A IO Force Main from Lift Station B (D)=Aikenhead & Odom, Inc. City Commission approved contract with Aikenhead & Odom to perform (C)= engineering design on 9/24/01. Survey scheduled for 11/5/Ol. Survey work Design -700% complete completed by 1 I/21/Ol. Design proceeding. Received 100% plans on 3/28/02. Construction - 0%complete Awaiting DEP permit. 11 Sherman Creek Trestle Crossing (D)=Nadeem Zebouni, P.E. Drawings and specifications complete. Project manual being completed in Stabilization (C) = house. Per SJRWMD, permit will be needed for project. Petxnit Design-/00%complete application submitted byll/21/01. SJRWMDPemutreceivedl/2/02. Construction - 0%complete Awaiting permit from FDOT. Additional information sent to FDOT on 3/11/02. 12 Water Line Replacement on (I)) =Charles Bassett Surveyors and Public Project proceeding in-house with Technical Designer who began employment on Park Terace East Works December 1 Q, 2001. Received additional survey information on 1/16/02. Design Design-100%complete (C)= complete. Awaiting DEP pemut. Construction-0%com fete 13 Stotmwater Master Plan (D) = Camp, Dresser & McKee Proposals were received 11/12/01, and City Convnission authorized staff to negotiate with Aikenhead & Odom on 1 I/26/Ol. Project to be readvertised Design - 0%complete (/13/02, to include modeling of the Hopkins Creek Basin. Received 6 proposals Construction - 0%complete on 2/13102, and City Commission approved contract with CDM on 3/25102. 14 Selva Streets (D) = J. Lucas & Associates Advertised for bids 11/4/01, bids received on 11/29/01. City Commission to vote (C) =Milestone-..Carlo on at the December 1Q, 2001 Commission Meeting. Comrtilssion awarded project Design - 100% complete on 1/14/02. Preconstruction conference held on 1/24/02. Start date is 2/I 1/02, Construction - 0%com lete and construction began oh 2/18/02. Paving began om 3129/02. 15 Repair and Painting of (D) = Howie Green Tank Inspections and Bid documents complete and bids due January 9, 2002. Awarded contract to Elevated Towei at Water Public Utilities Clifton's Tower Service on 1/28/02. Pre-construction meeting held on 2/8/02. Plant No: 1 (C) = Cliftom's Tower Service Final inspection scheduled for week of 4/1/02. (CE&I) = Howie Green Tank Inspections Construction -100% Bid Documents: 100% 16 CDBG Sewer Design 2002 (D) =Edwards Engineerimg Proposal requested from Edwards Engineering on 1/4/02. City Commission awarded contract to Edwards Engineering on 3/11/02. Survey ordered. Design - 0%complete 17 Sewer Improvements in the (D) =Public Utilities and Public Works Mandatory pre-bid meeting held on2/7/02. Bids received 2/20/02. City Donner Road Area (C) = Insituform Techuologies, Imc. Commission awarded the bid to Insituform Technologies on 3/11/02. (CE&I) =Public Works Design-100% complete Construction - _ CE&I -Public Works a ~d r~ co y N tiJ O O N A l8 Piping Modifications at (D) =Edwards Engineering Design underway. WWTP#1 (C)= (CE&I)=PublicWorks Desi n- 30% com lete 19 Sidewalks and Sewer (D) =Public Works Sewer televising scheduled for 4/4 and 4/5/02. Rehabilitation CDBG (C) _ (CE&I) =Public Works Y roz ~d r~ 0o H N txj O ~y O Fl N ~ A a