Exh 4ABUILDING DEPT.MONTHLY ACTIVITY REPORT
REPORTING FOR MONTH OF APRIL, 2002
COMPARISON: YEAR-TO-DATE APRIL , 2001 Vs. YEAR-TO-DATE APRIL , 2002
PERMIT TYPE NUMBER OF PERMITS CONSTRUCTION VALUATK)N TOTAL INSPECTK)NS
2001 YTD 2002 YTD 2001 YTD 2002. YTD 2001 Y7D 2002
SINGLE FAMILY 10 27 S 2,539,464.00 ; 8,143,387A0 667 1202
DUPLEX / THOUSES 0 4 S 437,500.00 E 2,400,000.00
REMODEUADDITION 88 62 E 1,702,994.00 S 2,450,012.00
COMMERCAL 11 3 S 1,062,848.00 S 8,215.00
OTHERS 43S S9
TOTAL 542 455 S 6,132,837.00 S 11,790,342.00
PERMITS ISSUED M ONTH OF APRIL , 2002
1 M p
SINGLE FAMILY 11 S 45,603.00 ; 3,622 234.00 BUILDING 86
DUPLEXIT'HOUSES 0 E S CONCRETE 39
REMODELIADDITION 24 : 10,006.00 $ 617,874.00 ELECTRICAL 37
COMMERCIAL 2 E 8,215.00 S 360,000.00 PLUMBING 69
FENCE 6 ~ S 80.00 S 13,677.00 MECHANICAL 31
UTILffY 9 S 3,975.00 S 15,000.00 OCC. LIC. 8
ROOFING 15 S 1,578.00 $ 147,022.00 TREES 24
SHEDS /PORCH 5 i 383.00 E 40,406.00 MISC.
GARAGE 0 ; - ; TOTAL 306
WELLS 0 S S '
SIGNS S S 175.00 S
ELECTRICAL 35 S 1,214.00 S -
PLUMBING 56 E 1,994.00 5 152,326.00
MECHANICAL 39 5 1,534.00 S
SWIMMING POOL 4 ; 437.00 ; 46,000.00
DRNEWAY/CONC. 1 5 25.00 5 -
DUNE WALKOVER 0 S S
DEMOLRION 2 E 200.00 S 10,500.00
SIDING 3 i 128.00 S 10,000.00
TOTAL 217 E 72,427.00 E 5,235,039.00
k
..~
~ y
N h,f
O y
N F1
PREPARED 5/06)02, 0:24:07 LICENSE ACfTVITY REPORT BY BUSINESS NAMB PAOB 1
City of Atlantic Beall NEN LICENSES POR YeAR: 2002 BBTNSSN: 04/01/02 TO 04/30/02
PROGRAM OL122L DEPT: ALL DEPARTMENTS CLA93: ALL CLASSBB
LIC 0 BUSINESS NAME ISSUED TYPE CLASSZFZGTION.
BVSINSSS ADDRESS ONNHR NAME G A[IDRSSS BUS PNONB ~
02-06298 AFFORDABLE GLASS i MIRROR INC 4/16/02 NBii GLA33: AUTO, PLATS, XINDON, MIRROR _
.1198 MAYPORT AD 411 CAROL JL YHTRY ~ 904-247-454]
ATLANTIC BSACN PL 32233 1094 INDIES DRIVE 3; 1AA BEACH FL 32250
02-05308 ALEX XINCNESTSR CARPET INSTALL 4/30/02 NSN MISC. SERVICE SSTAeLI8@Ief1T', NOT LISTHD
85 N @TR ST ALEX NINCIISSTBR 904-993-7800
ATLANTIC BEACH PL 32233 85 NEST @TN STREET, ATLANTIC HBACR PL 12233
02-09296 BARBARA MSARS AT STUDIO V 4/11/02 N8X NI3C. PROFESSIONAL ESTABLISIDIBNT -
1609 COQUINA PL BARBARA MSARS - .904-242-9090
ATLANTIC BBACR PL ]T233 1604 COQUINA 4[.ACS, ATLANTIC BHACN PL ]22]3
02-05297 BARBARA MBARS AT STUDIO V 4/11/02 NEN NI SCELLANHOVS PROPHSSIONAL
1604 COQUINA PL BARBARA MBAR9 909-292-9090
ATLANTIC BEACH PL 32233 1609 COQUINA PLACE, ATLANTIC BEACH PL 32233
02-05299 bOLORES UNZUBTA'S CLEANING SVC 4/19/02 NSN CLEANING/JANITORIAL/MAID S&RVICS
716 GVALLA RD DDLORSS H. UNZVETA 904-372-0709
ATLANTIC HBACN PL 32233 716 GVALLA ROAD, ATLANTIC BEACH PL 32233
02-05306 E.L. LANK CARS SBRVICB. 4/24/02 NSN LAXN/YARD SHRVICB
@2B GVALLA RD LOCIOIART, ffi.W 904-372-0672 ~ -
ATLANTIC BEACH PL 32233 @2B GVALLA RD, ATLANTIC BEACH PL 32273
02-05288 JAMES CIiOH .4)04)02 NEN TAILOR/DRESSMARBR
25 OL SAILPISN DR -
ATLANZIC BBACN PL 32233 1700 B SAN PAHLO RD 41118, JACRSONVZLLH PL 3222 4
02-05304 JOAN MCLOUD PHYSICAL SHSltAPY 4/23/02 N8X MISC. PROPB83IONAL ESTABLISHMENT
176 MAGNOLIA 9T JOAN MCLOUD 904-247-0505
ATLANTIC BEACH PL 32233 176 MAGNOLIA 9TR68T, ATLANTIC BEACE PL 32233
02-05305' JOAN MCLOUD PHYSICAL THERAPY 4/23/02 NEX PHYSICAL TAERAPIST
176 MAGNOLIA ST JOAN MCIAW 904-247-0505
ATLANTIC BBACH PL 32233 176 MAGNOLIA STREET, ATLANTIC BBACR FL72233.
02-05295 JOSEPH MANLSY PAINTING 4/10/02 NBN PAINTING/PAPBR HANGING
346 SAILPISN DR JOSSPA J. MANLSY 904-247-0933
ATLANTIC BHACB PL 32233 345 SAILPISN DRIVEE., ATLANTIC BBACH PL 32233 -
02-05307 MARGO'3 COLLSCZION 4/25/02 NSN CRAFTS/NOME ACCESSORIES
1549 OCEAN BLVD MARGO MAZZA MUDGB 904-249-9556
ATLANTIC BEACH PL 32233 1599 OCEAN BLVD., ATLANTICHBACN PL 3223]
02-05300 O'MALLEY RBAL BSTATB, INC 4/19/02 NBN RSA). ESTATE SALES AGENT
695 MAYPORT RD - O'MALLEY, JOHN J.
ATLANTIC BEACH FL 32233 3330 OCEAN BLVD, ATLANTIC BEACH PL 32233
02-05290 OCEAN SIATY, INC 4/05/02 NSN RESTAURANTS
60 OCHAH BLVD RACNEf. GOSNBLL 904-247-0060
ATLANTIC BEACH PL 32233 105 SOUTH ROSCOH BLVD., PONTB VSDRA F4 32082 -
02-05292 OCEANSIDB CLEANING SYSCIALZSTS 4/05/02 NEN CLEANING/JANITORIAL/MAID SBRVICH '~
139 MAGNOLIA ST TERSER A. BARYON 904-241-1652 -
ATLANTIC BEACH FL 32233 139 MAGNOLIA ST, ATLANTIC HSACN PL 32233 ~ ~
b
~
y
...
wy
oP7
N 'i-'
>k
A
PRHPARBD 5/06/02, 8:2{:0] LIC@I36 ACTIVITY RHPORT BY HUSINBSB NAMB - PAOH 2
City of Atlantic Beach NEN LICSNSBS POA YBAR: 2002 HHTWBHM:. 04/01/02 TO 04/30/02
PROGRAM
0L122L _
OBPT: ALL OSPARTMENTS CLASS: ALL CLA93S3
LIC 9 BUSINESS NAME ISSUED TYPE CLA93IPIGTI0N
BUSINHSS ADDRHSS OWNER NAME L ADDRHSS BUS PIiONB ~
02-05302 PLAY HALL USA, INC. l/22 /02 NBN MISC. SERVICH ESTABLISHM@Tf
NOT LISTED
1065 LITTER CYPRESS KBY ,
IIONNB ORDZLH 904-242-0161
ATLANTIC BSACN PL 32233 1065 LITTLB CYPRBSS KEY, ATLANTIC BBACN PL 32233
02-0528] P0TIIBAD9 4/09/02 NEW CRAFTS/ROME ACCBSSORISS
1220 EAST COASTDR LYNN ROSKBIN 909-299-2930
'., ATLANTIC BRACH PL 32233 1220 BAST COAST DRIVE, ATLANTIC HSACB PL 32233
02-05297 ROSETTA SNELLEY 80DBWES 4/06/02 NEN ATTORNEY PIRM/CORPORATION
531 ATLANTIC BLVD ROSSTTA 3. BODBiiHS 904-2{]-7555
ATLANTIC BEACH PL 32233 653 MONVMBNT ROAD, 91413, JACASONVZLLB PL 32225
02-05299 ROSBTTA SHBLLHY B0DBfi63 4/08/02 NBN AIT0RNEY
531 ATLANTIC BLVD ROSHTTA 3. BODBWSS. 904-299-]555
ATLANTIC BE11CH PL 32233 653 MONVNENT ROAD, 91413, JACKSONVILLE PL 32225
02-05303 SNELDON MORRISON MAINTBNANCE l/23/02 NHN MINOR CONTRACTOR (MISC. ODD JOBS/REPAIRI
1093 CORNBLL LN MORRISON, SBELDON P. 904-249-2830
ATLANTIC HSA® PL 32233 1093 CORNBLL LANE, ATLANTIC HBACH PL 32233
02-05291 STICKY PZNGSR9 9/05/02 NEN V@IDING MACNINB
363 901 ATLANTIC BLVD DONALD C. NICOL
ATLANTIC BEACH PL 32233 363 ATLANTIC BLV D., SUITB 1, ATLANTIC BBACA PL 31233
'yam
k~
..y
w H
o ~
o .~.
tJ ~
A
PUBLIC WORKS and PROJECT STATUS REPORT (D)=DESIGN ENGIIVEER
PUBLIC UTII,ITIES (CE&I~CONSTRUCT[ON ENGINEER
DEPARTMENTS (C)=CONTRACTOR
PROJECT DESCRH'7'[ON PROJECT NO. AND BVFORMATION STATUS ON 516/02
i Core City Stormwata Project CORE99 Design engines submitted 100% plans and specifications on I/16/02, and staff
(D) =Original by England, Thims $ Miller reviewed. Advertisement on 2/17/02 for bids on Core City Project and 8
Preliminary Redesign -100% Revised Preliminary Design by The contractow prequalified Consuuction, Engineering & Inspection contract
complete ~ .
Sherry Drive Design -100 /. R-A-M Professional Oroup -
RoDesiga by Aikenheed & Odom approved on 325/02 for GAI Consultants. Bids oprned on 4/3/02, snd rebida
due on 5/8/02.
complete
Sherry Drive Construction - (C) = Callaway Contracting, Ina
99% on water line, 85% overall (CE & I) =Public Works for Sherry Drive Water changeovers on Sherry Drive completed on 1/25/02. 4° to 6° Streer closed
Overall Redesign - /00% = GAI for Core City intamittentiy beginning 2/I 1/02 [o complete drainage and ova-atwvattan,
Downstream Design -/OOX -. Roadway bue construction completed. Paving to begin on 5/7/02, except .
near Famous Amos where BeILSonth <s working on ^ telephone manholes
2 Buccaneer Wastewater (D) =Gannett Fleming - Conlred for design work approved on 1/14/02. Design underway.
Tresiment Plant (C)
Design of Sludge Facility - (CE&n = Gannell Planing and Public Works
100%
Redesign ojSltdge Faeiliry-
dOX
Construction - 0% - _
3 Atlantic Beach and Bucwnes - (D) =Gee & Jenson Final inspection scheduled for 5/7/02.
Sews System Improvements (C) ~ Meadors Constriction Company
Design - /DO% complete (CE&I) =Gee & Jensw and Public Worker .-
Redesign -/00%
Consructton - 99X
4.a. Mayport Flyover (D) =Pittman, Hartrnstein & Assoa Delivery and installation of steel girders progressing for flyover ramp. Completed
Flyover Design -100%
~ JfA steel ovs Atlantic Blvd. wade of 625/01. All steel completed during luly, work
complete
- Connelly & Wicks for AUantc Beach on elevated roadway continues and six of the nine decks are complete. Large pile
Construction -100°/. complete (C) =Superior Constmction Ca of dut by the Radio Station has completed its surcharging effort for Ute pond, and
overall, 100%jor uHliry (CE&n =Public Works
~ is being removed Pond B on Mayport RA is completes ComplUion date is
relorntion
Utility Design -100% rnmplefe ITA (Reynolds, Smith & Hills) 4/14Po2. Final inspection to be held on 4/4/02. Llst of punch list items sent to
R
i
es
dent Engineer on 4111/02.
Y
r7
k
..a
w H
N t+1
O iy
N 1~
4.b. Mayport Flyover (D) = Bessit, Hammack 8c Ruckman (BHR) BHR impleting proposal and expert authoriration from ]TA to implete design
Piaza Bump - by next week. Design expected to take 5 weeks due to surveying needed.
Surveying to be scheduled week of t I/5/Oi. Surveying completed in early
Design - 95% compiett November, 2001. Received design plena on 2/8/02, stag revlewed and received
Bnal plena on 511/02, but no tum lane shown. Revision requested o0 5/3/02.
5 U61ity Improvements 2000 - (D) =Robot Phillips, P.E. Water main installation complete. Paving impleted week of 4/15/02. Final
Beach Avenue Water Main (C) ~ Gmhn May, Ina ieapectlon was held 5!2/02. '
(CE&n =Public Wmka
Design - /DO%wmpiete
Conrfntctlon -100% complete
6 Beach Renourishmat (D) =Army Corps of Engineers Project has been rescheduled to begin in Ole winter. Funds was approved by City
(C) =Great Lakes Dredge & Dock Co. of Jacksonville on 1128/00. Start date will be determined by Army Corps of
Engineers. Received the Technical Review Plans i 924/01. Smtf has reviewed
- end them was a Technical Review Conference on 10/4 & 10/5101. Survry field
- - work oomplered on 2/4/02 and profiles was delivered on 2/11/02.
- ~ Teleconference held on 329/02 with Army Coops. Army Corps Geld partnerieg
workshop on 4!30/02 at Jacksonville Beach..
Water Master Plan and (D) =Camp, Dresser & McKee Commission awarded in[ract for additional modeling and rase feasibility
~ Consumptive Use Permit engineering to CDM on 10/8/01. Logging and repairs of Buccatteer District
Renewal Welis complete on 1029101. Presentation to Commission on I I/12/Ol. Logging
Master Plan - !00% complete - - of three AB wells completed 12/3/01. Response to RAI #l abmitted to -
Consumptive Use Permit - 95%
- S]RWMD on 1/31/02. RAI #2 received on 2/22/02. CDM completed response
-
complete on 5/iJ02. -
8 Maypott Jr. Enlisted Mee (Dj = Prosser Hallodc _ Storm drainage is complrte. Construction of sanitary sewer is 100°/s implete,
Family Housing - l00 Unib (C) = Baei Enterprises, Ina with the exception of the lift station wetwell. Commenb on sheet pile and
~M
~ brecing plan submitted on 4/29/02. ConsWction of water is ]00%complete.
Design - J00°/. rnmplete' - Overall project is 70Yo complete. -
Construction-70Xcampiete
9 Upgrade of West End Lift (D) = Waia & Moye City Commission approved. intract wiN Weitz & Moye to perform engineering
Station (C) = Gmhtt May, Ina design on 924/01. Permit retxived 12/02. Bids received on 227/02. City
Design -J00%rnmplete (CE&n =Public Warka Commission awazded contract to Gruhn May on 3/11/02. Pro-construc[ion
inference held 328/02. Notice to Proceed 4/15/02. Pumps end materials oe
Constnretton - 0% complete - order. -
.~ ~
Yd
ky
..~
w H
N PY
O ./
N la
A
A
10 Force Main 6•an
Lift Station B
(D) = Aikenhead & Odom, Ina
City Commission approved contract with Aikenhead & Odmn topedorm
(~ _ - engineering design on 9/24/01. Survey scheduled for I 1/5/01. Survey work
Design -100% complete (CE&I) -Public Works completed by 11/21/Ol. Design complete. DEP Permit received 5/6/02. Bide
Construction-0%conplete - due on 6/5/02.
11 Sherman Creek Trestle Crossing (D) = Nadeem 7.ebouni, P.E. Drawings and specifications complete. Project manual being completed
Stabilr~hon (C) = in house. SJRWMD Permit received 1/2/02 and ACOE permit 2/5/02.
Design - J00%comptete (CE&I) =Public works Received FDOT permit on 4126/02. Bids due 6/5/02.
ConstrueNon-0%eo rate
i2 Water Line Replacanent on (D) =Charles Bassett Surveyor: and Public Project proceeding in-house with Technical Designer who began employment on
Park T~ East w'~+ ~ ' December 10, 2001. Received additional survey information on 1/16/02. Design
_ Design -100%romplete (C) = Gn6a May, Ica complete Blds received Sri/02. On City Commission agenda for approval
Construction - 0% complae _ (C~n ®Public Works 5/13/02.
13 Stonnwater Master Plan (D) = Camq Dressy & McKee Proposals were received l 1/12/01, and City Commission authorized staff to
~ negotiate with Aikenhead & Odom on 11!26/01. Project to be readvertised
Design - IM/ complete - - !/13/02, to include modeling of the Hopkins Creek Basin. Received 6 proposals
ConstrocMn - 0%complete on 2/13/02, end City Commission approved contract with CDM on 3/25/02.
Ftetd work began and GIS map being prepared.
14 Selva Streets (D) = J. Lucas & Associates Advertised for bids 11/4/01, bids received on 11/29/01. City Commission to vote
(C) = Milestono-Carlo on at the December 10, 2001 Commission Mewing. Commission awarded project
Design -100x/ complete ~ on 1/14/02. Precenstrvetion cenferarce held on 1/24/02. Stan date is 2/11/02,
Construction - 9g% and construction began on 2118/02. Paving completed and Beal inapectlou held
com late - 00 5/2/02. Eleven manhole to be Wised to gnde.
IS Repav and Painting of (D) = Howie Green Tank Inspections and Bid docmnents complete and bids duo January 9, 2002. Awarded rwnttaci to
Elevated Tower at Water Public Utilities - Clifton's Tower Service on 1/28/02. Pre-construction meeting held on 2[8/02.
Plant No. 1 - (C) =Clifton's Tower Service - Flual tuspeetioe held ou 4/5/02. -
(CFI)= Howie Gran Tank.Inspections ,
Construction -100•/ `
Bid Documents: 100%
16 CDBG Sewer Design 2002 (D) = Edwards Engineering Proposal requested from Edwards Engineering on 1/4/02. City Commission
awarded contraM to Edwards Engineering on 3/I 1/02. Survey ordered
Design - 0'/ complete
17 Sewer Improvements in the (D) =Public Utilities and Public Works Mandatory pro-bid meeting held on 2/7/02. Bids received 2/20/02. City
Donner Road Area (C) = Insituform Technologies, Ina Commission awarded the bid to Insituform Technologies on 3/11/02.
Design-100%complele (CE&n =Public Works - -
Construction - _
CE&I -Public WonEs
~ ~
k~
..a
W H
NtyiJ
O ~y
O Iq
N
a
18 Piping Modifications at (D) = Edwards Engineering Design underway.
WWTP#1 (~°
Desi - 75%co [ate (CE~n =Public Works
19 Sidewalk8and Sewer (D) =Public Works - Sewer televising completed. Bid documents prepared, end bids sre due
Rehabilitation CDBG (~ = 6/SroZ.
(CE&I)=Public Works
AGENDA ITEM #4A
:~ MAY 13, 2002
DEPARTMENT OF PARES AND RECREATION
716 OCEAN BOULEVARD
ATLANTIC BEACH, FLORIDA 32233-5455
TELEPHONE: (904) 247-5828
FAX: (904) 247-5849
SUNCOM: 852-5828
http://ci.atlsn6c-beach.fl.us
May 3, 2002
To: ..Jim Hanson, Cily Manager
From: Timmy Johnson, Recreation Directo~~
Re: Usage Report, Community Center, April 2002
Jim, here is a recap of activity at the Adele Grage Community Center, Jordan Paris Community Center and
Donner Community Center for'the month of April 2002:
Theater Room A
Meeting Room IReem Bl
Group/Event No. of
Mtgs/Events No. of
People
ABET Set Bldg/Performances Rehearsals and Workshops 23 840
Narcotics 2 35
Recepfions/Board Meetings None None
Totals 25 875
Group/Event No. of
Mtgs/Events No. of
People
AA. Meetin
9 4 50
Board Meeting 7 45
State Attorneys Office 1 10
Totals 12 105
Total Number of Persons usin Theatre 875
Total Number of Persons usin Meetin Room 105
Total Number of Persons usin Adele Gra a 9S0
AGENDA ITEM #4A
MAY 13, 2002
Summary ofDonner Park activities:
• IGds Cafa inspectors attended an afternoon homework session this month..
• The Northeast Florida Action Agency assisted a total of 52 people with their J.E.A. electric
bill payments. payment assistance ranged from $65.00 to $150.00. The program seems
to have helped families in the community with utility bill payments.
• 4-H club members partnered with Helping Hands Ministries to assist Habitat families
decorate bathrooms in their home. Helping Hands Ministries also volunteered services to
help build the home along with Donner Community Center children.
• Attended Kids CafA annual training meeting.
Donner Community CnMnr 11e~nn Rnnn.~
Northeast Florida Commun' Action en 52
Homework Club Sessions Attendance 496
Senior Citizen Grou Members Y3
Commodfies Eve Three Months 0
Cheerleadin Pr ram 32
Kids CafB Snack Pr ram gig
S ris Pro rams 50
Loam to Read Pr ram 0
GED Assistance ~
Famil Picnic's and other activites r a 2
Total Usa a of Donner Park C.C. 1334
Summary of Jordan Park Community Center activites:
• Coordinating and preparing for Summer Sports Camp at Jordan Park.
• Attended and competed in area Basketball Games. Younger Children 2-4, Older children
6-0
Jordan Park Community Center lleane Rennrf
- - ------- --- - •-- -•-
Homework CIub/Tutorin r rson 400
Beaches Habitat Usa a number of meetin s ~ p
Famii Gatherin sand other activities number of activities 3
Total Usa a of Jordan Park C.C. 412
Summary o/Perks end Recreation Activities:
• Met with Contractors on Dutton Island Completion
• Painted inside Jordan Park Community Center
• Moved ail Adele Grage office furniture and other items to Jordan Park Community Center
In preparations for Adele Grage renovations.
• Attended CPR and First Aid Training
• Coordinating Adele Grage Demolition Festival and Fundraiser with Commissioner Beaver.
• Met with City Manager on projects
•' Typed correspondence, answered phone, and all other parks and recreation related
activities.
• Worked with Teen Council on Concert in the Park preparation
City of Atlantic Beach, FL
Utility Sales Report
AGENDA ITEM #4A
MAY 13, 2002
2oa2
Water Sales
-~;. rti .~
Atlantic Beach
Buccaneer
Total Water Sales
2001
Accounts (000) Revenue par t,ooo pi Accounts (000) Revenue per t,ooo pl
5,253 44,317 $87,998 $1.99 5,095 41,033 $75 741 $1.85
2,570 25,436 $58,340 $2.29 2,509 29,146 $60,599 $2.08
.7,823 69,754. 5148,338 $2.10 7,804 70,179 S736,340 51.94
I Water Plant Production
~- o00
Atlantic Beach 63,556 61,840
Buccaneer 36,125 36,851
Total Production 99,881 98,691
Total Water Billed 89,754 70,179
Water Loss for month: 29,927 28,512
Percentage Loss 30.02°,6
28.89%
Tota112 mo. Avg. Loss
,« M 14.57% 12.69°k
Gallons Actual Revenue Gallons :Actual Revenue
Sealer Sales Accounts (000) Revenue par t,ooo gl Accounts (000) Revenue per t,ooo gi
.'riCM1 ~ -8446 §,.b, " i*D.'. ,. `'g ,- f. _.. _,: _ ~ ..
Atlantic Beach 4,719 35,460 $138,733 3.91 4,566 32,802 $119,670 3.65
Buccaneer 2,469 24,036 $115,523 4.81 2,408 28,154 $123
130 4
37
Total Sewer Sales 7,188 .59,496 5254,256 54.27 6,974 80,956 ,
5242,800 .
53.98
s
Sewer Treatment
'::. ,r p ~+
"i ,rx,, ~ -t .,~S~t °::~:': 'f"i_ .~ ;97y.„p} P
r3''.^,~~~1Y.k. k".#'<'~, aY'~uS~~~
° 6`~*~'~us~".x' ~, v, S3 ~r.~}
Y sk'~}Vk'~.'?. `~Y
~~Si'Ri: r 7r ii '4 ~si .. {'_:
3. .
fr'
Mllllons of Gallons 73.1140 86.3000
Rev. r 1,000 Gallons 53.48 S3.86