Loading...
319 Ahern St ROOF19-0010 pvc membrane roof permit ROOF NON SHINGLE PERMIT PERMIT NUMBER CITY OF ATLANTIC BEACH ROOF19-0010 800 SEMINOLE ROAD ISSUED: 2/6/2019 ATLANTIC BEACH. FL 32233 EXPIRES: 8/5/2019 MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. NOTICE: In addition to the requirements of this permit,there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. JOB ADDRESS: PERMITTYPE: DESCRIPTION: VALUE OF WORK: 319 AHERN ST ROOF NON SHINGLE PVC ROOFING MEMBRANE $10833.00 TYPE OF REALESTATE ZONING: BUILDING USE SUBDIVISION: CONSTRUCTION: NUMBER: GROUP: 1697420000 ATLANTIC BEACH COMPANY: ADDRESS: CITY: STATE: ZIP: Energy Roofing Technology 10153 W US HWY 90 LAKE CITY FL 32055 SE, LLC ADDRESS: STATE: zip: AHERN TH PROJECT LLC 830 13 AIA N #120 PONTEVEDRA FL 32082 BEACH WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION, IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. LIST OF CONDITIONS ,Roll off container company must be on City approved list . Container cannot be placed on city right-of-way. DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT BUILDING PERMIT 45S-0000-322-1000 0 $10S.00 BUILDING PLAN CHECK 455-0000-322-1001 0 $S2.50 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.36 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL:$161.8316 Issued Date: 2/6/2019 1 of 2 ROOF NON SHINGLE PERMIT PERMIT NUMBER ROOF19-0010 CITY OF ATLANTIC BEACH ISSUED: 2/6/2019 800 SEMINOLE ROAD oil ATLANTIC BEACH, FL 32233 EXPIRES: 8/5/2019 Issued Date:2/6/2019 2 of 2 City of Atlantic Beach APPLICATION NUMBER Building Department (To be d b th Building Department.) 800 Seminole Road Atlantic Beach, Florida 32233-5445 Phone(904)247-5826 - Fax(904)247-5845 E-mail: building-dept@coab.us L Date routed: 17 tic) City web-site: hftp://www.coab.us APPLICATION REVIEW AND TRACKING FORM Property Address: 1_4 k e-c Department review required Yes No (::�Build-in-) Applicant: P C 01 L-4 C) Planning &Zoning Tree Administrator Project: Public Works Public Utilities Public Safety Fire Services Review fee $ Dept Signature Other Agency Review or Permit Required Review or Receipt Date of Permit Verified By Florida Dept. of Environmental Protection Florida Dept. of Transportation St.Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS Reviewing Department First Review: [:]Approved. [�_D_enied. [:]Not applicable (Circle one.) Comments: BUILDING PLANNING &ZONING Reviewed by: Date: TREE ADMIN. Second Review: [:]Approved as revised. F]Denied.W RNot applicable PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: FIRE SERVICES Third Review: E]Approved as revised. []Denied. E]Not applicable Comments: Reviewed by: Date: Revised 05/19/2017 If- I Building Permit Application 1,.:.,�a�-,t e�!10/9,1 S l- 7 City of Atlantic Beach Building Department "ALL INFORMATION 800 Seminole Road, Atlantic Beach, FL 32233 HIGHLIGHTED IN GRAY Phone: (904) 247-5826 Email: t3uocIing-beptCd)coab.us IS REQUIRED. afi)l� )5? P Rc Job Address: lqhj&S., ermit Number: C) C I Legal Description -27 ;Zs-,24�� RE# Valuation of Work(Replacement Cost)s 14,SMA� Heated/Cooled SF Non-Heated/Cooled­ • ClassofWork: -Vi(New E:Addition DA(teration 0Repair -�,Move ElDerno --Pool -�Winclow/Door • Use of existing/proposed structure(s): LICommercial 56esidential • If an existing structure,is a fire sprinkler system irstalled?: --Yes F-No • Will tree(s)be removed in association with proposed pro ect? ElYes(r-nust submit separate Tree Removal P_ermi'� !�No Describe in detail the type of work to be performed: 1?0,t1C 1�e'111 Florida Product Approval# f7t—l—�w;y (Iotl)In Z,47-5:-� for multiple products use product approval form PropertX Owner InformatiAn Aj!�-lf ,qll Name klAzAtl -/* lk) Address city pzfi-�z V,--#",q , State r-1- zip 2 Phone , ?0(e- 145-111711 E-Mail "A0WZ111"1,? — 7- Owner o7Ag ent(If Agent, Power of At(orney or Agency Letter Required) Contractor Information Q I.fy. Name of Company - ua i ing Art kv 7.1 o' Address 11416--? h/ City­ZA)V1- S�ate rY-' _Zip -��-'K Office Phone R, 76 k Job Site Contact Number -J65 -/Y Zz State Certification/Registration# g e,-w7Z,,,,000,L e4w I E-MaiI9Z&eJa111,VeE. 1�1-0 e117 Architect Name&Phone# Engineer's Name& Phone# Wo rkers Co m pen sat io n I n s u re r 5�?SA J"Y-I^- -To--)e OR Exempt --- Expiration Date 12- .5/ -2al !F Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all the laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK,PLUMBING,SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS,TANKS,and AIR CONDITIONERS,etc. NOTICE:In addition to the requirements of this permit,there may be additional restrictions applicable to this property that may be found in the public records of this county,and there may be additional permits required from other governmental entities such as water management districts,state agencies,or federal agencies. OWNER'S AFFIDAVIT:I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULTI UR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROP�RTY. IF YOU INTEND SULT ' U R PAY'NG TW TO OBT I FINANCING, CONSULT WITH YOUR LENDER90R�rATTOR EY BEFORE 5 RYECOYOU ICEOF COMMENCEMENT. (Signatur -of Owner or Agent) signat 9f&ntractor) igned and s f ir bef re this ay of Signed and sworn to -, ­ rl': before me this day of by by A-- Cl (Signatu of otary) -(Signature of Notary) F-- A LESLIEANN PIAZZA 4 lvly CO%,,M1SSIO;,4 4 GG09031, 2021] EXPiRES A 1'��Illonally Known OR pril 04.2021 ,it4r)i FSPERGER ersonally Know 51 ]Produced Identi FF 9249 Produced Identification MY "'�43S01 rl F ,Ober 6,2019 pe of Identificati Type of Identification: N ly BordedThru 0'a' """or CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 (904) 247-5800 BUILDING REVIEW COMMENTS Date: 1/30/2019 Permit#: ROOF19-0006 Site Address: 321321 AHERN ST ST Review Status: denied RE#: 169742 0000 Applicant: Energy Roofing Technology SE, LLC -Property Owner: AHERN TH PROJECT LLC Email: geraldine.h@gnerf roofingco.com Email: pparneII1003@gmaii.com ,y__ Phone: 8557663852 Phone: 386.365.1471 3868674756 THIS REVIEW IS ONE OF MULTIPLE DEPARTMENT REVIEWS. Revisions may not be submitted until ALL departments have completed their respective reviews. Revisions submitted MUST respond to EACH department review. Submittals that respond to only one or a few correction items will not be accepted. Correction Comments: 1. The Atlantic Beach Building Department does plan review on all non-shingled roofing systems. 2. Submit 2 copies of the manufacturer's instillation instructions and the Evaluation Report from the DBPR Product Approval Number Website. 3. Of the 32 page report from the evaluation report, highlight the pages that pertain to the site specific instillation details of every item of this roofing system. Highlight only the information on each page that pertains to the instillation of this product and products involved with this roofing system. 4. These documents will be used by the Building Department to inspect the roof instillation from start to finish,multiple inspections to be done, including a roof dry-in, roofing-in-progress and the final roof. 5. If an outside Yd party will be inspecting the roof for its final inspection,the A.B. Building Department will not do its final roof inspections until that 3rd party has completed its evaluation and final inspection. 6. The resubmittals to these plan review comments may trigger more plan review comments. 7. This review is for all roof permits submitted so far for 313, 315, 317, 319, 321, 323 Ahern Street,A.B. Building Mike Jones Building Inspector/Plans Examiner City of Atlantic Beach 800 Seminole Road Atlantic Beach, FL 32233 904.247.5844 Email:mjones@coab.us Resubmittal Notes: Qe V;,e t" All revisions and changes shall clearly stand out from the rest of the drawing on the sheet as a revision by way of completely encircling the change with "clouding".The revision shall also be identified as to the sequence of revision by indicating a triangle with the revision sequence number within it and located adjacent to the cloud.The revision date and revision sequence number shall also be indicated in a conspicuous location in the title block for each sheet on which a revision for that sequence occurs. For projects still in the initial review stage and permit pending, all sheets with revisions shall be inserted into each set of drawings.The original sheets must be clearly marked "VOID" but are to be left within the set of drawings. Complete new sets of drawings will not be accepted.ADDITIONAL ITEMS MAY BE REQUIRED DEPENDING UPON NEW INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW. Revision Request/Correction to Comments "ALL INFORMATION HIGHLIGHTED IN City of Atlantic Beach Building Department GRAY IS REQUIRED. 800 Seminole Rd, Atlantic Beach, FL 32233 Phone: (904) 247-5826 Email: Building-Dept@coab.us PERMIT#: Revision to Issued Permit OR E2_18orrections to Comments Date: Project Address: Z i �) ., -3 U .. 3 US S _Z�� I � 3 1 S F'\ Contractor/Contact Name: Er\ P_r-2,W kocp-�(r�q -1J Contact Phone: Email: 1:�G�SQ -C>Z-74 — Rc�,0r--19- 0C_;>k0 J;�ccD OC_�,C>cj Cz3t7) Description of Proposed Revision Corrections: 'Roor_ — C>0C�,22>> i::;,' c>c> f= L c? c-> c>-7 C�1- C>0C:)C,0 (S-zi - , C__ 0 10 1 0 _-4-A 14�5 e_ J I t P,f z F_ affirm the revision/correction to comments is inclusive of the proposed changes. (printed name) * Will proposed revision/corrections add additional square footage to original submittal? FEB - 1 2019 ENo El Yes (additional s.f.to be added: e Will proposed revision/corrections add additional increase in building value to original submittal? E]No El"Yes (additional increase in building value: $ (Contractor must sign if increase in valuation) *Signature of Contractor/Agent: 'I—�, I:tLl y (Office Use Only) El Approved 11 Denied El Not Applicable to Department PermitFeeDue$ 50#'00 _t' Revision/Plan Review Comments =ent Review Required: Building Z Zoning Reviewed By Tree Administrator Public Works Public Utilities Public Safety Date Fire Services Updated 10/17118 3-Part Specification Division 07 54 19-Polyvi nyl-C h lo ride Roofing Ahern Townhouses 329 Ahern Street Atlantic Beach,Fl,32223 2800 Prepared For: Prepared By: Eric Smith Energy Roofing Duro-Last Roof Assembly Description * Duro-Last@ PVC thermoplastic membrane Membrane Thickness: 50 mil Color: White Attachment:Attached with mechanical fasteners * Duro-Guard@ ISO 11(tapered) Attachment:Attached with mechanical fasteners * Atlas FR-10 fire rated slip sheet Thickness:2 plies Attachment: Loosely laid * 5/8 inch Plywood Roof Deck 3-Part Specification Division 07 54 19-Polyvinyl-Chloride Roofing PART 1 GENERAL 1.1 SECTION INCLUDES A. Duro-Last9 PVC thermoplastic membrane attached with mechanical fasteners. B. Duro-GuardS ISO 11(tapered),attached with mechanical fasteners. C. Atlas FR-10 fire rated slip sheet,loosely laid. D. Prefabricated flashings,comers,parapets, stacks,vents,and related details. E. Fasteners,adhesives,and other accessories required for a complete roofing installation. F. Traffic Protection. 1.2 REFERENCES A. NRCA-The NRCA Roofing and Waterproofing Manual. B. ASCE 7-Minimum Design Loads For Buildings And Other Structures. C. UL-Roofing Materials and Systems Directory,Roofing Systems(TGFU.RI 0 128). D. ASTM C 1289- Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board. E. ASTM D 751 - Standard Test Methods for Coated Fabrics. F. ASTM D 4434- Standard Specification for Poly(Vinyl Chloride) Sheet Roofing. G. ASTM E 108- Standard Test Methods for Fire Tests of Roof Coverings. H. ASTM E 119- Standard Test Methods for Fire Tests of Building Construction and Materials. 1.3 SYSTEM DESCRIPTION A. General: Provide installed roofing membrane and base flashings that remain watertight; do not permit the passage of water; and resist specified uplift pressures,thermally induced movement, and exposure to weather without failure. B. Material Compatibility: Provide roofing materials that are compatible with one another under conditions of service and application required,as demonstrated by roofing membrane manufacturer based on testing and field experience. C. Physical Properties: I. Roof product must meet the requirements of Type III PVC sheet roofing as defined by ASTM D 4434 and must meet or exceed the following physical properties. 2. Thickness: 5 0 mil,nominal, in accordance with ASTM D 75 1. 3. Thickness Over Scrim:�!28 mil in accordance with ASTM D 75 1. 4. Breaking Strengths:�j 3 90 lbf. (MD)and�!43 8 lbf. (XMD)in accordance with ASTM D 75 1, Grab Method. 5. Elongation at Break:�:3 1%(MD)and�!3 1%(XMD)in accordance with ASTM D 75 1,Grab Method. 6. Heat Aging in accordance with ASTM D 3045: 176'F for 56 days.No sign of cracking, chipping or crazing. (In accordance with ASTM D 4434). 075419-1 3-Part Specification Division 07 54 19-Polyvinyl-Chloride Roofing 7. Factory Seam Strength:�!417 lbf. in accordance with ASTM D 75 1,Grab Method. 8. Tearing Strength:�! 132 lbf, (MD)and�! 163 lbf, (XMD) in accordance with ASTM D 75 1, Procedure B. 9. Low Temperature Bend(Flexibility): Pass at-40'F in accordance with ASTM D 2136. 10. Accelerated Weathering:No cracking, checking,crazing,erosion or chalking after 5,000 hours in accordance with ASTM G 154. 11. Linear Dimensional Change: <0.5%in accordance with ASTM D 1204 at 176±2'F for 6 hours. 12. Water Absorption: < 1.7% in accordance with ASTM D 570 at 158'F for 166 hours. 13. Static Puncture Resistance:�: 56 lbs. in accordance with ASTM D 5602. 14. Dynamic Puncture Resistance:> 14.7 ft-lbf. in accordance with ASTM D 5635. D. Cool Roof Rating Council(CRRC): 1. Membrane must be listed on CRRC website. a. Initial Solar Reflectance:> 88% b. Initial Thermal Emittance:�:87% c. Initial Solar Reflective Index(SRI):�: I I I d. 3-Year Aged Solar Reflectance: �:68% e. 3-Year Aged Thermal Emittance: > 84% f. 3-Year Aged Solar Reflective Index(SRI):> 82 E. Insulation 1. Provide overall thermal resistance for roofing system as follows: a. Average R-value: 13.1. 2. Tapered Insulation Slope: 1/4 inch per foot. 3. Configuration as indicated on the Drawings. 1.4 SUBMITTALS A. Submit under provisions of Section 01300. B. Duro-Last data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. 3. Installation methods. 4. Maintenance requirements. C. Shop Drawings: Indicate insulation pattern,overall membrane layout,field seam locations,joint or termination detail conditions,and location of fasteners. 075419-2 3-Part Specification Division 07 54 19-Polyvinyl-Chloride Roofing D. Verification Samples: For each product specified,two samples,representing actual prodLlCt, color,and finish. I. 4 inch by 6 inch sample of roofing membrane, of color specified. 2. 4 inch by 6 inch sample of walkway pad. 3. Termination bar,fascia bar with cover,drip edge and gravel stop if to be used. 4. Each fastener type to be used for installing membrane, insulation/recover board,termination bar and edge details. E. Installer Certification: Certification from the roofing system manufacturer that Installer is approved,authorized,or licensed by manufacturer to install roofing system. F. Manufacturer's warranties. 1.5 QUALITY ASSURANCE A. Perform work in accordance with manufacturees installation instructions. B. Manufacturer Qualifications: A manufacturer specializing in the production of PVC membranes systems and utilizing a Quality Control Manual during the production of the membrane roofing system that has been approved by and is inspected by Underwriters Laboratories. C. Installer Qualifications: Company specializing in installation of roofing systems similar to those specified in this project and approved by the roofing system manufacturer. D. Source Limitations: Obtain components for membrane roofing system from roofing membrane manufacturer. E. There shall be no deviations from the roof membrane manufacturees specifications or the approved shop drawings without the prior written approval of the manufacturer. 1.6 REGULATORY REQUIREMENTS A. Conform to applicable code for roof assembly wind uplift and fire hazard requirements. B. Fire Exposure: Provide membrane roofing materials with the following fire-test-response characteristics. Materials shall be identified with appropriate markings of applicable testing and inspecting agency. I. Exterior Fire-Test Exposure: a. Class A;ASTM E 108, for application and roof slopes indicated. 2. Fire-Resistance Ratings: Comply with ASTM E 119 for fire-resistance-rated roof assemblies of which roofing system is a part. 3. Conform to applicable code for roof assembly fire hazard requirements. C. Wind Uplift: 1. Roofing System Design: Provide a roofing system designed to resist uplift pressures calculated according to the current edition of the ASCE-7 Specification Minimum Design Loadsfor Buildings And Other Structures. 075419-3 3-Part Specification Division 07 54 19-Polyvinyl-Chloride Roofing 1.7 PRE-INSTALLATION MEETING A. Convene meeting not less than one week before starting work of this section. B. Review methods and procedures related to roof deck construction and roofing system including, but not limited to,the following. I. Meet with Owner,Architect, Owner's insurer if applicable,testing and inspecting agency representative,roofing installer,roofing system manufacturer's representative, deck installer, and installers whose work interfaces with or affects roofing including installers of roof accessories and roof-mounted equipment. 2. Review and finalize construction schedule and verify availability of materials, installer's personnel, equipment, and facilities needed to make progress and avoid delays. 3. Examine deck substrate conditions and finishes for compliance with requirements, including flatness and fastening. 4. Review structural loading limitations of roof deck during and after roofing. 5. Review base flashings, special roofing details,roof drainage,roof penetrations,equipment curbs,and condition of other construction that will affect roofing system. 6. Review governing regulations and requirements for insurance and certificates if applicable. 7. Review temporary protection requirements for roofing system during and after installation. 8. Review roof observation and repair procedures after roofing installation. 1.8 DELIVERY, STORAGE AND HANDLING A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled with manufacturer's name,product brand name and type,date of manufacture,and directions for storing and mixing with other components. B. Store liquid materials in their original undamaged containers in a clean,dry,protected location and within the temperature range required by roofing system manufacturer. Protect stored liquid material from direct sunlight. C. Protect roof insulation materials from physical damage and from deterioration by sunlight, moisture, soiling, and other sources. Store in a dry location. Comply with insulation manufacturer's written instructions for handling, storing,and protecting during installation. D. Store roof materials and place equipment in a manner to avoid permanent deflection of deck. E. Store and dispose of solvent-based materials,and materials used with solvent-based materials, in accordance with requirements of local authorities having jurisdiction. 1.9 WARRANTY A. Contractor's Warranty: The contractor shall warrant the roof application with respect to workmanship and proper application for two(2)years from the effective date of the warranty issued by the manufacturer. B. Manufacturer's Warranty: Must provide for completion of repairs,replacement of membrane or total replacement of the roofing system at the then-current material and labor prices throughout the life of the warranty. In addition the warranty must meet the following criteria: 1. Warranty Period: 20 years from date issued by the manufacturer. 2. First 15 years: 075419-4 3-Part Specification Division 07 54 19-Polyvinyl-Chloride Roofing a. Must provide for completion of repairs, replacement of membrane or total replacement of the roofing system at the then-cuffent material and labor prices. b. No exclusions for incidental or consequential damages. 3. Last 5 years: a. Excludes incidental and consequential damages. 4. Must provide positive drainage(no ponding water). 5. No exclusion for damage caused by biological growth. 6. Issued direct from and serviced by the roof membrane manufacturer. 7. Transferable for the full term of the warranty. PART 2 PRODUCTS 2.1 MANUFACTURER A. Manufacturer: Duro-Last Roofing, Inc.,which is located at: 525 Morley Drive, Saginaw, MI 48601. Telephone: 800-248-0280. B. All roofing system components to be provided or approved by Duro-Last Roofing, Inc. C. Substitutions: Not permitted. 2.2 ROOFING SYSTEM COMPONENTS A. Roofing Membrane: Duro-Lastg PVC thermoplastic membrane conforming to ASTM D 4434, type III, fabric-reinforced,PVC,NSF/ANSI 347 Gold or Platinum Certification,and a product- specific third-party verified Environmental Product Declaration. Membrane properties as follows: I. Thickness: a. 50 mil. 2. Exposed Face Color: a. White. 3. Minimum recycle content 7%post-industrial and 0%post-consumer. 4. Recycled at end of life into resilient flooring or concrete expansion joints. B. Accessory Materials: Provide accessory materials supplied by or approved for use by Duro-Last Roofing,Inc. I. Sheet Flashing: Manufacturer's standard reinforced PVC sheet flashing. 2. Duro-Last Factory Prefabricated Flashings: manufactured using Manufacturer's standard reinforced PVCmembrane. a. Stack Flashings. b. Curb Flashings. c. Inside and Outside Comers. 3. Sealants and Adhesives: Compatible with roofing system and supplied by Duro-Last Roofing, Inc. 075419-5 3-Part Specification Division 07 54 19-Polyvinyl-Chloride Roofing a. Duro-Caulkg Plus. b. Strip Mastic. 4. Slip Sheet: Compatible with roofing system and supplied by Duro-Last Roofing, Inc. 5. Fasteners and Plates: Factory-coated steel fasteners and metal or plastic plates meeting corrosion-resistance provisions in FMG 4470,designed for fastening membrane and insulation to substrate. Supplied by Duro-Last Roofing,Inc. a. #14 Heavy Duty Fasteners. b. Cleat Plates. c. 3 inch Metal Plates. 6. PV Anchors 7. Termination and Edge Details: Supplied by Duro-Last Roofing, Inc. a. Termination Bar. b. Vinyl Fascia Bar. c. Vinyl Fascia Cover. 8. Vinyl Coated Metal: Supplied by Duro-Last Roofing,Inc.24 gauge,hot-dipped galvanized, grade 90 metal with a minimum of 17 mil of Duro-Last membrane laminated to one side. 9. Two-Way Roof Vents: Supplied by Duro-Last Roofing,Inc. Install a minimum of I vent for each 1,000 ft2(93 M2)of roof area. C. Coated Glass Slip Sheet: 1. Atlas FR-10 fire rated slip sheet. a. 2 plies D. Walkways: 1. Provide non-skid,maintenance-free walkway pads in areas of heavy foot traffic and around mechanical equipment. a. Duro-Last Roof TrakO III Walkway Pad. 2.3 ROOF INSULATION A. General: 1. Provide preformed roof insulation boards that comply with requirements and referenced standards,as selected from manufacturer's standard sizes. 2. Provide preformed saddles,crickets,and other insulation shapes where indicated for sloping to drain.Fabricate to slopes indicated. B. Polyisocyanurate Board Insulation: Complying with ASTM C 1289,Type 11,felt or glass-fiber mat facer on both major surfaces. Material as supplied by Duro-Last. 1. Duro-GuardO ISO 11(tapered). 2.4 ROOF INSULATION ACCESSORIES A. General: Provide roof insulation accessories approved by the roof membrane manufacturer and as recommended by insulation manufacturer for the intended use. 075419-6 3-Part Specification Division 07 54 19-Polyvinyl-Chloride Roofing B. Fasteners: Provide Duro-Last factory-coated steel fasteners and metal or plastic plates meeting corrosion-resistance provisions in FMG 4470, designed for fastening insulation and/or insulation cover boards in conformance to specified design requirements. PART 3 EXECUTION 3.1 EXAMINATION A. Verify that the surfaces and site conditions are ready to receive work. B. Verify that the deck is supported and secured. C. Verify that the deck is clean and smooth,free of depressions,waves,or projections,and properly sloped to drains,valleys, eaves, scuppers or gutters. D. Verify that the deck surfaces are dry and free of standing water, ice or snow. E. Verify that all roof openings or penetrations through the roof are solidly set. F. If substrate preparation is the responsibility of another contractor,notify Architect of unsatisfactory preparation before proceeding. 3.2 PREPARATION A. Clean surfaces thoroughly prior to installation. B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions. C. Surfaces shall be clean, smooth, free of fins, sharp edges, loose and foreign material,oil, grease, and bitumen. 3.3 INSTALLATION A. Install insulation in accordance with the roof manufacturer's requirements. B. Separation Slip Sheet: Atlas FR-10 fire rated slip sheet. 1. Install in accordance with the roof manufacturer's requirements. C. Insulation: Duro-GuardO ISO 11(tapered). I. Install insulation in accordance with the roof manufacturer's requirements. 2. Insulation shall be adequately supported to sustain normal foot traffic without damage. 3. Where field trimmed, insulation shall be fitted tightly around roof protrusions with no gaps greater than 1/4inch. 4. Tapered insulation boards shall be installed in accordance with the insulation manufacture's shop drawings. 5. No more insulation shall be applied than can be covered with the roof membrane by the end of the day or the onset of inclement weather. 6. If more than one layer of insulation is used, all joints between subsequent layers shall be offset by at least 6 inches. 7. Mechanical Attachment: Use only fasteners, stress plates and fastening patterns accepted for use by the roof manufacturer. Fastening patterns must meet applicable design requirements. 075419-7 3-Part Specification Division 07 54 19-Polyvinyl-Chloride Roofing a. Install fasteners in accordance with the roof manufacturer's requirements.Fasteners that are improperly installed must be replaced or corrected. 8. Mechanically attach Duro-GuardO ISO 11(tapered) insulation boards in parallel courses with end joints staggered 50%and adjacent boards butted together with no gaps greater than '/4inch. D. Roof Membrane: 50 mil, Duro-LastS PVC thermoplastic membrane. I. Use only fasteners, stress plates and fastening patterns accepted for use by the roof manufacturer. Fastening patterns must meet the applicable design requirements. 2. Install fasteners in accordance with the roof manufacturer's requirements. Fasteners that are improperly installed shall be replaced or corrected. 3. Mechanically fasten membrane to the structural deck utilizing fasteners and fastening patterns that in accordance with the roof manufacturer's requirements. 4. Cut membrane to fit neatly around all penetrations and roof projections. 5. Unroll roofing membrane and positioned with a minimum 6 inch overlap. E. Seaming: 1. Weld overlapping sheets together using hot air. Minimum weld width is 1-1/2 inches. 2. Check field welded seams for continuity and integrity and repair all imperfections by the end of each work day. F. Membrane Termination/Securement: All membrane terminations shall be completed in accordance with the membrane manufacturer's requirements. I. Provide securement at all membrane terminations at the perimeter of each roof level,roof section,curb flashing, skylight,expansion joint, interior wall,penthouse,and other similar condition. 2. Provide securement at any angle change where the slope or combined slopes exceeds two inches in one horizontal foot. G. Flashings: Complete all flashings and terminations as indicated on the drawings and in accordance with the membrane manufacturer's requirements. I. Provide securement at all membrane terminations at the perimeter of each roof level, roof section,curb flashing, skylight,expansion joint, interior wall, penthouse,and other similar condition. a. Do not apply flashing over existing thru-wall flashings or weep holes. b. Secure flashing on a vertical surface before the seam between the flashing and the main roof sheet is completed. c. Extend flashing membrane a minimum of 6 inches(152 mm)onto the main roof sheet beyond the mechanical securement. d. Use care to ensure that the flashing does not bridge locations where there is a change in direction(e.g.where the parapet meets the roof deck). 2. Penetrations: a. Flash all pipes,supports, soil stacks,cold vents,and other penetrations passing through the roofing membrane as indicated on the Drawings and in accordance with the membrane manufacturer's requirements. b. Utilize custom prefabricated flashings supplied by the membrane manufacturer. 075419-8 3-Part Specification Division 07 54 19-Polyvinyl-Chloride Roofing c. Existing Flashings: Remove when necessary to allow new flashing to terminate directly to the penetration. 3. Pipe Clusters and Unusual Shapes: a. Clusters of pipes or other penetrations which cannot be sealed with prefabricated membrane flashings shall be sealed by surrounding them with a prefabricated vinyl- coated metal pitch pan and sealant supplied by the membrane manufacturer. b. Vinyl-coated metal pitch pans shall be installed, flashed and filled with sealant in accordance with the membrane manufacturer's requirements. c. Pitch pans shall not be used where prefabricated or field fabricated flashings are possible. H. Roof Drains: I. Coordinate installation of roof drains and vents specified in Section 15146-Plumbing Specialties. 2. Remove existing flashing and asphalt at existing drains in preparation for sealant and membrane. 3. Provide a smooth clean surface on the mating surface between the clamping ring and the drain base. 1. Edge Details: 1. Provide edge details as indicated on the Drawings. Install in accordance with the membralle manufacturer's requirements. 2. Join individual sections in accordance with the membrane manufacturer's requirements. 3. Coordinate installation of metal flashing and counter flashing specified in Section 07620. 4. Manufactured Roof Specialties: Coordinate installation of copings,counter flashing systems, gutters,downspouts,and roof expansion assemblies specified in Section 07710. J. Walkways: I. Install walkways in accordance with the membrane manufacturer's requirements. 2. Provide walkways where indicated on the Drawings. 3. Install walkway pads at roof hatches, access doors,rooftop ladders and all other traffic concentration points regardless of traffic frequency. Provided in areas receiving regular traffic to service rooftop units or where a passageway over the surface is required. 4. Do not install walkways over flashings or field seams until manufacturer's warranty inspection has been completed. K. Water cut-offs: I. Provide water cut-offs on a daily basis at the completion of work and at the onset of inclement weather. 2. Provide water cut-offs to ensure that water does not flow beneath the completed sections of the new roofing system. 3. Remove water cut-offs prior to the resumption of work. 4. The integrity of the water cut-off is the sole responsibility of the roofing contractor. 5. Any membrane contaminated by the cut-off material shall be cleaned or removed. 3.4 FIELD QUALITY CONTROL 075419-9 3-Part Specification Division 07 54 19-Polyvinyl-Chloride Roofing A. The membrane manufacturer's representative shall provide a comprehensive final inspection after completion of the roof system. All application errors shall be addressed and final punch list completed. 3.5 PROTECTION A. Protect installed roofing products from construction operations until completion of project. B. Where traffic is anticipated over completed roofing membrane,protect from damage using durable materials that are compatible with membrane. C. Repair or replace damaged products after work is completed. END OF SECTION 075419- 10 3-Part Specification Division 07 54 19-Polyvinyl-Chloride Roofing Ahern Townhouses 329 Ahern Street Atlantic Beach,FL 32223 2800 Prepared For: Prepared By:Eric Smith Energy Roofing Duro-Last Roof Assembly Description 0 Duro-Last@ PVC thermoplastic membrane Membrane Thickness: 50 mil Color:White Attachment:Attached with mechanical fasteners 0 Duro-Guard@ ISO 11(tapered) Attachment:Attached with mechanical fasteners * Atlas FR-10 fire rated slip sheet Thickness:2 plies Attachment: Loosely laid 0 5/8 inch Plywood Roof Deck 3-Part Specification Division 07 54 19-Polyvinyl-Chloride Roofing 7. Factory Seam Strength:�:417 lbf. in accordance with ASTM D 75 1, Grab Method. 8. Tearing Strength:�: 132 lbf. (MD)and�: 163 lbf, (XMD) in accordance with ASTM D 75 1, Procedure B. 9. Low Temperature Bend(Flexibility):Pass at-40 'F in accordance with ASTM D 2136. 10. Accelerated Weathering:No cracking, checking, crazing,erosion or chalking after 5,000 hours in accordance with ASTM G 154. 11. Linear Dimensional Change: <0.5% in accordance with ASTM D 1204 at 176±2 'F for 6 hours. 12. Water Absorption:< 1.7% in accordance with ASTM D 570 at 158'F for 166 hours. 13. Static Puncture Resistance:?:56 lbs. in accordance with ASTM D 5602. 14. Dynamic Puncture Resistance:?: 14.7 ft-lbf. in accordance with ASTM D 5635. D. Cool Roof Rating Council(CRRQ: 1. Membrane must be listed on CRRC website. a. Initial Solar Reflectance:�:88% b. Initial Thermal Emittance:> 87% c. Initial Solar Reflective Index(SRI):?: I I I d. 3-Year Aged Solar Reflectance:?!68% e. - 3-Year Aged Thermal Emittance:?:84% f. 3-Year Aged Solar Reflective Index(SRI):?!82 E. Insulation 1. Provide overall thermal resistance for roofmg system as follows: a. Average R-value: 13.1. 2. Tapered Insulation Slope: 1/4 inch per foot. 3. Configuration as indicated on the Drawings. 1.4 SUBMITTALS A. Submit under provisions of Section 01300. B. Duro-Last data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. 3. Installation methods. 4. Maintenance requirements. C. Shop Drawings: Indicate insulation pattern,overall membrane layout,field seam locations,joint or termination detail conditions,and location of fasteners. 075419-2 3-Part Specification Division 07 54 19-Polyvinyl-C h loride Roofing 1.7 PRE-INSTALLATION MEETING A. Convene meeting not less than one week before starting work of this section. B. Review methods and procedures related to roof deck construction and roofing system including, but not limited to,the following. I. Meet with Owner,Architect,Owner's insurer if applicable,testing and inspecting agency representative,roofing installer,roofing system manufacturer's representative,deck installer, and installers whose work interfaces with or affects roofing including installers of roof accessories and roof-mounted equipment. 2. Review and finalize construction schedule and verify availability of materials, installer's personnel,equipment,and facilities needed to make progress and avoid delays. 3. Examine deck substrate conditions and finishes for compliance with requirements, including flatness and fastening. 4. Review structural loading limitations of roof deck during and after roofing. 5. Review base flashings, special roofing details,roof drainage,roof penetrations,equipment curbs, and condition of other construction that will affect roofing system. 6. Review governing regulations and requirements for insurance and certificates if applicable. 7. Review temporary protection requirements for roofing system during and after installation. 8. Review roof observation and repair procedures after roofing installation. 1.8 DELIVERY, STORAGE AND HANDLING A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled with manufacturer's name,product brand name and type,date of manufacture,and directions for storing and mixing with other components. B. Store liquid materials in their original undamaged containers in a clean, dry,protected location and within the temperature range required by roofing system manufacturer.Protect stored liquid material from direct sunlight. C. Protect roof insulation materials from physical damage and from deterioration by sunlight, moisture,soiling, and other sources. Store in a dry location.Comply with insulation manufacturer's written instructions for handling, storing, and protecting during installation. D. Store roof materials and place equipment in a manner to avoid permanent deflection of deck. E. Store and dispose of solvent-based materials, and materials used with solvent-based materials, in accordance with requirements of local authorities having jurisdiction. 1.9 WARRANTY A. Contractor's Warranty: The contractor shall warrant the roof application with respect to workmanship and proper application for two(2)years from the effective date of the warranty issued by the manufacturer. B. Manufacturer's Warranty:Must provide for completion of repairs,replacement of membrane or total replacement of the roofing system at the then-current material and labor prices throughout the life of the warranty.In addition the warranty must meet the following criteria: 1. Warranty Period: 20 years from date issued by the manufacturer. 2. First 15 years: 075419-4 3-Part Specification Division 07 54 19-Polyvinyl-Chloride Roofing a. Duro-CaulkS Plus. b. Strip Mastic. 4. Slip Sheet: Compatible with roofing system and supplied by Duro-Last Roofing,Inc. 5. Fasteners and Plates: Factory-coated steel fasteners and metal or plastic plates meeting corrosion-resistance provisions in FMG 4470,designed for fastening membrane and insulation to substrate. Supplied by Duro-Last Roofing,Inc. a. #14 Heavy Duty Fasteners. b. Cleat Plates. c. 3 inch Metal Plates. 6. PV Anchors 7. Termination and Edge Details: Supplied by Duro-Last Roofing,Inc. a. Termination Bar. b. Viny I Fascia Bar. c. Vinyl Fascia Cover. 8. Vinyl Coated Metal: Supplied by Duro-Last Roofing, Inc. 24 gauge,hot-dipped galvanized, grade 90 metal with a minimum of 17 mil of Duro-Last membrane laminated to one side. 9. Two-Way Roof Vents: Supplied by Duro-Last Roofing,Inc. Install a minimum of I vent for each 1,000 f12(93 M2)of roof area. C. Coated Glass Slip Sheet: 1. Atlas FR-10 fire rated slip sheet. a. 2 plies D. Walkways: 1. Provide non-skid,maintenance-free walkway pads in areas of heavy foot traffic and around mechanical equipment. a. Duro-Last Roof TraklD III Walkway Pad. 2.3 ROOF INSULATION A. General: 1. Provide preformed roof insulation boards that comply with requirements and referenced standards,as selected from manufacturer's standard sizes. 2. Provide preformed saddles,crickets,and other insulation shapes where indicated for sloping to drain.Fabricate to slopes indicated. B. Polyisocyanurate Board Insulation: Complying with ASTM C 1289,Type H,felt or glass-fiber mat facer on both major surfaces. Material as supplied by Duro-Last. 1. Duro-Guard(&ISO H(tapered). 2.4 ROOF INSULATION ACCESSORIES A. General:Provide roof insulation accessories approved by the roof membrane manufacturer and as recommended by insulation manufacturer for the intended use. 075419-6 3-Part Specification Division 07 54 19-Polyvinyl-Chloride Roofing a. Install fasteners in accordance with the roof manufacturer's requirements.Fasteners that are improperly installed must be replaced or corrected. 8. Mechanically attach Duro-Guard(V ISO 11(tapered) insulation boards in parallel courses with end joints staggered 50%and adjacent boards butted together with no gaps greater than '/4 inch. D. Roof Membrane: 50 mil,Duro-LastS PVC thermoplastic membrane. 1. Use only fasteners, stress plates and fastening patterns accepted for use by the roof manufacturer.Fastening patterns must meet the applicable design requirements. 2. Install fasteners in accordance with the roof manufacturer's requirements. Fasteners that are improperly installed shall be replaced or corrected. 3. Mechanically fasten membrane to the structural deck utilizing fasteners and fastening patterns that in accordance with the roof manufacturer's requirements. 4. Cut membrane to fit neatly around all penetrations and roof projections. 5. Unroll roofing membrane and positioned with a minimum 6 inch overlap. E. Seaming: 1. Weld overlapping sheets together using hot air.Minimum weld width is 1-1/2 inches. 2. Check field welded seams for continuity and integrity and repair all imperfections by the end of each work day. F. Membrane Termination./Securement: All membrane terminations shall be completed in accordance with the membrane manufacturer's requirements. I. Provide securement at all membrane terminations at the perimeter of each roof level,roof section,curb flashing, skylight,expansion joint interior wall,penthouse,and other similar condition. 2. Provide securement at any angle change where the slope or combined slopes exceeds two inches in one horizontal foot. G. Flashings: Complete all flashings and terminations as indicated on the drawings and in accordance with the membrane manufacturer's requirements. I. Provide securement at all membrane terminations at the perimeter of each roof level,roof section,curb flashing, skylight,expansion joint,interior wall,penthouse,and other similar condition. a. Do not apply flashing over existing thru-wall flashings or weep holes. b. Secure flashing on a vertical surface before the seam between the flashing and the main roof sheet is completed. c. Extend flashing membrane a minimum of 6 inches(152 mm)onto the main roof sheet beyond the mechanical securement. d. Use care to ensure that the flashing does not bridge locations where there is a change in direction(e.g. where the parapet meets the roof deck). 2. Penetrations: a. Flash all pipes,supports, soil stacks,cold vents,and other penetrations passing through the roofing membrane as indicated on the Drawings and in accordance with the membrane manufacturer's requirements. b. Utilize custom prefabricated flashings supplied by the membrane manufacturer. 075419-8 3-Part Specification Division 07 54 19-Polyvinyl-Chioride Roofing A. The membrane manufacturer's representative shall provide a comprehensive final inspection after completion of the roof system. All application errors shall be addressed and final punch list completed. 3.5 PROTECTION A. Protect installed roofing products from construction operations until completion of project. B. Where traffic is anticipated over completed roofing membrane,protect from damage using durable materials that are compatible with membrane. C. Repair or replace damaged products after work is completed. END OF SECTION 075419-10 Certificate of Authorization No. 29824 CREEK 17520 Edinburgh Dr OFFICE COPY Tampa, FL 33647 TECHNICAL SERVICES, LLC (813)480-3421 EVALUATION REPORT FLORIDA BUILDING CODE,6 TH EDITION(2017) Manufacturer: Duro-Last Roofing, Inc. Issued October 12, 2018 525 Morley Drive Saginaw, MI 48601 989-737-3043 www.duro-last.com REVIEWED FOR CODE COMPLIANCE Manufacturing Plants: Saginaw, MI CITY OF ATLANTIC BEACH Jackson, MS SEE PERMITS FOR ADDITIONAL Sigourney, IA REQUIREMENTS AND CONDITIONS Quality Assurance: UL LLC(QUA1743) REVIEWED By.___Z2L� DATE: d SCOPE Category: Roofing Subcategory: Single Ply Roof System Code Sections: 1504.3.1, 1504.6, 1507.13.2, 1515.1.1, 1515.1.4, 1523.1.1, 1523.6.2 Properties: Wind Resistance, Physical Properties PRODUCT DESCRIPTION Products Specification Description Duro-Last Designer Series ASTM D 4434 Nominal 50-mil thick single-ply roof membrane composed of a Membrane thermoplastic polyvinyl chloride film laminated to both sides of a polyester fabric scrim. The membranes are available as Rock-Plya and Shingle-Ply@ prefabricated sections or roll goods. Duro-Last Membrane ASTM D 4434 Nominal 40-mil (DL40), 50-mil(DL50), or 60-mil (DL60)thick single-ply roof membrane composed 6Ta Tthermoplastic polyvinyl chloride film laminated to both sides of a polyester fabric scrim. The membranes are available as prefabricated sections or roll goods. Duro-Fleece Membrane ASTM D 4434 Nominal 50-mil (DF50), 60-mil (DF60), or 80-mil (DF80) thick single-ply roof membrane composed of a thermoplastic polyvinyl chloride film laminated to both sides of a polyester fabric scrim and backed with fleece. Duro-Tuff membranes are available in the following colors:White for all thickness, and Blue, Copper, Charcoal, Green, Light Gray, Patina, and Light Tan for DF50 and DF60 only The membranes are available as roll goods. Duro-Fleece Plus Membrane ASTM D 4434 Nominal 50-mil (DFP50) or 60-mil (DFP60) thick single-ply roof membrane composed of a thermoplastic polyvinyl chloride film laminated to both sides of a polyester fabric scrim and backed with fleece. The membranes are available as roll goods. Duro-Tuff Membrane ASTM D 4434 Nominal 50-mil (DT50), 60-mil(DT60), or 80-mil(DT80)thick single-ply roof membrane composed of a thermoplastic polyvinyl chloride film laminated to both sides of a polyester fabric scrim. Duro-Tuff membranes are available in the following colors:White for all thickness, and Blue, Copper, Charcoal, Green, Light Gray, Patina, and Light Tan for DT50 and DT60 only. The membranes are available as roll goods. DLR12001.14 FL16039-R14 Page 1 of 5 This evaluation report is provided for State of Florida product approval under Rule 61G20-3. The manufacturer shall notify CREEK Technical Services, LLC of any product changes or quality assurance changes throughout the duration for which this report is valid. This evaluation report does not express nor imply warranty, installation, recommended use, or other product attributes that are not specifically addressed herein. DURO-LAST ROOFING, INC. CREEKPVC Single-Ply Roofing Membranes TECHNICAL SERVICES, LLC APPENDIX B Me anically Fastened Recover Assemblies System Existing Roof Insulation Insulation Membrane Membrane Attachment MDP >_ No. Attachment CL Min.26 ga. R-Panel or Approved Insulation PBR panel metal roofing at filled between ribs. Preliminarily Duro-Last#15 Extra Heavy Duty Drill Point Fastener and -45 R-M-1 1 max. 5ft span and fastened Min. 0.5-inch secured DT Duro-Last Poly-Plates fastened 6-inch o.c. (Lim.7) 6-inch o.c.at each support Approved Insulation within 6-inch wide laps spaced 54-inch o.c with min.#12 HWH screws above ribs Duro-Last#15 Extra Heavy Duty Drill Point Fastener and C) R-M-1 2 Steel Deck DT Duro-Last Poly-Plates or Cleat Plates fastened 6-inch o.c.within -52.5 (G33, L6, PIN, S24) 6-inch wide laps spaced 54-inch o.c.; (Lim.7) fastener centered 1.25-inches from edge of tab Steel Deck OPTIONAL Preliminarily Duro-Last#15 Extra Heavy Duty Drill Point Fastener and -52.5 C) R-M-1 3 (G33, L6, PIN, SO) Approved Insulation secured DL Poly-Plates or Cleat Plates fastened 6-inch o.c. (Lim.7) along the 3-inch wide tabs spaced 60-inch o.c. Wood Deck OPTIONAL Preliminarily Duro-Last#15 Extra Heavy Duty Drill Point Fastener and -52.5 R-M-14 (TI9132, L24, 0.113-616) Approved Insulation secured DL Duro-Last Cleat Plates or Poly-Plates fastened 6-inch o.c.along (Lim.7) 3-inch wide tabs spaced 60-inch o.c. Duro-Last#15 Extra Heavy Duty Drill Point Fastener and R-M-15 Wood Deck OPTIONAL Preliminarily DL Duro-Last Cleat Plates fastened 6-inch o.c. -52.5 (TI9132, L24, 8d-616) Approved Insulation secured along 6-inch wide tabs spaced 57-inch o.c. (Lim.7) (Screws located 2.7-inches from tab edge) Wood Deck OPTIONAL Preliminarily Duro-Last#14 HD Fastener and Duro-Last 3-inch Metal Plates -52.5 R-M-16 (T19/32, L24, 8d-616) Approved Insulation secured DL fastened 6-inch o.c.along 6-inch wide tabs spaced 57-inch o.c. (Lim.7) Tab Sealer 4725 applied at 60 ft2/gal. Min.24 ga. R-Panel or Approved Insulation PBR panel metal roofing at filled between ribs Duro-Last#15 Extra Heavy Duty Drill Point Fastener and R-M-17 max. 5ft span and fastened Min.0.5-inch Preliminarily DL Duro-Last Cleat Plates or Poly-Plates fastened 12-inch o.c. -52.5 12-inch o.c.at each support Approved Insulation secured along 3-inch wide tabs spaced 28-inch o.c. (Lim.7) with min.#12 HWH screws above ribs I with min. 0.5-inch washers Min. 26 ga. R-Panel or Approved Insulation PBR panel metal roofing at filled between ribs. Preliminarily Duro-Last#15 Extra Heavy Duty Drill Point Fastener and -52.5 R-M-18 max. 5ft span and fastened Min. 0.5-inch secured DT Duro-Last Poly-Plates fastened 12-inch o.c. (Lim.7) 6-inch o.c.at each support Approved Insulation within 6-inch wide laps spaced 24-inch o.c with min.#12 HWH screws above ribs Wood Deck OPTIONAL Preliminarily Duro-Last#15 Extra Heavy Duty Drill Point Fastener and -60 R-M-19 (T19132, L24, 0.113-616) Approved Insulation secured DL Duro-Last Cleat Plates or Poly-Plates fastened 6-inch o.c.along (Lim.7) 1 6-inch wide tabs spaced 120-inch o.c. Wood Deck Duro-Last#15 Extra Heavy Duty Drill Point Fastener and -60 R-M-20 (T15132, L24, 0,113-616) DT Duro-Last Poly-Plates or Cleat Plates fastened (Lim.7) 6-inch o.c.within 6-inch wide laps in rows spaced 24-inch o.c Wood Deck Duro-Last#15 Extra Heavy Duty Drill Point Fastener and -60 R-M-21 (T15132, L24, 0.113-616) DL Duro-Last Poly-Plates or Cleat Plates fastened (Lim.7) 1 6-inch o.c.along 3-inch wide tabs spaced 28-inch o.c. I i DLR12001.14 FL16039-R14 Page 20 of 32 This evaluation report is provided for State of Florida product approval under Rule 61G20-3. The manufacturer shall notify CREEK Technical Services, LLC of any product changes or quality assurance changes throughout the duration for which this report is valid. This evaluation report does not express nor imply warranty, installation, recommended use, or other product attributes that are not specifically addressed herein. DETAIL 1020 DUROo-LAST #0000; THE WORLD'S BEST ROOF, 4 x 8 ft (;Opy 4 x 4 ft Approved Insulation Approved Insulation (D 0 (D 0 (D (D 0 0 (D 611 J 6" 6" 2 x 4 ft 4 x 8 ft Approved Insulation Approved Cover Board CD 01 ID (D E) (D (D CD 0 611 CD CD 6" 3 r T T 12" – *� �w— 6" ; Note 1- It is recommended to stagger all joints between boards by 50% from row to row and layer to layer. Note 2- Adjoin panel edges together. Neatly fit to the roof deck and around penetrations with no gaps greater than 1/4 inch. Note 3: Fasten with approved plates and fasteners. Note 4- These fastening patterns are to be used with mechanically fastened systems only. REVISED: 01/30/2017 GENERAL DETAIL FOR MECHANICALLY FASTENED SYSTEMS PREVIOUS: 01/01/2009 INSULATION AND RECOVER FASTENING k2CALE: NONE NEW CONSTRUCTION OR RE-ROOF 4%H i J.