Loading...
Exh 4APREPARED 6/03/02, 8:24:40 LICENSE ACZIV ITV REPGRT BY 6USIKESS NARE PAGE 1 Cify of A f laaf is Eeaffi XEd LI CE.V SES FOR YEAR: 2002 BETdEE=1: OSj01/02 TO 06 )01{02 FROGAV4 O L122L DEPT: OCCUPATI O!iAL LICEYSS DEPT CLASS: ALL CLAS SES LIC 0 BUSINESS Ni><r ISSUED TYPE CLASSI FICATI O:1 SUSIIIESS ADDRESS Onn^.IE3 NAY`n b ADDRESS EUS PHOi:E 4 02-05329 EEACH EVGGIES b 4 R 9•S, INC. 5/23/02 HE'd VE`~I1G NACA INE 1194 N_4YPOR7 RD 4 1-3 BILLY b AI LE~iA HITT 904-242-0392 ATLAttt IC BEACH FL 32233 9227 SAV PA=_LO ROAD, JACKSGSVILLE FL 32224 02-05310 DWAYNE PLASS SUPER SHINE 5/02/02 NEW MISC. SERVICE ESTASLI Sia'NENT, N07 LISTED 1212 VIOLET' ST DNAYNE PLASS 909-934-3223 ATLANTIC EEACH FL 32233 1212 VIOLET ST, ATLANTIC EEACH FL 32233 02-05309 FU: ~.AY'S LAYDSCAFE b LA:.V CA4E 5/02/02 kEA LAF'Y/YARD SERVICE 724 EASt COAST GR 41 FUR'!4Y PATRICK EDDINGS 904-246-5993 ATLA-YTIC EFACH FL 32233 724 EAST CVA9T DRI42 41, ATLANTIC BFACH FL 3223 3 02-05319 H H b A CONSTRUCTION, INC. 5/19/02 h-d CARPE.`ITRY 645 OL MAYPORT RD 43A 809 ALLIGOOD 904-241-0474 ATLANTIC EEACH FL 32233 13698 EROI!LEY PT DRIV^e, JACXSO :NIECE FL 32225 - 02-05312 .TN.C CYCLES, INC. 5/06/02 h-Ed RENTALS: BICYCLES 14 X 3RD ST NATTEEd C. BYSiATERS 904-249-2529 ATLAV'f IC EEACH FL 32233 1553 ARBOR ELVFF LAVE E., JACKSCRVILLE FL 32225 02-05713 JNC CYCLES, INC. 5/06/02 NEST N.OTORCYCLE SALES, NEd/USED 19 W 3RD ST MATTY.Ed C. HYWATERS 904-249-2529 ATLANTIC EEACH FL 32231 3953 AR9OR ELVFP LA~2 E., JACKSOhN ILLE FL 32225 02-05311 Y?iX C0:!STOCK NARINE REPAIR 5{03j02 NEd EOAT REPAIR 1089 ATLANTIC ELVD 47 H:,RR COMSTOCR 909-992-7375 ATLTN7TC fiEACH FL 32231 14228 FALCO9 CREST DRIVE, JACKSOtNILLE FL 32224 02-05115 PIDRO TORRESr JR. DRYWALL 5/09/02 heH CRYWALL INSTALLATION 1088 CORK ALL LN 433 PECRO TORRES, JR. 904-296-3619 ATLANTIC EEACH FL 32233 1088 CO vYELL LAl'E 433, ATLANTIC BEACH FL 32233 02-05316 SUSAY E. N.IILLISS, OTR/L 5/13/02 NEd RISC. PROFESSIGNAL ESTA9LISF?!E•tT 398 8TH ST SUSAY E. 1:VLLINS 504-297-9839 ATLANTIC EEACH FL 32233 348 8TH STREET, ATIJ,:ST IC EEACH FL 32233 02-05317 SU$AN E. 1`.ULLIIIS, OTR/L 5/13/02 NEd OCCUPATIONAL THERAPIST 398 8TH 57 SUSP_Y E. l:ULLINS 904-297-9839 ATI.AtiTIC EEACd FL 32233 398 8TH STREET, ATLANTIC EEACH FL 32233 02-05321 THE HERITAGS GRP VISION 21 INC 5/20/02 NEd MISC. SERVICE ESTASLI SIL`lF.NT, NOT LISTED 60 ARDELLA RII VICTOR L DORbU 904-221-9499 ATLAYTZC BEACH FL 32233 13925 Y-LaT'cflNOGD RD, JACKSO`.N ILLE FL 32225 02-05319 TINA Y...AZELG 5/07/02 N~ MISCELLP_4=0US SALES, OTHER TYaH L ISTED 160 OCEAY BLVD TINA M.EAZELL 504-291-7973 - ATI.FYTIC EEACH FL 322]3 160 OCEAN ELVD, ATLANTIC EEACH FL 32233 y ~ r. zG r-. y o~ -~ N r-. ~~ // N ~ 9~~~~I~~'' v ~ ~Cij~~~ y AcLlvnt~ rrLM tt4t~ JUIYl 10, 2002 Monthly Report for Public Safety Apr-02 Police Emergency Res Time Reported Crimes 3.500 Minutes 2002 April YTD 2002 MurderiManslau hter 0 0 Forcible Rae 0 1 Robbe 2 10 A ravated Assault 2 11 Sim le Assault/Threats 12 60 Bur la 8 49 Larcen 21 107 Auto Theft 5 16 Total 50 254 Activities 2002 April Y-T-D 2002 2001 April Y-T-D 2001 Calls for Service 1828 7125 2065 7919 Arrests 56 263 96 365 Uniform Traffic Citation 427 1685 559 2508 Training for Police DUI Standardized Field Sobriety Testing Police Fitness Microsoft Excel JSO Homicide Evidence Module on Report Management System CPR/First Aid Certifications Internal Affairs Investigations Police Applicant Background Investigation Conference Jacksonville Fire and Rescue Fire Alarms Fire Response Time Emergency Medical Calls EMS Response Time Code Enforcement 2002 April Y-T-D 2001 April Y-T-D # 23 66 8 54 Minutes 4.133 3.902 # 72 273 75 249 Minutes 4.285 4.405 See Attachment Received by RECORDS Divis! CALL NS CE OENTFED TOTALS E9297 CALL NS CE DB:TFED TOTALS ~i Nor-00 CALL NS CE DENTF6! TOtAl4 Am-01 CALL NS CE DE11TF6I TOTALS 2WTTDT_~L CALL NS CE DENTFHT i01A13 CODE ENFORCEMENT 0NE9TiGATgN REPORT FOR AP!®. 2002 ~_ mob" ~", F s tl # 0 F -, it C O Y P P L E 1 N A O x 1 C N E G ROS 1 146 10 ST ro 1w 38 36 fie 20! u 17 67 186 BS Y0 35 785 A P P E A l 1 N G 7 1zT ~ o 91 0 n 0 ~r z ~d ..„ o H N r-. o~ N ~ A PUBLIC ~\'ORKS and PROJECT STATUS REPORT (D)=DESIG\' ENGL\EER UTILITY (CE&I)=CONSTRUCTIOY ERGIYEER DEPARTnIENTS (C}-CONTRACTOR - PROJECT DESCR[PTIO?i PROJECT NO. AA'D INFOR\IATI02I STATUS OY 6/3!02 1 Core City Stortmvater Project CORE99 Design engineer submitted 100% plans and specifications on 1/16/02, and staff (D)= Original by England, Thims & Htiller reviewed. Advertisement on 2/ll/02 Cor bids on Core City Project, and 8 Preliminary Redesign - 100% Revised Preliminary Design by The contractors prequalified. CE$I contract approved 3/25!02 for GAI Consultants. complete R-A-IsI Professional Group Bids opened 4/3!02, and Re-bids opened on 5/8/02. Project awarded to Sherry Orise Design -100% Re-Design by Aikenhead & Odom Petticoat Contracting on 5!13102. Preconstruclion meeting held 5/29;02. complete (Cp Callaway Contracting, inc. Public 1lfeeting on 6!6/02. Tentative start date 7/14/02. Sherry Once Construction - 99°/a , (CE & I) = Public ~~ orks for Sherry Drive A~erall Redesign-J00% GAI Consulting for Core City Sherry Drive-Commission approved addit[onal sodding on 5!28!02. Fins/ Downstream Design-100% inspection held 5/20,'02, and contractor working on punchlist items. 2 Buccaneer Nastersa[er (D~Gannett Fleming Idew sludge holding facility design is 100°re complete. Awaited recommendations Treatment Plant (C}- on solids handling from Camp, Dresser & NcKee prior [o advertising for bids. Design of Sludge Facility- (CE&IpGannett Fleming and Public Norks Final Report received 7!3,`01. Rill need modification to sludge tank design to /00% accommodate future thickener. Contract design work approved on 1/74.'02. Redesign aJSludge Facility- Design under{s•ay. 85°/. Cotutrudion-0% 3 Atlantic Beach and Buccaneer (D)=Gee & Jenson Final Inspection completed 5/7/02. Contractor working on punchlist and Sewer System Improvements (C}=Afeadors Construction Company warranty items. Design - 100% complete (CE&i~ Gce & Jenson and Public Norks Redesign -100% - COIISiNChOn -100°/. 4.a. Mayport Flyover (D~Pittman, Hartenstein & Assoc. Delivery and installation of steel girders progressing for flyover ramp. Completed Flyover Design - 100% 1TA - steel over Atlantic Bird. week of 6/25/01. All steel completed during July, work complete Connelly & Nicker for Atlantic Beach on elevated roadway continues and six of the nine decks are complete. Large pile Cmistnrction -84'/• complete (C}-Superior Construction Co. of dirt by the Radio Station has completed its surcharging effort for the pond, and overall, 100%jor utility (CE&IpPublic Norks is being removed. Pond B on Nayport Rd. is complete. Completion date is relocation JTA (Reynolds, Smith & Hills) 4/14,'02. Final inspection held on 4/4.'02. List of punch list items sent to Residrnt Utility Design- 100%comple[e Engineer on 4/11102. City 11lanager sent letter to JTA on 5/31/02 regarding landscape maintenance. a c~ ~z zd r-. ~ •- ~, ,; N r-. 0 ., N y. A 4.6. btayport Flyover (D}=Hessen[, Hammack & Ruckman (BHR) Sureeying completed in early November, 200E Staff revieaved and received final Plaza Bump plans on 5/1102, but no tun lane shorn. Revision requested on 5/3,'02. RSK Design -9J%complete ~ contacted design engineer agato on 5/31/02 regarding additional tape, sub}act to FDOT approval. 5 Beach Renourishment (D)=Army Corps of Engineers Project has been rescheduled to begin in the winter. Funds acere approved by City of Jacksonville on 11/28'00. Start date will be determined by Army Corps of Engineers. Received the Technical Review Plans on 9/2A`Ol. Staff has reaiewed and there teas a Technical Reaiew Conference on 10,'4 & 10/5,'01. Sun~ey field work eompleied on 2/4,'02, and profiles acere delivered on 2/11102. Teleconference held on 3/29.'02 with Arrrry Corps. Army Carps Geld partnering avorkshop on 4/36102 at Jacksonville Beach. 6 \Vater 1\Taster Plan and (D~Camp, Dresser & AfcKee Commission awarded contrast for additional modeling and reuse feasibility engineering [o CDM on 10/8.01. Logging and repairs of Buccaneer District Consumptive Use Permit \Vells complete 10/29; 01. Presentation to Commission on ! 1/12,'0/. Logging of Renewal AfaslerP/aa-700%complete AB wells completed and presentation to Commisston on 5/28/02. Response to ~ RAI!{IsubmittedtoSJR\YhiDonll31f02. RA(g2receivedon2722/02,and Cansunrptive Use Permit -98% CDM completed response on 5/1/02. complele hta}port Jr. Enlisted 1•ten (DpProsser Hallock Sturm drainage is complete. Constmction of sanitary sewer is 100% complete, 7 Family Housing - 100 Units (CpBeneco Enterprises, Inc. with the exception of the lift station welas•ell. Construction of water is 100°% AJEht@ complete. Overall project is 70%complete. Meeting avith Nary engineers on Design - ]00%complete 5/7/02 regarding problem srlth sewer mein stabilization. Construction - 65%complele Upgrade of \Vest End Litt (DplVaitz S• Moye City Commission approved contract with \Vaitz & latoye to perform engineering g Station (C)=Gruhn Dlay, Inc. design on 9124!01. Permit received 1/2102. Bids received 2/27/02. Pre-Bid meeting held on 2/13!02. City Commission awarded Contract to Gruhn May, Inc. Design -IOt7°/, complete on 3/11/02. Preconstrvction conference held on 3/28;02. ICotice to Proceed on Construction - 0%complete 4/15,'02. Pumps and materials on order. Force htain from Litt Station B (D}=Aikenhead & Odom, Inc. City Commission approved contract with Aikenhead & Odom to perforn y (C}= engineering design on 9724!01. Sun•ey scheduled for I l/5701. Surrey work Design-100%complete completed by 11721/01. Design complete. DEP Permit received 5/6.'02. Bids due Construction - 0% Complete 6/SA2. ~~ ~z zd r-. ~ o ~ N 'i-t O O ~-a N ~ L 10 Sherman Creek Trestle Crossing (D}=Nadeem Zebovni, P.E. Drawings and specifications complete. Project manual being completed Stabilization (C) = in house. S1RNRfD Permit received 1/2/02. ACOE permit received Design -100% complete 2!5/02. FDOT permit received 4/26.!02. Bids received 5/22/02, on Construction-0%complete Commission agenda for 6/IOi02. 11 Rater Line Replacement on (D) =Charles Bassett Surveyors and Public Project designed in-house with Technical Designer tcho began emplo}•ment on Park Terrace East R'orks December 10, 2001. Bids received 5/1/02. Commission awarded contract to Design-100%rnmplete (C}-Gruhn Jfay, Inc. Gruhn hiay, Inc. on 5/13102. Preconrtruc[ion conference held on 5/22/02. Construction-- 0% complete (CE&n =Public Works 12 Stormw'ater Master Plan (D) = Camp, Dresser & McKee Proposals were received 11/12/01, and City Commission authorized staff to negotiate with Aikenhead & Odom on I I/26,D1. Project teas readvertised Design - 30/° rnmpfete 1/13,'02, to include modeling of the Hopkins Creek Basin. Received 6 proposals Construction - 0% complete on 2/13'02, and City Commission awarded project to CD\t on 2/25'02. Engineer working on modeling, and nearing completion of GIS mep. 13 $elva Streets (D) =1. Lucas & Associates Advertised for bids 11/4,'01, bids received on 11129!01 Commission awarded (C) = Tfilestone-Carlo Project on 1114.'02. Preconstruction conference held on 1/24.'02. Start date is Design - 100% compete (CE&I) =Public works 2/11/02, and actual construction began on 2/18.'02. Paving completed and final Corutructian -1000% inspection on 5/2102. Commission approved final assessment on 5/28;02, com (ele which was significantly less then expected. 14 CDBG Server Design 2002 (D) =Edwards Engineering, Inc. Proposal requested from Edwards Engineering on 1/4,'02. City Commission awarded contract to Edwards Engineering on 3/11/02. Sun•ey completed. Design - 60°/n complete Received 60% drawings for Church Road section on 5/21/02, and slat[ reviewed. Assembling information for easement on Dora Street. 15 Sewer Improvements in the (D) =Public Utilities and Public works hlandatory pre-bid meeting held on 2/7/02. Bids received 2/20.'02. City Donner Road Area (C) = Insimform Technologies, inc. Commission awarded contract to Insituform on 3/11/02. Construction (CE&1) =Public \Vorks proceeding, Heart}' complete. Design- /00% contpfete Constnrction - = 90% 16 Piping Afodifications al (D) =Edwards Engineering Design underway. Received 60% drawings on 5/21!02, and staff reviewed. ii7YTP #1 (~ _ (CE&I) =Public \Yorks 17 Sidewalks and Server Rehab. (D) =Public works Sewer televising completed. Bids documents prepared, and bids received 6/3/02. -CDBG 2002 (~ = On Commtssion agenda for 6/10/02. (CE&I) =Public \Yorks ~n ~ r--. zz r-, d D ..„ o N r-. c 7 N _. A I