AGENDA ITEM: Sidewalks and Sewer Rehabilitation -CDBG 2002
Bid No. 0102-18
SUBMITTED BY: Robert S. Kosoy, P.E., Public Works Director
Donna Kaluzniak, CEP, Utility Director
Sonya Doerr, Community Development Director
DATE: June 3, 2002
BACKGROUND: Community Development Block Grant funds were available for sidewalk
installation in the Marsh Oaks area and rehabilitation of a sanitary sewer main on Jackson Road
for the base bid. In addition, an additive alternate bid for sidewalk installation on Sandpiper Lane,
Francis Avenue and Simmons Road was included. Drawings and specifications were developed
by City staff. Bids were advertised, invitations wece sent to ten bidders, and two bidders
submitted prequalification packages. Only one contractor, Gruhn May, Inc., submitted the
required documentation to prequalify.
A Mandatory Pre-Bid Meeting was held on May 24, 2002, and one bid was received on June 3,
2002. The contractor submitted two alternate bids, based on two different methods for the sewer
construction-pipe bursting and cured-in-place piping. Prices for the sidewalk work were the
same on both alternates.
Contractor Gruhn May, Inc. - Gruhn May, Inc. -
Pi a Burstin Cured In Place Pi in
Bid Price -Sewer $79,695 $79,905
Work
Bid Price-Sidewalk $175,176 $175,176
Work
Since the total bid is greater than the budgeted CDBG funding, staffanalyzed the feasibility of
constructing the sewer or sidewalk work only.
The sewer rehabilitation part of the bid totals $79,695.00, and with a ten percent contingency
would be 87 664.50. The prices for the sewer rehabilitation were high, due to the small amount
of piping, the number of services, and the CDBG paperwork requirements. Staffdoes not
recommend that we award the sewer rehabilitation part of the bid.
The sidewalk portion of the bid totals $175,176, which yields a unit price of $27.37 per linear foot
for 6400 linear feet of 5-foot sidewalk. This linear foot price is consistent with prices JEA is
receiving for similar sidewalk work. The contractor is willing to do any portion of the scope of
AGINDA ITi';M #4ll
NNi', 10, 2002
work at this unit price. It is staffs recommendation to complete Orchid/Rose Streets (2560 LP)
and West Plaza (740 LP) for a total of 3300 LF at $27.37 per LF, which totals $90,321. We
would recommend a nominal $5,000 contingency for a total of $95,321.
BUDGET: A total of $96,000 was budgeted for construction of this project in the Community
Development Block Grant Account No. 110-1005-515.63-00.
RECOMMENDATION: Award the contract for a total of 3300 linear feet of sidewalk to be
constructed on Orchid/Rose Streets and West Plaza at a unit price of $27.37, plus a $5,000
contingency in the amount of $95,321.
ATTACHMENTS: 1. Bid tabulation for Bid No. 0102-18
2. Bid analysis
REVIEWED BY CITX
City of Atlantic Beach
Sidewalks and Sewer Rehabilitation -CDBG 2002
Bid No. 0102-18
Descri lion Quanti Units Unit Price Amount Unit Price Amount
BASE BID ITEMS
Sewer Items
1. Mobilization 1 LS $7,500.00 $7,500.00 $7,500.00 $7,500.00
2. Cured-in- lace or re Iacement of sewer main 430 LF $63.00 $27,090.00 $60.00 $25,800.00
3. Reconnect existin services under avement 8 EA $2,887.00 $23,096.00 $2,987.00 $23,896.00
4. Reconnect existin services not under avement 7 EA $2,887.00 $20,209.00 $2,987.00 $20,909.00
5. Install manhole liner in existin manhole 4-6' dee 2 EA $900.00 $1,800.00 $900.00 $1,800.00
Sewerltems Subtotal $79,695.00 579,905.00
Sidewalk Items
6. Tree rotection 1 LS $100.00 $100.00 $100.00 $700.00
7. Sitework 1 LS $48,356.00 $48,356.00 $48,356.00 $48,356.00
8. Installation of 5'sidewalks 6400 LF $19.80 $126,720.00 $19.80 $126,720.00
Sidewalk Items Subtotal $175,178.00 5175,176.00
Subtotal Base Bid 5254,871.00 5255,081.00
Ten ercentcontin en $25,487.10 $25,508.10
TOTAL BASE BID PLUS CONTINGENCY $280,358.10 $280,589.10
Additive Alternate No. 1
1. Installation of 5' sidewalks 2400 LF $27.00 $64,800.00 $27.00 $64,800.00
Ten ercentcontin en $6,480.00 $6.480.00
TOTAL ADDITIVE ALTERNATE PLUS CONTINGENCY $71,28D.OD $71,280.00
~ r
zC
r-, y
~„
,,
N r-.
o~
0
N ~
t
d
Gruhn Ma ,Inc. - Pi burstin Gruhn Ma ,Inc. -Cured-In-Place Pi in
Bid 0102-18
Gruhn-Ma Gruhn-Ma
Re wired Documents X X
1. Submission in Tri licate X X
2. Ori final Insurance Certificate X X
3. Bid Bond 5% X X
4. Utilization and Affirmative Action Ptan, A endix "H", X X
Section 3 Pro osal, Tables A 8 B, and A endix "I" Letter of Intent X X
and Business Contractin Questionnaire, in accordance with X X
24 CFT, Part 135 X X
5. Com leted W-9 Form X X
6. Si ned Co of Document Re uirements Checklist X X
7. Documentation of Recei t of An Addenda X X
Pi ebustin Method Cured in Place Method
1. Mobilization $7,500.00 $7,500.00
2. Install Cured in Place i in - 8" $27,090.00 $25,800.00
3. Reconnect existin services, includin cleanouts, not under avement - 6" $23,096.00 $23,896.00
4. Reconnect existin services, includin cleanouts, not under avement - 6" service in 8" i e $20,209.00 $20,909.00
5. Install manhole liner, in existin manhole 4'-6' dee $1,800.00 $1,800.00
6. Tres Protection $100.00 $100.00
7. Sitework $48,356.00 $48,356.00
8. Sidewalks- Installation of 5' wide sidewalks $126,720.00 $126,720.00
SUBTOTAL BASE BID Items 1-8 $254,871.00 $255,081.00
TEN PERCENT 10%) CONTINGENCY OF SUBTOTAL $25,487.10 $25,508.10
A. TOTAL BASE BID Items 1-8 PLUS 10% CONTINGENCY $260,358.10 $280,589.10
- - - - -- - - ~``a
ADDITIVE ALTERNATE NO. 1
1. Sidewalks-Installation of 5' wide sidewalk $64,800.00 $64,800.00
TOTAL ADDITIVE ALTERANAT NO. 1 $64,800.00 $64,800.00
TEN PERCENT (10%) CONTINGENCY OF TOTAL $6,480.00 $6,480.00
B. TOTAL ADD. ALTERNATE NO 1 PLUS 10°!° CONTINGENCY $71,280.00 $71,280.00
TOTAL BASE BID AND ADDITIVE ALTERNATE NO 1. (A & B) $351,638.10 $351,869.10
ZOUZ `Oi 3.~flf
Q6# I~3.LI tlQ\3Jtl
Bid Award based on Deparment Analysis and Commission Approval