Loading...
Exh 4DAGENDA ITEM #4D JUNE 10, 2002 CITY OF ATLANTIC BEACII CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Sidewalks and Sewer Rehabilitation -CDBG 2002 Bid No. 0102-18 SUBMITTED BY: Robert S. Kosoy, P.E., Public Works Director Donna Kaluzniak, CEP, Utility Director Sonya Doerr, Community Development Director DATE: June 3, 2002 BACKGROUND: Community Development Block Grant funds were available for sidewalk installation in the Marsh Oaks area and rehabilitation of a sanitary sewer main on Jackson Road for the base bid. In addition, an additive alternate bid for sidewalk installation on Sandpiper Lane, Francis Avenue and Simmons Road was included. Drawings and specifications were developed by City staff. Bids were advertised, invitations wece sent to ten bidders, and two bidders submitted prequalification packages. Only one contractor, Gruhn May, Inc., submitted the required documentation to prequalify. A Mandatory Pre-Bid Meeting was held on May 24, 2002, and one bid was received on June 3, 2002. The contractor submitted two alternate bids, based on two different methods for the sewer construction-pipe bursting and cured-in-place piping. Prices for the sidewalk work were the same on both alternates. Contractor Gruhn May, Inc. - Gruhn May, Inc. - Pi a Burstin Cured In Place Pi in Bid Price -Sewer $79,695 $79,905 Work Bid Price-Sidewalk $175,176 $175,176 Work Since the total bid is greater than the budgeted CDBG funding, staffanalyzed the feasibility of constructing the sewer or sidewalk work only. The sewer rehabilitation part of the bid totals $79,695.00, and with a ten percent contingency would be 87 664.50. The prices for the sewer rehabilitation were high, due to the small amount of piping, the number of services, and the CDBG paperwork requirements. Staffdoes not recommend that we award the sewer rehabilitation part of the bid. The sidewalk portion of the bid totals $175,176, which yields a unit price of $27.37 per linear foot for 6400 linear feet of 5-foot sidewalk. This linear foot price is consistent with prices JEA is receiving for similar sidewalk work. The contractor is willing to do any portion of the scope of AGINDA ITi';M #4ll NNi', 10, 2002 work at this unit price. It is staffs recommendation to complete Orchid/Rose Streets (2560 LP) and West Plaza (740 LP) for a total of 3300 LF at $27.37 per LF, which totals $90,321. We would recommend a nominal $5,000 contingency for a total of $95,321. BUDGET: A total of $96,000 was budgeted for construction of this project in the Community Development Block Grant Account No. 110-1005-515.63-00. RECOMMENDATION: Award the contract for a total of 3300 linear feet of sidewalk to be constructed on Orchid/Rose Streets and West Plaza at a unit price of $27.37, plus a $5,000 contingency in the amount of $95,321. ATTACHMENTS: 1. Bid tabulation for Bid No. 0102-18 2. Bid analysis REVIEWED BY CITX City of Atlantic Beach Sidewalks and Sewer Rehabilitation -CDBG 2002 Bid No. 0102-18 Descri lion Quanti Units Unit Price Amount Unit Price Amount BASE BID ITEMS Sewer Items 1. Mobilization 1 LS $7,500.00 $7,500.00 $7,500.00 $7,500.00 2. Cured-in- lace or re Iacement of sewer main 430 LF $63.00 $27,090.00 $60.00 $25,800.00 3. Reconnect existin services under avement 8 EA $2,887.00 $23,096.00 $2,987.00 $23,896.00 4. Reconnect existin services not under avement 7 EA $2,887.00 $20,209.00 $2,987.00 $20,909.00 5. Install manhole liner in existin manhole 4-6' dee 2 EA $900.00 $1,800.00 $900.00 $1,800.00 Sewerltems Subtotal $79,695.00 579,905.00 Sidewalk Items 6. Tree rotection 1 LS $100.00 $100.00 $100.00 $700.00 7. Sitework 1 LS $48,356.00 $48,356.00 $48,356.00 $48,356.00 8. Installation of 5'sidewalks 6400 LF $19.80 $126,720.00 $19.80 $126,720.00 Sidewalk Items Subtotal $175,178.00 5175,176.00 Subtotal Base Bid 5254,871.00 5255,081.00 Ten ercentcontin en $25,487.10 $25,508.10 TOTAL BASE BID PLUS CONTINGENCY $280,358.10 $280,589.10 Additive Alternate No. 1 1. Installation of 5' sidewalks 2400 LF $27.00 $64,800.00 $27.00 $64,800.00 Ten ercentcontin en $6,480.00 $6.480.00 TOTAL ADDITIVE ALTERNATE PLUS CONTINGENCY $71,28D.OD $71,280.00 ~ r zC r-, y ~„ ,, N r-. o~ 0 N ~ t d Gruhn Ma ,Inc. - Pi burstin Gruhn Ma ,Inc. -Cured-In-Place Pi in Bid 0102-18 Gruhn-Ma Gruhn-Ma Re wired Documents X X 1. Submission in Tri licate X X 2. Ori final Insurance Certificate X X 3. Bid Bond 5% X X 4. Utilization and Affirmative Action Ptan, A endix "H", X X Section 3 Pro osal, Tables A 8 B, and A endix "I" Letter of Intent X X and Business Contractin Questionnaire, in accordance with X X 24 CFT, Part 135 X X 5. Com leted W-9 Form X X 6. Si ned Co of Document Re uirements Checklist X X 7. Documentation of Recei t of An Addenda X X Pi ebustin Method Cured in Place Method 1. Mobilization $7,500.00 $7,500.00 2. Install Cured in Place i in - 8" $27,090.00 $25,800.00 3. Reconnect existin services, includin cleanouts, not under avement - 6" $23,096.00 $23,896.00 4. Reconnect existin services, includin cleanouts, not under avement - 6" service in 8" i e $20,209.00 $20,909.00 5. Install manhole liner, in existin manhole 4'-6' dee $1,800.00 $1,800.00 6. Tres Protection $100.00 $100.00 7. Sitework $48,356.00 $48,356.00 8. Sidewalks- Installation of 5' wide sidewalks $126,720.00 $126,720.00 SUBTOTAL BASE BID Items 1-8 $254,871.00 $255,081.00 TEN PERCENT 10%) CONTINGENCY OF SUBTOTAL $25,487.10 $25,508.10 A. TOTAL BASE BID Items 1-8 PLUS 10% CONTINGENCY $260,358.10 $280,589.10 - - - - -- - - ~``a ADDITIVE ALTERNATE NO. 1 1. Sidewalks-Installation of 5' wide sidewalk $64,800.00 $64,800.00 TOTAL ADDITIVE ALTERANAT NO. 1 $64,800.00 $64,800.00 TEN PERCENT (10%) CONTINGENCY OF TOTAL $6,480.00 $6,480.00 B. TOTAL ADD. ALTERNATE NO 1 PLUS 10°!° CONTINGENCY $71,280.00 $71,280.00 TOTAL BASE BID AND ADDITIVE ALTERNATE NO 1. (A & B) $351,638.10 $351,869.10 ZOUZ `Oi 3.~flf Q6# I~3.LI tlQ\3Jtl Bid Award based on Deparment Analysis and Commission Approval