Loading...
Permit 705 Atlantic Boulevard 08.17.1956 FOR OFFFICE USE ONLY/ .... !-Li Date. .../7 195.6 / � 00 _ Permit #...li F .Fee$ /Q� TOWN OF ATLANTIC BEACHOo Valuation $___ Q -r FLORIDA House # 7a.rigiUnA. hid APPLICATION FOR BUILDING PERMIT Application is hereby made for the approval of the detailed statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the Town of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the Town of Atlantic Beach and all rules and regulations of the Building Department of the Town of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the Town of Atlantic Beach, Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that a list of sub-contractors be submitted to this office so that licenses can be verified. Date /VI // d r/� / J , 19 Owner.__FP/ A /7 4.I2I2 !1T i Address 140c2 LJ IT//"Rl!!__/ hone No. Architect Address Telephone No. Contractor Builder Address // Telepp one No. Lot No..��.II— 7FD Block No. Sub Division !__7 .�f 1, .. Zone Street Side Between and !Sts. Valuation $ S Ot)�"""Forrwhat pu o e will building be used-_l.lr._ e.._.r Type of construction___) _0._.C.4,, Dimensions of Building.7.3__./1'410__. Dimensions of Lot 4._X_10.0 Size of Footings-.__ _.li leO Size of Piers..1 Q.X Z Size of Sills A/0.0.._Greatest Sill Span in ft. Type Roof___�r ilk!_ .__. How will Building be Heated?_s G4" i5ed �r Will Building be on Solid or Filled Ground?:. a./. Size of Ceiling Joists , Distance on Centers , Greatest Span " Size of Floor Joists , Distance on Centers , Greatest Span " Size of Rafters lcX.g , Distance on Centers !.-Q , Greatest Span " This rectangle is to represent the lot. Locate the building or buildings in the right position. Give distance in feet from all lot-lines and existing buildings. REAR LOT LINE Two copies of plans and specifications shall be submitted with application. Inspections required. 1. When steel is in place and ready to pour footing. W 2. When steel is in place and ready to pour columns and/or lintel. Z Z 3. When steel is in place and ready to pour beam. 11:1 `^ 4. When framing is completed. HOO p 5 .When rough plumbing is completed,and ready to cover up. W 6'g'! W 6. When septic tank drain field is laid but before it is covered. A Q 7. Electrical inspection by City of Jacksonville. POI CD 8. Final inspection. Wil Note: In case of any rejection,re-inspection MUST be called for after corrections are made. FRONT OF LOT In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance with the attached plans and specifications, which are a part hereof, and in accordance with the building regulations of the Town of )antic or%�A' Q/� Signature of Buil A Address "orf%gid f Signature of Owner l", Address ,../