Exh 8IAGENDA ITEM #8I JiJLY 8, 2002 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Change Orders to the Adele Grage~econstruction Contract SUBMITTED BY: Jim Hanson ritv_ArL~*+a - ~" DATE: July 1, 2002 BACKGROUND: Miller Construction Services was awarded the bid to remove the additions to the Adele Grage Cultural Arts Centerand construct in their place additions that were designed by an architect working on behalf of Atlantic Beach. The contract amount was $363,106.04. Since then, a change order was approved to encapsulate lead paint that was found after the siding was removed. This change order was for $15,737.09 bringing the total of the contract to $378,843.13. In the last week, three additional items have come to light that will require change orders. The first is that testing on the old materials removed from ..the Adele Grage building indicates that the concentration of lead paint is such that those materials must be disposed of in a hazazdous waste site. This will add $5,411.25 to the change order price for lead paint abatement. The original change order anticipated that the materials could be disposed of in anon-hazardous landfill, but referenced the possibility of lead concentrations requiring more extensive disposal. The second problem that came up deals with the roof over the front porch of the original building and the columns that support it. The existing columns contained lead based paint and were not attached to the foundation. They have already been removed and replaced with temporary shoring. The foundation of the columns has settled at a differential rate from the foundation for the rest of the building. The footers were not connected. Because of the difference in settling, the supporting joist holding the ceiling to the building has become partially :.separated from the exterior wall. They were connected to the wall by toenailing. Furthermore, the decking and joist are partially rotted in the middle sections due to moisture penetration in past yeazs. The edge beam on the perimeter appeazs to be structurally sound although it also contains lead based paint. Any further work on the beam would require additional use of licensed lead based contractors. After discussion between the City's azchitect, contractor and staff, the best solution was detemvned to be the removal of the porch roof and support columns and replacement to construction designed to meet current building codes. The change order price for this additional work will be $37,924.25. AGENDA ITEM #8I JULY 8, 2002 The third item that will be a change order is the addition of the bathroom as requested by ABET. After the design of the building was complete, ABET requested that a bathroom be added in the space previously designed as a "green room". The City agreed to add the bathroom if the design and construction expense were paid entirely by ABET. A check for the design was received, the City's azchitect completed the design and the contractor has provided a change order to add this to the construction for $7,248. ABET representatives have conunitted to Mayor Meserve that they will raise the funds to pay for this construction although they do not have the funds available at this time. BUDGET: The City's budget for the Adele Crrage renovations is $400,000. The present contracted price for the work, which includes the first change order, is $378,843.13. This leaves a balance of $21,156.87. The cost of the disposal for the hazazdous lead paint materials ($5,41 f.25)plus the change order for removal and replacement of the porch roof ($37,924.25) will bring the total construction value up to $422,178.63. Adding the bathroom cost of $7,248 will bring the total construction cost up to $429,426.63. This is excess ofthe City's budget by $29,426.63 and will require amid-year adjustment to the City's budget to fund this work. ATTACHMENT:. (1) Field Observation Report (with pictures) dated June 27, 2002 by Tat Architect (2) Change Order No. 4 for hazardous waste disposal, for $5,411.25 (3) Change Order estimate for porch roof replacement for $37,924.25. (4) Change Order estimate for bathroom addition for $7,248 ^ 07/01/02 MON 14:21 FAX 242 8922 Miller Construction Serv AGENDA ITEM #8I ^ JULY 8, 2002 Adele Grage Cultural Center Veranda Rework Proposal Request Division 01 General n i ns 2 200.00 A&E Clean U Permits/Fees Tools/E ui ment Division 02 itew rk 24 530.00 Demolition Landsca e Concrete Pavers Division 03 Concrete $ 3 640.00 Foundation Division 05 etals ; i29.zs Fasteners Division 06 S PI stics ; 7 425.00 Fnish Ca ent Rou h Ca en Total ; 37,924.25' Quallflcations/Exclusions 1 Footing price is based on the installation of a continuous 30" X 20"footing. (see attached detail) 2 Price includes removal/replacement of all brick pavers. {GC anticipates damage to exlsGng flaC pavers during the footing demolition activity) 3 Price includes removal of the existing footing and Is based on a 12" X 12" continuous footing design with a brick stem wall: If Further exploration reveals other design, MC$ will notify the Architect'for repricing. 4 Any unforseen conditions requiring extra demolition during the removal or installation . of the proposed footings is not included. 5 Price indudesahe handling and disposal of lead paint covered materials. 6 Price submitted is based on existing slab construction being independent of the stem wall and footing .. to be removed. AGENDA ITEM #8I JULY 8, 2002 w ,~ ----,_ __ - - :. --. OLD CITY HALL -EXISTING PORCH AREA 07/01/02. MON 14:9J FAX 242 8922 Miller Consiructlon Serv AGENDA ITEM#8I - " JULY 8, 2002.. 2000 Edition - Electronic: Format AIA Document G701- 2000 Change Order PROJECT: CHgNUE ORDER NUMBER: 02 OWNER O (Namcanduddmss/ DATE: ]a0e 4r 2002 - ARCHITECT O Adele Grage Cultural Center 716 Ocean Blvd. ARCHITECT"5 PROJECT NUMBER: CONTRACTOR. AtalantiC Beacfit Flooida 32223 i0 CONTRACTOR: CONTRACT DATE: FIELD (Nam<andaddr<ssl CONTRACT FOR: OTHER a Miller Construction Services Construction /Renovation 1155 Beach Blvd. Jacksonville Beach, Florida 32250 THE CONTRACT IS CHANGED AS FOLLOWS: /Inc/udc where appljcab/e, anY vndispulM alnoun[attrib[dable iopreviousryeaauaed Gonslruetion Charge pimlivesJ' AUTHENTICATION OF THIS ., See attached Additional ReStrOOM EStirtldter dated ]aria 4r 2D02. ELECTRONICALLY DRAFTED:. AIA ' DOCUMENT MAY BE MAOf 8Y USING The original (Contract Sum) (Guaranteed Maximum Price) was S 363!106.04 AIADOCUMENi040~ The net change by previously authorized Change Orders s 15,737.09 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was s 378,843.13 The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order in the amount of s 7,24$.00 The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be s 386,091.13 The Contract Time will be (increased) (decreased) (unchanged) by N/A ( )days. -The date gfSubstantial Completion as of thedate ofthis Change Order therefore is N/A , NOTE: This Change Order does "not include changes in the Contrail Sum, Contract. Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time arc in dispute asdesmbed in Subparagraph 7.3.8 oEAJA Document A2ot. Not valid until started by the Architect. Contractor and Owner. ..` ti '~~ ARCHITECT(Ty/~nluaurr! CONTRACTOR(%ypcdneme/. OWNER(7ypMnamel Tat Chan Architect Miller Construction Serv.. City of Atlantic Beach: m 2o0o ata® (signatuxl . (Signora, J , /Signalvrcl AIA DOCUMENT G701-.3000 CHANGE ORDER ~ .the American Institute of .Architects 1735 New York Avenge, N.W. BY ~ /. BY Washington, D.C.20006-5292 6~~' .p~ DATE DATE DATE ~ 1 e American nshtu e o rc netts, epro ucnon o t e matena ere n or su start! a quotation `. of Its provisions without written permission of the AIA vlolares the copyright laws of the united States and will sub)ect the violator to legal prosecution. WARNING: Unlicensed photeeopying vlolares US. copyright laws and will subject the violator to legal prosecurlon.7hls document was electronically produced with permission of the AIA and can 6e reproduced in accordance with your license whhou( vlolaNOn until the - date of expiration as noted below, User Document: ,del owner change order p2.aia -- 6/4!2002. AIA License N~mber,1008814, which expires on 7/31/2002. 'l 07/01/02 MON 14: J4 FA% 242 8922 6illler Construction Serv AGENDA ITEM #SI - - JULY 8, 2002 ... Adele Grage Cultural Center Additional itestroon- Estimate Division Dtvlslon Total DIVISIOn Ol General onditions $ 60 Division 06 woods Plastics $ 1289 Division 07 Thermal Pro -o $ 240 Division 08 Doors Windows 702 Division 09 1061 Finishes Division 10 $ 150 S ecialties Division 15 3 229 Mechani Division 16 Electri al $ 517