Exh 9As^, t r. AGENDA ITE1~~T #9 ALGji,~T I2, Z~~~ ~"'~ E.. CIT~r OF ATLANTIC BEACH ~-, CITY COMMISSION MEETING '_ STAFF REPORT R AGENDA ITEM: Additional Work on Core City Improvement Project ~* SUBMITTED BY: Robert S. Kosoy, P.E. Director of Public Works DATE: _ August 5, 2002 BACKGROUND: Work commenced on the Core City Improvements Project on July 15, 2002. Some additional work has been approved and other' work is ready for approval. ~"'' Approved additional work: a. ; Change Order No. 1: Six 4' x 8' project signs were approved with, a logo to provide information to residents where .construction work '""' was progressing and the estimated completion date. Total cost n approved was $4,460.00. ~"" Change Order No. 2: " "The proposed relocation of the 12" diameter water line on 11~' street required a vertical offset to go under the existing 8" ductile iron force main which was shown on the wrong side of the street. ' In addition, the new 12" water line needed to be'extended an additional 107 feet to reach the actual connection point, which was ~' much closer to Seminole Road than shown on-the plans. The total `_ cost was $11,196.73, which was approved on an emergency basis r so as not to hold up the contractor on 11 ch Street. . , . Work to be approved: , Change Order No. 3: BellSouth conflicts on Seminole Road were discussed at the ° The price of change preconstruction conference held. on May 29, 2002. Soft digs were ""'' order #3 is still being completed and confirmed the information BellSouth provided and negotiated as of the a revised alignment of the stormwater line was needed along .deadline for agenda th Seminole Road between Plaza. and 11 Street. The contractor was ~ copies, 8/602 provided a revised plan and, at this time, has not submitted a negotiated cost acceptable to the Construction Engineer. The original contingency amount, as approved by the. Commission is $627,623.09. The three change orders will reduce the contingency by $ , to $ A., RECOMMENDATION: Approve Change Order No. 3. *-• ATTACHMENT: Change Order No. 1, 2 & 3. REVIEWED. BY CITY MANAGER: i 6 ;. gyp..., - , CITY QF ATLANTIC BEACH AGENDA ITEM #9A AUGUST 12, 2002 .A, CONSTRUCTION CHANGE ORDER ,. Change Order: No.: 1 D Date: JuIY 12 2002 .~., JUL 1 5.2002 Description of Proiect- k Core City Improvements Project f Name of Contractor: _Petticoat Contractin Inc Contractor's Address: 11025 Blasius Rd. Jacksonville FL 32226 ~^ Bid No.: 0102-13 Original Contract Amount: _~ 4,184,153.91 ~^ + Change Order No.: 1 -$ 4.460.00 ' 'Revised Contracf Total through C.O.#: 1 $ 4.188.613.91 Original Contract Time: __540 davs Revised Contract Time Change Order #1: 540 davs In compliance with the General Conditions of the abovethe referenced contract, PETTICOAT k ~ CONTRACTING, INC. and THE CITY OF ATLANTIC BEACH do both hereby agree that PETTICOAT CONTRACTING, INC. shall make the following changes, additions or deletions to the work- """' specified in the specifications and plans.- k ,.~. Furnish, install,. relo-cafe, and remove 6 (six) project information signs. These ."`"' signs will be placed and relocated to streets under construction throughout .the projedt duration.. -Sign design and layout will be in accordance with the ' attached detail. -The cost ofthe changes under this Change Order will increase the initial Contract in the amount of: X4.460.00. ~~., ; ~< - PETTICOAT CONTRACTING, ..INC. c s 6 z--- "~"' Petticoat C tr cting, Inc. Date Title: V ~ ~' ~~ . , ' s - CITY OF ATLANTIC BEACH ~, f ger 1~Z~/o Z Date ` ~ - AGENDA ITEIbT #9A AUGUST 12, 2002 .: City of Atlantic Beach Construction Change .Order Change Order No: 2 Date: 29-Jul-02 ~" Description of Project: Core City Improvements Project Name of Contractor: Petticoat Contracting. Inc. Contractor's Address: 11.025 Blasius Rd. Jacksonville FL 32226 Bid No.: 0102-13 Original Contract Amount: $ 4,184,153.91 Original Contingency Previous Change Orders: $ 4,460.00 Amount: $ 627,623.09 aM*_ Change Order No.:: 2 $ 11,196.73 Less Total C.O. To Date: $ (15,656.73) ~" `- Revised Contract Total thru C.O. No.: 2 $ 4,199,810.64 Remaining Contingency: $ 611,966.36 ,,., Original Contract Time:: 540 davs Revised Contract Time C. O. No.: 2 540 davs ~' In compliancewith the General Conditions of the above the referenced contract, PETTICOAT CONTRACTING, INC. and THE CITY OF ATLANTIC BEACH do both hereby agree that PETTICOAT ..CONTRACTING, INC. shall make the following changes, additions or deletions to the work specified ~: in the specifications and plans. ' Furnish and install additional 10T of 12" DR 25 WM and "Case B" utility ~„ crossing of 11th Street Sta 8+53 to 9+70. `" The cost of the changes under this Change Order will increase the initial Contract in the amount of: $ 11,196.73 ~+ PETTICOAT CONTRACTING, INC. 1. r-, V " ~jZ,,~ Petticoat Cont cting, Inc. Da e ~^ Title ~""" CITYOF ATLANTIC BEACH City Manager Date ~+ R. ~~ _- AGENDA ITEM #9A ~ AUGUST 12, 2002 ,t , Petticoat Contracting, Inc. Additional 12" WM at 11th Street ~'"' Original $0.00 $0.00 Item Description Quantity Value Extension ~- t 12" W1V1 Case 'B' at 8" DI FM 1 EA " $7,364.64 $7,364.64 ~* X 12 PVC DR25 1.07 LF $31.75 $3,397.25 • . Subtotal Original Items: $0.00 $3,397.25 g - Subtotal New Items: $0.00 $7,364.64 General Conditions & Bond on priginal Items at 12.8%: $0.00 $434.85 ~-~- Total: $0.00 11196.73 n ,~„ 0. ~ > 1 ':.: .. ~. /~ -. A AGENDEI. ITEM #4A AUGUST 12, 2002 _ PEZ-rlcoaT CON•rRAC~I.1NG: uvc. PROlECI': ATL4*1T1C. BENCH CORE CITY fM PROVEMEDiT PR0IECT DATE: 7;30x02 . DESCRtPTION OF WORK: .CASE H COMFLICCS ON t?" WATER.b1.StN - ~ . - LOCATION: I tTH ST tYEST OF SEbIINOLE ( ~ SUPERINfED1DENT - - ~.... b HOURS ou 541.25 _ 5247.50 - FOREMAN 9.5 HOURS cm ' - . 'S27S0 -_ .. - 5261.25 ~ .. - GRADER OPER: 0 HOURS tii 52750 - 50.00 ~ "~ EXAV.,BACKHOEOPR. 9.5 HOURS Cq+. ~ 314.85 _ _.. 5341.08 -. LOADER,DOZER OPR 9.5 HOURS (b! 514.35 ' a SIJLOS ' PIPE LAYER 9.5 HOURS ui SIti.50 SL56.75 ~ ~ ~ ROLLER OPERATOR 0 HOURS Cr $9: I0. _ ' 50.00: ~ :. - . - LA80RER 95 HUURS a; 59.90 - -..594.05 TRUCK DRIVER 0 HOURS ~r4 512.IU = SO.W ~"' MECHAMC 0 ROURS taa S1ti.50 _ SO.W _. ...SUBTOTAL ~ 51.04L70 .. .. .. LABORBURDEV(50%) _ : ~ : 5320.81 .. ~ TOTAL LABOR - . .. 41,562.33 '. . ~ - ~ .. ems! -. ~ .. B. EQU7PNIENT COST - .. L•XC.4VATOR,320 0 DAYS ~ iii - 5579.00 SO.W ,. - ~. - EXC:\VATOR,S92 - 1 DAYS ~w 5348.W 5848.00 DOZER 0 DAYS (o, `5458.W _ SO.W B.4CKHOE 0 DAYS _ ~ (ty 5337.W = SO.W . `,. - :. GRADER ... ... - 0 DAYS 'C2; SSI7.00 50.00 ~ .`. _. 4" PU4.iP O DAYS ~ ~ (k) 587. W = 5D. W ; ... ,. .4lR COMPRESSOR ~ 0 DAYS - - ia; 5138.00 _ $0.W - ... FORbfANS TRUCK l DAYS (i{ SSO.W _ ' SSO.W ..ROLLER - 0 DAYS ~ 'd ~ 5422.W _ 50.00 - .. r~ _ .. LOADER _ - . i ~DAI'S - Cw. 5445.W _ Sa45.W - LIGHT PLANT ODAYS (a ~ SI03.W ~ - SU.W - i ~ SAWS,Tr44~StI1SC ~ ., ,, -;. - I DAYS ~ -. ,;~.. '"5250.00 _ ~ : S2.iU.W ~.. WELLPOINT'SYSTEM ,_ -.. ~ I DAYS - (cg 5250.OU _ ~ .5250.W DUMP"TRUCK 0 HR5 Cry 545.00 _ ~ - SO.W TRENCH BOX _ 9.3 1{RS SIU.W = 595.W n STEEL PLATES _ .... D DAYS toi 5250. W - S0. W `; .. TRANSPORT. 0 HRS fqA 575.00 _ - 50.00 SU8 TOT.~L SI~38.00 - F.O.G.R (3540) - .:. 5678.30. - e~ SUBTOTAL: ~ - 52,61b30 - ,. ..SALES TAX I7?o).. 5133:34 ~ ..: ~. :TOTAL EQUIPMENT - 32.799.44 . ~ - . G. MATERIAL COST t"~ - 12" 45 BENDS 4 EA r~ 526750 _ ~ ' 52,070. W - 12PVCDR25PIPE ~..-.~. OLF tu; 58.00 _ ....... SO.W ,. '; ?2"SLEEVES .. UFA- - ~ ~ (.w. 5450.W _ SU.00 ~.. _ .. RESTRAINING H.4RDtVARE ~ t 1.S - - ~ tai 5750.W _ 5750.00 57 STONE ... : 0 TN (2 ~ ~ SI7.W _ SO.W . .. -. ~ VAC .. ~ LS .d - SO.W _ SO:W . ~-+. E ..VAC .. O TAr ia, 30.W _ SO.W ,. ~~ ~ OVAL` 0 CY . _,.;<g ~ 50.00 _ 50.W :. 4,. SL'HTOTAL : 57,820.00 ,. - - - TAX {?°/) 'SI27.40 !~ TOTAL MATERIALS 31,9a.7.a0 .. VAC 0 LS, (rii .50.00 _ 50.00 ' VAC O~HR r~. 50.00 ~_ .50.00- ; _ .~ °'°"` :,:.-. .VAC ... ODY rig. SO.W a 50.00: - V.4C O HR wi SO.W ,, r 50.W '- VAC "OOY ,y :50.00 _ SO.W . `SUBTOTAL ~ ~ 50.00 A"' E. SUBCONTRACTORS 'JAC o SY ;a; Su. a) _ 50.00 ~.. V.4C u HRS ~~ SOUO SO.W ~. _. VAC ~ . 0 l.~ 'd S0.v0 ~ - .. 50.00 VAC 0 St' y0.00 SO.W ~ ~ - SLBTOTAL ... - - 50.00 . . F-. MARK.IIP(5%) ~ SO.W :.. TOTALSUHSln1lSC. ~ .... 50.00 - ~., SUB TOTAL OF [,ABOR. EQCRPMEN7 ~ MATERWL ...- S6.3P)J9 'TOTALSUBCONTRACI' . ~ SO.UU~ rcn , BOND ILS%) 5108.84 OTAL OsIOTE .. 57.364.64 r... G. - _ - ..