Loading...
771 Paradise Ln Blower Door Test Form Permit #: Blower Door Test Form Job Information �'+ Builder: C �LCC�I 1J C 1— /L--LD Community: cr AP rf �.� La T Lot#: 27 Address: 1 I P�a.An(� �� l� Unit#: City,State,Zip: /r't'1 LAr4 T7 L 322.33 Air Infiltration Test Results CFM(SO)= 167L Volume= ,p Z777O ACH(50)=CFMM((50)R 60/Volume= 3. 7B 2r11ass ❑ Fail Passing results must be 7 ACH(SO)or less Certification of Test Results 8402.4.1.2 Testing.The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zones 1 and 2,3 air changes per hour in Climate Zones 3 through 8.Testing shall be conducted with a blower door at a pressure or 0.2 inches w.g. (50 Pascals). Testing shall be conducted by either Individuals as defined in Section 553.993(5) or (7),F.S. or individuals licensed as set forth In Section 489.105(3)(8,(g).or(h)or an approved third parry.A written report of the results of the test shall be signed by the party conducting the test and provided to the code of iclal.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Authorized Third Party I hereby certify the above results and that I hold the below certification: _Class A or B A/C contractor or Mechanical contractor License No. D ESNET approved HERS Rater or Residential Field Inspector Certification No. ISC R#_Yy7 BPI approved Building Analyst or Energy Auditor Certification No. _Professional Engineer Lice o. Mechanical vend n has be ed: Yes No Si ature /7 t Printed Name: 44��1_9sS Date: Revised 5/5/2017