594 Coastal Oak Ln RES18-0287 Blower Door Test Form SCANNED
Date:
Permit#: KE51
u�
'± OFFI E COPY
Blower Door Test Form
Job Information 44"._,-S I
4
Builder: L \ 401-,$ I &A �-{ " c �--
Community: /YX1tr1 ( cn�j( tha--o-c(h�� l -nII, �+lo Lot#: _
Address: SQN Cpa A-al c )GU. Lam, UnitM
City,State,Zip: IL E>Clc (4 -
Air Infiltration Test Results
CFM(50)= V- 7 -Volume== �
ACH(50)=CFM(50)X60/Volume=�� 2 . Z0
Pass ❑ Fail Passing results must be 7ACH(SO)or less
Certification of Test Results
11402.4.1.2 Testing.The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes
per hour in Climate Zones 1 and 2,3 air changes per hour in Climate Zones 3 through S.Testing shall be conducted with a blower door at a
pressure or 0.2 inches w.g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7),F.S. or
individuals licensed as set forth in Section 489.105(3)(Q,(g).or(h)or an approved third party.A written report of the results of the test
shall be signed by the party conducting the test and provided to the code ofciol.Testing shall be performed at any time after creation of
all penetrations of the building thermal envelope.
Authorized Third Party
I hereby certify the above results and that I hold the below certification:
Class A or B A/C contractor or Mechanical contractor License No.
1r RESNET approved HERS Rater or Residential Field Inspector Certification No. ALT3W
BPI approved Building Analyst, Energy Auditor,&IDL Certification No.
_Professional Engineer / License No.
Mechanical ventil ion has been
added: Yes V No
Signature: �Z ti` ;
Printed Name: a
nAM[CIc o' UGa Date: ''
ynt7
4