Loading...
278 Seminole Rd RES18-0301 Permit Conditions ReportPermit Number: RES18-0301 Site Address: 278 SEMINOLE RD City, State Zip Code: Atlantic Beach, Fl 32233 Applied: 8/29/2018 Approved: 10/4/2018 Issued: 10/4/2018 Parent Permit: Parent Project: Applicant: <NONE> Owner: LAGNER JENNIFER A Contractor: <NONE> Description: Finaled: Status: ISSUED Details: LIST OF CONDITIONS SEQ NO ADDED DATE REQUIRED DATE SATISFY DATE TYPE STATUS DEPARTMENT CONTACT REMARKS 1 9/5/2018 UNDERGROUND WATER SEWER UTILITIES INFORMATIONAL PUBLIC UTILITIES Public Utilities Notes: Avoid damage to underground water and sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is needed, call 247-5834. 2 9/5/2018 METER BOX SEWER CLEAN OUT INFORMATIONAL PUBLIC UTILITIES Public Utilities Notes: Ensure all meter boxes, sewer cleanouts and valve covers are set to grade and visible. 3 9/5/2018 RT1 SEWER CLEANOUT INFORMATIONAL PUBLIC UTILITIES Public Utilities Notes: A sewer cleanout must be installed at the property line. Cleanout must be covered with an RT1 concrete box with metal lid. Cleanout to be set to grade and visible. 4 9/7/2018 DRIVEWAY APRON INFORMATIONAL PUBLIC WORKS Scott Williams Notes: All concrete driveway aprons must be 5 inches thick, 4000 psi, with fibermesh from edge of pavement to the property line. Reinforcing rods or mesh are not allowed in the right-of-way. 5 9/7/2018 EROSION CONTROL INSTALLATION INFORMATIONAL PUBLIC WORKS Scott Williams Notes: Full erosion control measures must be installed and approved prior to beginning any earth disturbing activities. Contact the Inspection Line (904-247- 5814) to request an Erosion and Sediment Control Inspection prior to start of construction. Printed: Thursday, 04 October, 2018 1 of 2 Permit Conditions City of Atlantic Beach 6 9/7/2018 ON SITE RUNOFF INFORMATIONAL PUBLIC WORKS Scott Williams Notes: All runoff must remain on-site during construction. 7 9/7/2018 POST CONSTRUCTION TOPO SURVEY INFORMATIONAL PUBLIC WORKS Scott Williams Notes: If on-site storage is required, a post construction topographic survey documenting proper construction will be required. All water runoff must go to retention area and retention overflow must run to street. 8 9/7/2018 ROLL OFF CONTAINER INFORMATIONAL PUBLIC WORKS Scott Williams Notes: Roll off container company must be on City approved list (Advanced Disposal, Realco Recycling, Shapell''s, Inc., Republic Services, Donovan Dumpsters). Container cannot be placed on City right-of-way. 9 9/7/2018 RIGHT OF WAY RESTORATION INFORMATIONAL PUBLIC WORKS Scott Williams Notes: Full right-of-way restoration, including sod, is required. 10 9/7/2018 CONSTRUCTION SITE MANAGEMENT INFORMATIONAL PUBLIC WORKS Scott Williams Notes: Provide construction site management plan, including location of silt fence, dumpster, portable toilet. Right-of-Way Permit is required if using right-of- way for construction parking. 11 9/7/2018 RUNOFF INFORMATIONAL PUBLIC WORKS Scott Williams Notes: All runoff must remain on-site. Cannot raise lot elevation. 12 9/7/2018 TOPO SURVEY INFORMATIONAL PUBLIC WORKS Scott Williams Notes: Must provide a topographic (TOPO) survey with water retention for final C.O. Inspection. Printed: Thursday, 04 October, 2018 2 of 2 Permit Conditions City of Atlantic Beach