278 Seminole Rd RES18-0301 Permit Conditions ReportPermit Number: RES18-0301
Site Address: 278 SEMINOLE RD
City, State Zip Code: Atlantic Beach, Fl 32233
Applied: 8/29/2018 Approved: 10/4/2018
Issued: 10/4/2018
Parent Permit:
Parent Project:
Applicant: <NONE>
Owner: LAGNER JENNIFER A
Contractor: <NONE>
Description:
Finaled:
Status: ISSUED
Details:
LIST OF CONDITIONS
SEQ NO ADDED DATE REQUIRED DATE SATISFY DATE TYPE STATUS
DEPARTMENT CONTACT REMARKS
1 9/5/2018 UNDERGROUND WATER SEWER
UTILITIES INFORMATIONAL
PUBLIC UTILITIES Public Utilities
Notes:
Avoid damage to underground water and sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is
needed, call 247-5834.
2 9/5/2018 METER BOX SEWER CLEAN OUT INFORMATIONAL
PUBLIC UTILITIES Public Utilities
Notes:
Ensure all meter boxes, sewer cleanouts and valve covers are set to grade and visible.
3 9/5/2018 RT1 SEWER CLEANOUT INFORMATIONAL
PUBLIC UTILITIES Public Utilities
Notes:
A sewer cleanout must be installed at the property line. Cleanout must be covered with an RT1 concrete box with metal lid. Cleanout to be set to grade
and visible.
4 9/7/2018 DRIVEWAY APRON INFORMATIONAL
PUBLIC WORKS Scott Williams
Notes:
All concrete driveway aprons must be 5 inches thick, 4000 psi, with fibermesh from edge of pavement to the property line. Reinforcing rods or mesh are
not allowed in the right-of-way.
5 9/7/2018 EROSION CONTROL INSTALLATION INFORMATIONAL
PUBLIC WORKS Scott Williams
Notes:
Full erosion control measures must be installed and approved prior to beginning any earth disturbing activities. Contact the Inspection Line (904-247-
5814) to request an Erosion and Sediment Control Inspection prior to start of construction.
Printed: Thursday, 04 October, 2018 1 of 2
Permit Conditions
City of Atlantic Beach
6 9/7/2018 ON SITE RUNOFF INFORMATIONAL
PUBLIC WORKS Scott Williams
Notes:
All runoff must remain on-site during construction.
7 9/7/2018 POST CONSTRUCTION TOPO
SURVEY INFORMATIONAL
PUBLIC WORKS Scott Williams
Notes:
If on-site storage is required, a post construction topographic survey documenting proper construction will be required. All water runoff must go to
retention area and retention overflow must run to street.
8 9/7/2018 ROLL OFF CONTAINER INFORMATIONAL
PUBLIC WORKS Scott Williams
Notes:
Roll off container company must be on City approved list (Advanced Disposal, Realco Recycling, Shapell''s, Inc., Republic Services, Donovan Dumpsters).
Container cannot be placed on City right-of-way.
9 9/7/2018 RIGHT OF WAY RESTORATION INFORMATIONAL
PUBLIC WORKS Scott Williams
Notes:
Full right-of-way restoration, including sod, is required.
10 9/7/2018 CONSTRUCTION SITE
MANAGEMENT INFORMATIONAL
PUBLIC WORKS Scott Williams
Notes:
Provide construction site management plan, including location of silt fence, dumpster, portable toilet. Right-of-Way Permit is required if using right-of-
way for construction parking.
11 9/7/2018 RUNOFF INFORMATIONAL
PUBLIC WORKS Scott Williams
Notes:
All runoff must remain on-site. Cannot raise lot elevation.
12 9/7/2018 TOPO SURVEY INFORMATIONAL
PUBLIC WORKS Scott Williams
Notes:
Must provide a topographic (TOPO) survey with water retention for final C.O. Inspection.