Exh 8FCITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Additional Work on Core City Improvement Project SUBMITTED BY: Robert S. Kosoy, P.E. ~~ Director of Public Works AGENDA ITEM #3F OCTOBER 14, 2002 DATE: September 24, 2002 BACKGROUND:, Work on the Core City Improvements Project on Seminole Road and 11`h Street uncovered some unforeseen, unorthodox water main configurations. As-built plans did not show, and the design engineer nor the Atlantic Beach Utility Department was aware, that two parallel water mains crossed 1.1 cn Street, a 1.0" and a 12" diameter line. Since the 10" diameter line is the main running down the west side of Seminole Road, it needed to be maintained. The 12" diameter line was crossing to the 12" main to be abandoned, so this line needed to be abandoned. For future maintenance, it was necessary to remove unnecessary piping, install a new 12x12 cross at the southwest corner of the intersection and install new valves. Sketches of the area before and after the construction are attached. We could not stop the project and move elsewhere, since this area of Seminole Road is on the critical path of the project and any delay would have been more costly than the actual work to be performed., The contractor was directed to perform the work on a time and materials basis, which was tracked very carefully by GAI Consultants. The contractor submitted the costs and, after negotiation with GAI, Change Order 4 was submitted for approval. BUDGET: The original contingency amount, as approved by the Commission . is $627,623.09. The four change orders will reduce the . contingency by. $95,059.36 to $532,583.73. RECOMMENDATION: ATTACHMENT: Approve Change Order No. 4. Change Order No. 4. Sketches REVIEWED BY CITY MANAGER: City of Atlantic Beach Construction Change Order Change Order No: 4 Date: 12-Sep-02 Description of Project: Core City Improvements Project Name of Contractor. Petticoat Contractin g. Inc. Contractor's Address: 11025 Blasius Rd.. Jacksonville. FL 32226 Bid No.: 0102-13 Original Contract Amount: $ 4,184,153.91 Original Contingency Previous Change Orders: $ 67,613.99 Amount: Change Order No.: 4 $ 27,445.37 Less Total C.O. To Date: Revised Contract Total thru C.O. No.: 4 $ 4,279,213.27 Remaining Contingency: AGENDA ITEM #8F OCTOBER 14, 2002 $ 627,623.09 $ (95,059.36) $ 532,563.73 Original Contract Time: 540 Davs Contract Time Added thru C.O. No.: 4 14 Davs Revised Contract Time : ~ 554 Davs Projected Completed Date: 19-J -04 Ta~ua~y /9, 200 ~~--~~' In compliance with the General Conditions of the above the referenced contract, PETTICOAT CONTRACTING, INC. and THE CITY OF ATLANTIC BEACH do both hereby agree that PETTICOAT CONTRACTING, INC. shall make the following changes, additions or deletions to the work specified in the specifications and plans. Modify existing watermain configuration at the intersection of Seminole Rd. and 11th Street to provide far enhanced operation and maintenance. Exhibit 1 & 2 detail the proposed modifications. 4 days of contract time will be added due to this extra work. The cost of the changes under this Change Order will increase the initial Contract in the amount of: $ 27,445.37 PETTICOAT CONTRACTING, INC. (`(~~ ?i Petticoat Con cting, Inc. ~ • Date ~,L~` Title CITY OF ATLANTIC BEACH City Manager Date