Loading...
355 W 3rd St Blower Door Test N 0 Permit M. Blower Door Test Form Job Information Builder: 1C.1 T ' Community: I�' ltt L Lot#: cyam Address:��W _Ij �11 t '7 Unit#: City,State,Zip: �)AOAV, Air Infiltration Test Results CFM(50)= 1tk:`LIb Volume= i ACH(50)-CFFM(50)X 60/Volume= -.16 61/P,55 ❑ Fail Passing results must be 7ACH(50)or Jess Certification of Test Results 8402.4.1.2 Testing.The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zones 1 and 2,3 air changes per hour in Climate Zones 3 through B.Testing shall be conducted with a blower door at a pressure or 0.2 inches w.g. (50 Pascals). Testing shall be conducted by either individuals as defined in section 553.993(5)or (7),F.s. or individuals licensed as set forth in section 489.105(3)(f),(g), or(h)or an approved third party.A written report of the results of the test shall be signed by the party conducting the test and provided to the code official.Testing shall be Performed at any time after creation of all penetrations of the building thermal envelope. Authorized Third Par[v I hereby certify the above results and that I hold the below certification: _Class A or B A/C contractor or Mechanical contractor License No. IRESNET approved HERS Rater or Residential Field Inspector Certification No.4A BPI approved Building Analyst or Energy Auditor Certification No. _Professional Engineer License No. Mechanical ventilation has een added: Yes No�_ Signature:— '� Printed Name: Date: Revised 5/5/2017