791 Paradise Ln RES18-0324 Blower Door Test till Permit #: ��510 0 032
,.:
Idek
Blower Door Test Form
Job Information
Builder: P P-J t K El[—ZD
Community: pz'e5mv-�ALot#: 2�
Address: -791 Unit#:
City,State,Zip: L6nf-772 kF)4LZ4 3203
Air Infiltration Test Results
CFM(50) = ZZ9 J Volume= 2 i-f y LI ,
ACH(50)= CFM(50)X 60/Volume
NJ ass ❑ Fail Passing results must be 7 ACH(50)or less
Certification of Test Results
R402.4.1.2 Testing.The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes
per hour in Climate Zones 1 and 2,3 air changes per hour in Climate Zones 3 through 8.Testing shall be conducted with a blower door at a
pressure or 0.2 inches w.g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7),F.S. or
individuals licensed as set forth in Section 489.105(3)(f), (g),or(h) or an approved third party. A written report of the results of the test
shall be signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after creation of
all penetrations of the building thermal envelope.
Authorized Third Party
I hereby certify the above results and that I hold the below certification:
Class A or B A/C contractor or Mechanical contractor License No.
-��NET approved HERS Rater or Residential Field Inspector Certification No. �C L/�'I fir►
BPI approved Building Analyst or Energy Auditor Certification No.
Professional Engineer License No.
i
Mechanical ven ' ion has b added: Yes Noy
Signat re.
Printed Name: C SS Date: to/Z if�Z 9
Revised 5/5/2017