Loading...
Exh 3AAGEtiDA ITEM q3A JANUARY' 8, 2001 January 2, 2001 MEMORAiVDUM TO' The Honorable Mayor and Members of the Cjty Commission FROM: Jim SUBJECT: Follow-u>f items The following aze responses to questions and requests for addit•.onal information that were made in recent City Commission meetings. Ouestions on Water 1Saster Plan/Consumptive L'se Permit Renewal Application: Several questions objections to the City's contract with Camp, Dresser and McKee for a Water Master Plan and prepazation of the Permit Renewal Application were r::ised at the December 11'" City Commission meeting. One allegation was made that the City's ,:ontract with CDM included approximately 1,450 hours of consultants time to complete the Application. This allegation was incorrect. The spreadsheet which was attached to the agenda picket included only 98 hours to prepare and submit this Permit Application. Additionally, there was a (not to exceed) total of 36 hours included in the contract for response to any questions tha: may be raised by the St. Johns Water Management District. Consequently, the total hours allocated to the Consumptive Use Permit Application equals 134, not 1,450. A second question was raised about a requirement to pay for engineering services if the City chose to terminate the project. The contract states that, in the event of any termination, the engineer will be entitled to invoice the City "for all services performed or furnished and all reimbursable expenses incurred through the effective date of termination." Distribution of Agendas: A request was made by the Commissioners at the December 18m meeting for an earlier distribution of the agendas for upcoming meetings. In the future, all Commissioners with fax machines will receive a copy of the (preliminary) agenda on Wednesday prior to each meeting. Those that do not have fax machines wif have them placed in their box at City Hall at the same time. The responsibility for delivery of the complete agenda packets has been reassigned and should ensure for more timely deliveries on Thursday afternoons. AGENDA ITEM p3A JANUARY S, 2001 Posting Agenda Packets to the Web Site; Another issue about the availability of the City's agendas was raised at the last Commission meeting; posting the material on the web site. Few people realize the steps necessary to put the information on the web. By Wednesday afternoon prior to the meeting, the City Clerk's office must make one cieeat copy of all documems to be posted and deliver them to the Federal Express collection box for shipping to a company that scans the data for us. That company then a-mails the scanned cata as attachments back to the City by late the following day (Thursday). if the a-mail is recei red early enough, these can sometimes be posted by City employees to the web site by that evening. More often however these supporting documents aze placed on the web page on Friday. City staff will continue to look for better/faster ways to post the information to the web site. Use of Eaisting AUantic Beach Wastewater Facilities for rlaster Wet Well? A question was raised at the December 18°i meeting about whether or not there were any existing facilities at the Atlantic Beach Wastewater Treatment Plant which could be medified for use as a master wet well. Doug Lavton of Smith & Gillespie Engineers, Inc initially responded that he was not aware of any at the meeting. Since then, Mr. Layton has reviewed copies of the As-Built drawings of the WWTP and has discussed the matter with City employees. He has reported that they have been unable to find any existing structures which could be modified to function as a master wet well. Complaints About Water Plant Number One: Several complaints were raised in the December 18'" Commission meeting about the City's Water Plant located on the west end of 11~' Street. These complaints included an odor coming from the plant and possible overflows of the water tank running into the City's sewer system and thereby contributing to the need to build additional wet well and pipe capacity to handle the flows. Bob Kosoy contacted the person raising these issues after the meeting and was told that there had not been any overflows at the water plant for at least two yeazs. Further, if any water tank overflow occurred due to equipment malfunction, the excess water would flow into the storm drainal;e system, and not the sewer system. The complaint about water plant odor originally came 17om another resident in the vicinity of the water plant who was not present at the December 18'" meeting. Mr. Kosoy has tried repeatedly to get in touch with the resident to find out moi a about the complaint, but has been unable to do so. Ailanik Beaa, ara Buccaneer Waer Maalerpian me Comampliw Uae pertnX Renewsl ADPllunon e Eil1160 A Task No. 2000.2 Senior Senior Pwlcd Deslpn TlNnkal AAvHOr OHwer Meneper Engineer Deslpner On6a Clerkal Total Total Work Task DasWptbn Ss]1.50 f121,00 fB0.00 S6B.00 f57.75 519.50 5]5.75 Men0oun CDSI TASK1 AeNew o/Esistlnp COMebm . i.t ReNew Dala t ~ 12 TO ]0 S 1,059 TASK2 Water System GlS Development - 2.1 Dals Conversbn Plen 0 - 60 - DO 25 175 S 12 X22 2.2 Oavebp GlS s2 60 120 100 ]72 i 2].502 2.] ArtVlaw Propnminp, Tnlnirp m0 SappoA 16 56 T2 S 5,101 TASK] Hy0nuns System Moeelinp ].i MenlWlets Customer 891hp Oe4 ! t0 22 ]2 S ],1]2 ].2 COnwH Eslsthp Wtlar DUwhps t ] 10 t9 ~ t0 92 S 6,292 ~ ] ] C9mpue to PrtNous MoEel / 2 t0 10 52 S 1,]12 '~ It Caiprate to Tesi Dan 0 1 12 100 i1B S 9.210 ' TA6K1 ElOdanry Evaluetbns jJJ 1.1 EslaUXrA Efetlertcy GONS ant OeJeahxs B 2 / 12 11 29 f 2,601 , i ` 1.2 Complete Tecnnlul Analysis antl Evatualb 12 2 t 25 25 50 3 1,70e ~ to ComPgs BencMnarka 12 2 1 25 16 17 S I,t80 TASKS Evaluate Future BYelem Nee0s 5.3 Plant lnspedbm e 1 e f 1,900 5.2 Anayte Letlmanl Capac0y e e 12 2 22 f 2,680 i]Naev SDWA ftepulafbns 0 e 2 10 f 1)00 5.1 Soeankq, Taste, arq Oeor ReCOpmeMatl I 2 1 10 0 ~ 0 32 3 2.211 S.5 Ewlmis Stange. me Imartmneabns t 1 t0 t9 2 e 2 e] S 1,]JI ' S.0 Ewlutls SCADA 0 ~ 12 12 f 1192 TA9K6 CUP ftanewai e 2 2 r s2 20 ~ B0 f tN 7 e.1 PnPara arM Sugn0 Pem91 Appllulbn eR PespoM to Ml a r1 ,6 •e t 12 ae 3 , ],ttl TAOK 7 RepoO Propuallon 5.1 Pnpan 00 Penenl Report ip 2 2 10 a ]5 t0 12] 3 0,OSe 5.2 Prepero 89 PemanlPmenlelbn t e ~ 1 s0 20 i t.i77 51 PraDara fhtl Repo0 ~ 1 2 2 i/ a 20 I/ 70 3 1,203 SA Prapam Final Pmsennlbn 1 t t 0 20 S l,]5] 122 85 .._ 258 ]It ]0 501 20] 1595 6u81otel 3 119,551 FkM DaIa LaCNlon Featwes 600® f 22.00 _ f . iT,800 OIOer Dlrea COSls Reproeualan eagles B10 ® f 0.10 S Bs Bwellnea iH ~ 3 1.25 S 115 - mylm ® 3 11.OD f - 4 Y Compulen pC ]30 ® f 12.D0 f ),e19 ,9 aua tep a4 s zo.po s ],a99 Z ~ La toe ® s 1 n9 s sos 0 C C a eapreas map 10 ® i 000 f 0 a ~ toutler ] - ® f 7.00 3 21 v t 25,150 ~ ~ ^~ Tolel ProJact Coat S 145,000 c o W