Exh 4APREPARED 1/02/01,72-48-12
CITY OF ATLANTIC BEACH
PROGRAM OL 122E
_________________________________________
LAC - --CTRL; --e US IN~$g'-N'AMB ~--_-_---
BUSINESS AD DRES$
- HUS CITY ST ZIP --
LICENSE ACTIVITY REPORT - NEW LiC EN SES
FOR PERIOD FROM 12/01/00 TO 12/31/00
FOR ALL DEP.A RTMENTS
'"''-- -f $$UED _-- -- TYP@ -CLASS --DESCRIPTT
OWNER NAME
OWNER AD.D RESS
PAGE 1 ~~
.____ _.
__ _-. - -
OUS PHON E_-
01 04957 4784 CHALK LINE SAWIN6 INC. 12/01/00 NEW 5325 MISC. SERVICE ESTABLISHMENT, NOT LISTED
-- - -~~089 -21'"AfiLANTI C-1'4-eLVO__,-.__ - __ _._- -. .__J TCC-A.--KNe cE -_ - -. ___9 U4--'2.46-#934- _____.-.. __. --
'.ATLANTI C-OEACH, B1 .32233 523: CLIP PERS HIP LANE, ATLA NT bCOEgCH, FL 72233
--81--0 4 9 58--- -k78S---SUN t9AST-ENV-F-RONMENiAt-INS=- --1-2/01/00- --NEW---5325-MIS C:-SERVi-tE-E3i-ABLISHMENT;-NO P-L-33fiED------
405 MEALY DR BARTI EY ERIC SNOW -904- 241-3111
ATLANTIC HE ACH, FL 32233 498 S. MILL WAY, PO NTE yEDRA, FL 32082
Dt 04959 4786 MARIA 2 AL DIVA R'DRYWALL 12/05/00 NEW 5175 DRYWALL INSTALLATION
-253 ATLANTIC GARDENS CIR MARIA 2ALDIVAR -
- = -- Afi LA'Nfit-P-BE ACH, -FL-32233---- - ------- ---255-p-TL ANT-St-G A'R DEN-E-f Rc -APT--C-, -ATbANTi [-eEA GN--f1322-33-------
O1 04960 4787 BARBARA GALLOWAY"DESIGN 12/06/00 NEW R707 [RAf TS/.NOME ACCESORIES
-- - ~$0-0CC-A-N-ULVD ----_.____ -._. _ __. _- ____HAR eAR A-G ACtO WA.Y--_-904-~44-4624 -..__. __-
--. Ai~.F NTIF HEq[H~`FL 32$33 350`OCEAN-ely D, ATLANTIC eEACN,. FL-3223Y
-09 0496~i ~k239--FU RY Dp-d!'ETNOI2~LL-C~ B/Bi-A--- - 12H-1-/00-- ---NEµ---P 69U-----REAt-E3~ATE eft OK ER~- -
363-12 ATLANTI ['BLVD ~ -9U4- 241-2417
ATLANTIC BEACH, fL 32233 ATLANTIC BEACH, FL 32233 '
Ot 04962 4788 .P AOL DAVI4~B IRD poOL SERVICE 12/14 (D0 NEW. .5385 PODL SE gy7 CE MAINTENANCE
75. FO RRE STAL CIR - PAUL'-0AVIO BIRD '-^904- 246-6462
- -AfiL-A-NT-H-BEACH-, -F1-32233-- - -~----- --73 -FORRES TAL-CIR S., AFLpNT-IFeEAGH, FL 32233- ~ --~- -
O7 0496Y 4789 .ATLANTIC BE ACN INVESTORS 12/19/00 NEW P745 MISC. PROFESSIONAL ESTABLISHMENT
_..- --. _-.~__-X986-W-i EV ILL A-BLVD--. ..- _ _---__- --RI GNA RD M:-ME ARS _--_---. _...__-,904--2.41-4399- ,.--_..-.---:--
~.ATLp NTIG ,B EACH, FL .72233 198 ti'-.SE VI LLA BLVD- W, ATLANTIC BEACH, EC 32233 _
---01-049.64-- ---4-790-ONE-SOURBE-PEN-EONTROI-- - 12/21`/0 D-- NfW---S 36i------PEST-FONT-ROL/EXT EftMINAT OR- --- --
49 ARDEIIA RD -,~~ ~„ ~„~
ATLANTIC BE of H, FL 32233
O1 04966 4791 TOM CHRONISTER '.$ERV ICES 12 /28/OU' NEW'' 5320 MINOR CONTRACTOR -MISC. oDP JOBS/REPAIR-.
2]71 SEMI{qO LE RD THOMASH. CHRONISTE R;Jft--904- 246-763 G
O1 04967 4792 JAS & KAT WALLS KU STOM GRAPHIC 12/29/00 NEW 5325 MIS[. SERVICE ESTABLISHMENT, NOT LISTS D l~.
-4i~-NHIfI Nfi-LN -- Jq MSS--L AW REN Cf--WALLS- 9q4-403-6973- ------ -
- ATLANTIC BEACH, FL 32233 412 NHITI N6 LANE, ATL gNTI[ eEACH,,FL 32233 -
TOTAL NUMBER Of N EW LICENSES- 10 -
_... _ NEN}-PAYMEN T._PEN DING-. __ _ -... ~. _....
- TOTAL NUMBER OFLICENSES PROCESSED- 10
- -----T-OFAi, PAYMENT PEN PI NG- --- -___---1- ____ ______
TOTAL, ACTIVE- 9
z ~,
ay
-_-__-____ .___ - -_.- ~! H
0o MM
N 7
O ~
`a°
AGENDA ITE~1 q4A
JANUARt' 8, 2001
rlonthly Report
Public Safety
November 2000
Significant Trends
Police Department:
The Police Department continues to demonstrate increased activity in specific
areas. The arrest rate for the year 2000 has increasedi approximately 23%, and the
number of Uniform Traffic Citations (UTC) has increased by approximately 21 %.
There has been a 6% decrease in the number of incic.ents reported.
Statistics 1999 2000 Diff
Calls for Service 19,059 20,588 +1529
Arrests 839 1,031 +192
L~Cs 4439 5361 +922
Incidents Reported 768 720 -48
Animal Control:
Calls 2,165
Bites 14
Animals Impounded 1,226
Citations 214
Fire and Rescue: November Only
Fire Responses 12
Average Response Times 5.314
EMS Calls SI
Average Response Times 4.294
See Attached Code Enforcement Report
s :~- ~ "~~
A
~
o
oP
N
m
~'
y0
2
n
Z
N
~
T
Z
~
y
N
A
BN
y
Pn
A
8P~
N
41
~
OT
L
y
ON
~
NN
G
N
~°
F
n
!
N
~
ycyn
m
'?~
C~
~
y
GR`
yc
3
N
t~
yN N
.~
yv
m
°t
y
.~
A
L
3
~'
c~
o
O
.~
~N
CAl
CE
T01
CAl
CE
TOl
cAi
CE
TO'
CA
CE
~a
a~
z~
Cd
ay
z
Ky
y~
N y
O ~
"a°
PUBLIC WORKS PROJECT STATUS REPORT (D)=DESIGN ENGINEER
DEPARTMENT (CE&I)=CONSTRUCTION ENGINEER
(C}=CONTRACTOR
PROJECT DESCRIPTION PROJECT NO. AND INFORMATION STATUS ON 1/2/00
1. Village of Mayport (D)=USCG &JEA Force main installation and tie in for Coast Guat+d Station has been completed.
(CE&I)=JEA & Public Works The lift station is 92%complete, installation of sanitary sewer is 75%complete,
Design -1 DO°lo complete (C)=Petticoat Contracting (to USCG Station) and the force main is SO%complete. Roadway work is 90%complete, drainage
(C}=United Brothers (North of USCG Station) is 40%complete, water is 9S%complete, and electrical conduit is 50%complete.
Construction - 60•~ complete The scope of work was increased to add substantial electrical work and drainage.
2. Core City Stormwater Project CORE99 Received 7S % design plans for Sherry Drive on December 11, 2000. Staff
(D)= Original by England, Thuns & Miller reviewed and submitted comments to consultant.
Preliminary Redesign -100% Revised Preliminary Design by The
complete R-A-M Professional Group
Sherry Drive Design - 75% Re-Design by Aikenhead & Odom -
complete
3. Core City Sanitary Sewer PW0002 Completed 1"Street, 2nd Street, 3'd Street, 4'" Street, 5'" Street and 4'" Street and
Improvements Project (D)=Public Works will complete 6'n Street by I/12101. Driveways are completed on 1° Street, 2"d
(CE&.[)=Public Works Street and 9'" Street. Services are SS%complete and total project is
Design - 100% complete (C)=lnsituform Tec}inologies, Inc. approximately 7S%complete.
Construction -75%complete
4, Wonderwood Connector ~(DpThe R-A-M Professional Group, Inc. Traffic transferred to new bridge over Puckett Creek. Contractor wmpleted
Utility Relocation (CE&1}=JTA ,JEA, and Public Works setting hangers under bridge and the force main piping on south side of bridge.
(CrSuperiorConsWCtionCo,
Design -100% complete
Construction - 90'x° complete -
forAtlantic Beach portion
5. Buccaneer. Wastewater _(D)=Filer Engineering - -- - -- -- - -New sludge holding facilitydesignis9S%complete. ReceivedPreliminaiy
Treatment Plant Expansion (C)=Meadors Construction Co. Design plans for Aerated Sludge Holding Tani: on 12/20/00. Staff is reviewing.
(CE&[}= Gam~ett Fleming Engineering
Design -100% complete
Construction - 99•~ complete
ti~
Y ~
~~
~a
~! y
o°yyy
N a
O ~
6. Atlantic Beach and Buccaneer (D)=Gee & Jenson This project includes the Master Wetwell at the Atlantic Beach Plant,
Sewer System Improvements improvements to Fairway Villas and Park Street Lift Stations, force main
improvements on Donner Road, and abandonment pf Shangri-La Lift Station.
Design - 100% complete Staff to submit application for pemrit aRer funds are approved by City
Commission
7. Town Center and Atlantic Bid opening held on 12115/00 and staff report will be submitted to City
Blvd. Median Landscape Commission on 1!8/01.
Maimenance
Design -100%rnmpteie
Construcion - J00•~ complete
8. Widening of Atlantic Blvd. (D)=H.W. Lochner, Inc., Pilings have been finished, substmchue is complete and concrete grders have all
Bridge FDOT been set Steel girders are being set. Expected wmpletion date of new bridge
(C)=Superior Construction Co. has been advanced to May 2001. Work ou existing bridge will then begin.
Design -100% complete (CE&I)=Reynolds, Smith & Hills
Construction - 43% complete
9. Mayport Flyover ~ (D)=Pittman, Hartenstein & Assoc. Received Department of Health cleazance to make fmal tie in. Scheduled to
JTA complete eazly in January 2001.
Flyover Design - ]00% Connelly & Wicker for Atlantic Beach
complete (C)=Superior Construction Co.
(CE&I)=Public Works
Constntction - 20% complete JTA
overall, v8% jor utility
relaca0on
Utility Design - !00%
complete
10. Sewer Master Plan (D)=Smith & Gillespie Engineers, Inc. Complete.
!00% complete
11. Utility Improvements 2000 (D)=Gee & Jenson Engineer submitted proposal for redesign. Staff reviewing and will discuss
Design -100% complete (C)= design with City Commission onl/22/00.
Redesign - 0% complete (CE&I)~Public Works
4
z ~'
Cx
ay
~ '"
~~
N
O ~
O 4
a
12. Effluent Structure Repairs (D)=Nadeem 7.ebouni, Inc. and Public Works Completed cross beams and X-beams. Phase II complete. Final inspection held
PHASE II (C)=T.W. Blount, Jr. & Son Contracting Co. on 12/28/00, ,
(CE&1j=Public Works
Design - !00% complete - ~ -
Construction - SO% complete
13. Beach Renourishment (D)=Army Corps of Engineers - Project has been rescheduled [o begin in the winter. Funds were approved by
City of Jacksonville on 11/28100. Start date will be determined by Army Corps
of Engineers
~,
a~
zz
~d
~a
Ky
~y~
N 7
O
a
AGENDA ITEM #4A
JANUARY 8, 2001
City of Atlantic Beach, f=1.
Utility Sales Report
November 2000
Gallons Actual Revenue Gallons '. Actual Revenue
Water Sales Accounts (000) . Revenue Per t,ooo gl Accounts (000) ' Revenue Per t,ooo gl
~ ~. ~
Atlantic Beach 5,128 49,092 $94,068 $1.92 5,016 55,879 $90,841 $1.63
~I. BIICCaneer 2,556 35,373 $72,727 $2.06 2,373 30,371 ' $58,379 $1.92
Total Water Sales 7,684 84,465 $166,796 $1.97 7,389 86,249 $149,220 $1.73
Water Plant Production ~
Gallons Gallons '.
(000) (000)
Atlantic Beach 58,433 56,298
Buccaneer 32,968 3x,040
I Total Production 91,401 90,338 '.
Total Water Billed 84,465 86,249
Water Loss for month: 6,936 4,089
Percentage Loss 7.59% 4.53% '.
Total 12 mo. Avg. Loss 13.70% 17.84% '.
Sewer Sales
.+. - Y v`J mil} fl~n
Atlantic Beach
Buccaneer
Total Sewer Sales
Gallons Actual Revenue Gallons Actual Revenue
Accounts (000) Revenue Per 1,000 gi Accounts (000) Revenue Per 1,000 gI
4,571 37,538 $132,408 3.53 4,431 35,002 '. $116,761 3.34
2,457 32,820 $141,515 4.31 2,273 27,661 '. $111,180 4.02
7,028 70,358 $273,923 $3.89 6,704 62,663 ',. $227,941 $3.64
November 1999
Sewer Treatment
Millions of Gallons
Rev. per 1,000 Gall
67.6290
78.9880