Loading...
Exh 7AAceNnA tTe.t nza JANUARY 8, 2001 CITY OF ATLANTIC BErtCH CITY CO[rL~IISSIO~ rIEE'tLtiG STAFF REPORT :~GE`fDA TTE~I: Bud;et Ordirarce \o. 20-CO-50 ~loditicatio^ for Projects Recommenced in Sewer vlaster Plan SL"B}IITTED BY': Robert S. Kosoy, P.E., Public Wor!cs L~irector~r.~ Donna Ka:uz-tiak, CE?, utility Direct,tr(~ DATE: November 21.2000 BACIiGROL"1'D: The Sewer 1vlaster ?lan, including recommenaations for capital improvements, is now complete. Canitai improvement recommendations for the first year include the followine items which have already been designed, but were not budgeted, pending completion of ttte master plan: I Description: ~ Estimated Cost: I Master Lift Sta[ion at Atlantic Beach WW"I"P, and instal! new 8" force :Hain from Lift Station C (Donne: Rd.) i 5375,000 upgrade Lift Station H (Fairway Villas) 1566,000 Upgrade Lift Station I (Park Street) ,545,000 Abandon Shangri-La Lifr Station and replace with graviry sewer main to [he Cypress Creek Lift Station S 140,000 Total Construction 15626,000 Other first year recommendations have not yet been designed. We propose to design these items [his fiscal year, and begin construcnon early next fiscal year. Estimated design costs aze: Description ~ Estimated Cost: I Engineering for force main upgrade from Lift Station B (11" Street), and 1530,000 ~ pumpiwetwel! upgrades at Lifr Stations C (Donner Rd.) and E (tifayport ' Road) Engineering for upgrade of West End Lifr Station S 10,000 Engineering to replace de*.erorated force mains on blayport Road I S 10,000 Total Engineering 550,000 Page 1 ACE~IDA ITE~1 H7A JA V UARY 8, 2001 he Cota; amours; for corst:uc:ion and desi~ , of :::e recommer.Cec Caplla! ::^prove:renu !S S67b,000 B(IDGET: Funding was eostponed for these items, pending co repletion of the Sewer Master ?ian. A budget adjus :merit is recuesred to complete design and or construction of the above !fisted imorovemeats. with an increase in exoendin:res o; SS io.000 t'or account number 4;0- 4!Ol-53S-6360 and 5150,000 for account 410-?»'0 i-S3S-6300 RECOrL~lEtiD:~TIOiV: Approve [he Ordinance No. 20-GC-SO, amending the operating budget for fiscal yea.- 2000;3001 to approprate additional funds for sewer utility proiecu in accordance with t^.e Sewer Master Plan recommenda[ions ^.:rded'oy fund talance unrestr.cted reserves in the amount of Sb76,OCG. ATTAC1~tiLE~TS: l Ordinance :vo. 2C-00-SO REVIEWED BY CITE' ~LaNAGER: Page 2 AGE\DA 1TE~1 p7A JA V UA RY 8, 2001 ORDLtiAYCE i\O. 20-00-;~0 AV ORDIN:~~CE r1-~4ENDIYG THE OPER4TIitiG BUDGET FOR THE CITY OF ATLA\TIC BEACH, FLORIDA FOR ;FISCAL YEAR 2000/2001 BEGIVYL~G OCTOBER 1, 2000 AtiD E\DIrG SEPTEMBER 30, 2001. WHEREAS, the City Charter ot'the Ciry of Atlantic Beach recuires that the City Commission approve all budgelarv increases and transfers at the fund level, and WHEREAS, the nature of budgetary systems and those day to day decisions affecting such budgetary systems require adjustments from time to time. \OW', THEREFORE, BE IT ENACTED BY THE CI"fY CO~I~IISSIO\ ON BEHALF OF THE PEOPLE OF THE CITY OF ATLA-VTIC BEACH, FLORIDA, that; The Fiscal Year 2 00012 00 1 Final Budget ire amended as follows: Sewer Utility Fund Expenditures: Atlantic Beach Division Capital Outlay Infrastructure Improvements 410-4101-135-63-00 Buccaneer Division Capital Outlay Infrastructure Improvements 410-4401-i3~-63-00 Total Expenditures Change in Fund Balance Reserves $516,000 $ ! 60,000 $676,000 <5676,000> Description: To appropria[e additional funds for sewer utility Erojects in accordance with the Sewer Ivlaster Plan recommendations funded by find balance unrestricted reserves. 2. This ordinance shall take effect immediau:ly upon its adoption. Passed by the City Commission on first reading this -clay of November, 2000. Passed by the City Commission on second and final reading this -day of December, 2000. John S. deserve Mayor i Presiding Officer Approved as to form and correctness: ATTEST: Alan C. Jensen, Esquire City Attorney ylaureen {ing, CMC City Clerk