Loading...
Exh 8BAGENDA ITEM #8B FEBRUARY 26, 2001 City of Atlantic Beach City Commission Meeting Staff Report Agenda Item: Dutton Island Park Recommendations Submitted by: David E. Thompson, Chief ofPolice/DPS Timmy Johnson, Parks and Recreation Director Don Ford, Building Official Donna Kaluzniak, Water Distribution Director Date: February 20, 2001 Background: The plans prepared by Landers-Atkins Planners, Inc. indicated full development of all facilities as to their ultimate location. It would have been more feasible for the plans to have been bid with the minimal amount of facilities needed but with unit costs and "add alternates" to expand facilities as necessary or desired. The plans were bid with all facilities indicated. After reviewing the bids that were submitted for the construction of Dutton Island, it was clear that the project was not going to be constructed within budget unless some significant modifications were made to the bid package. Staff members have prioritized the various facets of the Dutton Island project, and recommend rebidding. the park with only specific items and quantities identified, with unit prices. The original Master Plan estimated a price of less than $200,000 to construct the proposed park. However, there were a several items that grossly underestimated the funding necessary to provide the facilities and utilities described in the plans. For example, the Master Plan proposed an artesian well to provide the water for the comfort station. The problem with this estimate was the numerous regulatory requirements for a well that is going to provide water for public consumption. The City would be required to build a water plant at that location, and the maintenance would require daily monitoring of chlorine levels in addition to regular testing and maintenance. Instead of a $3,250 well, the City would be required to build a water plant at approximately $24,000, or run water lines out to the Island at an expense of approximately $63,000. There were some items on the specifications that were overpriced, and some items which could be deferred to a future date. After eliminating certain items and making decisions relative to services and utilities, staff has recommended the following proposals based on the estimates provided: AGENDA ITEM #8B FEBRUARY 26, 2001 Freshwater Marsh Creation This will be reimbursed up to $40,000 by the Jax Port Authority. Based on the bids, this should have a value neutral effect on the costs to Atlantic Beach. This bid includes moving the fill material from on site to the fresh water marsh area. Total $32,000 2. Potable Water After exploring options and reviewing costs and maintenance; staff recommends running a 6" water line out to Dutton Island. Although the short term costs would be lower if a small water plant was built, the maintenance would overshadow the savings within approximately 5 years. The capacity of a small plant would be very limited for fire fighting and expansion in the future. The best long term solution would be to run the water line to the Island. Total $63,000 Comfort Station The comfort station will include restrooms for visitors to the island. Considering the anticipated usage of the island, restroom facilities are considered to be a necessity. Master Plan estimate was for $60,000. Total $49,300 4. Turn Around Area Just as people enter the island from the causeway, there is a need for a stabilized area for limited parking and turning around. This area needs to have barriers to prevent people from driving around the island, and to assure vehicular safety away from the marshes. This area was enlarged from the original master plan concept. Total $45,000 Emergency Call Box This mechanism is needed for safety purposes. If there is an emergency on the island, the call box. would assure emergency communication with the City. These were not part of the original master plan estimate. Total $3,000 AGENDA ITEM #8B FEBRUARY 26, 2001 6. Excavation and Clearing Old Pump House These will be necessary to build the comfort station and eliminate the existing pump house on site. Total $11,000 Selective Clearing The original bids interpreted a great deal of land clearing for boardwalks and trails. This is not the case. Only minimal clearing of selective understory is needed. This may be performed by local volunteer groups. The new proposal eliminates the boardwalks and utilizes the existing trail systems. As much as possible, land clearing costs should be greatly reduced. There may be a necessity to .construct a few small boardwalks across wet areas where there are existing trails. Kiosks/Picnic Pavilions The original concept in the Master Plan was for three (3) small kiosks for information and educational literature, and for four (4) shelters for picnics. The bid specifications expanded these small structures into nine (9) large picnic pavilions with aggregated costs exceeding $100,000. A review ofprefabricated shelters (24x24) (smaller than proposed) reveals prices of $16 - $18, 000 as compared to $12 - $18,000 bid prices. It is the staff recommendation to eliminate all but one of the large picnic pavilions, and seek volunteer assistance for erecting additional sheltered picnic areas. Several organizations have expressed an interest in individual projects on the island, and picnic shelters maybe an appropriate mechanism for their participation. If this can not be accomplished with volunteers, then other means can be explored to design and erect several appropriate structures. Total: $18,000 9. 'the total estimate of the items above is based on the bids submitted previously by contractors, and is approximately $221,300. This allows for some flexibility relative to constructing a few small boardwalks over wet areas, as necessary, and to address limited land clearing. AGENDA ITEM #8B FEBRUARY 26, 200] To be eliminated: 1. 500 Lf of boardwalks at an expense of approximately $162,000, (This is 3 times the estimate on a per foot basis); 2. Floating Dock at an expense of $20,000; (Jacksonville is building a floating dock on the South end of the Island, and this can be added in the future if desired) 3. 48 Picnic tables at a cost between $57,000 to $83,000, recycled plastic recommended by COAB; 4. 10 Trash receptacles at a cost of $8,000 to $11,000; recycled plastic recommended by COAB; 5. 9 Pavilions at a cost of $108,000 to $267,000, recycled plastic recommended by COAB; 6. 15 Benches at a cost of $13,000, recycled plastic recommended by COAB; 7. Trail stabilization at a cost of approximately $40,000. Budget: The budget for this project for fiscal year 2000-2001 is $250,000, with 50% (up to $125,000) funded by the Florida Inland Navigation District. The estimated costs of the priority projects are approximately'$221,300. Included in the project is up to $40,000 reimbursement from the Jacksonville Port Authority for the freshwater marsh creation. Recommendation: To approve the recommendations in the staff report, and authorize staff to submit the revisions to the Florida Inland Navigation District for approval. After obtaining FIND approval, to authorize staff to advertise for bids for the construction of the Dutton Island Park. Attachments: None Reviewed by City Manager- 1- ~~ Agenda Item Number: