Loading...
89 West 2nd Street ROW19-0025 50' Pole RIGHT OF WAY PERMIT PERMIT NUMBER ROW19-0025 CITY OF ATLANTIC BEACH ISSUED: 8/12/2019 800 SEMINOLE ROAD ATLANTIC BEACH. FL 32233 EXPIRES: 11/10/2019 MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL • 'K MUST CONFORM TO THE CURRENT 6TH EDITION1 OF • ' + BUILDING CODE, ' AND OF ATLANTIC +CH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. NOTICE: In addition to the requirements of this permit,there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts,state agencies, or federal agencies. JOB ADDRESS: PERMIT TYPE: DESCRIPTION: VALUE OF WORK: 89 W 2ND ST RIGHT OF WAY SINGLE OR TWO 50' POLE $0.00 FAMILY RIGHT OF WAY TYPE OF ZONING: :D • • • • 170836 0000 ATLANTIC BEACH SEC H COMPANY: ADDRESS: • ADDRESS: BCEL 8 LLC 7563 PHILIPS HWY 4109 JACKSONVILLE FL 32256 WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. P - Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. 1 PUBLIC WORKS ON SITE RUNOFF INFORMATIONAL Notes: All runoff must remain on-site during construction. 2 PUBLIC WORKS ROLL OFF CONTAINER INFORMATIONAL Notes: Roll off container company must be on City approved list(Advanced Disposal,Realco Recycling,Shapells, Inc.,Republic Services,Donovan Dumpsters, Phillips Containers,JDog/Dennis Junk Removal,All American Roll Off,WCA Waste Corporation). Container cannot be placed on City right-of-way. Issued Date: 8/12/2019 1 of 2 RIGHT OF WAY PERMIT PERMIT NUMBER s, CITY OF ATLANTIC BEACH ROW19-0025 800 SEMINOLE ROAD ISSUED: 8/12/2019 ATLANTIC BEACH. FL 32233 EXPIRES: 11/10/2019 3 PUBLIC WORKS RIGHT OF WAY RESTORATION INFORMATIONAL Notes: Full right-of-way restoration,including sod,is required. 4 PUBLIC WORKS ADDITIONAL COMMENTS PUBLIC WORKS INFORMATIONAL Notes: Any damage done to infrastructure must be repaired by Contractor. 5 PUBLIC UTILITIES UNDERGROUND WATER SEWER UTILITIES INFORMATIONAL Notes: 6 PUBLIC UTILITIES UTILITY MAP INFORMATIONAL Notes: See attached Utility Map. FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT TOTAL: Issued Date:8/12/2019 2 of 2 riyLy;y�, City of Atlantic Beach �V APPLICATION NUMBER Building Department (To be assigned by the Building Department.) 800 Seminole Road AUG 01 2 I Atlantic Beach, Florida 32233-5445 9 0 Phone(904)247-5826 - Fax(904)2 45 ^�� 9 E-mail: building-dept@coab.us 6 Date routed: City web-site: http://vmw.coab.us APPLICATION REVIEW AND TRACKING FORM <�f> 9 Z Property Address: C Department review required Yes No Building Applicant: -Franning &Zoning ree minis ra o LG Public v0or s Project: PQ Public Utilities Public Safety Fire Services Review fee $ Dept Signature Other Agency Review or Permit Required Review or Receipt Date of Permit Verified By Florida Dept. of Environmental Protection Florida Dept. of Transportation St.Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS Reviewing Department First Review: Approved. []Denied. []Not applicable (Circle one.) Comments: BUILDING PLANNING &ZONING /, •.� Reviewed b Date: i TREE ADMIN. Second Review: A roved as revised. ❑ pp ❑Denied. ❑Not applicable PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: FIRE SERVICES Third Review: ❑Approved as revised. ❑Denied. ❑Not applicable Comments: Reviewed by: Date: Revised 05/19/2017 rig:Lyr City of Atlantic Beach APPLICATION NUMBER �s Building Department (To be assigned by the Building Department.) 800 Seminole Road I / 0 _t j Atlantic Beach, Florida 32233-5445 l l- !� Phone(904)247-5826 • Fax(904)247-5845 l E-mail: building-dept@coab.us Date routed: City web-site: http://www.coab.us APPLICATION REVIEW AND TRACKING FORM G� C, z i\.6 C Property Address: CID Department review required Yes No Building Applicant: fanning &Zoning reeminis ra o Project: C RD,L& Public ors - y Public Utilities > Public Safety Fire Services Review fee $ Dept Signature Other Agency Review or Permit Required Review or Receiptof Permit Verified By Date Florida Dept. of Environmental Protection Florida Dept. of Transportation St. Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS Reviewing Department First Review: ❑Approved. ❑Denied. of applicable (Circle one.) Comments: BUILDING PLANNING &ZONING Reviewed by: 4. e= zo?'P _ Date: ^�lei TREE ADMIN. Second Review: ❑Approved as revised. ❑Denied. ❑Not applicable PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: FIRE SERVICES Third Review: ❑Approved as revised. []Denied. ❑Not applicable Comments: Reviewed by: Date: Revised 05/19/2017 rS!rLYr�� City of Atlantic Beach APPLICATION NUMBER Building Department (To be assigned by the Building Department.) r v 800 Seminole Road I Atlantic Beach, Florida 32233-54459 w �� v Phone(904)247-5826 • Fax(904)247-5845 E-mail: building-dept@coab.us L Date routed: City web-site: http://www.coab.us APPLICATION REVIEW AND TRACKING FORM Property Address: C:D V� Department review required Yes No Building Applicant: anning &Zoning reeminis rrator-- Project: c Pc�)LC, Public Wor s Public Utilities �;` Public Safety Fire Services Review fee $ - Dept Signature Other Agency Review or Permit Required Review or Receipt Date of Permit Verified By Florida Dept. of Environmental Protection Florida Dept.of Transportation St. Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLIC N STATUS Reviewing Department First Review: Approved. ❑Denied. ❑Not applicable (Circle one.) Comments: BUILDING PLANNING &ZONING Reviewed by: a e. — T{ TREE ADMIN. Second Review: ❑Approved as revised. []Denied. ❑Not applicable PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: FIRE SERVICES Third Review: ❑Approved as revised. ❑Denied. ❑Not applicable Comments: Reviewed by: Date: Revised 05/1912017 PUBLIC UTILITIES PLAN REVIEW COMMENTS Date: Application#: Project Address: Check Box Check APPLICATION TRACKING COMMENTS to Add Box to Comment Print j Underground Avoid damage to underground water and sewer utilities. Verify vertical and Water Sewer horizontal location of utilities. Hand dig if necessary. if field coordination Is D d Utilities needed, call 247-5878. Meter Boxes Ensure all meter boxes,sewer cleanouts and valve covers are set to grade Sewer Cleanout and visible. ❑ ❑ A sewer cleanout must be installed at the property fine. Cleanout must be RT1 Sewer covered with an RT1 concrete box with metal lid. Cleanout to be set to grade ❑ ❑ Cleanout and visible. A reduced pressure zone backflow preventer must be installed if irrigation will RPZ be provided or if there is a private well on the property. Backflow preventer ❑ ❑ Backflow must be tested by a certified tester and a copy of the results sent to Public Utilities. Plans note the building will be unsprinkled. if plans change,any fire line Sensus installed must be metered with a Sensus touch-read meter in a properly sized Touch-Read vault and an appropriate backflow preventer installed. Backflow preventer ❑ ❑ Meter must be tested by a certified tester and a copy of the results sent to Public Utilities. Fire Sprinkler if fire sprinkler system is provided,call 247-5878 for backflow requirements. Backflow At a minimum,will require a double check backflow preventer. ❑ ❑ Requirement Fire Line Fire lines must be metered with a Sensus touch-read meter. Meters larger ❑ 0 Meter than 2" must be installed in a vault as noted in JEA specifications. Utility Map See attached Utility Map. Disconnect &Cap Disconnect and cap water and sewer lines. ❑ ❑ inspection Must call the inspection Line at 247-5814 to request an inspection of the Prior disconnected and capped water and sewer lines prior to demolition. ❑ [3 ❑ ❑ ❑ ❑ ❑ ❑ 0 13 f r Irk '..AP fw k, # PVC WATER MAIN !r- fAl �t. t ,r a ) t. � sus-�„ RIGHT—OF-WAY/EASEMENT PERMIT APPLICATION "ALL INFORMATION City of Atlantic Beach HIGHLIGHTED IN GRAY IS 800 Seminole Road,Atlantic Beach, FL 32233 REQUIRED. fun 9" PERMITTEE RESPONSIBLE FOR NOTIFYING 811 AND OBTAINING UTILITY LOCATES RCD W 1-`�1 � Job Address U W. Permit Number n Contractor Information Company �CrJ L f, Qualifying Agent Address 7ij �es1 �U✓r/� S(/ City )�X State__Zip ��i7id7i Phone Email State Certification/Registration# Architect Phone Email Engineer I'V" yt Phone 66S-77 3 Email Workers Compensation Insured I OR ExemptElExpiration Date • Permittee declares that prior to filing this application they have ascertained the location of all existing utilities,both aerial and underground and the accurate locations are shown on the sketches. • Whenever necessary for the construction,repair,improvement,maintenance,safe and efficient operation,alteration or relocation of all,or any portion of said street or easement as determined by the Public Works Director,any or all said poles, wires,pipes,cables or other facilities and appurtenances authorized hereunder,shall be immediately removed from said street or easement or reset or relocated hereon as required by the Public Works Director and at the expense of the Permittee unless reimbursement is authorized. • All work shall meet City of Atlantic Beach or Florida Department of Transportation Standards and be performed under the supervision of (Project Superintendent) with(Company Name) Phone &6r- g 3 • All materials and equipment shall be subject to inspection by the Public Works Director. • All city property shall be restored to its original condition as far as practical,in keeping with City specifications and the manner satisfactory to the City. • A sketch of plans covering details of this installation,as well as a copy of a recent survey shall be made a part of this permit. Calculations showing any increase in impervious area on owner's lot or in the City right-of-way are to be included with this application. • The permittee shall commence actual construction in good faith within days. If the beginning date is more than 60 days from date of permit approval then permittee must review the permit with the Public Works Director to make sure no changes have occurred in the area that would affect the permitted construction. • It is understood and agreed that the rights and privileges herein set out are granted only to the extent of the City's right, title and interest in the land to be entered upon and used by the holder,and the holder will,at all times,assume all risk of and indemnify,defend and save harmless the City of Atlantic Beach from and against any and all loss,damage and cost of expenses arising in any manner of the exercise or attempted exercises by the holder of the aforesaid rights and privileges. • Th I or �o�shall tified 24 hours prior to starting work and again immediately pupon completion, Date Permittee(signed in presence of otary Public) STATE OF FLORIDA,COUNTY OF DUVAL The foregoing instrument was acknowledged this day of 20 by who personally appeared before me and (printed name of Permittee) acknowledged that he/she signed the instrument voluntarily for the purpose expressed in it. [ ]Personally Known Signature of Notary Public,State of Florida [ ]Produced Identification(Type) H:\Applications&Forms\Word Documents\201801001 Right-of-Way Easement Permit Application.docx Revision Date:10/1/18 ENGINEERING DESIGN ORACLE PERMIT MAXIMO DATE REL PROJECT#: 39549 N.O.; 8005212 WO#: 30462651 CONST: 08101/19 CIR. TREE TRIMMING SUB-STA: NEPTUNE BEACH N.O.: 561 RECD:NO CELL ENGINEER:Robert Simpson N.O.: N/A ZIP CODE: NIA CUSTOMER/ SVC PHONE LOCATION: 89 W 2ND ST/50/2W AND TRANS INSTALL 561 CENTER: SSSC N.O.:665.7793 STA 1, P# 91 W. 2ND STI INSTALL 50/2W -- AND 75KVA, RUN 4/OP TO STA 2. i STA 2, P# 88 W 2ND ST./ REMOVE 410P TO \ p .� STA 3. STA 3, P#95 W 2ND ST. �• 9 NEW HOMES BUILD OCAe�00 a cv 1/0 • .� STA 3 STA 1 110-r .� 98 6 N 97 4 l� \� 4t) v 93 89 92 .`v 87 ® 85 ICD D 0 200 %r -j -- i 0 25A �N` CD �� 96 8� -)/Op Imo' 0 4/1OP 8q 4/gyp i 6 0 ^o 4/0 190 '; [STA 2 ,�� o�Z'• b 5OTCD ro -JE*A CUE Reports Estimate Number:39549 89 W 2ND ST./50/2W AND TRANS Estimate Type:SR Contract:089-16-HM OH FY19 INSTALL Estimate Version: By: SIMPRB MWO#/Task:30462651 Required Date: Oracle Project#:8005212 Estimated On: 07/31/2019 Cost Estimate Materials JEA Contractor 1.New Material Cost(wl sales tax) $1,323.75 $1,323.75 2.Transformer Cost(w/sales tax) $1,980.44 $1,980.44 3.Returned Material Salvage Value $0.00 $0.00 Labor 4.Crew Time S938.80 $1,659.31 5.Extraordinary Costs $0.00 $0.00 JEA Overhead 6.Fringe Benefits(43.52%of lines 4&7) $522.76 $121.59 7.Engineering Costs(Variable%of line 4) $262.39 $279.40 8.Project Equipment Costs(40%of total equipment costs) $553.01 $0.00 9.Material Handling(6.67%of lines 1 &2) $220.39 $220.39 10.Inspection(6.84%of line 4) $0.00 $113.50 11.Total Cost of Project $5,801.54 $5,698.38 12.Work Order Estimate(Line 11 minus line 8,9,&10) $5,028.14 $5,477.99 13.Billable Equipment Depreciation(60%of total equipment costs) $829.52 $0.00 14.Billing Estimate(Including Transformer Cost)(Lines 11+13+(64.49%of 4&7)) $7,405.72 $5,878.56 15.Billing Estimate(W/O Transformer Cost)(Lines 11+13+(64.49%of 4&7)-Line 2) $5,425.28 $3,898.13 Time Estimate Crew Hours Total Manhours 7.53 30.11 --------------------------------------------------------------------------------------------------------------------------------- JEJV CUE Reports Estimate Number:39549 89 W 2ND ST./50/2W AND TRANS Estimate Type:SR Contract:089-16-HM OH FY19 INSTALL Estimate Version: By: SIMPRB MWO#/Task:30462651 Required Date: Oracle Project M 8005212 Estimated On: 07/31/2019 CU Detail Station: 01 91 W 2NO ST. Build Transfer Remain in Place Remove CAMP 75 DC1 F-5*2 1 DGAC*75 1 DHLC*1/0 3 G1 W*2 1 I.BAYSW004 1 P.50/2W 1 RUBDOWN 8 RUBUP 8 S4*4/0 1 S9*1/0 5 S9*4/0 2 Station;2 :: W 2ND ST. Build Transfer Remain in Place Remove GY3*5 1 S20ES*4/0-1/0 2 S20ES*410-4/0 1 S4*4/0 1 C.4/OP 75 POLECON 3 Station: 3 Build Transfer Remain in Place Remove ARRESTER 1 BANK10 1 CUTOUT 1 POLECON 1 RUBDOWN 8 RUBUP 8 SWITCH 1 JE*1 CUE Reports Estimate Number:39549 89 W 2ND ST./50/2W AND TRANS Estimate Type:SR Contract:089-16-HM OH FY19 INSTALL Estimate Version: By: SIMPRB MWO#/Task:30462651 Required Date: Oracle Project#:8005212 Estimated On: 07/31/2019 Conductor, Conduit and Pipe Detail Quantities From Station To Station CU Build Transfer Remain Remove 01 2 CA10P 75 0 0 0 2 3 CAMP 0 0 0 75 -AF-A. CUE Reports Estimate Number:39549 89 W 2ND ST./50/2W AND TRANS Estimate Type:SR Contract:089-16-HM OH FY19 INSTALL Estimate Version: By: SIMPRB MWO#/Task:30462651 Required Date: Oracle Project#:8005212 Estimated On: 07/31/2019 Material Summary Item Quantity Item Number Item Description 1 ANCSS002 ANCHOR, SCREW, SINGLE-HELIX, GALVANIZED 10"X 8' X 1-1/4", SHIP ON OPEN FLATBED ONLYI 1 ARRL1003 ARRESTER, LIGHTNING, 18 KV, DISTRIBUTION CLASS AND RISER POLE (MOV)WITHOUT MOUNTING BRACKET, 15.2/26.4Y NOMINAL VOLTAGE 1 BAYSWO04 BAYONET, SHIELD WIRE, STRAIGHT 40" LENGTH 1 BKTAC009 BRACKET, ARRESTER AND CUTOUT, FIBERGLASS WITH RAYCHEM MATERIAL OVER ROD TYPE: SINGLE PHASE 3 BKTFS001 BRACKET, FIBERGLASS STANDOFF, 2" FIBERGLASS ROD, 18" STANDOFF TO INS BASE ROD COVERED WITH RAYCHEM HEAT- SHRINK MATERIAL, DUCTILE IRON FITTINGS 2 BOLDA015 BOLT, 3/4"X 14", DOUBLE ARMING, GALV.WITH 4 SQUARE NUTS ATTACHED, (MUST BE SHIPPED IN STD. BOX QUANTITIES OF 25 EACH) 1 BOLDA016 BOLT, 3/4"X 16", DOUBLE ARMING, GALV. WITH 4 SQUARE NUTS ATTACHED, (MUST BE SHIPPED IN STD. BOX QUANTITIES OF 25 EACH) 4 BOLMS035 BOLT, MACHINE, 3/4"X 12", SQUARE HEAD GALVANIZED STEEL, W/SQUARE NUT ATTACHED, (MUST BE SHIPPED IN STD. BOX QUANTITIES OF 25 EACH) 4 BOLMS036 BOLT, MACHINE, 3/4"X 14", SQUARE HEAD GALVANIZED STEEL, W/SQUARE NUT ATTACHED, (MUST BE SHIPPED IN STD. BOX QUANTITIES OF 25 EACH) 1 BOLMS037 BOLT, MACHINE, 3/4"X 16", SQUARE HEAD GALVANIZED STEEL, W/SQUARE NUT ATTACHED, (MUST BE SHIPPED IN STD. BOX QUANTITIES OF 25 EACH) 12 BOLTE001 BOLT,TERMINAL KIT, ( KIT INCLUDES ) 1-EACH 1/2" DIA.X 2"S/S BOLT FULL THREAD,2-EACH S/S FLAT WASHERS, 1-EACH S/S BELLEVILLE 1-SILICON BRONZE NUT( SHIPPED IN BAGS OF 10-EACH ASSEMBLED )"(SEE SPECIFICATION)" 75 CA10SO03 CABLE,4/0-19(PAP),OVERHEAD SERVICE DROP, 600 VOLT MULTIPLEX CABLE"VICKSBURG" PRE-ASSEMBLED PARALLEL 1000 FOOT REELS 1 CLAGRO01 CLAMP, GROUND ROD, 5/8"-4SOL"HAMMERLOCK" 3 CLAHL001 CLAMP, HOT LINE, 6-1/0-MAIN,6-1/0-TAP 1 CLASR002 CLAMP, STRAIN RELIEF WEDGE,ALUMINUM, 1/0 TRI-4/0 PAP 4 CLASR003 CLAMP, STRAIN RELIEF WEDGE MESSENGER, SIZE:#6-2/0 2 CLASS006 CLAMP, STRAIGHT STRAIN,ALUMINUM, 10000#3/0-556 ALUM (STD PKG 15 EA) 1 CLATGO01 CLAMP,TRANSFORMER TANK GROUND, "BRONZE"6 SOL-1 STR. 3 CNNCP002 CONNECTOR,#2, 6-2 MAIN, 2-1/0 TAP,ALUMINUM COMPRESSION, PARALLEL TAP, 10 CNNCP004 CONNECTOR,#4, 1/0-2/0 MAIN, 1/0-3/0 TAP COMPRESSION, PARALLEL TAP,ALUMINUM, 8 CNNCP006 CONNECTOR,46, 1/0-2/0 MAIN, 3/0-4/0 TAP COMPRESSION, PARALLEL TAP, ALUMINUM, -1E.*1 CUE Reports Estimate Number:39549 89 W 2ND ST./50/2W AND TRANS Estimate Type:SR Contract:089-16-HM OH FY19 INSTALL Estimate Version: By: SIMPRB MWO#/Task:30462651 Required Date: Oracle Project#:8005212 Estimated On: 07/31/2019 7 CNNCP007 CONNECTOR, #7, 3/0-4/0 MAIN, 3/0-4/0 TAP COMPRESSION, PARALLEL TAP,ALUMINUM, 4 CNNCP008 CONNECTOR,#5, 6-2 MAIN,4/0 TAP, COMPRESSION, PARALLEL TAP, ALUMINUM, 2 CNNGRO02 COUPLING, GROUND ROD, "THREADLESS"REMARKS: FOR THREADLESS GROUND RODS 3 CNNTS006 CONNECTOR, TRANSFORMER SECONDARY SET SCREW TYPE W/INHIBITOR,4-HOLE NEMA RANGE: 10-500, 3-PORTS. 4 CNNVG003 CONNECTOR, 6-2 SOL/10-2 SOL, VISE GRIP PARALLEL, BRONZE 36 COBCCO28 CONDUCTOR, #4 SOLID, SOFT DRAWN, BARE COPPER, 200', 25#, ON PLASTIC REEL,4"X 11.5"W/2" HOLE 70 COBCW014 CONDUCTOR, #4, TYPE 40 DSA, COPPERWELD & COPPERWELD- COPPER .204" DIAMETER 14804 BREAKING STRENGTH ( 50#COIL- 427' ) 30 COVIC002 COVER, "D" DIE, INSULATING,2-1/2" 1 CUTOT006 CUTOUT, CONTAMINATED ENVIRONMENT, 26" LEAKAGE DISTANCE TO GROUND, 100A, 27 KV, 170 KV BIL (54 EA PER PALLET) 1 FUSOH026 FUSE,OVERHEAD DISTRIBUTION, 5.2 AMP,TRANSFORMER. 1 GUAGWO01 GUARD, GROUND WIRE, 1/2"X 1/2"X 96",GRAY PLASTIC 1 GUAGWO02 GUARD, "YELLOW", GUY WIRE, 1/4"TO 1/2"8', POLYETHYLENE, USED ON ALL 3/8"AND 7/16" GUY STRANDS (DISTRIBUTION) 1 GUYAT008 GUY HOOK, COMBINATION, MALLEABLE OR DUCTILE IRON, HOT DIP GALV. 13/16" MOUNTING HOLE,20,000 LB MIN. ULT. STRENGTH. FOR WOOD OR CONCRETE POLES 2 GUYGR001 GRIP, GUY, 3/8", 26", GALVANIZED 50 GUYST005 STRAND, GUY, 3/8" DIA, 7 PER STRAND, GALVANIZED STEEL, CLASS "B" GALV. OR BEZINOL IS ACCEPTABLE (500'COIL) 1 INSGB002 INSULATOR, STRAIN, GUY BREAKER, 21,000#RATED, 60" ROD LENGTH, FIBERGLASS FOR USE ON JEA'S DISTRIBUTION SYSTEM ONLY 2 INSS0002 INSULATOR, SUSPENSION,4", CLASS 52-9 NEMA STRENGTH 10000#, GALV. FITTINGS 3 INSVP001 INSULATOR, VERTICAL POST,TIE TOP 35-KV,3/4"STUD TAP STANDARD PACKAGING IS NOT TO EXCEED THREE UNITS OR 72 POUNDS. 2 NUTSL003 NUT, LOCK, SQUARE, 5/8"HOLE SIZE, HOT DIPPED GALVANIZED 2 NUTSL004 NUT, LOCK,SQUARE, 3/4" BOLT SIZE, HOT DIPPED GALVANIZED 1 POLW0008 POLE,WOOD, 50'CLASS 2 (T/L= 18), WEIGHT=2,424 LBS 3 RODGRO03 ROD, GROUND, THREADLESS, 5/8"X 8', SHIP ON OPEN FLATBED ONLYI 5 SLEAL003 SLEEVE, RED TO RED NEUTRAL 2-2 ALUMINUM TRIPLEX NEUTRAL SPLICING 2 SLEFT006 SLEEVE,4/0 7-STR AAAC, FULL-TENSION ALUMINUM, COMPRESSION TYPE 3 STIC0001 STIRRUP, COMPRESSION, 2-1/0,ALUMINUM BODIES, COPPER BAIL, BAIL SIZE-2-SOL 3 STUL1001 STUD, LINE POST, DIA. SHANK-3/4", SHANK LENGTH- 1-3/4", GALVANIZED STEEL W/NUTS AND WASHERS; 3/4" HEAD SIZE CUE Reports Estimate Number:39549 89 W 2ND ST./50/2W AND TRANS Estimate Type:SR Contract:089-16-HM OH FY19 INSTALL Estimate Version: By: SIMPRB MWO#1Task:30462651 Required Date: Oracle Project#:8005212 Estimated On: 07/31/2019 1 TAGH0007 ALUMINUM VERTICAL TAG HOLDER FOR ADHESIVE BACK CHARACTERS((NOT FOR"SLIDE IN"CHARACTERS)). 19.5'HIGH X 2" WIDE WITH 3-1/8"NAIL HOLES @ THE TOP AND THE BOTTOM. (PKG. OF 50 EACH) 3 TIEPRO01 TIE, PREFORMED LINE, #2 AAAC,23" MIN. LENGTH, "F"NECK, SIDE TIE .316"-.357" COND. RANGE 1 TRAC0003 TRANSFORMER, 75 KVA, 14760/25565Y VOLT PRIMARY, 120/240 VOLT SECONDARY, SINGLE PHASE, CONTAMINATED ENVIRONMENT 2 WASRD004 WASHER, ROUND, 5/8"BOLT SIZE X 1 3/4" DIAMETER, GALVANIZED, 650 EA P/BOX) 18 WASRD005 WASHER, ROUND, 3/4" BOLT SIZE X 2"DIAMETER, GALVANIZED,**" 500 EACH PER BOX*** 10 WASSF003 WASHER, SQUARE FLAT, 3" SQ X 1/4", 5/8"X 3/4" BOLT SIZE, GALVANIZED 8 WASSP002 WASHER, SPRING, 3/4" BOLT SIZE, DOUBLE COIL HELICAL TYPE, GALVANIZED(EXTRA HEAVY DUTY) CUE Reports Estimate Number:39549 89 W 2ND ST./50/2W AND TRANS Estimate Type:SR Contract:089-16-HM OH FY19 INSTALL Estimate Version: By: SIMPRB MWO#/Task:30462651 Required Date: Oracle Project#:8005212 Estimated On: 07/31/2019 CU Summary s,i« FyyC9y a Cy 19 D l n� Tu �} xr �P6 k� ,.w -1d.s.. �'n 1n U Name ,Quantity Description C.4/OP 75 4/0 AAC PAP W/4/0 AAAC NEUTRAL DC1F-5*2 1 TANGENT TO 10 DEGREE ANGLE UNSHIELDED, CONTAMINATED DGAC*75 1 TRANS; CI, 26AKV 120/240 75KVA DHLC*1/0 3 1/0 JPT-LINE CLAMP FOR AERIAL CABLE G1 W*2 1 WOOD POLE- EQUIPMENT GROUND GY3*5 1 GY3*5 3/8"DOWNGUY W/8 FT SCREW ANCHOR P.50/2W 1 50 FT. CLASS 2 WOOD POLE RUBDOWN 8 LINE RUBBER REMOVAL, PER SECT. RUBUP 8 LINE RUBBER INSTALLATION, PER SECT. S20ES*4/0-1/0 4 SECONDARY CONNECTION AT POLE S20ES*4/0-4/0 1 SECONDARY CONNECTION AT POLE S4*4/0 2 SECONDARY DEADEND S9*1/0 5 SECONDARY SPLICE S9*4/0 2 SECONDARY SPLICE w �+ - r` F. e� EY4a± a.^.'.r CU Name Quantity Description ARRESTER 1 DIST.ARRESTER REMOVAL BANK10 1 SINGLE TRANS. REMOVAL, UP TO 75KVA C.4/OP 75 4/0 AAC PAP W/4/0 AAAC NEUTRAL CUTOUT 1 FUSE CUTOUT REMOVAL POLECON 4 S20 REMOVAL RUBDOWN 8 LINE RUBBER REMOVAL, PER SECT. RUBUP 8 LINE RUBBER INSTALLATION, PER SECT. SWITCH 1 CUTOUT&ARRESTER BRKT. REMOVAL