Exh 4A PREPAft EU 4/02/01,10-24-32 LICENSE gCTIVITY REPORT - NEtJ LICENSES PAGE 1 1
CIT Y OF ATLANTIC BEACH FOR PERIUU FROM 370})01 TO -3131101
PROGRAM OL 122E f0ft ALL DEPARTMENTS
I - (r
-- --- LIC - C7 RL - BUS IIJE SS NAME 1SS UED TX PE .CLASS- -.D ESCRSPLLOfI. -. __._ __..._ _. __. __
BUSINESS ADDRESS OWNER NAME BUS PHONE -
{ BUS CITY S7 ZIP OWNER ADDRESS I
I Oi 049'19 4820 SMU KERS E%PRESS -1401 3/05/01 NEW 5090 SERVICE STATION- _.I
2415 71AY PO R7 RD . .STEVEN J_.F ERRE LRq -904-..464-7226._ _____. _._._ _...
ATLANTIC OEACN, FL 32233 4143 PHILLIPS HIGHWAY, JACKSONVILLE, fL 32256
l ~.~
-01 05000 4820 SIdO KE RS E%Pft ESS -1401 3/OS/U1 -- _- .NEW -.5560 ___ VFN DLN G_.MA CHIRE___.__
2425 MAYPORT RD STEVEN J. FERRET RA -904- 464-7226
/ ATL AMTIC BEACH, FL 32233 9143 PHILLIPS HIGHIJp Y, JACKSONVILLE, fL 32256 /
01 05001 4820 S140KE RS EXPRESS -1401 3107/01 NEW R100 CONVENIENCE STORE
~ 2425 MAYPORT RD - STE VEM LfERREIRA -904- 454-7226 `~
- ATLANT LCaEpGH, FL 32233. 9143 .PHI LLIP-5__H.IGHWA Y.,_-JA[KSO NVILLI,-f-L .32.252_. .--__..._ _________
`~'
O1 05002 4820 SMOKERS EXPRESS -1401 3/07/01 NEW 5420 RESTAURANTS
.2425 M0.Y PO RT RD - STEV.EN_.1..-pE RftEl RA ..._.. ._-494-_564-7226.. _______ __. _. '~`
ATLANTIC BEACH, FL 32233 9143 PHILLIPS HI GH WAY,JpCKSONUILLE, FL 32256
~
O1 -05003 482.1- 80d !.S-PALM TREES ACID .FENCE 3/14/O1-._.. -tJEW--R-1-]A___-__.. GAR DEN_.C ENTER/NURSERY ----______ _-___.-__ ___-.__
75U OL MAYPORT RD ROBERT LEVESgUE -904- 249-2950
`
ATLANTIC BEACH, fl 3R 33 69 OAKWOOD ROAD, JpX BEACH, FL "52250 I
01 05005 4665 MAGI[ NAILS 3/08/01 NEW P625 NAfL SPECIALIST
- 469 -06 ATLANTIC BI VD DEA IJ NG UYEN -904- 242-0940 -
- - - - ATLAN Ti.C -BEACH, FL 32233 - _.- _ _9667-BA7.OU-aLll EE SRI VE., _JA CKSONVILLE~ FL_32257. _.___. -_ __- ~ -~
~
01 05006 4822 SH AMNON SMITH'S COpY SERVICE 3/19/01 NEW 5325 MISC. SERVICE ESTABL [G HMENT, NOT LISTED -
`L '.
.2277 SEM INULE RD `B __ . S.H ANN ON _S MITH _. _. '..-904-.249-0457__ __. _._.. ~'
ATLANTIC BEACH, FL 32233 2277 -8 SEM 4102E RD, p.D. 80% 50502, JAX BEACH, FL 32240
=
:
,.
01 05007 - .4823 --TAINTED FLESH-7ATTD0 &. BODY 3/1.3 /_U 1. _-. HEY ._. S52i____.___8-DY. P_IE.R CI MGl IeTT9-_AR.TISL__.. .-__..__ _-____
1195 MAV PO RT RU MICHAEL A. SH A7T0 -904- 241-3055
ATLANTIC HEACH, FL 32233 105 25TH AVE, S. -l Oti, ATL AryTIC BEACH, FL 32233 '~-'
01 05008 4546 COST CUTTERS fAMILY HAIR SALON 3/19/01 NEW P540 COSNET OLOGIST
991 ATLANTIC BLVD TILL IE JANET KNIGHT -904- 645-3500
_ ATL ANTIC.aEACH, FL .322 L'. _ _441_AILASiT i_C_BLVD.,_.ATL BIiTl G_i1 EpC9.,_F_t.._3],23}.___ _._..-_-._. . __.._
Ol 05009 4546 COST CUTTERS FAfII LY HA [R SpL ON 3/19/01 NEW P540 COSMETOLOGIST '
. ...491-ATLANTICdL VU TILLI E._JANET KNIGHT -904- 645-15Wp_
ATLANTIB BEACH, FL 32233 991 .q TL ANTIC BLVD, ATLANTIC BE0.CH, FL 32233
>I (.
01 05010 ..4556 _. COST SuTIERS FA MLLY N ATR S0.LON 3/19/01. _._ .N EW_ P54W -._ _S.DSME TULQGI3T ~. -
9'11 ATLANTIC BLVD TIILIE JANET KNIGHT -904- 645-3500
~ ATLANTIC HEACH, FL 32233 991 ATLANTIC BLVD, ATLq NTIC BEACH, FL 32233
O1
05011
4546
COST CUTTERS fgMI LY HAIR SpI ON
3/27/01 _ __..
___
NEtJ P540 COSMETOLOGIST
~ 991 0.T lA NTlC BLVD TILL [E JANET Kt1I GHT -904- 645-3500
_ ATLA NTI [..dEACd, FL 32233 421.p.TLANTI C_ BLV D, ATLA NTIC WF9 C_H ,_F1, }2211
-. _-. __
~
O1 05012 4824 JIGGER VENC ITO TILE SETT IiJG 3/19/01 NEW 5325 TAI SC. SERVICE ESTAdL IS HMENT, NOT LISTED ~
1101 H Sd1SC US.ST JI uGER_VENC ITO _.. -904- 993_-_5153$_ F
i ~
0.TL AfiT IC BE AEH, ft 32233 1101 HIBISCUS STREET, ATLANTIC BEACH, FL32233 r
r
~ ~
_ _ N y
_ _ _.. __ __._ _-__- -__-__ _- _-__. __. _. G r'~.
O
~+ ak
A
- PREPA REU 4/02/01,10-24-32 LICENSE ACTIVITY REPORT - NEW LICENSES PAGE 2 I
CIT Y OF A TLANTIC E+E ACH fOR PERIOD FR019 3/01/01 TO }/31/07
PRO GRAM O L 1221 FOR ALL DEPARTMENTS
(
LIC .- CTRL - BUSINESS' NAME ISSUED TYPE _. CLA SS DES.C RIPTJON.. _.. __.. __._. __
~. BUSINESS ADDRESS OWNER NAME BUS pNOPIE -
BUS CITY ST ZIP OWNER ADDRESS
T 01 05013 4326 BROGA, LLC 3/20/01 NEW S}OD MANAGEMENT COMPANY ~~
1685 SE LVA MARINA DR ROB ER-T.-..CLARK. -904- .247 84-1.__.. ____._ -___.. _.
. ATLANTIC BEACH, FL 32233 1685 SELVA MARINA OR, ATLANTIC BEACH, FL 32233 !
1
i
( .
_
t
- 07 -5014 4827 ALWA YS-7 HE_GARDEN LANDSCAPING .3120 /01_. _ NEW __. S2B0 ___L AI{NLY AR D3 ERVICE ____-_ __--____. -.__-_____
1520 FRANCIS AyE MATT GROWERS -904- 242 0860
~~
! '~ ATLANTIC BEACH, fL 32233 1R0 FRAfIC IS AV E, ATLANTIC BEACH, FL 32233 ~
''
' 01 05015 4828 WILLI AItl PROFITT S A$$DL IATES 3/26/01 NEW P11- INSURANCE AGENCY '
~ ~. 1079 -OS ATLANTIC BLVD WILLIAM PROFFITT -904- 241-6556 !
- ATLANTIC-e EACH, FL_32233 _. __.._ 1.243-_fikAD Y-HOdIl.,_.JALKS9NVILL E,_FL_32223. ___.__.. --_____ -.______ ,°.
~
01 05016 4828 WILLIAM PROF ITT & ASSOCIATES 3/26/01 NEW P585 INSUR ANCE 'A GENT j~,
rif
1079 -0B AT LpNT IC.eLVD.. _ 1JLLLIAM_P ROF EIT T_. __ _..________.-9.04-_25.1.-545b-__... _. - ___ _..._ ,'i
ATI ANTIC BEACH, fL 32233 12.430 BRADY ROAG, JALKSONV ILLS, FL 32223
i"(.
-1 05-12. 4829.--. .CHRISTOPH Ek. J,AND EµSON __.._ . .372910.1...... N£W-.P.02-- _ ._AT T9RN EY__FS RN /_C ORPORALI9N__._. ~-_I
531 ATLANTIC BLVD CHRISTOPHER J. ANGERS ON -904- 246-4448
'
ATLANTIC BEACH, FL 322}3 7679 $EMINBLE RD -4, ATLANTIC BEACH, FL 32233 ~~"
~
i;.
01 OSOtd 4329 CN RISTO PIIER J. ANDERSON 3129/01 NEW P515 ATTORNEY -
I
' ~ 531 RTLA NTIC BLVD CHRISTOPHER J. ANDERSON -904- 246-4448 I
I -
~,.i
__ _-. -_- .A7LA NTI C__LE AI H, _F L.32233 _._._ _. ___-___ .16Z2SENLNOLE_RD->4.,_ALIANii i_Q€ASH <_F.L-3.223___ .__- --___-- -~~~
I
~"
01
05019
4830
ARCH ESTER NEIL AGENCY
3/29/01
NEW P585 INSURANCE A6ENT ~ .
.
-i~'
. .529 ATLANTT C BLVD AR LTTESTER .NES L____.. -___._.. _-_. ._ _. _. __.__ ...____._ __.______
~ ~
__.'I
ATLANTIC BEACH, FL 32233 14548 CRYSTAL U1EW LANE, JA% OEA CH,
FL 32250 F5J,1,
O1 05020 4830 _- ARCH EST ER-NES L. AGENC Y.. _ 3/Z9/O L _ _NEW__._fl1.1-_.__.___1N SURflYL E_AGENCY____.__ __ ______ ___- _____- _. ~~
529 ATL APiT [C BLVD
L
IC B
L 32 ARCNE STEft NEIL - -
X BEACH
L 32250
14548 C
S
L
EW LAN
J '
;
~~I--
ANT
EACH, F
AT
233 E,
A
, F
R Y
Tp
VI .,
D7 05021 4831 TURF SU Rf ERS, INC,: 3/29/01 NEW 5230 LAWN/YARD SERVICE -
1826 TIERRA YERDE DR RICHARD e. ROUGHER -904- 463-2728
AT LANTlt B EACH, FL 32231. ]82-~_TLE RRII_Y ER Dp_DR._,__P._O.,_NRX._330]74.,_A1LANI[LBEACN., _Fl 32233_-__
j`~C r
TOTAL NU?IBER OF NEW LICENSES- 22 =
NEW, ACTIVE- 22 -
`
+
1-
TOTAL NUhIBE R. Qf LICENSES. CROCESSE D- 22 _ _.. __ ____
TOTAL, ACTIVE- 22 I".
PUBLIC WORKS PROJECT STATUS REPORT (D)=DESIGN ENGINEER
DEPARTMENT (CE&I)=CONSTRUCTION ENGINEER
(C)=CONTRACTOR
PROJECT DESCRIPTION PROJECT NO. AND INFORMATION STATUS ON 4/2/01
1. Village ofMayport (D)=USCG &JEA Force main installation and tie in for Coast Guard Station has been completed.
(CE&i)=JEA & Public Works The lift station is 100% complete, installation of sanitary sewer is 100%
Design - 100% complete (C)=Petticoat Contracting (to USCG Station) complete, and the force main is 100% complete. Roadway work is 100%
(C)=United Brothers (North of USCG Station) complete, except for the striping, drainage is 100% complete, water is 100%
Construction - 100% complete - complete, and electrical conduit is 100% complete, except for testing. The
scope of work was increased to add substantial electrical work and drainage.
Received permit application for new pump station and force main at Coast Guard
Station on 2/2/01. Final inspection held week of 3/26/01.
2. Core City Stormwater Project CORE99 Received 75% design plans for Sherry Drive on December 11, 2000. Staff
(D)= Original by England, Thims & Miller reviewed and submitted comments to consultant. City Commission approved
Preliminary Redesign - 100% Revised Preliminary Design by The subconsultant agreement on 12/11/00 far wetlands, water quality, and surveying.
complete R-A-M Professional Group Staff approved subwnsultant agreement for geo[echnical and sediment analysis.
Sherry Drive Desrgn -100% Re-Design by Aikenhead & Odom Received digital terrain model information on 2/1/01. Received 100% Sherry
complete Drive plans on 2/22/01. Had presentation for Ci[y Commission on 2/26/01.
Overall Redesign - 25% Authorized peer review of revised model by Eovironmentai Consultants
Downstream Design - 20% Technology to begin on 4/4/01.
3. Core City Sanitary Sewer PW0002 Completed 1" thru 10th Street. All driveways and sidewalks are completed,
Improvements Project - (D)=Public Works with the exception of 6'" through 81h Streets,
(CE&I)=Public Works
Design - /00% complete (C)=Insituform Technologies, Ina
Construction - 90% complete
4. Wonderwood Connector Utility (D)=The R-A-M Professional Group, Inc. Traffic transferred to new bridge over Puckett Creek. Contractor completed
Relocation (CE&I)=JTA ,JEA, and Public Works setting hangers under bridge and the force main piping on north (with the
(C)=Superior Construction Co: _ exception of expansion joints) and south side of bridge. Monitoring settlement at
Design - 100% complete the east side of Puckett Creek Bridge, and will pressure test existing 12" line
after settlement. Settlement still occurring in area and will continue to
Construction - 90% complete for monitor.
Atlantic Beach portion
~-
a~
zd
r9
~a
N t=1
G "~
O
H ~
A
5. Buccaneer Wastewater (D)=Eder Engineering New sludge holding facility design is 100% complete. Awaiting
Treahnen[ Plant Expansion (C)=Meadors Construction Co, recommendations on solids handling from Camp, Dresser & McKee prior [o
(CE&I)=Gannett Fleming Engineering advertising for bids. One year warranty inspection scheduled for 4/4/01.
Design - 100% complete
Construction ofFxpansion-
100%comptete
Construction of Sludge Facility
0%
6. Atlantic Beach and Buceaneer (D)=Gee & Jenson This project includes the Master We[well at the Atlantic Beach Plant,
Sewer System hnprovements improvements to Fairway Villas and Park Street Lift Stations, force main
improvements on Donner Road, and abandonment of Shangri-La Lift Station.
Design - 100% complete City Commission approved transfer of funds for project on 1/8/Ol. Received
Redesign -100% negotiated redesign proposal on 2/2/01. Met with consultant 2/26 to finalize
redesign. Bid opening scheduled for 4!25/01.
7. Town Center and Atlantic Blvd. (C)=Trim All Lawn Service Commission approved wntrac[ to Trim All Lawn Service on 1/8/01. "Kick off"
Median Landscape Maintenance meeting held I/23/Ol and contractor began work on 2/1/01. Trim All placed
crimson stone at islands neaz Sea Turtle. Received proposals for new medjool
Design - 100% comp/ete palms ou 3/30/01. Will obtain new bricks to make repair by the Sea Horse
_ Motet, and wilt reinstall new light poles. Contacted JEA regarding pole in
Construction -Ongoing front of the Sea Turtle.
8: Widening of Atlantic Blvd. (D)=H. W. Lochner, Inc., Pilings have been finished, substructure is wmplete and concrete and steel
Bridge FDOT girders have al] been completed. Expected completion date of new bridge has
(C)=Superior Construction Co. been advanced to mid-May 2001 and traffic will be transferred to new bridge at
Design - 100% complete (CE&n=Reynolds, Smith & Hills that time. Work on existing bridge will then begin.
Construction - 60% complete
9. Mayport Flyover (D)=Pittman, Hartenstein & Assoc. Received Department of Health clearance to make final tie in. Scheduled to
JTA complete early in January 2001. Final inspection was held on 1/26/01.
Flyover Design - 100% complete Connelly & Wicker for Atlantic Beach Contractor began on Piers on 2/2/01 and closed inside westbound lane on
(C)=Superior Construction Co. Atlantic Blvd. for approximately 3-4 weeks. Modified eastbound lanes on
Construction - 33% complete (CE&I)=Public Works Mayport Road -widening and curb and gutter in place. Working on sub-base
overall, 100% for utility JTA on east side of Atlantic Blvd. and completed placing concrete pilings on the
relocation northbound lane of Mayport Road. Traffic to be shifted to new westbound
lane in 2-3 weeks.
Utility Design - 100%comptete
10 Utility hnprovemen[s 2000 (D)=Gee & Ienson Engineer submitted proposal for redesign. Engineer submitted renegotiated
Design - 100% complete (C)= proposal on 2/2/01. Met with consultant on 2/26 to finalize redesign. Bids are
Redesign -10% complete (CE&T)=Public Works due on 4/25/01, and prebid meeting scheduled for 4/12/01.
Y
C
t" ~
~~
N ti7
O
O
N #
A
a
11 Beach Renourishment (D)=Army Corps of Engineers Project has been rescheduled [o begin in the winter. Funds were approved by
City of Jacksonville on 11!28(00. Start date will be determined by Army Corps
of Engineers.
l2 Water Master Plan (D)=Camp, Dresser & McKee Began digitizing As•Builts and performed site visit to water plants on 2/5/01.
City staffbeing trained to input data, learn GIS and facilitate transfer of
Design - 30% complete information to City in [he future. CDM has performed site visits at all plants and
is obtaining information for efficiency analysis. Suweyors have begun
marking GPS points.
13 Mayport Jr. Enlisted Men Family (D)=Prosser Hallock Received 100% plans and sewer permit on 1/26101. Holding permit until
Housing - 100 Units (C)=Beneco Enterprises, Inc. maintenance of Navy Lift Station issue is resolved. Permit application signed on
"JEM" 2/27/01 and transmitted on 3/1/01. Received approved permit from DEP on
4/2/01.
Y
Ci
a r-1
~d
a
~y
N 1H
O
H ~
a
AGENDA ITEM #4A
APRIL 9, 2001
DEPARTMENT OF PARKS AND RECREATION
716 OCEAN BOULEVARD
ATLANTIC BEACH, FLORIDA 32233-5455
TELEPHONE: (904) 247-5828
FAX: (904) 247-5849
SUNCOM: 852-5828
http://ci.atlantic-beach.fl.us
April 2, 2001
To: Jim Hanson, City Manager
.From: Timmy Johnson, Recreation Director'~~
Re: Usage Report, Community Center, March 2001
Jim, here is a recap of activity at the Adele Grage Community Center for the month of March 2001:
Theater (Room AI
Group/Event No. of
Mtgs/Events No. of
People
ABET Set Bldg/Performances Rehearsals and Workshops 20 900
Narcotics 4 45
ReceptionsBoard Meetings 3 25
Totals 27 970
Meeting Room (Room B)
Group/Event No. of
Mtgs/Events No. of
People
A.A. Meeting 9 100
Board Meeting 5 40
State Attorneys Office 1 10
Cribbage/Scrabble 4 15
Totals 19 165
_.-~.
AGENDA ITEM #4A
APRIL 9, 2001
Summary of Donner Park and Jordan Park activities:
• Attended the Camp out under the Stars with 22 youth from Donner Park
Attended Basketball "Tip Off" games at Darnell Cookman Middle School or Emmett Reed
Community Center. Our team entered 3 tournaments and plan on participating in more
tournaments in the upcoming days.
• Donner Park serviced 98 families with a total of 420 household members for its monthly
commodities giveaway. The children volunteered 16 hours to pack boxes and serve
families.
• The Dental Van came to Donner Park this month. Twenty-six children received teeth
cleaning, fillings and instructions on dental care and mouth health:
• The Donner Park Senior citizens group assisted with plans for Summer Camp. Camp is
scheduled to begin June 11, 2001. Thirty-six senior citizens volunteered there services.
Summary of Parks and Recreation activities:
Planned and coordinated Camp Out Under the Stars
• Completed grant application for fishing pier and met with engineers to get estimates on
fishing pier at Dutton Island.
Planned and. coordinated Annual Egg Hunt.
Completed Tree planting at Seminole, Francis and Sailfish
• Began work on re-surfacing Tennis Courts.
• Attended strategic plan meetings.
• Attended Recreation Advisory Board meetings
Worked on landscaping at Lifeguard Station
• Typed correspondence, answered phone, webpage updates and all other parks and
recreation activities.