Exh 4AAGENDA ITEM #4A MAY 14, 2001 MEMORANDUM May 1, 2001 TO: Jim Hanson, City Manager FROM: Don C. Ford, Building Official ~C~ RE: Building Permits Report Please be advised that the following. permits were issued in the month of March, 2001 TYPE PERMIT NO. PERMITS PERMIT COST VALUATION Single Family 2 3,574 186.399 Duplexes Addition/Remodel 30 5,628 466,907 Swimming Pool 2 235 30.300 Commercial 4 9,124 764,979 Garage/Carport Fence 8 80 1,000 Utility 4 1,240 Well 3 30 Roofing 8 245 55,342 Shed 1 35 3,500 Sign 4 115 Trees 10 Driveway 1 25 950 Tent 1 25 Foundation 1 25 2,200 TOTAL 79 20,381 1,511,577 Miscellaneous permits issued in wnnection with new construction, additions, remodeling, etc: Number of Permits Permits Costs Electrical 28 10,510 Plumbing 17 759 Mechanical 26 1,114 Inspections performed March 2001 Building Concrete Electrical Plumbing Mechanical Trees Occup. Lic. 29 15 $2 29 12 14 5 AGENDA ITEM #4A MAY 14, 2001 Agenda Item No. Date: CITY OF ATLANTIC BEACH CITY COMMISSION STAFF REPORT AGENDA ITEM: Building Permits Report March, 2001 /1/ SUBMITTED BY: Don C. Ford, Building Official `e.2~ Q DATE: May 1, 2001 The following is a comparison report of Building Permits for New Single Family, Duplexes, Townhouses, Remodeling/Additions and New Commercial for years to date for March 2000 and March 2001. Year to Date March 2000 TYPE PERMIT NO. PERMITS •"CONSTRUCTION VALUATION Single Family 7 $ 634,273 Duplex Residences 6 437,500 Remodeling/Additions 59 1,276,534 Commercial 5 985,731 Total 64 3,334,038 Inspections: Total 469 Year to Date March 2001 New Single Family 10 $ 2,539,464 Duplex Residences 6 437,500 RemodelinglAdditions 75 1,332,564 New Commercial 9 1,062,645 Total 91 $ 5,372,173 Inspections: Total 555 RECOMMENDATION: ATTACHMENTS: Building Permit Report for March 2001 REVIEWED BY CITY AGENDA ITEM #4A MAY 14, 2001 City of Atlantic Beach, FI. Utility Sales Report March 2001 Water Sales r„. Atlantic Beach Buccaneer Total Water Sales Accounts (000) Revenue per 1,000 gi Accounts (000) Revenue Per 7,000 gi 5,079 42,914 $87,557 $2.04 5,079 45,506 $82,691 $1.82 2,551 31.050 $64,449 $2.08 2,356 27,069 $57,004 $2.11 March 2000 Water Plant Production Atlantic Beach Buccaneer Total Production ~., Total Water Billetl Water Loss for month; Percentage Loss Total 12 mo. Avg. Loss Gallons (000) 53,217 33,7sa 86,971 73,964 13,007 14.98% 11.84% (000) 63,152 36,144 88,296 72,575 26,721 26.91 16.93% Sewer Sales Atlantic Beach Buccaneer Total Sewer Sales I Sewer Treatment Gallons Actual Revenue ACCOUOYS (000) Revenue Per 1,000 g1 4,588 ,34,824 $125,049 3.59 2,452 29,848 $128,530. 4.31. Gallons Actual Revenue Accounts (0001 Revenue Perl,aooai 4,514 34,312 $128,011 3.73 Millions of Gallons PREPRRED 5104/01,14-51-19 LICENSE ACTIVITY REPORT - NEW LICENSES CITY OF ATLANTIC BEACH FOR PERIOD FROM 4/01/01 TO 4/30/01 PRO G.4 AM OL122L fOR ALL DEPARTMENTS ' lLC = _. CTRL = _ BUSINESS NAME___. ISSUED TY.P E, CLASS DESCRIPTION ~:+I tlUJ1Nt)p RU UI(tpp UIJNti NR!9t cop rnon[ - :, ~' BUS CITY ST TIP - OWNER ADDR[SS ti I i ~ ~ O1 04891 4732 KING FOOD DISCOUNT 1 4/10/ut NEW F1C0 CONVE dIENCE STORE r ~ I 31 SEMIYOLE RD GEORGc iAYER -904 242-4799 c, ~ _ _ ATLANTIC BEACN,~FL 32233 3906 CHEROKEE VILLA LANE, JACKSONVILLE, FL 32277 _ e r O1 05023 4832 DOERING MASONRY `I NC. 4l02lG1 __ _ NF.W __5315 _ _ MASONRYICERAMIC TILE - -___,_______ ' "~ 22 `, 2ND ST LARRY M, DOERIr7G -904- 241-1278 ~ - , I +. ' ATLANTIC BEACH, FL 32233 225 2ND STRE `t T, ATLANTIC BEACH, FL 32233 ~- y . __ ____.-___. _ __--.____~- ___-__ _ _ - ______-_... ___. ,~ O1 05024 4833 THE GOOD HOUSEKEEP ER 4/ 3/01 .. NEW 5145 tLEANING/JANI iORIAL/MAID SERVICE ,_I +<1 500 CLIPPERSHIP LN _ LISA GOOD -904-247-5609 _ IJ t+,i +"~ ATLANTIC BEACH FL 32233 500 CIZPPERSHI P. LANE~O. BOX 330261 ATLANTIC BEACH, fL 32233 i .oi -- ~ ;1 +"I Oi '75025 4834 DORIS JOHNSON 4/05/01 NEW R107 CRAFTS/HOME ACC ESORIES - ~1i s 466 ,CIA KO DR - -904- 249-7397 DURIS J OH NSON Iw +_ _ _ _ ATLANTIC BEACH, Fl __ __ 32233 ___ ____ ._ _ - _____, 466NAK0 DR, ATL A"IT IC BEACH, FL 32233 _ ~i ~ zu~ -01 05026 4835 JACK FRY PAINTING 4/06/01 NE9_ 5350 PAINTING/PAPER HANGING _ z>I _ ' 74 W 5TH ST JACK FRY -904- 241-3695 S, z31 ATLANTIC BEACH, rl 32c33 74 W T 5TH STREET, ATLANTIC BEACH, Fl 32233 yJ u -Ot 05027 46'35 BRIAN P. WRAP ~ 4/05/01 NE W 5151 SOF T'W ARE PROG P.A MS,WRIT INGOF " 2305BAREF00T TRAi HRIANP. WRAY -904- 247-9208 n ?r ATLANTIC BEACH Fl 32233 _ .2305 5AREFOOT TRA[E, ATLANTIC HEACH, Pl 32233 ~ I zs 01 -05028 4837 AS7R0 PEREZ PdUFFLE R & BRAKES 4/06101 NEW 5070 AUTO- SERVItE7 REPAIR 1420 MAY PO RT RD -904- 591-1078 ASYRO ALN ERT O PcRE21 JR! fwi 3+ oz ~ ATLANTIC 3EACH, FL _ _ . 32233 - _ - - '6949 OELISLE DRIVE, JACKSONVILI E, Fl 32244 ~+ ~Ot 05029 3080 BROOKS & LIMB ALIGN C-LECT IC CO, 4/11!01 ' NEW SS60 VENDING MACHINE - - . 41 OL W 2tdD ST BROOKS, [HRISTY.A. -904- 241-9051 °s ~ ATLANTIC HEACH, FL :2233 1222 JASMINE STREET, ATLANTIC SEACN, FL 32233 4 3> 01 05030 4838 BENNETT'S SP. WOOD WORKING, INC 4/18701 NEW. R070 LABI NET/CARPENTRY SHOP ~ °a ~ 47 W 2ND ST -MARY CATHERINE BENNETT -904-242-0506 5, ~+ ATLANTIC BEACH, FL 32233 _ ___ 1538 6TH AVE, N_ JAX BEACH, Fl 32250 _ _ 'ez w sf 07 OS 2 3154 4!19/01 O T ~ f I C 3 N t B ,J - ---- 322 F0432082N7241 _ 20TH S~" O E VEO R O Y W ___ ~ ~ ATL TIC EACH, FL 33 E 6 A, R , P ~ l ~ D ;S O1 OS 3 3154 F00 Y ALAN td. 4/19 01 Rp E A N W PS TTO I Y ~~ •~ 599 ATL AiMT IL HI VD _. _ ALAN M. f00DY -904- 249-7241 _ _ n .ATLANTIC BEACH, FL 32233 207 S ROSCOE BLVD, PONTE VEDRA, FL 32082 7 I~ °e __:. w . 01 .05035 4839 7S TiJI LAS CLOTHING COMPANY -4/20/01 NEW RC85 CLOTHING w ' 578 CRUISER LN VARICK ROSETE - --404-. 997-1096 s, ATLANTIC HEACH, FL 32233 578 CRUISER LANE, ATLANTIC BEACH,FL 32233 ~ ~ _ sz ~sr O1 75036 329D 0'MA LLEY REAL ESTA TE, INC. 4/24/0! _- . NEIJ P130 kEAL ESTATE gGENCY t~. ~~ 645 hIAYPORT. RD O'MALLEY,_ JOHN-J - - J ~ ss ATLANTIC BEACH, FL ___ _ 32233 _ _ ____ _ ___ 1330 GLEAN HLUD, ATLANTIC aEACH, FLFL 32233 _ __ ~ sn r A s ~ . ~ N r f' f.. ,.. r 1., .y - O a ~~ v PAGE 1 'r: { PREPARED 5/04/01,14-51-19 LICENSE ACTIVITY REPURT - NEW LICENSES CITY OF ATLANTIC BEACH FOR PERIOD FROM 4/O1/O1 TC 4/30/01 PROGRAM OL122L FOR ALL DEPARTMENTS LIC - C RL - B SINESS NA E ISS OFD TYPE CLA"S DES GRIP ION PAuE 2 ~' BUSINESS ADDRESS OWNER NAME _L dUSPHONE - 1_ I ' -BUS CITY ST ZIP OWNER ADDRESS s _ ________ - _______ - ____ ___________________-___ - __ _-_-____ ___ --- - ____ _____________________ -_ ___---_ __-___-_____-________ _ ~ ________ _____ _J -.. ° ~ s 01 OSC37 3290 O'MAILEY REAL ESTATE, INC. 4/24/01 NEW P685 RGAL ESTATE SALES AGENT F ' 645 MAYPO RT RD _ O'NpLLE Y_, JOHN J,_________ - _ __ s -- ' e ATIAtVTIC BEACH, FL 32233 1330 OCEAN BLVD, ATLANTIC BEACH, _ Fl 32233 ~ s O1 0 SD38 329D 0'MA LLEY EAL ESTATE, INC. 4/24/01 NEWS P685 REAL 'e STATE SALES AGENT '0 b45 MAY PO RT RD O'MALLEY, JOHN J. - _ - _ ATLANTIC 3EACH, FL 32233 ~ 1330 OCEAN BLVD, ATLANTIC BEACH, FL 32233 _~ ~z '°~ '3 01. 05039 3290 O'MALLEY REAL ESTATE, INC. 4/24!01 NEW P68`. REAL ESTATE SALES ~- .4GENT ° - 645' MAYPORT RD O'MALLEY, JOHN J, - - ! ATLANTIC BEACH FL 32233 1330 OCEAN BLVD,_ATLANTIC dE.gLH. FL 32233 V iw ~ '~' O1 05040 3290 O'MALLEY REAL ESTATE, INC. 4/24/01 NEW P685 REAL ESTATE SALES AGENT ~;~ 1 '" 645 MAYPO RS D _ O'MALIEY~ JOHiJ J._ __ - - ______ _ I~=+ ~ AT LgNTIC BEACH, FL 32233 1330 OC EAR BLVC, ATLANTIC BEACN, __ fL 32233 _ ~w ' ze 01 05041 3290 0'MA LLEY REAL ESTATE INC. 4/24/01 NEW P685 _ REAL ESTATE SALES - .AGENT ral '~ 645 iq AY PORT RD 0'MA LLEY, JOHN J. - - - ~"I ATLANTIC BEACH, fL 32233 1330 OCEAN-BLVD, ATL ANT[C dEAtH, FL 32233 ~=~ !9 ~ I+ J O1 05042 3290 - O'MALLEY RERL ESTATE, INC. 4/24/01 _ ._. _ NEW P(~85 REAL ESTATE SALES AGENT Rti - b45 MAYPO RT RD "0'M.4LLEY, JOHN J. -- - ~- ~'~ ATLANTIC BEACH. FL 32233 1330 OCEAN 3LVD,_AT~AyTIC 9£ACN, - fL 32233 ~j ® _ ~ ~~ zN C1 05043 3290 O'MALLEY RERL ESTATE, INC. 4/27/01 NEW P685 REAL ESTATE SALES AGENT j ~' -- 645 MAYPU RT RD _ - - - O'MNLLE Y~ JOIIN J__ _ _ _ - - __ - -- id "i ATLANTIC BEACH, FL-32233 1330 OCEAN BLVDy ATLA NT ZC©EA[H, FL 32233 L1 N d ihnk i,: ICI TOTLI NW MRFR AC NFW I if FIJSFC- -:1T .1T 01 ~. .. ) 1 ~y la d A N O ~j '~ 11 H AGENDA ITEM #4A MAY 14, 2001 Monthly Report for Public Safety 1-Mar Emergency Response Time: Mean 4.1 Minutes Median 3.0 Minutes Training Completed: All Officers Juvenile Sex Offenses Emotional Survival for Police Officers Department Updates Physical Fitness for Police Who Moved My Cheese? The One Minute Manager Meets the Monkey Firearms Qualification The Role of the Supervisor Individual National Symposium on Child Sex Abuse Labor and Employment Law Workshop MADD Awards luncheon Criminal Profiling Police Workload Mar-00 Y-T-D 1-Mar Y-T-D Number of Calls for Service 2058 5195. 1944 5855 Number of Arrests 110 285 90 269 Number of UTCs 522 1515 555 1949 Number of Incidents Reported 72 211 81 190 Jacksonville Fire and Rescue Fire Res onses # 11 42 16 46 Time 4.462 4.99 Emergent Medical Responses # 58 254 65 174 Time 4.435 4.472 Animal Control Statistics Number df Tele hone Calls 210 513 227 674 Number of Animals lm ounded 86 166 75 269 Number of Citations Issued 19 58 9 43 Number of Bites Re orted 2 4 1 6 Code Enforcement Report Attached PUBLIC WORKS and PROJECT STATUS REPORT (D)=DESIGN ENGINEER UTILITY (CE&I)=CONSTRUCTION ENGINEER DEPARTMENTS (C)=CONTRACTOR PROJECT DESCRIPTION PROJECT NO. AND INFORMATION STATUS ON 5/1/O1 1. Village of Mayport (I))=USCG &JEA Final inspection held week of 3/26/01. Informed JEA that we need a (CE&I)=JEA & Public Works procedure for payment of sewer fees to the City of Atlantic Beach as Design - 100% complete (C)=Petticoat Contracting (to USCG Station) customers tie-in (none are tied-in to date). (C)=United Brothers (North of USCG Station) Construction - 100% complete 2. Core City Storrrtwater Project CORE99 Received 75% design plans for Sherry Drive on December 11, 2000. Staff (D)= Original by England, Thims & Miller reviewed and subntitted comments to consultant. City Commission approved Preliminary Redesign - 100% Revised Preliminary Design by The subconsultan[ agreement on 12/11/00 for wetlands, water quality, and surveying. complete R-A-M Professional Group Staff approved subconsultant agreement for geotechnical and sediment analysis. Sherry Drive Design -100% Re-Design by Aikenhead & Odom Received digital terrain model information on 2/1/01. Received 100% Sherry complete - Drive plans on 2/22/01. Had presentation for City Commission on 2/26/01. - Overall Redesign - 40% Authorized peer review of revised model by Environmental Consultants Downstream Design - 50% Technology [o begin on 4/4/01. Completed peer review on 4/18/01. Sherry Drive advertised on 4/22/01. 3. Core City Sanitary Sewer PW0002 Cured in place piping completed I°'thru 10th Sheet. Replacement of services Improvements Project (D)=Public Works completed on aII streets except for Ahern. (CE&I)=Public Works Design - 100%comp[ete (C)=Insituform Technologies, Inc. Construction - 95% complete 4. Wondenvood Connector Utility (D)=The R-A-M Professional Group, Inc. Traffic transferred tonew bridge-over Puckett Creek. Contractor completed Relocation (CE&I)=JTA ,JEA, and Public Works setting hangers under bridge and the force main piping on north (with the (C)=Superior Construction Co. exception of expansion joints) and south side of bridge. Monitoring settlement a[ Design - /00% complete the east side of Puckett Creek Bridge, and will pressure test existing 12" line after settlement. Settlement stopped and after monitoring is complete, line will be Construction - 90%canplete for retested. - Atlantic Beack portion 5. Buccaneer Wastewater Treatment (D)=Eder Engineering New sludge holding facility design is l00% complete. Awaiting -~- G] .~ ~t ~ C ~C ~ .... a y N ~~[jjs-'j O a I-+ Plan[ Expansion (C)=Meadors Construction Co. recommendations on solids handling from Camp, Dresser & McKee prior to (CE&I)= Gannett Fleming Engineering advertising for bids. One year warranty inspection was held on 4/4/01. Design - 100%complete - Construction ofExpansiao- 100%complete Coustruclion of Sludge Facility - 0 6. Atlantic Beach and Buccaneer (D)=Gee & Jenson This project includes the Master Wetwell at the Atlantic Beach Plant, Sewer System Improvements improvements to Fairway Villas and Park Street Lift Stations, force main improvements on Donner Road, and abandonment of Shangri-La Lift Station. Design - 100% complete City Commission approved transfer of funds for project on 1/8/01. Received Redesign -100% negotiated redesign proposal on 2/2/01. Met with consultant 2/26 to finalize redesign. Bid opening was 4/25/01. Completed bid analysis, and revising cost benefit analysis based on actual bid prices. 7. Town Center and Atlantic Blvd. (C)=Trim All Lawn Service Commission approved contract to Trim All Lavm Service on 1/8/01. "Kick off" Median Landscape Maintenance - - meeting held 1/23/01 and contractor began work on 2/1/01. Trim All placed crimson stone at islands neaz Sea Turtle. Receivedproposals for new medjool Design - 100%complete palms on 3/30/0!. Repairs to bricks made at the Sea Horse Motel, and new light poles installed. JEA removed pole in front of [he Sea Turtle. Construction - Oxgoing 8. Widening of Atlantic Blvd. (D)=H. W. Lochner, Inc., Pilings have been finished, substructure is complete and concrete and steel Bridge - FDOT girders have all been completed. Expected completion date of uevv bridge is (C)=Superior Construction Co. estimated to be late May to early June and traffic will be transferred to new Design - 100%complete (CE&I)=Reynolds, Smith & Hills bridge at that time. Work on existing bridge will then begin, which includes removal of the existlng median and installing new style barrier Ovals. Construction - 75%complete 9. Mayport Flyover (D)=Pittman, Hartens[ein & Assoc. Received Department of Health clearance to make final tie in. Scheduled to JTA complete early in January 2001. Final inspection was held on 1/26/01. Flyover Design - 100%emnplete Connelly & Wicker for Atlantic Beach Contractor began on Pier 5 on 2/2/01 and closed inside westbound lane on (C)=Superior Construction Co. Atlantic Blvd. for approximately 3-4 weeks. Modified eastbound lanes on Construetion -41 %complete (CE&I)=Public Works Mayport Road -widening and curb and gutter in place. Working on sub-base on overall, 100%jor utility JTA (Reynolds, Smith & Hills) east side of Atlantic Blvd. and completed placing concrete pilings on the relocation northbound lane of Mayport Road. Traffic [o be shifted to new westbound lane on 5/14/01. Last pile caps tobe finished by 5/5/Ol and steel girders to be set Utility Design - 100%canplete beginning 5/21/01. 0 Utility Improvements 2000 (D)=Gee & Jenson Engineer submitted proposal for redesign. Engineer submitted renegotiated a ~z kb „a A y N py O y C r1 t+ A Design - 100% complete (C)= proposal on 2/2/01. Met with consultant on 2/26 to finalize redesign. Bids were Redesign - 10% cwnplete (CE&I)=Public Works received on 4/25/01. Performed bid analysis. - I 1 Beach Renourishment (D)=Amry Corps of Engineers Project has been rescheduled to begin in the winter. Funds were approved by City of Jacksonville on 11128/00. Start date will be detemvned by Army Corps of Engineers. Due to high cost of material at Buck Island, material will be obtained from channel dredging project scheduled to star[ 9/01 and renourishment should startin January 2002. 12 Water Master Plan (D)=Camp, Dresser & McKee Began digitizing As-Builts and performed site visit to water plants on 2/5/01. City staff being trained to input data, Team GIS and facilitate transfer of information to Desige -60% eourplete City in the future. CDM has performed site visits at all plants and is obtaining information for efficiency analysis. Surveyors have begun marking GPS points. Sizty percent presentation scheduled for 5/14101. 13 Mayport Jr. Enlisted Men Family (D)=Prosser Hallock Received 100% plans and sewer pemrit on 1/26/01. Holding permit until Housing - 100 Units (C)=Beneco Enterprises, Inc. maintenance of Navy Lift Station issue is resolved. Pemri[ application signed on "JEM" - ~ 2!27!01 and transmitted on 3!1701. Received approved pemut from DEP on 4/2/01. Construction underway. Desige - 100% complete Coustrnction - 12% complete Y G1 ~z ~c d ~~ ~~ o~ o~ v AGENDA ITEM #4A MAY 14, 2001 DEPARTMENT OF PARKS AND RECREATION 716 OCEAN BOULEVARD ATLANTIC BEACH, FLORIDA 32233-5455 .TELEPHONE: (904) 247-SS28 FAX: (904)247-5849 SUNCOM: 852-5828 http://ci.atlantic-beach.fl.us May 1, 2001 To: Jim Hanson, City Manager ,/,/~/ ~ From: Timmy Johnson, Recreation Director/ry { Re: Usage Report, Community Center, Apri12001 Jim, here is a recap of activity at the Adele Grage Community Center for the month of April 2001: Theater Room A GrouplEvent No. of Mtgs/Events No. of People ABET Set Bldg/Pertormances Rehearsals and Workshops 17 870 Narcotics 5 100 YMCA/Jacksonville Waldorf Initiative 5 90 ReceptionsBoard Meetings 1 40 Totals 28 1100 Meeting Room (Room B) Group/Event No. of Mtgs/Events No. of People A.A. Meeting 10 150 Board Meeting 7 70 State Attorneys Office 1 10 Cribbage/Scrabble 5 13 Totals 23 243 AGENDA ITEM #4A MAY 14, 2001 Summary of Donner Park and Jordan Park activities • Met with Karen Wolfson of B.E.A.M. to discuss Summer Camp and BEAM sponsoring children for the Dental Van this Summer. • Donner Park Cheerleaders assisted the Department by filling Easter Bags with toys and candy for the Egg Hunt in Jordan Park. They also assisted in felting the senior citizens baskets vdth staple food items and fruits. • Donner Park hosted the Beaches Youth Explosion Talent Week the week of April 9-15. Some of the activities consisted of various forms of talent being performed, arts and crafts show and hot dogs and chips being served. • Cheerleaders were invited to perform at Jacksonville Beach housing complex and the .Holly Brook housing complex. They also assisted children from these areas with filling Easter baskets and dying eggs: • Concluded Basketball Season at Donner Park by attending four Basketball games including play-off and championship games. Donner Park's 16 and older team came in second place and 16 and younger came in third place in the league. • Gary Walker of the Jacksonville Jaguars came out and signed autographs and assisted the children with homework for our after school program. • Donner Park is planning for Youth Kickball and Softball Teams to begin this summer. A conference was held with officer J.J. Dixon of the Police Athletic League to assist in coordinating the teams. • Planned and coordinated all necessary paperwprk for Donner/Jordan Park summer camp. Atl forms and corcespondence has been sent out. Summary of Parks and Recreation activities: • Held annual Egg Hunt at Jordan Park. Approximately 70 people were in attendance. • Completed Tennis Court re-surtacing. • Completed landscaping at Lifeguard Station • Worked on Beautification Department flower beds. • Attended strategic planning meetings. • Attended Recreation Advisory Board meetings. • Typed correspondence, answered phone, webpage updates and_all other parks and recreation activities.