Exh 8DAGENDA ITEM #8D 7LTNE 11, 2001 CITY OF ATLANTIC BEACH CTTY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Sherry Drive Reconstruction Project Bid No. 0001-19 SUBMI'T'TED BY: Robert S. Kosoy, P.E., Public Works Director ' DATE: June 8, 2001 BACKGROUND: On June 8, 2001, bids were opened at 2:00 p.m. on the Sherry Drive Reconstruction Project. Five bidders were prequalified and four submitted bids. The bids were as follows: Contractor: Subtotal: 10% Contin enc : Total Aggregate Base Bid Price: BGCO, Inc. $1,432,867.95 $143,286.80 $I,S76,154.75 Callawa Contractin $1,269,510:16* $126,951.02* $1,396,461.18* Jacksonville Eighteen Construction No bid submitted Jensen Civil Construction $1,621,333.87 $162,133..39 $1,783,467.26 Su eriorConstruction $1,789,484.47 $178,948.45 $1,968,432.92 *Corrected totals per attached bid analysis. All contractors submitted the required documentation. The low bidder was Callaway Contracting for a total of $1,396,461.18. BUDGET: The funding will be obtained from available monies for the Core City Drainage Project -Account No. Core 99 Bond Fund. RECOMMENDATION: Awazd the contract for Sherry Drive Reconstruction Project, Bid No. 0001-19, to Callaway Contracting in the amount of $1,396,461.18, and authorize the City Manager to sign the contract. ATTACHMENTS: " Bid Analysis dated June 8, 2001. REVIEWED BY CTTY MANAGER: Page Q W f--~ '. 0 0 N '. Sherry Drive Reconstruction Project -Bid Opening on June 8, 2001 ~ 2:00 p.m. PREQUALIFIED BIDDERS: Item No. Item Descri lion: En ineer's Estimate: BGCO, Inc. Gallows Conlractin Jax 18 Construction Jensen Civil Consl. Su erior Construction 1 Pertormance & a enl bondin $50,000.00 $13,600.00 $14,065.00 - $11,900.00 $5,000.00 2 Maintenance of traffic $110,283.74 $119,677.00 $26,008.67 $84,485.80 $473,322.05 3 Roadwa reconstruction $620,063.81 $293,395.36 $463,018.50 $456,872.17 $520,335.92 4 Stormwater drains e/s stem construction $362,170.50 $369,558.48 $367,925.09 $379,370.00 $372,700.00 5 Water distributionsstern corn lete $288,356.00 $211,526.67 $295,255.92 $308,607.00 $286,450.00 6 Wastewater collection ad'ustmenls $47,275.D0 $62,392.50 $42,822.82 no bid $112,300.00 $86,925.00 7 Si nin and markin $16,228.00 $10,012.94 $27,749.18 $14,796.90 $22,251.50 8 Surve 'n stake-out & as built surve in $40,000.00 $25,800.00 $12,358.00 $39,000.00 $5,000.00 9 Production of as-built drav~in & certification $10,000.00 $6,800.00 $1,784.00 $6,000.00 $1,500.00 10 Testid Rsam tin $59,000.00 $13,800.00 $10,273.00 $10,000.00 $15,000.00 11 Bid acka a miscellaneous ~ $30,000.00 $306,305.00 $8,250.00 $198,000.00 $1,000.00 SubtotaC $1,633,377.05 $1,432,867.95 $1,269,510.16 - $1,821;333.87 $1,789,484.47 $1,269,520.00 12 Ten ercent 10% contin en $163,337.71 $143,286.80 $126,951.02 $162,133.39 $178,948.45 $126,952.00 ' - Total a r ate base bid dce: $1,796,714.76 $1,576,154.75 $1,396,461.18 $1,783,467.26 $1,968,432.92 $1,396,472.00 Maximum Bid: $1,968,432.92 Minimum Bid: $1,396,461.18 Average Bid: $1,681,129.02 "erroneous total submitted by contractor .Bid Analysis by: Robert S. Kosoy, P.E.