Loading...
Exh 8DAGENDA ITEM #SD AUGUST 13, 2001 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Construction Phase Engineering Services Atlantic Beach & Buccaneer Sewer Improvements Project SUBMITTED BY: Donna Kaluzniak, Utility Director / DATE: August 2, 2001 BACKGROUND: The City Commission awarded the contract for Bid No. 0001-17, Atlantic Beach and Buccaneer Sewer Improvements, to Meadors Construction Company on May 14, 2001. This project includes the master lift station at Wastewater Treatment Plant #1, the force main from Lift Station C, and upgrades to the Park Street and Fairway Vi7Ias Lift Stations. This project will require numerous mechanical, electrical, civil and structural shop drawing submittals, contractor requests for information (RFIs), pay request certifications and other administrative tasks. Staff requested a proposal for construction phase services for this project from Gee & Jenson to include reviewing shop drawings and assisting with administrative services. Because our Inspector, Ernie Beadle, is involved in several projects at this time (Sherry Drive, Dutton Island water main, Church Road Water & Sewer), we requested they include intermittent site visits in the proposal as well. Gee & Jenson has provided a proposal for the above construction phase services for a total of $14,800. This amount is less than 1.5% of the construction costs. BUDGET: Funds for miscellaneous engineering services are available in the Sewer Utility Fund in the amount of $21,486 under account number 410-4101-535-3100. RECOMMENDATION: Accept the proposal from Gee & Jenson to provide construction phase services for the Atlantic Beach and Buccaneer Sewer Improvements Project in the amount of $14,800, and authorize the City Manager to sign the contract. ATTACHMENTS: 1. Proposal from Gee & Jenson dated July 27, 2001. REVIEWED BY CITY AGENllA ITEM #8A AUGUST 13, 2001 Gee 8z Jenson .r~ , Celebrating 50 Years afDetign Excellence Mr. Bob Kosoy, P.E. July 27, 2001 Director of Public Works City of Atlantic Beach 1200 Sandpiper Lane Atlantic Beach, Florida 32233-4381 Re: Atlantic Beach and Buccaneer Sewer System Improvements j s, ~ : _ . I ., __ _.....:~::: G&J Project No. 99-137 Atlantic Beach, Florida Dear Bob: Pursuant to our conversation last week with Donna Kaluzniak regarding our assistance with shop drawing review and other construction phase services, we have prepazed this fee proposal for your review and consideration. As discussed with Donna. we have disaeeregated the construction phase tasks into administrative assistance, periodic site visits and shop drawing review by specific discipline. The fee breakdown for construction phase services for the referenced project is shown on the attached sheet. We would propose to review- and respond to shop drawing submittals including the mechanical, structural, electrical and civil disciplines. Also we will assist the City (including assisting City Onsite Observer Ernie Beadle) with general administrative services during the construction contract, including routine construction coordination, review of pay requests (if required), consideration of and response to contractor questions and proposed change orders, and project closeout. LJp to six periodic site visits would be scheduled on an as needed basis, for project startup and to coincide with any significant concrete pours or other noteworthy construction milestones. Coordination of the above mentioned aspects of the construction phase of the referenced project could be performed by Cree & Jenson staff for a total lump sum fee of $14,800 which amount would not be exceeded without prior authorization from the City of Atlantic Beach and providing that the Construction Contract is substantially completed within the 240 day time frame allotted in the contract. We appreciate this opportunity to assist the City of Atlantic Beach in this endeavor. If you have any questions regarding this proposal, please call me in our Jacksonville office at (904)292-9097. Si John E. pins, Jr., P.E. Vice resident cc. Donna Kaluzniak, City of Atlantic Beach 9452 Philips Highway, Suite i4, Jacksonville, Fiotida 32256 T(904) 292.9097 F(904) 292.4206 ENGINEERING tER GGG293A AAGMITECTURE /AA CGOO66fi tANOSGPE ARCHITECTURE /lC GMGGfiO LANG SURVEYING IlB GW39341NTERIOR DESIGN IIB MOI010 AGENDA ITEM #$D AUGi3ST 13, 2001 ATLANTICAND BUCCANEER SEWER SYSTEM IMPROVEMENTS Breakdown of Construction Phase Services Construction Phase Task Lump SumFee Shop Drawing Review Mechanical - $2,90 Structural - $1,880 Electrical - ~ $3,320 Civil - $1,330 Periodic Site Visits - $1,710 Administrative - $3610 TOTAL $14,800