Exh 8HAGENDA ITEM #8H AUGUST 13, 2001 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA TTEM: Replace Emergency Generators at Lift Stations C and F SUBMITTED BY: Donna Kaluzniak, Utility Directo Tim Townsend, Plants Division Duector ' X lY J DATE: July 30, 2001 BACKGROUND: Currently the City has budgeted $70,000 to replace the emergency generator at Lift Station A (460 Palm Street). This replacement is part of an ongoing program for lift station upgrades and maintenance. However, under emergency conditions at the end of last fiscal year, the genset and related equipment at Lift Station A had to be rebuilt. There is no present need to replace the genset at Lift Station A, but the generators at Lift Stations C (69 Donner Road) and F(858 Cavalla Road) will soon need replacement, and we would like to use the budgeted funds for this purpose. In the last ten years, developments in technology have made older gensets obsolete, and replacement parts difficult to obtain due to the change from analog to digital controls. The gensets at Lift Stations C and F aze 1985, 45 kilowatt, LP gas powered units. Both of these units aze in need of reconditioning, including rewinding the units, replacing the reaz main seals, and upgrading the controls. JEA has a contract with Ring Power.for purchasing, replacing and maintaining auxiliary generators, and the City of Atlantic Beach has the opportunity to replace these units under JEA's contract. The total cost for Ring Power to provide a turnkey replacement of both units, which includes electrical and mechanical installation, start-up, testing and instruction is $48,618. The cost to recondition both existing generators would be approximately $20,000, or about 40% of the cost to replace them under the JEA contract. The majority, and all of our larger gensets aze Caterpillar units, and staff recommends standardizing all of the generators in the Atlantic Beach water/sewer system to Caterpillaz as they aze replaced. City staff contacted Mr. James T. Maedel, JEA Fleet Maintenance Manager, to inquire about their replacement schedule for auxiliary generators, and their satisfaction with the Ring Power contract. JEA has over 200 auxiliary generators, which they replace as determined by the size, type and condition of the existing units. If an existing genset is a smaller, older analog type requiring a fairly extensive amount of work, the unit is replaced. Due to the variety of existing units, JEA specified only certain types and sizes of gensets in their bid. If there is no bid item matching the existing unit, they replace it with either the next larger size unit or with a like unit, with pricing quoted after the fact. JEA has been very pleased with both the pricing and performance per their contract with Ring Power. AGENDA ITEM #8H AUGUST 13, 2001 Our existing gensets aze 45 KW, LP gas units, and Ring Power has agreed to offer the same pricing to the City of Atlantic Beach as they would for JEA to provide replacement units. BUDGET: Funding was budgeted genset replacement, and is available in the amount of $70,000 under account number 410-4101-535-6300. RECOMMENDATION: Accept Ring Power's proposal for replacing the two gensets at Lift Stations C and F for a total of $48,618. ATTACHMENTS: 1. Proposal from Ring Power to replace two existing gensets in the amount of $48,618. 2. Copy of e-mail from Keith Moore offering pricing as provided to JEA. 3. JEA bid tabulation for generator replacements and maintenance. REVIEWED BY CITY AGENDA ITEM #8H AUGUST 13, 2001 R~ OL1fMPfAN~ CompAir LeR01 GENERATORS SrsrEMS ~ amid a .mwnx•a.>»wn.. SULLAI R. INDUSTRIES, INC. JACKSONVILLE TALLAHASSEE LAKE CITY PERRY OCALA GAINESVILLE 8040 PhiiGps Hwy. 4752 Capital Circle N.W. 500 Cannon Creek 2920 S. Butler Pkwy. 6202 North U.S. 301/441 4900 N. Mein Street JacksomAlle, FL 32256 Tallahassee, FL 32303 Lake City, FL 32055 Perry, FL 32347 Ocala, FL 34475 Gainesville, FL 32609 (904) 737-7730 (904) 562-1622 (904) 755.3997 (904) 584-2600 (352) 732-4600 (352) 371-9983 SALES SERVICE PARTS LEASING RENTALS CITY OF ATLANTIC BEACH QUOTATION #: 11KM0220 1200 SANDPIPER LANE DATE: .03127/01 ATLANTIC BEACH FL CUSTOMER INQUIRY: LIFE STATIONS F&C 32233 TERMS: NET 30 DAYS ATTN: DONNA KALUZNIAK F.O.B.: JOBSITE SHIPPING DATE: 12-14 WEEKS AFTER RECEIPT OF ORDER DESCRIPTION OF MATERIAL UNIT PRICE EXTENSION Two Cz) 7]=IREE{~ NEW CATERPILLAR OLYMPIAN LP GAS VAPOR GENERATOR SETS MODEL G45F1 RATED AT 45 KW EACH FOR CONTINUOUS STANDBY DUN, .80 POWER FACTOR, 120/240 VAC, 3 PHASE, 4 WIRE, WYE CONNECTED, 60 HERTZ, 1800 RPM WITH STANDARD EQUIPMENT PER THE ATTACHED SPECIFICATION SHEET AND THE FOLLOWING OPTIONS: • MAIN CIRCUIT BREAKER, 135 AMP, 3 POLE, GENERATOR-MOUNTED, MOLDED CASE CONSTRUCTION • CONTROL PANEL SAFEN SHUTDOWNS, AC METERING, ALARM HORN • ELECTRONIC GOVERNOR FOR .25 PERCENT FREQUENCY REGULATION • VIBRATION ISOLATORS, UNIT MOUNTED • ALUMINUM CRITICAL GRADE MUFFLER WITH STAINLESS STEEL FLEXIBLE CONNECTOR AND RAIN CAP, SHIPPED LOOSE • BATTERY CHARGER, i0 AMP, 2-RATE AUTOMATIC, 120 VAC INPUT • BATTERY, HEAVY DUTY LEAD ACID NPE WITH RACK AND CABLES • FIVE YEAR WARRANTY • LUBE OIL, ANTIFREEZE -INITIAL FILL TOTAL PRICE FOR ABOVE $14,165.00 $28,330.00 QUOTATION ACCEPTED BY: DATE: TAX #: CUSTOMER: SALESPERSON: KEITH R. MOORE, EPG SALES REPRESENTATIVE TERMS: • This offer to sell is made suhjecl to huyers acceptance within ten (10) days from this date • All quoted pdces are suhject to change without notice end those in eHeC on the date of shipment shell prevail • Suhjed to credit approval • Used equipment subject to prior sale No sales tax is included Page 1 AGENDA ITEM #8H AUGUST 13, 2001 SYS~EEIE QUOTATION # 11KM0220 Page 2 DESCRIPTION OF MATERIAL UNIT PRICE EXTENSION ELECTRICAL INSTALLATION RING POWER WILL PROVIDE FOR A COMPLETE ELECTRICAL INSTALLATION OF EACH GENERATOR. TOTAL NET FOR ABOVE (PER SITE) MECHANICAL INSTALLATION RING POWER WILL PROVIDE FOR A COMPLETE MECHANICAL INSTALLATION OF EACH GENERATOR. TOTAL NET FOR ABOVE (PER SITE) TOTAL PROJECT PRICE FOR LIFT STATIONS F , 8 C RING POWER WILL OFFER A TRADE ALLOWANCE FOR EACH EXISTING GENERATOR AS FOLLOWS LIFT STATION "F" LIFT STATION "C" TOTAL REI/ISED PROJECT PRICE NOTES: 1. THE ABOVE PRICE INCLUDES START-UP, TESTING, INSTRUCTION TO OPERATING PERSONNEL AND 08M MANUALS. ALL LABOR AND MATERIAL FOR A COMPLETE INSTALLATION IS INCLUDED. 2. NO FUEL IS INCLUDED. 3. THE TRANSFER SWITCH AT EACH SITE IS IN GOOD WORKING CONDITION AND WILL NOT BE REPLACED. 4. IF AN EXTENDED OUTAGE IS REQUIRED DURING THE GENERATOR REPLACEMENT, RING POWER WILL PROVIDE AND CONNECT A PORTABLE GENERATOR AT NO COST TO THE CITY OF ATLANTIC BEACH. 5. ALL EQUIPMENT IS IN ACCORDANCE WITH THE REQUIREMENTS OF JEA CONTRACT SPECIFICATIONS IFB JXF-09359. $6,024.00 $5,120,00 ($1,000.00) ($1,000.00) $12,048.00 $10,240.00 $50,618.00 548,618.00 AGENDA ITEM #8H AUGUST 13, 2001 Kafuzniak, Donna From: Keith.Moore@RingPower.com Sent: Monday, April 30, 2001 4:07 PM To: dkaluzniak@ci.atlantic-beach.fl.us Subject: JEA -Ring Power Contract Donna, I wanted to follow up on our conversation from last week. We have offered to provide the same pricing structure to the City of Atlantic Beach as per the specifications detailed in JEA's bid request JXF-093-99. We have discussed the fact that these specifications are based upon the use of diesel engine. The two generators that the City has chosen to replace operate on LP gas. In this case, we do not have pricing in the JEA contract to compare generator cost. However, i can tell you that if the JEA were to purchase LP gas units of this size and consist, I would offer the same pricing to them as I have offered to the City of Atlantic Beach. Like wise, if you choose to purchase a diesel generator that was not covered on the original JEA contract but has been quoted after the fact, you would receive the same pricing as offered to JEA. I hope this information and commitment is useful Regards, Keith v'1 °~ w N M 'i W °o Ol N N Caterpillar Cummins Detroit Diesel Zabatt New t/ntta $5,820,690.00 $8,047,819.00 $0,883,797.00 $7,074,048.00 Maintenance New $450,050.00 $922,875.00 $826,775.00 $1,489,070.00 Conuols $1,754,913.00 $2,030,112.00 $1,948,055.00 $9,948,890.00 ota ` 13 1 I 1 8 ~ 1 8 1 I ) 0 l less Glrvin Sub T $ , 03, B.OO 4,19 008.OD $ $ 5,71 ,5 :OO $ 6 857,003 .00 ~irvrn aI,LS ,tiZi7.W n0 bid p2,U49,~38U.00 82,770,000.00 Total ~ $14,381,348.OOf nonresportsive ~ $17,761,562.901 $99,fi2T,003A0~ a P m m d 0 0 H N Pos t -It° Fax Mote 7671 Dale 1 .1 C~ w9es~ ' t to VbJ ro 4 A V 7 I /7 From ~> J~ ~ ~i0./DEpi , / :LL ,'iW l< CiO.• ~`'~'''j 1'A ~fj~~i (G4'. ~ ,y `y tyl JLd .. .~ . _ . . ... r.... • V [ C ~7 ~FaxM (._ ~ 7 ~ Fazi / ~S! •-0 S_ I F+ H w ti7 N G ~ H yy N ,~ O ~irtC1 PnWGY" i , 0 0 a N Calerp Ilan Cummins Detroll plesel Zahaft Bld Hems Q Unlt Price Amount Unlt Price Amourrt Unit Price Amount Unit Price Amount 2b k 5 >91.5oz0u $a7,>o"u.D is,u7s'.;0 w°8 ~75.DD f1?,2?T.!~!~ $Rg.g86 DD 15,110.00 $75.550.00 W endosure 3 $19 750.00 3 i ~ jo y g5g,250.00 $16,513.00' ~~r $49,539.00 $26,033.00 $78,099.00 $28,500.00 565,500.00 Cendosure 2 523130.003~IetL$46,260A0 ~ $19,079,003K?`~$38,158.00 $28,950.00 557,900.00 $31,335.00 ~ $62,670.00 Maa7[enanra L5 •^--•~.+.. wl IJ.UU o.+eu nn w.t,,,,...vv .1 arS nn tat N7fi (1n _ 61;737.00 543.425.ao $2,742A6 $68,550.06 50 kW 5 13,511.00 $87,555.00 2,133.00 $110,665.00 $19,481.00 $97,305,00 $t6,525.00 $82,625.00 W encloswe 3 $23,360.00 $70,140.00 $16,513.00 $49,539.00 $26,033.00 $78,099.00 $28,500,00 $85,600.06 C enclosure 2 $26,579.00 $53,158.00 $19,079.00 $38,158.00 $28,950.00 $57,900.00 $31,335.00 $62,670.00 Maintenance 25 $725.00 $18,125.00 $1,725,00 $43,125.00 $1,737.00 $43,425,00 52,804.00 $65,100. iaevJ i;. :r:~,~.`.,',.~~ :""'^^^ Q++^adm -~~addnnn 524-055.00 $240,550.00 $18,870.00 188,700.00 W endosure 6 $26,494.00 $158,964,00 $17,096.00 $102,576.00 $26,033.00 $156,198.00 $28,500.00 $171,000.00 C endosure 4 $29,078.00 $116,312.00 $19,860.00 $79,440.00 $28,950.00 $115,800.00 $31,335.00 $125,340.00 Maintenance 50 $735.00 $36,750.00 $1,775.00 $88,750.00 $1,737.00 586,859,00 $2,649.00 $132,450.00 100 kW 15 $17,513.00 262,695.00 $25,639.00 387,585.00 525,425.00 $381,375.0 $21,105.00 $316,575.00 W endosure t0 530,199.00 5301,990.00 $17,098.00 5170,880.00 $26,390.00 $263,900.0- $29,875.00 5298,756.00 Cendosure 5 $33,215.00 $166,075.00 $19,880.00 $99,300.00 S8Q404.Q0 $152,020.00 $33,845.00 $169,215,00 Maintenance 75 $750.00 $56,250.60 $1,825.00 $138,875.00 $1,737.00 $130,275.00 $2,791.00 $209,325.00 150 kW 15 21,050.00 15,750.00 $29,880.00 $445,200.00 31,068.00 $465,990.00 $27,390.00 $410,850.00 W endosure 1D 531,614.00 $316,140.00 $19,380,00 $193,800A0 $29,817.00 $298,170.00 $33,380.00 $333,800.00 C endosure 5 $35,144.00 $175,720.00 $23,352.00 $116,760.00 $36,997.00 $184,985.00 $40,480.Q0 $202,400.00 Malnlenar>ce 75 $780.00 $58,500.00 $1,925.00 $144,375.00 51,750.00 $131,250.00 $2,925.00 $219,375.00 200 kW 10 524,759.00 $247,500.00 $24,972.00 $249,720.00 30,415.00 $304,150.00 $29,490.00 $294,900.00 W endosure 6 $26,914;00 $161,484.00 $23,355.00 $140,130.00 $28,881.00 $173,286.00 $29,335A0 $176,010.00 C endosure 4 $32,243.00 $128,972.00 $27,965.00 $1 tt,860.00 $33,658.00 $134,624.00 534,055.00 $136,220.00 Maintenance 50 5785.00 539,250.00 $2,025,00 $101,250.00 $1,750.00 587,500.00 $3,308.00 5165,400.00 250 kW 4 $26,009.00 $104,036.00 $30,765.00 $123,060.00 $34,201.00 $136,804.00 $35,100.00 $140,400.00 W enclosure 3 529,113.00 $87,339.00 $24,297.00 $72,69i.0U $28,881.00 $Bfi,643.D0 529,735.00 $88,005.00 C enclosure 1 $34,573.00 534.579.00 $'19,364,00 $29,384.00 $33,656.00 $33,656.00 $34,055.60 $34,055.00 Maintenance 20 $790.00 $15,800.00 $2,125.00 $42,$00.00 $1,790:00 $35,800.00 .$3,663.00 573,880,00 .,;;;;:;;. ~ c~oo+cnn tea a7snn 44f F~nnn 5708,100-00 $42.723.00 5213,615.00 . $41,350.00 $206,750.00 W endosure a au.oav.v~ m~~,~„~.,.,, wJVw,...,,,. ._,.r..,.._-t ---- -- --• C endosure 2 $40,715.00 $81,430.00 $37,177,00 $74,354.00! $42,109.00 t $84,218.001 $43,395.00 $86,79D.OD~ Maintenance 25 $1,200.00 $30,000.00 $2,425.00 $60,625.00 $1,880.00 $47,000.00 $4,375.00 $109,375.00 s s A m , m ;a gT 1 0 n y n N A ~. N ~ L7 ~z H ,~, ~. y w ~ N °o m ~x 600 kW 2 57,525.00 5115,060.00 70,261.00 $140,522.00 $68,849.00 $137,698.00 $71,000.00 $142,000.00 W erdosure 1 537,700,00 $37,700.00 $38,969.00 $38,969,00 $37,891.00 $37,691.00 $39,655.00 539,655.00 C enclosure 1 545,818.00 $45,818.00 $48,639.00 $48,639.00 $46,493.00 $46,A93.00 $48,165.00 $48,165.p0 (i,/alnk~ancn fn gi?3~nn .$1? _ugg_ g2.,7sg,Dn . , s27~50gttn $??OO:D~+ - A2z firlrr,M .. $5,435 nQ $Sd 75n nn. 750 kW 3 $74,353.00 $223,059.00 $84,601.00 $253,603.00 $82,998.00 248,994.00 $97,210.00 $291,630.00 W endosure 2 540,034.00 $80,088.00 $38,969.00 $77,938.0 $39,155.00 $78,310.00 $40,905.00 581,810.00 C: anrlnc„m 1 f~d5 R')O (1n ~d5 fMG n(1 4,6R R4Q nil ~6R C.1C_ _ _ CdR AAti Qn 48R.Qd''i,Qf1 PdA fit n n0 C4A R111 (ID Maintenance 1 51,950.00 $29,250.00 $3,200.00 $48,000.00 52,950.00 $44,250.00 $5,955.00 569,325.00 1000 kW 2 592,435.00 $184,870.00 $113,798.00 227,596.00 $111,7.00 $223,538.00 $117,475.00 $234,950.00 W endosure 1 $42,787.00 542,787A0 $41,160.00 $41,160.00 543,505.00 $43,505.00 $45,610.00 $45,610.00 C enclosure 1 $65,043.00 $65,043.00 $51,228.00 $51,228.00 $54,062.00 $54,062.0 $56,050.00 $56,050.Q0 Maintenance 10 53.360.00 533.800.00 53.575.00 535.750.00 53.100.00 531.000.00 56,805.00 568,050.00 1500 kW 3 5137,555,00 $412,665.00 $165,983.00 $497,949.00 $189,650.00 $568,950.00 $187,920.00 $563,760.00 W endosure 2 $52,647.00 $105,284.00 $41,160.00 582,320.00 $49,496.00 $98,992.00 $52,520.00 5105,040.00 C endosure t $59,052A0 559,052.00 $51,228.00 $51,226.00 $60,250.00 $60,250.00 $63,275.00 .$83,275.00 Maintenance 10 $3,385.00 $33,850.00 54,575.00 545,750.00 53,600.00 $36,000.00 $7,135A0 $71,350.00 1750 kW 2 $156,018.00 $312,036.00 $213,267.00 $426,534.00 $225,777.00 $451,554.00 $258,460.00 $516,920.00 W endosure 1 $54;755.00 $54,755.00 $52,039.00 $52,039.00 $52,665.00 552,666,0 $94,100.00 $94,100.00 C endosure 1 $87,371.00 $87,371.09 $67,546.00 $87,548.00 561,637.00 $81,637.00 5102,595.00 $102,595.00 Maintenance 10 $3,410.00 $34.100.00 $5,075.00 $50,750.00 $3,900.00 $39,000.00 $7,785.00 $77,850.00 2000 kW 2 5187,910.00 $375,820.00 5251,609.00 $503,218.00 $279,852.00 $559,704.00 $280,370.00 5560,740. W endosure 1 $59,809.00 $59,809.00 $52,039A0 $52,039.00 $57,241.00 557,241.00 $60,670.00 $60,670.00 Cenclosure 1 $76,164.00 $76,164.00 $67,546,00 $67,546.00 $70,874.00 $70,874.00 $74,305.90 $74,305.09 Maintenance 10 $3,435.00 $34,350.00 55,575.00 $55,750.00 $4,400.00 $44,000.00 $8,485.00 $84,850.00 ATS W 25 to 15 32 $12,055.00 $385,760.00 $13,822.00 $442,304.00 $13,407.00 $429,024 $13,225.110 $423,200.00 ATS C 25 to 15 20 $14,965.00 $299,300.00 $17,160.09 $343,200.00 $16,593;00 $331,880.00 $16,445.00 $328,900.00 ATS W 200 and 9 514,599.90 $131,391.00 $16,818.00 $151,362.00 $16,374.00 $147,366.00 $]6,115.00 $145,035.00 ATS C 200 and 5 $17,511.00 $87,555.00 $19,886.00 $99,430.00 $19,341.00 $96,705,00 $19,115.00 $85,575.00 AT9 W 400 to 6 4 8118,919.00 5487,876.0 $135,681.00 $542,724.00 $128,424.00 $513,698.00 5130,445.00 $521,789.90 ATS C 400 l0 6 3 5127,477.00 $382,431.0 $150,364.00 $451,092.0 $142,468.00 $427,404.00 $144,800.00 $434,400.00 Ma1n.0 to 35 10 5715.00 57,150.00 $1,675.90 $16,750.00 $1,737.00 517,370.00 $2,742.00 $27,420.00 Mein. 35 to 56 15 $726.00 $10,875.00 $1,775.00 $26,625.00 $1,737.00 $26,055.00 $2,609.00 $39,135.00 Main. 91 to 120 35~ $760.00 527,300.00` $1,825A0 $63,875.00 $1,737A0 $80,795.001 S2,B00.00 $98,000.OOI Maln.1201016 95 5785.00 $74,575.00! $1,925,00 $182,875.00 $1,790.00 5170,050.00 52.900.00 $275,600.00 qD_ 1 m d e gT l N N A N ~~ ~~ y~ ,.. ..y W~ N o ~ x 0 0 °~ w •-1 'Y' 'o u v ti Main.l6Dto21 BO $790.00 $63,200.00 $2,025.00 $162,000.00 $1,790.00 $143,200.00 $3,100.00 $248,000.00 Main. 21510 27 15 $800,00 $12,000.00 32,125.00 $31,875.00 $1,790.00 $26,650.00 $3,500.00 $52,500.00 Main. 2701031 15 $950,00 $14,250.0 $2,2D0.~ $33,000.00 $1,820,00 $27,300.00 $3,600.00 $57,000,00 tAai~.. 295 is 28 25 $97s.nn $29 azs nn ~ ~ nn X33:.__ ¢5@_ aF n ,1__.__ f a nn $.,_BD:.._ $a7,tmOnp lnli/119 $4, 1 $ Q2 SD9-9D Main. 360 to 48 20 $1,200.00 $24,000.0 $2,425.00 $48,500.0 $1,990.00 $39,800.OD $4,800.00 $96,000.00 Ma~.460to60 20 $1,48!.00 0 $29,700.00 $2,750,00 0 $55,000.00 $2,200.00 $44,000.00 ~ $5,100.00 $102,000.00 nreb,- gnn t~ 70 1s A~ inn nn xaapnt9.9n _ $a_astf n0 544250.Oa 52300.00 534,590.00 $5.500.00 $82.500.00 Main. 700 to 80 5 $2,225.00 $11,125.0 $3,200.00 $18,000.00 $2,500.00 $12,500.00 $5,800.00 529,000.00 Main.B00to95 5 $2,250.00 $11,250.0 $3,400.00 $17,000.00 $2,870.00 $14,350.00 $6,500.00 $32,500.00 MaIn.95Dio11 5 $2,490.00 512,450.0 $3,575.00 $17,875.00 $3,450,00 $17,250,00 $8,900.00 534,500.00 Maln. 115010 9 10 $3,365,00 $33,650A $4,575.00 $45,750.00 $3,900.00 $39,000.00 $7,000AO $70,000.00 MaIn,16D0101 1 $3,415.00 $3,415.0 $5,075.00 $5,075.00 $4,400.00 $4,400.00 $6,000.00 $6,000.00 Girvin Meintena 20 $45,731.00 $914,620.00 no bid no bid $62,719.09 $1,254,380.00 $112,500.00 $2,250,000.00 Complete Over 4 $57,200.00 $228,890,00 no bld no bid $124,880.00 $499,920.00 $80,000,00 $320,000.00 In•Frame Overlt 4 S28,600.00 $114,400.00 o bid no fbd $73,920.00 $295,680.00 $50,000.00 $200,000.00 Parts $0.05 $950,000.00 $0.15 $850,000.00 $0.15 $850,000A0 020 $800,000.00 Egfdpfnent ta`,M9 $0.15 $850,000.00 $0.40 $690,000AO $0.15 $850,000.00 $0.10 $900,000.00 Tech Rep #tH{ $70,00 $1,059,000, $59.00 $885,009.00 $68.00 $1,629,000.00 $60.00 $900,000.00 Eng Gen Rep #I1N $70.00 $1,050,000.0 $59.00 $885,000.00 $68.00 $1,020,000,00 $60.00 $900,000.00 Eng Gen Help $25.00 $750,000.00 $35.00 $9,050,000.00 $50.00 $1,500,000.00 $45.00 $1,350,000.00 R011s Royce i - 5,000.00 5,000. 0 - ,00 .DO - 2,000.00 - ,000.00 -$5,000.00 - 5,000.00 5, 00.00 14,961,348.00 non responsive $17,761,562.00 19,627,003,00 Caterptlhar Cummins Detroit Diesel Zabatl Caterpillar Cummins DatroN Diesel ZabaH New Un(ts $5,820,800.00 $6,047,818.00 $6,883,797.00 $7,071,048.00 Maintenance New $450,050.00 5922,875.00 $826,775.00 $1,489,010.0 Controls $1,754,713.00 $2,030,112.00 $1,946,055.00 $1,848,890.00 Maintenance Existing $433,565.00 $922,200.0 $899,955.00 $1,503,055.00 ,Parts and Labor $4,645.000.00 $4,288,000.00 $5,235,000.00 $4,845,000.00 $1,257,820.OO~no bid $17 p m m m m n N a A ~9 N a a c~ a~ ~Y ~y W rYj N 0 o ~ x