Loading...
Exh 8FAGENDA ITEM #SF NOVEMBER 26, 2001 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Professional Engineering Services - Stormwater Master Plan Update SUBMITTED BY: Robert S. Kosoy, P.E., Duector of Public Works ~~~ DATE: November 19, 2001 BACKGROUND: The City Commission's Strategic Plan identified master planning and mapping as high priorities. CH2M Hill prepazed a Stormwater Master .Plan is 1995. Most of the improvements recommended in this plan have been constructed or are under design. An update to this master plan is needed, which will include GIS mapping: of the system and a revised capital improvement plan with priority rankings, a recommended timeline and probable costs for improvements. Requests for proposals were advertised, and proposals from the following two firms were received on November 6, 2001: Aikenhead & Odom Stanley Consutants, Inc. Staff reviewed the proposals and ranked the firms on the following criteria: competence and availability; similar project experience; project approach;: current workload; financial stability and insurance. After a thorough review of the proposals and completion of reference checks, the firms were ranked as follows: Aikenhead & Odom Stanley Consultants, Inc. BUDGET: Funds in the amount of $75,000 were budgeted for the Stormwater Master Plan Update, under account number 470-0000-538-6300: RECOMMENDATION: Authorize staff to negotiate a contract with the top ranked firm, Aikenhead & Odom. If staff is unable to negotiate a satisfactory fee with the top ranked firm, authorize staff to negotiate with Stanley Consultants, Inc. ATTACHMENTS: 1. Request for Proposal. 2. Evaluation of Proposals for Stormwater Master Plan Update. 3. Proposals on file with City C k.* REVIEWED BY CITY MANAGER: *Proposals aze lengthy documents, and it is not actical to make copies. Those wishing to review the proposals may contact the City Cle to obtain copies. AGENDA ITEM #8F NOVEMBER 26, 2001 REQUEST FOIL PROPOSALS PROFESSIONAL ENGINEERING SERVICES ATLANTIC BEACH STORMWATER MASTER PLAN The City of Atlantic Beach, Florida is soliciting for proposals from professional engineering firms to provide engineering services to develop a,Stormwater Master Plan for the City of Atlantic Beach. Proposals must be submitted in triplicate by 4:30 o.m., Tuesday, November 6, 2001, and addressed to: Mr. Robert S. Kosoy, P.E. Director of Public Works City of Atlantic Beach 1200 Sandpiper Lane Atlantic Beach, FL 32233 I. SCOPE OF WORK A. Update to the February 1995 CH2M-Hill Stormwater Master Plan. B. System review of the 1995 Drainage Maps and update using GIS; and with coordinate system in state plane NAD 83. C. Analyze system for deficiencies and problems, considering Best Management Practices and in accordance with the National PollutantDischarge Elimination System (NPDES) Permit. D. Complete 10 year Capital Improvement Plan, including: 1) Recommended system improvements and construction projects, considering future system requirements.. a) Include a priority rating for each recommendation. b) Include a recommended time line. c) Include an estimation of probable costs. for each improvement. E. Provide City staff with three copies of a sixty percent (60%) Master Plan for review within 90 days. F. Prepaze and lead presentations on the. Plan to the City Commission at the 60% review stage and after the completion of the final Master Plan. G. As directed by City staff and the City Commission, make corrections or revisions to the 60% Plan. H. Within 45 days ofreceiving comments on the 60% Plan from the City staff, provide and submit for review the Final Master Plan, including: 1) Five sets of system maps and schematics 2) Five sets of the Final Master Plan report 3) One set of the Master Plan on disk, with maps and drawings in AutoCAD 14 format, GIS format with the coordinate system in state plane NAD 83, and text and material in Microsoft Word format. GIS mapping shall coordinate with existing GIS water and sewer base maps. Page 1 of 2 AGENDA ITEM #8F NOVEMBER 26, 2001 REQUEST FOR PROPOSALS PROFESSIONAL ENGINEERING SERVICES ATLANTIC BEACH STORMWATER MASTER PLAN II. SELECTION CRITERIA The firms responding to this Request for Proposals must include detailed information concerning the following criteria for selection: A. Staff Competence and Availability during the entire project period, including detailed resumes. (Rating weight - 25%) B. Past Similar Project Experience, including size, construction costs, and familiarity with stormwater master planning. (Rating weight- 20%) C. References, including telephone and fax numbers. {Rating weight -10%) D. Project Approach, with specific tasks outlined. for each phase as outlined above. (Rating weight - 20%) D. Current Workload for the firm and the selected project team. Timeliness of completion of current or past projects with the City of Atlantic Beach, if applicable, will be rated in this criterion. (Rating weight -1 S%) E. Financial Information, including the most recent audit. summary for the firm and the current certificate of insurance. (Rating weight - 5%) F. Rates and Fees, including direct labor rates (without fringe benefits) for Principal, Project Manager,. Design Engineer, Technician, Drafter, Field Inspector; Clerical, or other personnel (specify). Also include. the proposed overhead rate on direct labor, profit rate, and other direct project costs. (Rating weight - 5%) Note: Proposed rates and costs will be used in the negotiatamof flees and shall remain in effect throughout the length of the project. In no case will the City pay a total overhead rate that exceeds 150 percent of direct labor. Profit rate shall be applied only to direct labor plus overhead and shall not exceed 10 percent. No mark-up or profit. shall be paid on non-labor related job costs, reimbursable or on services provided by subcontractors. Prior to negotiation, the selected consultant will be required to provide proposed total compensation utilizing the rates shown in proposal and detailing employee hours needed for each activity, number of sheets required for drawings,. amount of proposed geotechnical investigations and all other costs associated with the project. All proposals will be reviewed and rated by City Staff. Negotiation of fees will commence upon City Commission approval, and the Standard Form of Agreement (E3CDC) will be developed for signatures. All work will commence immediately following City Commission approval and signing of the Agreement. All questions concerning the submittal. of proposals must be addressed to Mr. Robert S. Kosoy, P.E., Director of Public Works at (904) 247-5834. No questions maybe directed to any other party. Submit (3) copies of the proposal. Page 2 of 2 EVALUATION OF PROPOSALS FOR THE STORMWATER MASTER PLAN Engineering Firm Staff Competence andAvailability (25%) Similar Project Experience (20,/°) References (10%) Project Approach (20%) Current Workload (15%) Financial w/Audit Summary & Insurance (5%) Rates and Fees 5% ( ) Aikenhead & Odom, Neil Aikenhead, P.E. -Project Manager 43.3 28 18 34.7 28 7.3 8 Inc. 5730 Bowden Road, Fred Odom, P.E. -Principal In Charge Suite 200 Robed Edmunds -CAD Manager and GIS Jacksonville, FL Specialist (904) 636-5432 Ric Locquiao, P.E. -Project Drainage Engineer Mike Yuro, P.E. -Project Production Manager Charlie Tran, E.I. - Stormwater Design Engineer Sam Kadi, P.E. -Traffic. Advisor Stanley Consultants George McGregor, P.E. -Project MgrlGIS. 39.2 28 18 30.7 28 7.3 10 9250 Baymeadows Will Stewart, P.E. -Principal In Charge Road, Suite 440 Eric Huskey, P.E. -Project Engineer Jacksonville. FL 32256 Amin Ahmed, P.E. -Civil Engineering (904) 737-7225 Artefio Cartagena, E.I. -Civil/Drainage Analysis 8 with :. Design_ `Kloss, Mosley& Shawn Waldeck, P.E.-Structures Associates, Inc. Renaud Oliver, E.I. -Drainage Design 6015 Chester Circle Ian McAllister -Quality Control Jacksonville, FL Donald Mixon - CADD (904)739-5621 EdSlattery-Quality Control `Walter Kloss, P.E. -Drainage Analysis & Utility `= subconsultants Coord. - `Alan-MOSiey,P.E.-DrainageAnalysis&Utility Coord `Daryl Thie, P.L.S. - Surreys `Jeff Callahan --Underground Imaging `Lynn Miller, P.E. -Stormwater Routing and Modeling `Nancy Zyski - ERS -Environmental Permitting R D P avg S V N K K 7 I6 I6 2 4 6 5 I5 I5 1161.2 7. 7 9 zy o~ ~ ~ ~C t~i7 .~. 7J H N tit N O ~ H