Loading...
Exh 4C CITY OF j''~Z`1~cR:K~GG ~'e~i - ~~vuda MEMORANDUM January 3, 2000 ~ , i ~c /~ f O r o0 1200 SANDPIPER LANE ATLANTIC BEACH, FLORIDA 32233-4381 TELEPHONE (904).247-5834 FAX (904) 247-5843 TO: JIM HANSON CITY MANAGER FROM: BOB KOSOY PUBLIC WORKS DIRECTOR RE: PROJECT STATUS REPORT Attached is the updated status report on Public Works projects recently completed or currently underway. If you have questions on any of these projects, please call. PUBLIC 1'VORKS DEPARTMENT PROJECT STATUS REPORT D~=DESIGN ENGINEER, '' C ~&I) =CONSTRUCTION ENGINEER C) =CONTRACTOR PROJF,CT DESCRIPTION I'ROJF.CT NO. STATLJS ON .12/30/99 l . Village of It4ayport D~=USCG &JEA C ~&I~ =JEA & Public Works Force main installation and tie in for Coast Guard Station has been completed. Mobilization started for collection. system improvements. Began installation of master C) =1 etticoat Contracting - to USCG tat~on wetwell on 8/20/99. The underground portion of the hft station is 60% complete, installation of sanit i 50% (C) =United Brothers -North of USCG ary sewer s complete, water is 20% complete, and the force main is 20% complete. 5tahon 2. Core City Stormwater Project CORE99 (D) =Original by England, Thims R. i~iiller A & O presented their preliminary report to the Commission on 11!8/99. A Public I-leering was held 11/17/99 at 6PM at AB Elementary School. City Commissiai atrthorized A & O t l li Revised Preliminary Design by The R-A-M Professional Group o comp ete a pre minary design on 12/1.4/99. Sewer televising crew mobilized 9/1.7/99, work is 100% complete, significant amount of infiltration discovered with approximately 70'% from laterals and 30% from main lines One Re-design by Aikenhead 8i Odom (C) =Video Industrial Sernces, Inc. (for . serious lea~C will he repaired by ~oint repair contractor prior to 1/I S/U0. Smoke testing was completed December 8, 1934. Most problems noted were broken or uncap ed sewer televising) Florida Rural Water Asso (F p cleanouts. Two direct connections beriveen the storm and sewer systems were found, d f c. or smoke testing) (CE&;I) =Public Works an a ew possible cracked laterals. Letters sent to residents notifying of problems encountered from smoke testing, Public Works has reviewed tapes and reports, and is assembling specif cations and plans. 3. Wonderwood Connector Utility Relocation (D) =The R-A-M Professional Group, Inc. Constn~ction be >an on 7/12/99. Contractor completed demolirion of convenience store at corner o~AlA a d W d d E CE&I =JTA, JEA & Public Works ~C ) =Su erior Constructio C n on erwoo . J A set new electric poles on ~~'onderwood Road. Received information from JTA Project Manager on 8/9/99 that AC.OE pem~it f . p n o. ar project has not yet been issued. Began installation of water main 9/17/99. Boil water notice issued 10/19/99 when contractor broke water main lifted 10/21/99 after , clearance from Health Dept. A second boil water notice issued l t/1/99 and lifted 11/4/99 after clearance from Health Dept. Director met with contractor JTA and , , en ineer on 11/4/99 to discuss project problems. A water outage was scheduled for 12/1 3/99 and the contractor made connections t th . , o e new system. Awaiting clearance from Health Dept. on section of line at intersection of Wonderwood Road and AIA. 4. 1999 Water Line Improvements Project D} =Smith & Gillespie Engineers, Inc. C$&:I) =Public Works Commission awarded bid to Gruhn May, Inc. to construct entire Non-CDBG project, including all alternates, on 7/26/99. Preconstruction conference was (field 8/4/99 d (Water Line Installation and Replacement-Various C) = Grulm May, Inc. , an Notice to Proceed was issued 8/23/99. Installation of 6-inch water main on Park Locations) Terrace West to Country Club :Lane to Seminole Road is complete, Started installation of water line on East Coast & I2~' Street 10/25/99, Installation and pressure test complete by I 1 /19/99, awaiting Health Department clearance. Received partial clearance on Coi t Cl b L d ut ry u ane an connected new services. Completed installing 6- inch water line on Lewis Street. Pressure test completed, awaiting clearance from }Iealth :Department. 5. 1999 Stormwater Improvements Project (stormwater (D~=Smith & Gillespie Engineers, Inc. C =Petticoat Contracting, Inc. improvements at various locations) C &:I) =Public Works 6. Buccaneer Wastewater D = Eder Engineering Treatment Plant Expansion. ~ C = Meadors Construction Co. C '&I) =Gannett Fleming Engineering 7. Atlantic Beach and Buccaneer CE&I =Public Works Sewer System Improvements. ~D) =Gee & Jenson 8. Town Center D) =Glen Mitchell ~~ Assoc. ~ C) = ABBA Construction 9. Dutton Island Culvert Replacement and Roadway D)* = Bueme En ~ineerin~ ~C)* =Callaway Contracting Inc Repair , . *Design/Build Project 10. Widening of Atlantic Blvd. (D) = H. W. Lochner Inc Bridge , . FDOT 11. Mayport Flyover (D) =Pittman, Hartenstein & Assoc. JTA C =Superior Construction Co. C &:I) =Public Works Bid awarded to Petticoat Cantractin~, Inc. by Commission on 10/11/99, Budget Ordinance appproved 10/25/99, ]Notice to Proceed issued for 11/1/99. Contractor mobilized 11/15/99. Discovered conflicts with existing force mains and Southern Bell lines on Donner Road on 12/3/99. Southern Bell relocated their line on 12/15/99. The City's point repair contractor, Gruhn May, Inc. added proper restraints to an existing sewer force main located above the new storm pipe on 12/20/99. Influent stn~cture and installation of influent line and four manholes completed. Grit removal stn-cture and master wetwell have been constructed. New transformer pad, main electrical feed conduit and other conduit stub outs have been installed. New generator has been installed, load tested, and inspected by RESD. Painting of two additional tanks approved by Commission on 10/25!99. Force main tie-in made on 1111.0/99. Old surge tank taken otT line, drained and cleaned by 11!19/99. Chlorine Contact Chamber bypassed on t t/30/99, has been inspected and will need total sandblast and repaint on interior. Hightower Geotechnical completed underpinning of operations building on 12/1.6/99. Contractor installing pipin > for effluent pumps. Core bored two holes in chlorine; contact chamber acid instal~ed piping by 12/10/99. Completed effluent piping from tanks except for connections to SBR 2 & 3. Completed 25% of waste stud a piping. Installed effluent pumps. 80% of piping to be removed leas been removed Installed all fiberglass piping inside SBR #I and poured equipment pads for SBR #1 by 12/28/99. Startup of first SBR scheduled for 1 /4/99 - 1 /7/99. Commission approved engineering contract on 4/12/.99 to include cost/benefit analysis of Shanb>ri La lift station abandonment. Cost/benefit Analysis of Shangri La lift station abandonment received on S/2 I /99. 100% desigm plans have been submitted. On hold until completion of Sewer IViaster Plan, Construction be Tan on 7/28/98. Roadway work completed on Atlantic Blvd. by 1O,/I 5/99, On l~overnber 1, 1999 the City'Commission voted not to include additional work on Ocean Blvd. Contractor will not be working in area until after holiday season. Commission awarded desi Tn/build contract to Callaway Contracting on 7/12/99. Notice to Proceed issued 726/99.:Design work began 7/26/99, Permit package submitted on 8/13/99. Materials for culvert were delivered on 10/12/99. Construction began 11 /1 /99, after contractor received permit from Water Management District. Culvert pi e has been installed as of 11/19/99. Headwall poured on 12/1/99, Project substantially complete, and final inspection held 12/10/99. Striping of asphalt to be completed by Public Works. Received partial reliminary plans for review on 4/29/99, and advised on 5/5%99 that no utilities are af3~ected. Geotechnical work underway on 8/13/99. Public Works received 90°io plans on 12/22/99; plans under review. Bid for constn~ction was awarded to Superior Contracting on 10/27!99. Pittman Hartenstein, Tnc. completed utility design for JEA improvements. Received 100a/o plans on 12/7/99. Staff to review for utility conflicts and comments. 12. ADA Ramps -Atlantic Blvd. from Mayport to 3`d St and 3`~ (D} = FDOT Preconstruction conference held 8/4/99. Project began in''AtlantidBeach on 9/13/99 . St. from Atlantic Blvd. to and is now complete. Florida Blvd. 13. Sewer Master Plan (D) =Smith & Gillespie Engineers, Inc. Request for Proposals advertised 9/5/99. Received 7 proposals 9129/99 and Public W k i or s rev ewed proposals on 10/6/99, Interviews with engineers held on 10/28/99 and 11/2/99. Authorization to negotiate with Smith & Gilles ie En inee p g rs was approved by Commission on 11/8/99. Contract still under negotiation, will be on City Commission agenda 1/10/00. 14. Utility Improvements 2000 Request for Proposals for engineering design advertised on 11/14/99 received 8 , propos~ls.on ] 2/17/99. Appproval to negotiate with engineer will be on City Comnuss~on agenda 1/10/00. 15. CDBG Project -Francis Avenue sidewalk & sewer line Request for Proposals for engineering desi~i advertised on 11/14/99 received 8 , propos~is.on 12/17/99, Appproval to negotiate with engineer will be on City Commission agenda 1/10/00. 16. Effluent Structure Repairs (D) = Nadeem Zebouni, inc. Engineering evaluation, specification development underway. Received plans and spec-6cations on 12/20/99. 17. Milling & Paving (D) = Geotechnical report completed on 10/28/99. 1 S. Walkways/Handrails on AB WWTP handrails (D} =Jim Gillian Division Director met with designer on 12/17/99 to determine scope and price for design work. Design underway as of 1/3/00,