Exh 8BAGENDA ITEM NO:~~ DATE: / - ~y - y a CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Engineering Design for Utilities 2000 Project, Including CDBG Sewer Line Rehabilitation/Replacement SUBIVIITTED BY: Robert S. Kosoy, P.E./Director of Public Works ~~~'~/ George Worley, Community Development Director DATE: January 3, 2000 BACKGROUND: As part of the Public Works Capital Improvement Program, we are making improvements to the water, sewer and stormwater systems at several locations throughout the City, in accordance with the current approved budget. Part of this work will consist of a Community Development Block Grant (CDBG} project to rehabilitate or replace a deteriorated sewer line on Francis Avenue. Because the CDBG portion of the project will use grant funds ,the plans and specifications will be separate, but the work will be designed by one firm. We have attached a copy of the Request for Proposals which outlines the work areas. We advertised our Request for Proposals on November 14, 1999. Eight proposals were received on December 17, 1999 from the following firms: Burns & McDonnell Connelly & Wicker, Inc. Consul-Tech Engineering, Inc. Gee & Jenson Gresham, Smith and Partners Hartman & Associates, Inc. J. Lucas & Associates, Inc. North Beach Engineering Staff reviewed the proposals on December 27, 1999. In accordance with the Consultants Competitive Negotiation Act (FIorida Statute 287.055) and based on the review of the proposals, we have selected the top three firms deemed to be the most highly qualified to perform the required services: 1. Gee & Jenson 2. Burns & McDonnell 3. Connelly & Wicker, Inc. Staff Report Engineering Design for Utilities 2000 Project Page two BUDGET: Utilities 2000 is a combination of several small projects totaling $358,700 for design and construction. Funds are located in accounts as follows: =110-1005-515-6300 (CDBG) $ 68,700 001-5002-541-6402 (Streets) $ 55,000 400-4001-533-6300 (AB Water) $185,000 130-5002-541-6300 (Gas Tax) $ 50,000 RECOMMENDATION: Authorize staff to negotiate a contract with Gee & Jenson, and if unable to negotiate a satisfactory contract, authorize staff to negotiate with the next most qualified firm. ATTACHMENTS: 1. Request for Proposals 2. *Proposals from all firms o -file with City Clerk REVIEWED BY CITY MANAGER: ~~ - *Proposals are book-length documents, and it' s impractical to make copies. Anyone who wishes to review the proposals may contact the City Clerk or Public Works office and copies will be provided for review. REQUEST FOR PROPOSALS PROFESSIONAL ENGINEERING SERVICES DESIGN AND PLAN PREPARATION FOR UTILITY IMPROVEMENTS 2000 The City of Atlantic Beach is soliciting for proposals from professional engineering firms to provide engineering services to design improvements to the water, sewer and stormwater systems in Atlantic Beach, Florida. Proposals must be submitted by 4:34 PM, December 17, 1999 and addressed to: Mr. Robert S. Kosoy, P.E., Director of Public Works 1200 Sandpiper Lane Atlantic Beach, FL 32233 The scope of work involves: 1. Preparation of design plans and specifications for water, sewer and stormwater system improvements at various locations throughout the Cit<r. J 2. Also included will be the preparation of separate design plans and specifications for sewer improvements and sidewalk construction funded by the Community Development Block Grant. This portion of the project is being funded by a grant from the U.S. Department of Housing and Urban Development, Community Development Block Grant (CDBG) Program. All applicable provisions of the CDBG requirements are incorporated into this part of the project. 3. Although it is the City's intent to bid the entire project at one time, the Engineer shall expedite the CDBG funded portion of the project if necessary, to have complete plans and specif cations submitted to allow for completion of construction prior to August 1, 2000. 4. Within thirty (30) days from the date of Agreement, develop a Preliminary Design to: A. Design and rebuild swales and concrete driveways on West 13`x' Street. B. Replace 2-in;,h and 3-inch water mains with an 8-inch main on Beach Avenue beriveen Ahern Street and 7`h Street using directional boring. C. Replace the 4-inch water main with a 6-inch main at Sea Oats Apartments and .r~ ,<<, analyze fire-flow. ~ ~„n~ ~~, ,~~ .Y ` .:.z D. Construct a sidewalk on Levy Road from Mayport Road to Main Stre ~111~~ ,/~ J ~/ _ E. Construct a sidewalk on the north end of Francis Avenue. (CDBG funded porrion) "-~'` F. Install a sewer line on Francis Avenue. (CDBG funded portion) _ - ~~. ~. Present five (5) sets of the Preliminary Plans, with cost estimates and time schedules of the major tasks for the remaining design, bidding and construction to the City Staff for review. As directed by City Staff, make corrections or revisions to the Preliminary Plan. This will act as the 30% submission. Page I of 3 REQUEST FOR PROPOSALS PROFESSIONAL ENGINEERING SERVICES UTILITY IMPROVEMENTS 2000 6. Within sixty (60) days from the date of Agreement, develop and submit for review five (5) sets of 60% plans of the Final Design to include: , A. All plan and detail sheets for the project, showing pipe sizes, locations, profiles, design elevations, road profiles, with sufficient details to adequately discuss and review the plans and design. B. Cost estimates and major task schedules for the remaining design, bidding and construction. 7. As directed by the City Staff, make corrections or revisions to the 60% plans. 8. Immediately after the corrections are made, submit permit applications to the Duval County Public Health Department, the Department of Environmental Protection, and the St. Johns River Water Management District with all necessary information. Any necessary process fees will be provided by the City of Atlantic Beach. Respond immediately to requests for additional information. Prepare and submit the Florida Department of Transportation and State roadway utility and access permit applications. Coordinate closely with the Citv staff during the permit process. 9. Within twenty (20) days from the date of approval ofall permits, develop and submit for review to the Citv Staff five (5) sets of 100% plans of the Final Design to include: A. All plan sheets and specifications completed. B. All detail sheets completed. C. Coordinate with the City staff to establish dates for Pre-Bid meetings. prequalification requirements and deadlines, advertisement and bid opening dates, and the date of tentative award. D. All specifications completed, including the Invitation to Bid and Bid Form. E. Final Cost estimates and major task schedules for the remaining bidding and construction. y y 10. Prepare plans and specifications as necessary for the bidding phase to be sold to the bidders through the City Purchasing Department. Attend the Pre-Bid meeting, and assist City staff with responses to questions from the bidders, and prepare an_y necessary bid addendums. The firms responding to this Request for Proposals must include detailed information concerning the following criteria for selection: v 1. Staff Competence and Availability during the entire project period, including detailed resumes. Rating weight - 30%. 2. Past similar project experience, including size, construction costs, and familiarin~ with water, sewer and stormwater design. Rating weight - 20%. 3. References with telephone numbers. Rating weight - 10%. 4. Project Approach, with specific tasks outlined for each phase as outlined above. Rating weight - 30%. Page 2 of 3 REQUEST FOR PROPOSALS PROFESSIONAL ENGINEERING SERVICES UTILITY IMPROVEMENTS 2000 5. Current Workload for the firm and the selected project team. Rating weight - 5%. 6. Financial Information, including the most recent audit summary for the firm and the current certificate of insurance. Rating weight - 5%. All proposals will be reviewed by City Staff, and a submittal of the proposals of the three top rated firms will be made to the City Commission. Selection will be determined by the City Commission. Negotiation of fees will commence upon City Commission approval, and the Standard Form of Agreement {EJCDC) will be developed for signatures. All work will commence immediately following signing and approval of the Agreement. All questions concerning the submittal of proposals must be addressed to Mr. Robert S. Kosoy, P.E., Director of Public Works. No questions may be directed to any other party. Submit three (3) copies of the proposal. Page 3 of 3 CITY OF ATLANTIC BEACH REQUEST FOR PROPOSALS DESIGN AND PLAN PREPARATION FOR UTII,ITY IlVII'ROVEMENTS 2x00 ADDENDUM NUMBER I November 29, 1999 The scope of work for the above project is clarified by changing Item 4. as follows: 4. 5~'A. Design and rebuild swales and concrete driveways on West 13t'' Street between Mavnort Road and Orchid Street on the north side of the road. B. Replace 2-inch, 3-inch and 4-inch water mains with an 8-inch main on Beach Avenue between Ahern Street and 7'~ Street using directional boring. ~ C. Replace the 3-inch water main with an 8-inch main and 6-inch bypass oina to Sea Oats Apartments at 900 Plaza. The existing 3-inch water main crosses Plaza apt~roximately 400 feet east of Mayport Road D. Construct a sidewalk on the north side of Levy Road from Mayport Road to Main Street. ~ E. Construct a sidewalk on Francis Avenue from Jackson Road to immons Road (CDBG funded portion) ;~'' F. Rehabilitate or replace sanitary sewer line and manholes on Francis Avenue from Church Road to Donner Road. (CDBG funded portion} Add item 4.G: Include an additive alternate in the specifications for installing two new manholes on Ardella Road near Richardson Lane. Page 1 of 3 -. _ ~iAiP'^,5FREE7 ....- ._....~ ,.- _._ _~iklN S1Fit~T ._.._ _.. ~ :~ _...... _ _.'~ - ..._... _... _ ~... tEAEPt 57REEF _ _ ` i ~_ ~ _... ~ c~ € _ ..... _.- -._. ~ ._._ _. A 5?OCKS STREET 3-,jQCIZSs SlR[.E'I' ..~ _...~ I•- - ........ -3 ~~ ~ MA.~^s~Y ,_,:•t[ET„~~i..-. _.. _... _ I~ I - ~ - ._ HERk5ClJ5 S?REE'f ~€':3ESCU5 STHEr-.F - ~s Ir! ly f !yl ~. t' - 1! y _ _..li()LET' ST.Fi~ET -.....- ;- -. ~ - 4_J+~~Y $jREFT I ~_ .,, ``. ,.,,, ^ °" !€ g ~^ y ~ ~ ~~ ~' ~_A~EALY 5?TEL•T 5. ~ - ~ f !~' -} / ~ /`~ ~.. cos` snz~- - ._ - ~rn~ I ~J ~ I ~; t J 1 1 !'.. I >n ~`~~ ~y ~ ~ ~~ i I EIS i!~ I' "~ [ . f ~` ~..,,~, 'f~ '\ ~ t Cam] ~ - I ~ ~ l ! -~.. ::~ n ~_; 1 1 1 1 ! f p! I I!a III r„'/f '~ ~~ ~ "~ - ~.. f j j ! 1 ~ ~ ~ ~ 1 R3CHAfdDS9:'~ Eti. ~(- -,~' Y D~ I I 3 1 ..1 ~ 3 ' f } ~ ~ ~ ~ EI ' n of `~ [ ~ 1 ~ E I~ I ~RAnr:TS AvErjue ..- _._....._._ _....._. _..._ -..... .._.._ ~ ._ _ -- f __ ~ ) ,~ f f~ f f ` ' ~ ~ t I "^~f-'_.""'.~_..:---._.......-,.,.,._--~"~..E-r JOR57AN ST'.~ z .. n R I ~ 1 ~ ~' : I ~ ~ f ~It ~f ,i"ROa~I s=a~Er _ y ~ I ~ ~ > ! I ro z ~ NH c ~~ ~ m ~~ ozr ~~K N _` ~ 3~ x~o O 3 ~n ~ z w ,~ _ -- -~~~~-' S.~ ~--~ '" ~ ~ ~ CITY OF ATLANTIC ---~~ ~~ ~ ~ BEACH ' ~ } ~ UTILITY IMPROVEMENTS ~ ; ' ~ 2000 ~ ~--~ '"".~"' ~ _ --~-~ ~~~" "~" ~ ADDENDUM NO. 1 M.~ ~ _.~._ __.- ~~ ~ t ~ ~~~ t~ ~ ~~ i~ 1 } ~ ~~ ~ ~ i t t ~......... ~ _ ~ t t - ~ t ~ 1 € ~ ~ ~~ ~ ~ ~ ~~ , •~ ~ ~ ~~ ~ ~ . ~ ~~ ~ ~ ~ ~._a ~~ ~ ~~ ~~ ~ ~ -~' ~ ~~ Page 3 of 3 ~~ { } ~ ~ ~~ ~ ~ ~ ~_i~ ~ } ~ ~ s~ ~~ i 1 S ~ ; { _ o 1 ~