Exh 8EL) i~~o-oa Agenda Item: Date: Submitted by: Background: City of Atlantic Beach City Commission Meeting Staff Report Dutton Island Contract January 3, 2000 David E. Thompson Director of Public Safety Through the competitive consultant negotiation process, the City of Atlantic Beach selected Landers-Atkins Planners, Inc. to prepare.a Master Plan for Dutton Island. The Master plan was submitted to the City Commission in September 1999. On September 27, 1999, the City Commission approved the Dutton Island Master Plan, and the Commission authorized staff to negotiate with Landers-Atkkins for construction plans for bidding and building the project. Since that time, negotiations have taken place on several occasions between City staff and Landers-Atkins to identify the specific work and the compensation for providing specific services. The attachment outlines the fee proposal from Landers-Atkins Planners, Inc. It includes the construction documents and construction administration for the project. The fees are addressed separately to provide clarity for the City in determining whether or not to obtain these services. Totals Construction Documents $44,002.41 Construction Administration $9,183.35 After reviewing the proposal and discussing the project with City Staff members, staff has recommended against spending $9,183.35 for construction administration. The construction administration can be handled by existing staff. Funding Sources: The design costs will be initially funded from the Capital Improvement budget, and reimbursement will be sought for approximately $11,500 in Florida Inland Navigation District (FIND) grants for design, and for the expenses directly related to the fresh water marsh creation through the Jacksonville Port Authority. The City of Atlantic Beach approved $250,000 in the 1998-1999 budget for Dutton Island. Of that funding, $138,381 was spent on the replacement of the culvert leading out to the island. This left a balance of $111,619 in the 1999-2000 Capital Improvement Projects fund. Of the $138,381 spent on the culvert, $30,000 will be reimbursed by the Jacksonville Port Authority. Relative to the FIND funding,- FIND -has awarded a grant for design work not to exceed $25,000 reimbursement with a 50% match on the part of the City. We have akeady spent approximately $27,000 on the design for the Master Plan, leaving a balance of approximately $11,500 of reimbursement funding for design from FIND. Relative to the fresh water marsh creation, this portion of the project was established when the island was acquired by the City, and the Jacksonville Port Authority committed $40,000 to the creation of the marsh. The City will request this funding from the Port Authority a$er the project is designed and the construction bid is awarded. Review of Expenses: Atlantic Beach staff reviewed the proposed expenses with staff from Jacksonville who has had Landers-Atkins provide design work on similar projects. The expenses for this project appear to be in line with design work in Jacksonville on similar projects. Recommendations: Staffrecommends the approval of the proposal from Landers-Atkins Planners, Inc. for preparing the construction documents for Dutton Island. This does not include construction administration. Attachments: Letters and fee schedules from Landers-Atkins Planners, Inc. Reviewed by City Manager: Agenda Item Number: JHI~I-u~'UU f1UlY U3 ~ vu r,~ ax~:r.! .c T C ;~trsun 1 i r~ i a raevarnts hkw.•ard M Lanacrs, nlr.P fiom.ic Y7, ,4`t~nF. NC.". A'41 A Grm~ L. Wanh~m. NC.F. NIR losepti Enaroc, lr.. NCr% November S, 1999 Mr. David Thompson, Director - Public Safety-City of Atlantic Beach 800 Seminole Road Atlantic Beach, FL. 32233-5445 Re: Dutton Island Master Plan 99043 C HrY NV. ~U43~4UUgO r +'-+ r. uc ~~H _~ 201 N, Marpvl- nr~~c, Sd;;C 4C0 laccionvuic, Flcntki 3720b4203 9O4rd&d•8C6R 904A;4~OCL: Fnrt ma~ratArousgr wrtt www,W'ongn.com LANDERS ATKlNS P~CAAlNERS, ZINC, LC; CUCUIUU Dear David, ~nciosed is our fee proposal and revised scope of work regarding the construction documents for the following site elements on Dutton island: ^ Review of tfie bid proposals, compiling a summary and issuing a letter with the results. ^ Coordinating the implementation of the Construction contract. Reviewing bond submittals. ~~NST ^ Review of site related material submittals by the contractor. ADn'1 ~ Provide clarification to the intent of construction documents. ^ Site visits and preparation of periodic inspection reports. . Review of change order requests by the contractor. ^ Review of product data and test reports. ^ Final inspection. ^ Certification of water, septic, and starrnwater facilities. ^ Comfort station/lnterpretive shelter-approximately 200 SF with genercus overhangs to accommodate men and women toilets and storage. . A cance launch facility at the north end of the island -site adapted from City of Jacksonville s Specifications and design for septic system and well permitting ^ Specifications ,design and permitting far fresh water marsh creation ^ Plant material and instaliatien of fresh water marsh Design and specifications for typical trail sections s DESign, specifications and permitting for vehicular tum-around area using pervious materia! . Surveying for selected areas on site ^ Review of shelter design from Mayport for picnic areas ^ Selection and spec cations for site furnishings Please review the attached proposa! and call at your earliest convenience to discuss. er Thomas W. A ins, AICP, ASLA Senior Vice-President ~ F.599047 Outten ialandlOhicclF2wrrsd scope d worfc 120899.doc µ........, _. .., r -• .... ~~ ... ,,..• , Land Plannrr,g Land•~,<ar~~~ Archm~ch,rr• Em~uru:rnwu,r! ('I,rnr,~nr; frOrnrrnm~;y Planning Urha~ Qesgn JArI-03-00 h10N 02 ~ 45 PM SAXELBYE ARCHITECTS FA,~ rya. 5043540065 LANDERS ATKINS P~NNJrRS, uyc. PTO: ~~-~J~.. ~~Q m~~~ RE: SENT BY: COMPANY: (' tip bF ~ n ~~1~.~~PRO,l. NO.: ti Ax #: ~.4 ~i -~ s ~7 FROM: ~ n~m ~~ ~ . DATE: l ~ e NIESS,4GE: MAILED: P, OI ..~u.xr-o r~.l t~t_nc,~ m~ ~9 04~. ~_. z._. YE5 __ N~q ~~ PAGES ~`" INCLUDES COVER 1F YOU DO NOT RECEIVE ALL PAGES QR HAVE pE; F;CULTY REgDING TNlS DflCU141ENT Pl_E~SE CALL US AT (904} 35¢8068, OUR FAX NUMBER 1S (904) 35d-Oe65 Z01 North Hogan Street, Suite 400, Jacksonville, Florida 32202 JAN-03-00 MO~I 02,45 PM SAXELB~'E ARCHITECTS FAX N0, 9043540065 P. 02 ..,. rrtivarJ~s Mov ar6 M Ldr,Jrrs, r1C.o 7ham~t W. Atkins, ,VCF, rlS:A C: rol C. Wcrlnrr; A:'CP, /ISIA Josrph EharJC Jr., AiCA J~~+ 70 ~ M. Huy +n Serr;ct, Suttra 400 Jarxsan•rltk, fbridn 37.7.024271 90•tJ35•ti•806b 90~1J1SA.OObS fax ma.io:J4~dr:tg,,cam V+W W.iNJr:iyr..ccm November 8, 1899 Mr. David Thompson, Director Public Safety-City of Atlantic Beach 800 Seminole Road Atlantic Beach, FL 32233-5445 Re: Dutton Island Master Plan 99043 Dear David, tANdFRS i1 TK/NS PLANNERS, /NC. L: CGr:~JIlw Enclosed is our fee proposal and revised scope of work regarding the construction documents for the following site elements on Dutton Island: ^ Review of the bid proposals, compiling a summary and issuing a letter with the results. Coordinating the implementation of the construction contract. Reviewing bond submittals. ^ Review of site related material submittals by the contractor. ^ Provide clarification to the intent of construction documents. ^ Site visits and preparation of periodic inspecticn reports. ^ Review of change order requests by the contractor. ^ Review of product data and test reports. ^ Final inspection. ^ Certification of water, septic, and stormwater facilities. ^ Comfort station/lnterpretive shelter-approximately 200 SF with generous overhangs to accommodate men and women toilets and storage. ^ A canoe launch facility at the north end of the island -site adapted from City of Jacksonville ^ Specifications and design for septic system and well permitting a Specifications ,design and permitting for fresh water marsh creation ^ Plant material and installation of fresh water marsh ^ Design and specifications for typical trail sections ^ Design, specifications and permitting for vehicular tum-around area using pervious material ^ Surveying for selected areas on site r Review of shelter design from Mayport for picnic areas ^ Selection and specifications for site furnishings Flaase review the attached proposal and call at your earliest convenience to discuss. e I Thomas W. A gins, AICP, ASLA Senior Vice-President ~ F:19P043 CU.^.Of: Island~Of!icO,RM:4d TyCOpp 0~ WCrh ~ZOASO dot 1 land Planning I .rr,rly„p~ Arrhut<lurv En~•ironrnental f lann:ng Can+mun~ty I'ilanin~ Uih:ul G>csif;n UHfV U~ UU I'lU~l UC~4G Y!1 5H1Sl;LtfY~ i~3K~Hll~~la rHK I`lU~ 5U~3;,~0U~i"J P. 03 .~ f~ /^~, 1AN-03-00 MON 02 46 P"f SAXEi.BYE ARCHITECTS FAX K0, 9043540065 P, 04 .., CIWINDON/3iTEMP(MUNaaa (1)JCLSjStln.Ta~y PRINCIPALS Howard M. Landers, AICP Thomas W. Atkins, AICP, ASIA Carol C. Worsham, AICP ASLA Joseph Ehardt, Jr., AICP December 20, 1999 Mr. David Thompson, Director Public Safety-City of Atlantic Beach 800 Seminole Road Atlantic Beach, FL 32233-5445 Re: Dutton Island Master Plan 99043 Dear David, 20I N. Hogan Street, Suite 400 Jacksonville, Florida 32202203 904/3548066 904/354-0065 Fax mail®LAPdesign.com www.LAPdesign.com LANDERS ATK/NS PL4NNERS~ /NC. LC 0000100 Enclosed is our updated fee proposal regarding the Construction Administration Services to include " As Built "drawings and final locations for permenant facilities on the island. Any architectural modifications will be handled at no additional cost. However the location of the comfort station, well, septic tank, parking area, and canoe launches will be located and tied to some (as yet to be determined) control point and related to the City's GIS mapping. (See attached revised fee schedule). An additional $500.00 has been allocated to this task. Prior to our final submittal of construction drawings they will be submitted to the City of Atlantic Beach Building Department for review. Please review t attached proposal and call at your earliest convenience to discuss. erely, , Thomas W. Atkin ICP, ASLA Senior Vice-President \\SERVERLLAP JOBS\99043 Dutton IslandlOffice1122099 DT CA AsBUILTLetter.doc Land Planning Landscape Architecture Environmental Planning Community Planning Urban Design CONTRACT FEE SUMMARYFOR ENGINEERJNG DMSION CITY OF JACKSONVILLE. FLORIDA <:; PAR T ONE -:GENERAL ; 1. PROJECT 2. PROPOSAL NUMBER Dutton Island-Construction Admin Services 4.DATE OF PROPOSAL Landers -Atkins Planners Inc. December 6,1999 Revised December 20,1999 PART TWO?LABOR REL ATED COSTS _ -- 5. DIRECT LABOR HOURLY ESTIMATED ESTIMATED TOTAL RATE . HOURS COST Principal $ 37.00 3 $ 111.00 Landscape Architect $ 26.32 $ - Landscape Designer $ 14.10 28 $ 394.80 CADD Technician $ 11.30 $ - Clerical $ 10.80 2 $ 21.60 TOTAL DIR ECT LABOR $ 527.40 6.OVERHEAD (COMBINE FRINGE BENEFIT AND ADMINISTRATIVE) $ 791.10 OVERHEAD RATE -150°!° X TOTAL DIRECT LABOR 7. SUBTOTAL -LABOR + OVERHEAD {!TENS 5 8 6} S 1,318.50 8. PROFIT -LABOR RELATED COSTS {ITEM 7) X 8% $ 131.85 •.PART THREE -.OTHE R COSTS 9. MISCELLANEOUS DIRECT COSTS ORIGINAL REPRODUCIBLE - REPRODUCTION $ 100.00 SHIPPING 5@ $25.00 $ 125.00 MILAGE $0.35 @200 S 70.00 MISCELLANEOUS DIRECT COSTS SUBTOTAL $ 295.00 10, SUBCONTRACTS -LUMP SUM Civil Engineer-Chantal Bowen Enginering $ 4,138.00 $ 4,138.00 Environmental Resource Solutions . $850.00 $ 850.00 Surveying -Boatwright 8 Associates $ 950.00 $ 950.00 Geotech - Ellis & Asso . EbertBAssociates $ 1,500.00 $ 1,500.00 SUB-CONTRACT SUBTOTAL $ 7,438.00 TOTAL LUMP SUM AMOUNT (ITEMS 5,6,8,9 &10J S 9,183.36 11. REIMBURSABLE COSTS (LIMITING AMOUNT} TRAVEL OTHER (SPECIFY) $ SUBTOTAL REIMBURSABLE PARTFOUR-SUM MARY TOTAL AMOUNT OF CONTRACT (LUMP SUM PLUS REIMBURSABLE) ITEMS 5,6,8,9,10,811 $ 9,183.35