Exh 8Ar ., ~. 8A ~ ~~ ~ REPORT OF OPPORTUNITIES, OBSERVATIONS, AND MAJOR ASSIGNMENTS PREPARED BY ATLANTIC BEACH CITY MANAGER JANUARY 10, 2000 .r.~ Introduction The City of Atlantic Beach is a great place in which to live and work. Preservation of the`natural environment and the open and friendly attitude of everyone are two major components that have made the City so successful. Opportunities lie in building upon the City's strengths. The City's water, waste water, personnel, and other major operating systems have grown to their present state over many years through modification, as needed, to meet the demands of a growing community. Many of these systems could be more efficient, provide better service to the public, and contribute more to the high quality of life in Atlantic Beach if comprehensive planning were completed and long term strategies implemented. Many of these systems are inter-dependent and inter-related. For example, creation and maintenance of a modern mapping system is an essential component of water and sewer system planning. Development of the Information Technology System (IT) with expanded use of the Internet will allow for better communication with our citizens. The issues and opportunities raised in this report fall into three sections; General City- wide Issues, Utilities, and New or Expanded Areas of Service. Each of the items in these sections will take significant amounts of top level staff time and resources to be developed/implemented as envisioned in this report. The City does not have the time available or resources to do all of these at once. This report to the Mayor and Commission is made with the hope and anticipation of obtaining direction and prioritization of these issues as well as generation of long term support. Most of the items listed herein will take at least one year to implement. General. Organization-Wide Issues 1. Information Technology Systems. For our purposes here this will include both those systems that serve internal customers of the City (staff) and external customers (citizens, developers, and others). The present system is made up of one central mainframe (AS-400) that runs the Finance, Utility, and Personnel systems software, several individual PC's and some networking of those through servers. Most internal users of the !T System now have the ability to send and receive a-mail to other City staff. This has been developed over the last three months. The continued development of internal communications through the IT System will dramatically improve internal efficiencies in a number of ways. Sharing data bases on central servers will allow for the use of this information by multiple users and reduce the amount of time needed for the preparation and maintenance of multiple data sets, many of which are presently done by hand. Allowing web access for internal users on a limited basis will enhance the research capabilities of City staff. A Geographic Information System (GIS) with overlays for zoning, water, sewer, and storm water is a major system goal that is attainable within the next several years and would dramatically improve the speed and quality of information communicated not only with internal users but to many outside the organization. One present obstacle to improve communications is the fact that several departments have different software programs and can not transfer the simplest of documents electronically. Responsibility for the City's IT System is shared by several individuals in various departments. No full time staff are assigned except for the mainframe operations. The use of the IT System for improved external communications is almost limitless. In the short term, expansion of the City's Web Site to provide minutes, meeting schedules, public notices, and o#her information can be accomplished within the next several months. Similarly, direct a-mail ability from citizens to City staff would reduce the turn around time for citizen responses and improve extemal communications in many other ways. The first step to improving the IT System would be the creation of an IT Systems Plan which would set forth the vision, priorities, cost estimates, and timetable for implementing each of the necessary steps. The cost of preparation of this initial plan is estimated to be less than $10,000. 2. Mapping, The City's mapping capabilities are very limited. The only computer based mapping capabilities that the City presently has includes a CAD (Computer Aided Design) layout of the water system and some small projects done in house. All other maps of the City's utilities, zoning, tax parcels, streets and other items are reproduced from Mylar (hand drawn) originals and copied elsewhere. The City mainly relies on consultants or other governmental entities to create and maintain the maps that we use. A GIS based mapping system would allow for City staff to immediately update the maps that are used for rezonings, replatting, water and sewer extensions or modifications and many other purposes, and custom prints could be made for both public and in-house use. 3. Performance Indicators. Very few numeric objective performance indicators are used by City staff at present. Management of most large organizations rely on performance indicators to help identify positive and negative trends, and opportunities for improvements in efficiency and management. These can be used in virtually all Atlantic Beach departments in one form or another. 4. Personnel Systems. Most large organizations have formal systems for personnel .,classification, pay and written evaluations. Atlantic Beach does not. Job classification 2 and pay systems offer a mechanism through which to set entry and maximum salaries for new or changed jobs and to provide employees a clearer picture of their career opportunities. Lack of such systems creates concerns over pay compression whereby employees with varying lengths of service receive the same pay. Written performance evaluations can provide a mechanism for yearly goal setting, training plans and a frank assessment of the employee's contribution to organizational goals. Performance evaluations are an issue of fairness to the employee; an organization has an obligation to let each employee know what the expectations are and how closely that employee has been meeting them. 5. Multi Year Financial Planning This issue relates both to the purchase/construction of capital items and to the continuing costs of future maintenance and operation. The City of Atlantic Beach generally does not prepare cost projections for the future operation and maintenance of facilities. Future costs are generally discussed but not quantified when new City responsibilities are accepted. Projections of multi-year revenues, operational expenses and expected capital costs should be prepared and updated as part of each year's budget process and decisions that have long term cost consequences should be evaluated as such before any final vote is taken. 6. Phone System . The phone systems in City Hall and the Public Works buildings utilize outdated equipment and are patched together without planning for the overall system. The result is poor service to the public by many calls being delayed or unanswered, and less than optimal communication both within the organization and with the public. One example is the City Hall switchboard. While it is fully staffed and there is time available to handle more calls, many incoming lines in City Hall cannot be picked up by the switchboard operator. During busy times or when staff are out in the field, many phones go unanswered. New equipment designed to make maximum use of existing personnel and new features would greatly improve communications. 7. Maintenance of City Facilities. This item includes City buildings, landscaped areas, street signs, hydrants and other facilities. For various reasons, maintenance on many city facilities has been less than needed to keep them in good condition. Fire hydrants have otherwise received adequate maintenance with the exception of cleaning and painting. A little attention to most of these would result in much improved appearance. Building maintenance is on track for improvement with a new janitorial contract due to begin in February, 2000. The one item that may result in a major increase in workload is in the landscaped areas that the City maintains. Many landscaped areas have been accepted by the City for maintenance and long term projections as described in Item 5 above have not been made. Utility Issues 8. System Planning The City's water, sewer, and storm water systems grew into their °'~-~resent configurations through a long series of individual developments. As the City grew, new lines were added to existing ones in the most convenient locations. As problems arose, repairs were made. Mostly these consisted of breaks in the lines or breakdowns of major component equipment. Without taking the time and resources to make and follow long-term plans to improve these systems, opportunities exist to better serve the public through more effective provision of utilities and lower costs. One good example is the need for major revisions and rehabilitation in the storm water system that serves the Core City area. The problems-associated with this project have grown in size and complexity so as to require that bonds be issued, and the area has endured flooding for many years. Significant disruption of the community will be necessary to make the corrections over the next two years. If the City had identified the needed work and budgeted for it over several years this issue would not have grown to the point of being a major community controversy. Sewer master planning has already been started. Water master planning should follow as well as storm water planning for areas outside of the Core City. Once plans are in place for each of the City's utilities, they should be implemented and periodically updated. Creating and maintaining a sound GIS based mapping system will be a cornerstone to successful utility planning. 9. Core City Project. The storm water improvements for the Core City area are ongoing and (hopefully) funding is in place. !t is listed here simply because of the amount of top management time and City resources that will be utilized in its completion over the next two years. 10. Water & Sewer Efficiency. Much like many of the other issues listed in this report, planning for system efficiency has not been stressed at top management levels because of the attention to the daily °brush fires" that take so much time. Major opportunities exist to improve the efficiencies of our water and sewer/ wastewater systems. In turn these can reduce cost and possibly postpone the need for future rate increases to keep up with inflation. Areas of particular attention include water loss, the t use of new technologies to automate our systems, optimization of electrical usage and the best mix of'contracted vs. in-house provided services. New or Expanded Areas of Service 11. Public Information Several initiatives to broaden the scope or otherwise improve communication with the public have been suggested in recent months. The expansion of the Ci#y's web page to include more timely information such as upcoming agendas and supporting material and a-mail capability directly with many staff members would be important steps. Televising City Commission meetings and/or having televised reports on various City projects has also been suggested. The City's newsletter could be improved. Some improvements could be done with existing staff and only minor expense, but major improvement in this area may require dedicated staff and a .-(significant increase in funding. ~= 4 12. Acquisition and Development of New Parks. Duttan Island, the Centex property, Tideviews Preserve, Johnston Island, Bull Park Renovations and additional parks in the Section H area of Atlantic Beach are all ongoing projects in various stages ranging from initial conception to land acquisition, construction, development and ongoing management. Like the Core City Project, these are listed because of the large amount of management time and resources that will be needed over the next couple of years to complete. 13. Improvements to the IUlayport Road Corridor. The attention of many City activities can be brought to bear or improving the commercial areas along Mayport Road. These might include zoning, Code Enforcement, installation and maintenance of landscaping, construction of recreation facilities or other City services. This project has been started by the Chamber of Commerce and has had significant City involvement during the first meetings. The City's continued participation in this effort will require significant top staff time and resources. 14. Enhancing the Character of Atlantic Beach. It is widely recognized by the City's elected and appointed officials that the natural residential environment of the City is unique and should be protected and, wherever possible, enhanced. Many initiatives are presently ongoing and many others have been suggested. Most concern improvements to landscaping, especially in the areas of the City that have beers clear cut in past years to allow for development. Expanding the improvements in the Town Center area, the Mayport Rd. corridor, enhancing beach access points and numerous smaller landscaping projects are all examples. These all require varying amounts of top staff time and financial resources and will increase the City's need for maintenance in the future. How far and how fast the City proceeds in these areas is a major policy decision to be made by the Commission. Conclusions /Observations The City of Atlantic Beach can accomplish significant progress in these areas and probably others, but can not do a{I of them at once. There is not enough time or money. It is the appropriate responsibility of the Mayor and Commission to prioritize these items which may be one of the most important decisions made by this Commission. While Atlantic Beach has much to be proud of, significant opportunities exist for cost savings, better service to the public, and other improvements. My recommendation is for the Mayor and Commission to make these decisions after having one or more work sessions devoted to discussion of these. strategic planning issues. The Mayor and Commission may have other top issues to add to this list for consideration. The best setting is possibly a retreat with a professional paid facilitator. Decisions should only be made after careful consideration and only after substantial consensus has been achieved among the elected officials. Attaining consensus will .~,~ contribute to continued support needed to accomplish each and evil! help to refocus 5 attention away from the °brush fires" periodically. The prioritization of these issues should be revisited every one to two years so that the decisions can be modified to accurately reflect the changing views of newly elected officials. Respectful) ubmitted, Ji anson ity Manager January 10, 2000 -...~ 6